June 2016 Quarterly Report

June 2016 Quarterly Report 27 July 2016

Highlights

  • A$30M generated from operations after interest and contractor profit share

  • 3.7M WMT shipped (March 2016 Quarter 3.9M WMT)

  • Average realised price of A$57/WMT CFR (March 2016 Quarter A$53/WMT CFR)

  • Full cash costs* of A$49/WMT CFR (March 2016 Quarter: A$49/WMT CFR)

  • Net Debt reduced to A$109M at 30 June 16 (A$257M at 31 March 16) following successful debt restructure

  • Utah Port Charges reduction extended to 30 June 2017

  • Identified lithium prospects on Atlas tenements

  • Cash on hand at 30 June 2016 A$81M (31 March 2016: A$88M)

Atlas Iron Limited (ASX: AGO) is pleased to report on the June 2016 Quarter.

Atlas Managing Director David Flanagan said: "The June Quarter's excellent performance and completion of the debt restructure puts Atlas on a sound footing for the future.

"The business has achieved significant cost and debt reductions over a number of months and this is now leading to strong operating margins. We generated A$30M from our operations over the Quarter after interest payments and our contractor profit sharing obligations. It's now about consolidating that improved performance and delivering value for shareholders."

Quarterly - Key Metrics

June16 Quarter

Mar 16 Quarter

Variance Quarter

Ore tonnes shipped (WMT)

3.7M

3.9M

(3%)

C1 cash costs (A$/WMT FOB)

$33

$33

--

Full cash cost* (A$/WMT CFR China)

$49

$49

-

Development Capital (A$)

-

-

-

Depreciation & Amortisation (A$/WMT)

$4

$6

33%

Net AUD Atlas CFR Sale Price (A$/WMT)

$57

$53

7%

* Please refer to Glossary in this announcement

Note: All costs in this table are unaudited and are quoted in Australian dollars unless otherwise stated.

Atlas Iron Limited

ABN 63 110 396 168

Raine Square, Level 18

300 Murray Street Perth WA 6000

PO Box 7071

Cloisters Square Perth WA 6850

P: +61 8 6228 8000

F: +61 8 6228 8999

E: [email protected]

W: www.atlasiron.com.au

FY 2016 Performance - Key Metrics

FY2016

Actual

FY2016

Guidance

Variance

Ore tonnes shipped (WMT)

14.5M

14-15M

within guidance

C1 cash costs (A$/WMT FOB)

$34.39

$35 - $38

2%**

Full cash cost* (A$/WMT CFR China)

$52.60

$55 - $58

4%**

Development Capital (A$)

$9.5M

$10M - $15M

5%**

Depreciation & Amortisation (A$/WMT)

$5.9

$6 - $7

2%**

* Please refer to Glossary in this announcement (includes contractor margin share)

** Variance calculated from lower end of FY2016 Guidance

Note: All costs in this table are unaudited and are quoted in Australian dollars unless otherwise stated.

Debt Restructure

On 6 May 2016, Atlas completed the debt restructuring announced in December 2015 (see ASX release dated 6 May 2016 for further details). This debt restructure has resulted in the following:

  • Atlas has reduced its term loan debt from US$267M to US$135M and extended the maturity date from December 2017 to ~April 2021;

  • Atlas has reduced its annual cash interest expense by ~65% as a result of the lower debt balance and reduced cash interest rate;

  • Atlas has issued 6.22 billion fully paid ordinary shares and 4.51 billion options to acquire fully paid ordinary shares in Atlas to the Term Loan Lenders (Lenders) such that the Lenders held 70% of all Atlas shares and options on issue at 6 May 2016; and

  • The Lenders and Atlas have entered into an amended Term Loan Agreement where the six monthly Asset Coverage Ratio covenant has been replaced with a minimum cash balance covenant requiring Atlas to have a minimum of A$35 million at the end of each month.

  • Mr Eugene I Davis, Mr Alan J Carr and Mr Daniel Harris (the New Directors) have been appointed as Directors of the Company and Mr Ken Brinsden and Mr Jeff Dowling resigned as Directors.

Operations

Table 1 - Production

June 16 Quarter (WMT)

Mar 16 Quarter (WMT)

Variance Quarter (WMT)

Variance Quarter (%)

Ore Mined*

3,636,530

3,828,300

(191,770)

(5%)

Ore Processed

3,898,937

3,686,228

212,709

6%

Haulage to Port

3,817,371

3,799,484

17,887

0%

*- Includes intra-mine tonnes

Table 2 - Inventory and Shipping

June 16 Quarter (WMT)

Mar 16 Quarter (WMT)

Variance Quarter (WMT)

Variance Quarter (%)

Final Product Stock at site

327,862

194,015

133,847

69%

Final Product Stocks - Port

148,678

72,588

76,090

105%

Shipping

Ore Shipped (Wet)

3,741,281

3,859,848

(118,567)

(3%)

Ore Shipped (Dry)

3,510,354

3,638,745

(128,391)

(3%)

Note 1: Please see Appendix 1 for further details of production outputs by mine and inventory.

Atlas shipped 3.7M WMT for the June 2016 Quarter; 2.3M WMT of Standard Fines, 0.3M WMT of Value Fines and 1.1M WMT of Atlas Lump.

Shipped tonnes were slightly lower than the prior Quarter due to an unplanned six day port outload shut in June 2016 when the Utah Point ship loader was damaged while loading another proponent's vessel. This resulted in higher levels of finished product inventory at Quarter end and delayed receipt of some sale proceeds to July 2016 due to a greater number of ships loading later in June 2016 than originally scheduled.

Marketing

The benchmark Platts 62% Fe IODEX averaged US$56/DMT in the June 2016 Quarter compared with US$48/DMT in the March 2016 Quarter. Atlas achieved an average price of US$45/DMT, which was inclusive of three cargos of lower grade Value Fines product and increased discounts for products of Atlas' grade over the June 2016 Quarter.

The average AUD:USD exchange rate strengthened over the Quarter (June 2016: 0.7455, March 2016: 0.7215) which negatively impacted on the received AUD sale prices in the June 2016 Quarter.

At the date of this report, Atlas had approximately 3.4M WMT of December 2016 Half sales subject to some form of forward price fixing via the use of forward sales, swaps, collars. This includes some 1.1M WMT of fixed price sales or swaps at an approximate average 62% Fe DMT equivalent price of US$52/t and collars comprising 2.3MT of puts with an average 62% Fe DMT equivalent of US$47/t and 1.9Mt of calls with an average 62% Fe DMT equivalent price of US$55/t. Approximately one third of puts have price protection limited to approximately US$40/t levels at 62% Fe DMT equivalent levels.

Financial Position Summary

Cash as at 30 June 2016 was A$81M (31 March 2016: A$88M) with the reduction driven by payment of one off restructuring costs, debt and royalty assistance repayments and other working capital movements offsetting cash generated from operations.

Working Capital as at 30 June 2016 was A$70M, an increase of A$17M from the prior Quarter end (A$53M at 31 March 2016) reflecting the improved operating performance during the June 2016 Quarter. The majority of key contractors and service providers continue to be paid in month of service.

Corporate

On 28 June 2016, the Company advised the market that David Flanagan had resigned as Managing Director. David Flanagan will finish as Managing Director of the Company on 5 August 2016.

Atlas Non-Executive Director, Mr Daniel C Harris, has been appointed as interim Managing Director (MD) and Chief Executive Officer (CEO) and will continue in this role until a permanent replacement MD and CEO is appointed and commences employment with the Company. Thereafter, Mr Harris will revert to being a Non-Executive Director of the Company. Information about Mr Harris and the material terms of his employment while acting as interim MD and CEO are set out in Appendix 2 to this announcement

Read the rest of the article at www.publicnow.com
Data and Statistics for these countries : China | All
Gold and Silver Prices for these countries : China | All

Atlas Iron Limited

PRODUCER
CODE : AGO.AX
ISIN : AU000000AGO1
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Atlas Iron is a iron exploration company based in .

Atlas Iron holds various exploration projects in Australia.

Its main asset in production is PARDOO in Australia, its main assets in development are WODGINA and RIDLEY MAGNETITE PROJECT in Australia and its main exploration properties are ABYDOS, MT WEBBER and MID WEST IRON in Australia.

Atlas Iron is listed in Australia and in Germany. Its market capitalisation is AU$ 416.8 millions as of today (US$ 302.7 millions, € 265.6 millions).

Its stock quote reached its highest recent level on July 29, 2011 at AU$ 3.96, and its lowest recent point on June 24, 2016 at AU$ 0.01.

Atlas Iron has 9 261 129 728 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Atlas Iron Limited
10/16/2018Australia's Atlas Iron names ex-Hancock executive CEO in boa...
6/8/2018Australia's Fortescue takes stake in Atlas Iron, may block b...
2/28/2018Atlas Iron reveals strategy to weather storm of discounts
12/24/2014Atlas Iron to take a $900 million write-down
Nominations of Atlas Iron Limited
5/25/2011Retirement of Chairman and Appointment of Interim Chairman
12/2/2008Appoints Geoff Clifford as Chairman
Financials of Atlas Iron Limited
10/19/2016September 2016 Quarterly Activities Report
Project news of Atlas Iron Limited
9/22/2016Mineral Resources and Ore Reserves at 30 June 2016
5/9/2011(Wodgina)Increases production capacity at Wodgina by 75% to 7Mtpa
6/21/2010(Wodgina)Mining Commences at Wodgina
6/16/2010(Wodgina)New DSO Discovery at Wodgina
4/7/2010(Wodgina)Key DSO Growth Projects on Track
10/13/2009(Pardoo)Progress Update - North Pilbara DSO Projects
8/4/2009(Mt Webber)Maiden Resource for Mt Webber DSO Project
7/31/2009(Wodgina)Wodgina DSO Project Feasibility Study Compete
6/19/2009(Mt Webber)Continued North Pilbara Exploration Success
5/26/2009(Wodgina)Wodgina DSO Project - Interim Feasibility Study Outcomes
5/21/2009(Mt Webber)New DSO Discovery at Mt Webber
5/19/2009(Wodgina)500% Increase in Wodgina DSO Resource
3/9/2009Drilling Results Add to Wodgina Infrastructure Potential
1/29/2009(Pardoo)Atlas Increases Pilbara DSO Resources By 45 per cent to 56.7...
1/7/2009(Pardoo)Intersects High Grade at Pardoo DSO Project
12/31/2008(Abydos)New Hematite Discoveries at the Abydos DSO Project
12/11/2008(Abydos)New DSO Discovery at Wodgina
12/8/2008(Abydos)Signs Native Title Mining Agreement for Abydos
11/26/2008(Pardoo)Ridley Magnetite Resource Upgrade to 2 Billion Tonnes
11/24/2008(Pardoo)Pilbara DSO Projects - Operations Update
11/10/2008(Pardoo)Delivers First Iron Ore to Port
10/2/2008(Pardoo)Ridley Magnetite Resource Upgrade
8/6/2008(Abydos)Abydos Magnetite Joint Venture with FMG
7/30/2008(Abydos)Abydos Direct Shipping Ore Project - Pre Feasibility Study U...
6/17/2008Ridley Magnetite Pre Feasibility Study Technical Update
4/7/2008(Abydos)Abydos Drilling Continues To Impress
Corporate news of Atlas Iron Limited
11/16/2016Change in substantial holding for Centaurus
11/16/2016Change in substantial holding (Marathon)
7/27/2016June 2016 Quarterly Report
6/28/2016Atlas welcomes WA Government announcement
6/28/2016David Flanagan resigns as Managing Director
6/23/2016Change in substantial holding for CTM
6/6/2016Appointment of Chairman
5/23/2016May 2016 Investor Presentation
5/10/2016Ceasing to be a substantial holder
5/6/2016Implementation of Creditors' Scheme
4/29/2016Creditors' Scheme
4/27/2016Chairman's Address to Shareholders at General Meeting
4/27/2016Presentation at General Meeting
4/21/2016Atlas March 2016 Quarterly Activities Report
4/18/2016Letter to Shareholders
4/4/2016Update on Debt Restructure
3/24/2016Notice of General Meeting/Proxy Form
12/23/2015Atlas signs debt restructure agreement
12/22/2015Trading Halt
12/15/2015Change in substantial holding for CTM
12/2/2015Change in substantial holding for CTM
10/28/2015Managing Director's AGM Presentation
10/28/2015Chairman's Address to Shareholders
10/22/2015Atlas Iron September 2015 Quarterly Report
10/22/2015Pre-feasibility Study Underway for Corunna Downs
10/6/2015Company Secretary Appointment/Resignation
9/29/2015Notice of Annual General Meeting/Proxy Form
9/29/2015Annual Report
9/24/2015New Iron Ore Sales Agreement and Marketing Update
9/9/2015Atlas Production Figures
9/1/2015Executive Changes as Part of Cost Reduction Programme
8/28/2015Production Update
8/17/201513 August 2015 Sale of Pilbara Iron Tenements
8/14/20152015 Annual Results
8/14/20152015 Annual Financial Report
8/14/2015Appendix 4E - 30 June 2015
8/13/20152015 Annual Financial Report and Appendix 4E
8/13/2015Full Year Results Presentation FY2015
8/13/2015SFX: Sale of Pilbara Iron Tenements
7/31/2015Quarterly Report
7/30/2015Ceasing to be a substantial holder
7/29/2015Becoming a substantial holder
7/29/2015MCS: Business Update and FY15 Result
7/27/2015Shares in Australia's Atlas Iron sink 70%
7/24/2015Reinstatement to Official Quotation
7/24/2015Request to Lift Suspension
7/22/2015Australia shares fall on profit taking, NZ stocks up
7/20/2015Atlas set for stronger future after raising $86m
7/15/2015Extension of the Closing Date - SPO and General Placement
7/8/2015Update on Forward Price Strategies
7/6/2015Supplementary Prospectus
7/2/2015Letter to Shareholders
6/17/2015Prospectus
6/11/2015Capital Raising to Strengthen Balance Sheet
6/11/2015Change of Date for General Meeting
6/11/2015David Flanagan Appointed as Managing Director
4/21/2015Voluntary Suspension Extension Request
4/14/2015Update Regarding Operational and Financial Review
4/13/2015Atlas Iron Suspends Production
4/12/2015Abydos Contract Update (1 pages)
4/10/2015Atlas Suspends Production in Response to Low Iron
4/6/2015Voluntary Suspension
3/9/2015Resignation of Director
3/6/2015S&P DJ Indices Announces March Quarterly Review
2/13/2015AGO: Investment Update - Mt Webber Project and Shaw River
2/13/2015Investment Update - Mt Webber Project and Shaw River
4/21/2011Quarterly Report for the Period Ending 31 March 2011
4/7/2011Media Alert - Atlas Iron MD to shed his locks this Friday......
4/4/2011Atlas posts shipping record in March
2/24/2011Reports $30M maiden half year profit
2/14/2011Declares Giralia takeover offer unconditional and accelerate...
7/6/2010More DSO Success at Hercules
5/28/2010Broker Report from Credit Suisse
5/5/2010to Ship Additional Tonnes Through Port Hedland Port Ahead of...
4/29/2010To Raise $63.5 Million To Capitalise On Strong Iron Ore Pric...
2/22/2010Atlas And Aurox Enter Into Utah Point Port Cooperation Agree...
11/6/2009Dr David Smith Joins The Atlas Board
10/20/2009Merger Moves Ahead
9/8/2009and Warwick Resources Agree to Merge
7/31/2009June 2009 Quarterly Report
6/15/2009to raise $116.7 Million to fund development of Pilbara Iron ...
2/17/2009and Talison Complete Infrastructure Sharing Agreement
1/19/2009 Ships Second Commercial Iron Ore to China
1/15/2009Maiden Inferred Resource At Wodgina
12/19/2008Completes Sale of Second Shipment of Connie Deposit Ore
12/15/2008Additional Excellent Results Enhance Wodgina DSO Project
12/5/2008Ships First Commercial Iron Ore to China
11/21/2008Managing Director's Address
9/25/2008Pardoo DSO Project - Mining Team Mobilised to Site
8/6/2008Signs Port Access Agreement with FMG
8/4/2008North West Iron Ore Alliance Maintains Pressure for Fair and...
8/1/2008June 2008 Quarterly Activities Report
7/28/20081.3 Billion Tonne Ridley Magnetite Resource
7/25/2008 DSO Resource and Reserve Update Summary
7/22/2008Pardoo Project Development Update
7/17/2008New Hematite Mineralisation Discovered at Pardoo
6/23/2008Welcomes NCC Recommendation to Declare Goldsworthy Railway
6/16/2008EPA Recommends Pardoo DSO Project for Ministerial Approval
5/19/2008Pardoo Mining Contract Awarded to CDE Capital
5/1/2008Supports Goldsworthy Railway Declaration
4/23/2008to Raise $100 Million to Accelerate Growth of Pilbara Iron O...
3/25/2008 Targets 120-180Mt of Pilbara Iron Ore
2/25/2008Open BriefingR. Production and Export of DSO
1/31/2008December 2007 Quarterly Activities Report
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (AGO.AX)Berlin (ATU.BE)
0.045+0.00%0.0000
AUSTRALIA
AU$ 0.045
11/21 10:00 -
0%
Prev close Open
0.045 0.045
Low High
0.045 0.045
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.045 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : 19
Produces Iron
Develops Iron
Explores for Iron
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.73-1.90%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.98-2.44%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.56-3.12%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.44-2.01%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.29-0.78%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20-2.38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.74+0.87%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.35-0.63%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+3.03%Trend Power :