Canadian Zinc Corp

Published : June 09th, 2015

JUNE 9, 2015: ENCOURAGING RESULTS FROM UNDERGROUND EXPLORATION PROGRAM CONFIRM POTENTIAL OF STOCKWORK AT PRAIRIE CREEK MINE

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

JUNE 9, 2015: ENCOURAGING RESULTS FROM UNDERGROUND EXPLORATION PROGRAM CONFIRM POTENTIAL OF STOCKWORK AT PRAIRIE CREEK MINE


CZN-TSX CZICF-OTCQB

PRESS RELEASE

FOR IMMEDIATE RELEASE June 9, 2015

ENCOURAGING RESULTS FROM UNDERGROUND EXPLORATION PROGRAM CONFIRM POTENTIAL OF STOCKWORK AT PRAIRIE CREEK MINE

Detailed Sampling Reveals Significant Stockwork Mineralization, grading 5.6% Pb, 14.2% Zn and 119 g/t Ag across 4.4m over 71.8m Strike Length

Diamond Drilling Continues to Intercept Main Quartz Vein

Vancouver, British Columbia, June 9, 2015 - Canadian Zinc Corporation (TSX: CZN; OTCQB: CZICF) ("the Company" or "Canadian Zinc") is pleased to provide an update on the continuing underground exploration program at the Prairie Creek Mine in the Northwest Territories, Canada last reported on May 5, 2015.

Assays have now been received from five additional Diamond drill holes and from an underground chip sampling program.

Highlights of Underground Exploration:

Detailed chip sampling of Stockwork Zone ("STK") on the 930m Level, has returned composite grades of 5.6% Pb, 14.2% Zn and 119 g/t Ag across a true width of 4.4m along a strike length of 71.8m within an area named "the Northwest Drift".
Diamond drilling of the lower portion of the Main Quartz Vein ("MQV") structure has intersected significant grades in three holes, PCU-15-56, 58 and 59. Hole PCU-15-59 returned an intercept of 14.82% Pb, 3.95% Zn, 377 g/t Ag over an estimated true width of 2.6m, approximately 300m vertically below the existing workings.

Multiple intercepts of STK mineralization were also returned in PCU-015-60 including a

1.4m assay interval grading 4.8% Pb, 11.7% Zn and 66 g/t Ag.
In this particular area of the property, base metal mineralization occurs both in the Main Quartz Vein, which is a high-grade, steeply dipping, fault structure that hosts the majority of the defined reserves and resources, and in the Stockwork Zone, which is a series of narrow high-grade veins occurring at an oblique angle to the Main Quartz Vein.
Most of the previous exploration at Prairie Creek has been on the MQV since the STK mineralization was previously estimated to be somewhat lower grade; however, this recent detailed underground chip sampling of the STK has demonstrated there are areas within the Stockwork zone that exhibit high grades of lead, zinc and silver mineralization and which are accessible from the existing workings.

1

This data will be further interpreted, modelled and incorporated into the future resource and reserve calculations and mineplan.

930m Level Underground Chip Sampling

The 930m Level underground workings were developed primarily to access the Main Quartz Vein which is now well exposed and partially developed in numerous headings. Towards the end of the existing 930m Level workings, mineralization occurs both within the MQV and STK structures. The Northwest Drift ("NWD") which was developed in this STK zone; was never previously sampled.

Results of Underground Chip Sampling of STK on the 930m Level

Chip Sample Location

True Strike Width Length (m) (m)

Pb (%) Zn (%) Ag (g/t)

COMPOSITE SECTIONS IN NORTHWEST DRIFT (NWD)

and CROSSCUT (XC) 29

XC-29-15m

10.00 4.25

8.39 12.27 143

XC-29-10m

4.00 5.00

4.55 7.45 73

XC-29.5-5m section

3.00 10.00

7.41 21.50 123

NWD-10m section

4.00 10.00

3.53 10.52 126

NWD-15m section

3.40 5.00

2.13 12.41 92

NWD-20m section

3.00 5.00

5.23 18.33 116

NWD-25m section

3.20 5.00

8.40 19.83 167

NWD-30m section

3.40 5.00

5.96 13.21 111

NWD-35m section

3.40 5.00

9.25 21.02 128

NWD-40m section

3.30 5.00

3.90 5.92 62

NWD-45m section

4.10 5.00

3.41 8.56 77

NWD-50m section

5.40 4.50

4.89 11.66 70

NWD-54m section

6.00 3.00

7.95 19.23 326

Weighted Composites from 13 Sections

4.40 71.75

5.64 14.16 118.87

INDIVIDUAL STK SAMPLES PROXIMITY TO NWD

XC-32

70m north

0.50 -

8.25 26.60 107

XC-31

50m north

0.50 -

9.86 19.90 189

XC-30/31

45m north

1.40 -

8.41 23.80 121

XC-30

10m north

0.50 -

14.80 20.20 198

XC-29

2m north

1.00 -

5.78 11.00 143

XC-28

50m north

0.50 -

5.83 22.20 127

XC-28

55m north

0.50 -

3.75 13.20 50

XC-27

70m north

1.00 -

17.60 27.10 360

XC-27

85m north

1.00 -

2.23 15.90 95

2

Chip Sampling Methodology

The rehabilitation of the 930m Level underground workings has allowed further access into this mid-level and provided an opportunity to sample the STK mineralization. The 930m Northwest Drift and Crosscut 29 provided over 70m exposure of strike length within the STK zone.
Chip sampling, by air hammer, of 50 back samples was completed across 13 cross sections within the drift at 5m intervals. All individual sectional samples were width weighted according to each section. Resulting sectional composites were then strike length weighted half way to the adjacent sections or, at the end of the workings, half way from the previous strike interval. Additional wall and back sampling was completed on Stockwork mineralization in proximity to the Northwest Drift using a minimum sample width of 0.5m.

Stockwork Mineral Resource

The March 26, 2015 Resource Estimate included, for the first time, both an Indicated and
Inferred STK Resources summarized below. (See Press Release March 26, 2015):

Stockwork

Tonnes

Pb %

Zn %

Ag g/t

Indicated Resource

1,400,000

4.0

7.1

63

Inferred Resource

790,000

4.0

4.7

61

While the Northwest Drift area is still subject to geological interpretation and modelling the recent chip sampling program shows evidence that it contains higher grades than previously estimated in the overall STK mineral resource.

870m Decline Diamond Drilling Results

Exploration drilling continued from underground drill stations #8 and #9, in the 870m decline testing for new areas of mineralization near the mine workings and to further detail Inferred resources, with the objective of converting part of the large Inferred Mineral Resource to the Indicated category. Three holes, PCU-15-56, 58 and 59, intersected significant grades in the MQV and hole PCU-015-60 returned multiple intercepts of STK mineralization. Recent received assay results from the Diamond drill program are as follows:

3

Drillhole Mineral From To Core True Pb (%) Zn (%) Ag (g/t) Number Style (m) (m) Interval(m) Width(m)

PCU-15-56 Vein 273.50 274.48 0.98 0.43 7.34 3.74 143

PCU-15-56 MQV 327.00 331.93 4.93 3.65 10.85 0.78 131

PCU-15-57 abandoned

PCU-15-58 Vein 213.58 214.58 1.00 0.52 16.20 0.13 202

PCU-15-58 MQV 302.97 306.20 3.23 2.42 8.85 1.15 64

PCU-15-59 Vein 349.75 351.74 1.99 0.63 18.84 0.15 199

PCU-15-59 MQV 368.00 370.60 2.60 1.80 14.82 3.95 377

PCU-15-59 STK 377.65 378.65 1.00 0.33 4.33 2.25 33

PCU-15-60 STK 109.65 110.95 1.30 0.90 4.60 6.61 117

PCU-15-60 STK 139.35 140.35 1.00 0.69 0.15 4.18 2

PCU-15-60 STK 144.40 145.40 1.00 0.69 7.87 9.47 118

PCU-15-60 STK 158.48 159.48 1.00 0.68 1.55 14.10 21

PCU-15-60 STK 164.57 166.70 2.13 1.38 4.83 11.72 66

PCU-15-60 STK 167.70 169.70 2.00 1.25 0.36 3.58 57

PCU-15-60 STK 173.70 174.96 1.26 0.74 0.92 5.73 10

PCU-15-60 STK 176.50 177.50 1.00 0.57 0.21 6.66 23

PCU-15-60 STK 235.92 237.44 1.52 0.95 6.02 0.70 43

2015 Underground Exploration Program

To date, Canadian Zinc has completed 4,100m of core drilling from 3 stations on 4 sections. Drilling is presently continuing from drill station #10 at the end of the decline tunnel of the 870m Level.
The drilling program is scheduled to continue to the end of June and the new geological data is being incorporated into a newly interpreted geological block model.
A further update on the program will be issued upon receiving analytical results.

Quality Assurance/Quality Control

The underground chip samples were collected by air hammer across representative lithologies with an average sample size of 8kg. The drill core samples were cut by Diamond saw and securely, through chain of custody, all samples were shipped to AGAT Laboratories for initial multi-element assay by ICP-OES analysis. Further assays and analysis was completed where appropriate standards, duplicates and blanks were inserted and included within the analysis.
Alan Taylor, P. Geo., Chief Operating Officer & Vice President Exploration and a Director of Canadian Zinc Corporation, is responsible for the exploration program, and is a Qualified Person for the purposes of NI 43-101 and has approved this press release.

4

About the Prairie Creek Mine

The Prairie Creek Mine contains a partially developed infrastructure including an almost complete flotation mill, workshops, accommodations, and support facilities. The Company holds a Type "A" Water Licence which, along with previously issued permits and licences, permits the operation of a mine at Prairie Creek. An update Resource Estimate was completed by AMC Mining Consultants (Canada) in March 2015 (refer to March 26, 2015 press release) with overall results as follows:

OVERALL RESOURCE ESTIMATE: MARCH 2015

TOTAL MQV+STK+SMS TONNES Zn % Pb % Ag g/t

MEASURED INDICATED

MEASURED & INDICATED

INFERRED

1,279,000

5,309,000

6,588,000

7,078,000

13.2

9.5

10.2

11.7

11.6

9.0

9.5

9.6

211

131

147

177

For further information contact:

John F. Kearney

Alan B. Taylor

Steve Dawson

Chairman &

Chief Executive

Vice President Exploration

& Chief Operating Officer

Vice President

Corporate Development

(416) 362-6686

(604) 688-2001

(416) 203-1418

220 Bay Street,

12th Floor

Toronto, ON M5J 2W4

Suite 1710 - 650 West Georgia Street, Vancouver, BC V6B 4N9

Tollfree:1-866-688-2001

220 Bay Street,

12th Floor

Toronto, ON M5J 2W4

E-mail: [email protected] Website: www.canadianzinc.com

Cautionary Statement - Forward-Looking Information

This press release contains certain forward-looking information, including, among other things, the expected completion of acquisitions and the advancement of mineral properties. This forward looking information includes, or may be based upon, estimates, forecasts, and statements as to management's expectations with respect to, among other things, the completion of transactions, the issue of permits, the size and quality of mineral resources, future trends for the company, progress in development of mineral properties, future production and sales volumes, capital costs, mine production costs, demand and market outlook for metals, future metal prices and treatment and refining charges, the outcome of legal proceedings, the timing of exploration, development and mining activities, acquisition of shares in other companies and the financial results of the company. There can be no assurances that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Inferred mineral resources are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that mineral resources will be converted into mineral reserves.

Cautionary Note to United States Investors

The United States Securities and Exchange Commission ("SEC") permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. We use certain terms in this press release, such as "measured," "indicated," and "inferred" "resources," which the SEC guidelines prohibit U.S. registered companies from including in their filings with the SEC.

5

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Canada | Georgia | All
Gold and Silver Prices for these countries : Canada | Georgia | All

Canadian Zinc Corp

DEVELOPMENT STAGE
CODE : CZN.TO
ISIN : CA1368021053
CUSIP : 136802-10-5
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Canadian Zinc is a zinc and silver development stage company based in Canada.

Canadian Zinc develops zinc, silver and gold in Fiji.

Its main asset in development is TUVATU in Fiji and its main exploration property is PRAIRIE CREEK in Canada.

Canadian Zinc is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 30.6 millions as of today (US$ 23.2 millions, € 20.1 millions).

Its stock quote reached its highest recent level on February 20, 2004 at CA$ 2.04, and its lowest recent point on December 04, 2015 at CA$ 0.06.

Canadian Zinc has 265 920 016 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Canadian Zinc Corp
2007 Annual Report
Financings of Canadian Zinc Corp
7/7/2016Announces Closing of $10,200,000 FInancing
8/1/2014CZN Closes $15.8 Million Bought Deal Financing
8/2/2013ANNOUNCES C$4 MILLION BOUGHT DEAL FLOW-THROUGH PRIVATE PLAC...
Nominations of Canadian Zinc Corp
6/13/2013Reports on Election of Directors at Annual General Meeting o...
Financials of Canadian Zinc Corp
5/17/2016Reports Financial Results for Q1 2016 and Operations Update
3/31/2016CZN Reports Financial Results for 2015
11/13/2015Reports Results for Third Quarter 2015
8/14/2015Reports Financial Results for Second Quarter 2015
3/31/2015Reports Financial Results for Fiscal 2014
11/15/2013CZN Reports Financial Results for Third Quarter 2013
8/13/2013Reports Financial Results for Second Quarter 2013
5/13/2013Reports Financial Results for First Quarter 2013
3/20/2013REPORTS FINANCIAL RESULTS FOR FISCAL 2012
8/10/2012Reports Financial Results for Second Quarter 2012
3/16/2012Reports Financial Results for Fiscal 2011
3/17/2011Reports Financial Results for Fiscal 2010
11/17/20092009 Third Quarter Results
8/17/2009Reports Second Quarter 2009 Results
5/16/20092009 First Quarter Results
8/8/2008Reports Second Quarter 2008 Results
5/15/2008First Quarter Results
Project news of Canadian Zinc Corp
4/19/2017Drilling Extends Mineralization at Lemarchant, NFLD
9/15/2016CZN Modifies 2016 Preliminary Feasibility Study
1/21/2014Engineering and Procurement Contracts awarded for Prairie Cr...
12/12/2013Assay Results of 2013 Drill Program at South Tally Pond
12/9/2013(Prairie Creek)Assay Results of 2013 Drill Program at Prairie Creek
9/18/2013(Prairie Creek)Granted Water Licence for Prairie Creek Mine
6/21/2013(Prairie Creek)CZN RECEIVES PERMITS FOR OPERATION OF PRAIRIE CREEK MINE
3/25/2013(Prairie Creek)RECEIVES PROPOSED WATER QUALITY CONDITIONS IN DRAFT WATER LI...
3/18/2013(Prairie Creek)Receives Draft Water Licence and Permits for Operation of Pr...
1/15/2013to Drill South Tally Pond Project, Newfoundland
1/8/2013(Prairie Creek)oration: Permitting Progress for Prairie Creek Mine
8/28/2012(Prairie Creek)and Government of Northwest Territories Advance Co-operation...
6/14/2012(Prairie Creek)oration: Minister Confirms Environmental Impact Review Not R...
5/15/2012(Prairie Creek)oration: Additional Permits Approved for Prairie Creek Mine ...
10/3/2011(Prairie Creek)Reports Success With Prairie Creek Exploration Drilling
9/26/2011(Prairie Creek)oration: Environmental Assessment of Prairie Creek Mine Ente...
8/22/2011(Prairie Creek)and Government of the Northwest Territories Sign Socio-Econo...
6/19/2011(Prairie Creek)and Liidlii Kue First Nation Sign Impact and Benefits Agreem...
6/8/2011(Prairie Creek)oration: Exploration Drill Program Commences at Prairie Cree...
2/28/2011(Prairie Creek)oration: Prairie Creek Mine Feasibility Study Commissioned
2/2/2011(Prairie Creek)CZN Obtains Permit Extension
1/24/2011(Prairie Creek)CZN Signs Agreement with NDDB
1/21/2011(Prairie Creek)and Nahanni Butte Dene Band Sign Impact and Benefit Agreemen...
9/2/2009(Tuvatu)Diamond Drilling Commences at Tuvatu
7/21/2009(Prairie Creek)Federal Minister Visits Prairie Creek Mine
6/5/2009(Prairie Creek)Prairie Creek Metallurgical Results
5/20/2009(Tuvatu)Tuvatu gold project option
8/21/2008Permitting Update
7/22/2008(Prairie Creek)Prairie Creek Permitting Update
6/11/2008(Prairie Creek)Submits Permit Applications for Production at the Prairie Cr...
Corporate news of Canadian Zinc Corp
8/10/2017Reports Financial Results for Q2 and Provides Project Update...
7/15/2016DEH CHO DRUM - July 14, 2016 Public voices thoughts on road
7/7/2016JULY 7, 2016: CANADIAN ZINC ANNOUNCES CLOSING OF $10,200,000...
6/29/2016JUNE 29, 2016: CANADIAN ZINC ANNOUNCES FILING OF FINAL PROSP...
6/21/2016JUNE 21, 2016: CANADIAN ZINC REPORTS ON ANNUAL GENERAL MEETI...
6/16/2016JUNE 16, 2016: CANADIAN ZINC ANNOUNCES C$8.0 MILLION UNDERWR...
6/16/2016JUNE 16, 2016: CANADIAN ZINC PRICES $8-MILLION OVERNIGHT OFF...
6/15/2016JUNE 15, 2016: CANADIAN ZINC ANNOUNCES PUBLIC EQUITY OFFERIN...
5/30/2016Minco Press Release First Quarter 2016 Financial Results
5/27/20162016 First Quarter Managements Discussion and Analysis
5/24/2016MAY 24, 2016: CANADIAN ZINC ANNOUNCES NEW NOMINEES TO BOARD ...
1/25/2016JANUARY 25, 2016: UPDATE ON RESEARCH PROGRAM TO INVESTIGATE ...
1/25/2016Canadian Zinc provides update on research program to investi...
12/2/2015DECEMBER 2, 2015: RESEARCH FUNDING AWARDED TO CANADIAN ZINC ...
12/2/2015Research Funding awarded to Canadian Zinc to investigate cen...
10/24/2015Sandstorm Gold Provides Asset Updates
10/23/2015Sandstorm Gold Provides Asset Updates
9/17/2015SEPTEMBER 17, 2015: MINERAL RESOURCES INCREASE AT PRAIRIE CR...
9/17/2015Canadian Zinc Corporation : Mineral Resources Increase at Pr...
8/14/2015AUGUST 14, 2015: CANADIAN ZINC REPORTS FINANCIAL RESULTS FOR...
8/14/2015Canadian Zinc Reports Financial Results for Second Quarter 2...
8/11/2015AUGUST 11, 2015: UNDERGROUND DRILL PROGRAM AT PRAIRIE CREEK ...
8/11/2015Canadian Zinc Corporation: Underground Drill Program at Prai...
3/31/2015MARCH 31, 2015: CANADIAN ZINC REPORTS FINANCIAL RESULTS FOR ...
3/31/2015Canadian Zinc Reports Financial Results for Fiscal 2014
3/26/2015MARCH 26, 2015: NEW MINERAL RESOURCE UPDATE AT PRAIRIE CREEK...
3/26/2015(Prairie Creek)oration: New Mineral Resource Update at Prairie Creek Mine
1/29/20142014 Winter Drill Program Commences at South Tally Pond, NFL...
10/31/2013Drilling Extends Massive Sulphide Mineralization at Lemarcha...
10/31/2013oration: Drilling Extends Massive Sulphide Mineralization at...
9/16/2013Drill Program Underway for South Tally Pond, Newfoundland
9/12/2013and Messina Minerals Announce Agreement on Proposed Acquisit...
9/5/2013(Prairie Creek)CZN Receives Permits from Parks Canada for Prairie Creek Min...
9/4/2013(Prairie Creek)Commencing New Drill Program at Prairie Creek
8/20/2013Announces Closing of C$4 Million Bought Deal Flow-Through Pr...
8/1/2013announces C$4 million bought deal flow-through private place...
7/15/2013OtcbbJournal.com Sheds Light on Micro-Cap Companies Under th...
7/8/2013oration: Water Board Completes Regulatory Process; Water Lic...
5/31/2013Raises US$10.0 Million
5/10/2013oration: Annual General Meeting and Adoption of Advance Noti...
4/17/2013Completes Winter Drill Program at South Tally Pond
1/29/2013(Prairie Creek)First Operating Permit Received For Prairie Creek Mine:
1/25/2013CZN Submits Final Responses To Water Board Ahead Of Public H...
1/22/2013Submits Final Responses to Water Board Ahead of Public Heari...
1/15/2013to Drill Lemarchant Massive Sulphide Deposit at South Tally ...
10/31/2012Visit Canadian Zinc Booth # 418 Hard Assets San Francisco
9/24/2012Acquires Paragon Minerals Corporation
7/31/2012Announces Merger and Private Placement With Paragon Minerals...
6/27/2012(Prairie Creek)Reports Results of Prairie Creek Preliminary Feasibility Stu...
3/5/2012and Parks Canada Sign Renewed Memorandum of Understanding
2/29/2012Reports Significant Assay Results from Final Holes of 2011 D...
2/10/2012(Prairie Creek)Closes $4 Million Second Tranche of Zhongrun Private Placeme...
1/6/2012Announces the Closing of $5.1 Million Bought Deal Public Off...
12/30/2011Announces Closing of: $2.5 Million Private Placement of Flow...
12/9/2011Receives Environmental Approval
8/29/2011Federal Government Provides $3 Million Funding to Assist in ...
6/28/2011oration: Environmental Assessment Hearings Completed
3/26/2010Developers Assessment Report Filed
9/30/2009Vatukoula Finance - Operations Update
6/24/2009Gold Production Up at Vatukoula Mine
6/12/2009Vatukoula Approves Share Purchase
5/27/2009Normal Course Issuer Bid
2/24/20092009 Convention - Prospectors & Developers Association of Ca...
11/18/2008SULPHIDE VENT COMPLEX/FEEDER ZONE IDENTIFIED AT THE NORTH LE...
11/4/2008Memorandum of Understanding Signed With Nahanni Butte Dene B...
8/1/2008Memorandum Of Understanding Signed With Parks Canada
4/1/20082007 Year End Results
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (CZN.TO)FRANKFURT (SRS.F)
0.115+4.55%0.017-5.56%
TORONTO
CA$ 0.115
09/10 16:58 0.010
4.55%
Prev close Open
0.110 0.110
Low High
0.110 0.115
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.115 -%
Volume 1 month var.
122,370 -%
24hGold TrendPower© : 11
Produces
Develops Gold
Explores for Copper - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 10/18/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+6.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :