Kaminak Gold Corporation

Published : February 05th, 2015

Kaminak Reports Infill Drill Results from the Supremo Deposit, Coffee Gold Project

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Kaminak Reports Infill Drill Results from the Supremo Deposit, Coffee Gold Project

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Feb 5, 2015) - Kaminak Gold Corporation (TSX VENTURE:KAM) today announced final results for the 2014 infill drilling at Coffee, Kaminak's flagship development track gold project located 130 km south of Dawson City, Yukon. A Preliminary Economic Assessment (PEA) completed for Coffee in 2014 defined a robust, high-margin, 11-year open-pit mining opportunity at a US$1250/oz gold price; the project is currently at the feasibility stage.

In 2014, close to 23,000 metres of infill drilling was undertaken on the series of parallel, north-south striking gold bearing structures comprising the Supremo deposit, which contributes approximately 70% of the oxide gold ounces targeted for mining in the PEA. Approximately 32,000 metres or 55% of the total planned infill drilling program at Supremo remains to be completed in 2015. The objective of the infill drilling program is to verify and upgrade the classification of in-pit resources defined in the 2014 PEA from the "Inferred" category to the higher-confidence "Indicated" category for eventual inclusion in the Coffee Mining Feasibility Study.

"The Supremo oxide-gold bearing structures are expected to contribute 70% of the ounces in our initial, 11-year open-pit mine plan for Coffee and underpin the strong economics of the Project," stated Eira Thomas, Kaminak President & CEO. "Further, all of the Supremo structures remain open along strike and to depth offering excellent potential for resource expansion in the future. As with the infill drilling results recently reported for Latte, Double-Double and Kona, the infill drilling completed so far at Supremo continues to demonstrate good agreement with existing geological interpretations and the resource block model."

Based on the 2014 PEA, the Supremo deposit contributes approximately 1,272,000 ounces of gold (recoverable) at an average diluted grade of 1.13 g/t Au in oxide resources plus an additional 44,000 ounces of gold at 1.64 g/t Au as transitional resources. A total of 22,830 metres of infill drilling from 132 holes completed to date at Supremo has firmed up the existing geological interpretation providing additional confidence in the location, geometry and continuity of the mineralized lodes. The bulk of the 2014 Supremo program was focused within Supremo T3 and T4 South where infill drilling has now been completed over strike lengths of 1,300m and 800m respectively. The Supremo 2015 drilling program commenced 1 February, 2015 as planned, with two RC drills currently turning at the Coffee property.

The location and spacing of infill drilling was determined in consultation with independent Qualified Person Robert Sim, P.Geo of SIM Geological Inc., who completed the Coffee Gold Project Mineral Resource Estimates (announced December 13, 2012, and updated January 28, 2014). The Company plans to update the mineral resource estimates for inclusion in the final feasibility study once all of the drill results from all 2014-15 infill drill programs have been received.

Table 1 2014 Supremo Deposit Infill Drilling Results

Prospect Drill Hole From (m) To (m) Width (m)* Weighted Average grade (g/t Au)
Supremo T1 CFD0467 19 20 1 3.24
Supremo T1 CFD0470 151 160 9 1.90
Supremo T1 CFD0470 166 171 5 4.20
Supremo T2 CFD0395 33 35 2 1.96
Supremo T2 CFD0397 NSV
Supremo T2 CFD0450 120 123 3 2.68
Supremo T2 CFD0460 162 164 2 1.99
Supremo T2 CFD0464 101 108 7 2.28
Supremo T2 CFD0464 131 145 14 1.74
Supremo T2 CFD0474 163 166 3 1.09
Supremo T2 CFD0481 NSV
Supremo T2 CFD0483 NSV
Supremo T2 CFR0752 94.49 111.25 16.76 1.03
Supremo T2 CFR0755 47.24 62.48 15.24 1.22
Supremo T2 CFR0756 18.29 21.34 3.05 1.72
Supremo T2 CFR0758 9.14 10.67 1.53 1.92
Supremo T2 CFR0761 3.05 4.57 1.52 1.09
Supremo T2 CFR0768 NSV
Supremo T3 CFD0438 203 210 7 2.58
Supremo T3 CFD0441 191 203 12 3.78
Supremo T3 CFD0443 225 234 9 2.45
Supremo T3 CFD0443 264 269 5 9.23
Supremo T3 CFD0447(1) 213 226 13 5.99
Supremo T3 CFD0447 248 276 28 1.49
Supremo T3 CFD0452 35 41 6 2.65
Supremo T3 CFD0452 49 52 3 1.72
Supremo T3 CFD0452 57 61 4 3.69
Supremo T3 CFD0456 11 13 2 3.91
Supremo T3 CFD0456 59 64 5 4.24
Supremo T3 CFD0456 91 92 1 6.64
Supremo T3 CFD0469 250 265 15 1.80
Supremo T3 CFD0471 145 146 1 15.00
Supremo T3 CFD0473 174 178 4 1.46
Supremo T3 CFD0473 182 185 3 13.99
Supremo T3 CFD0475 235 241 6 4.06
Supremo T3 CFD0475 246 255 9 4.12
Supremo T3 CFD0475 261 262 1 6.61
Supremo T3 CFD0476 196 211 15 6.41
Supremo T3 CFD0477 NSV
Supremo T3 CFD0480 176 183 7 3.56
Supremo T3 CFD0487(2) 176 187 11 4.54
Supremo T3 CFD0487 242 246 4 8.94
Supremo T3 CFD0491 NSV
Supremo T3 CFR0763 39.62 41.15 1.53 2.01
Supremo T3 CFR0765 51.82 54.86 3.04 1.69
Supremo T3 CFR0765 124.97 128.02 3.05 6.46
Supremo T3 CFR0771 102.11 115.82 13.71 2.85
Supremo T3 CFR0774 143.26 153.92 10.66 1.72
Supremo T3 CFR0775 27.43 38.1 10.67 1.56
Supremo T3 CFR0775 54.86 59.44 4.58 3.71
Supremo T3 CFR0777 60.96 64.01 3.05 2.58
Supremo T3 CFR0777 129.54 135.64 6.1 9.08
Supremo T3 CFR0778 67.06 73.15 6.09 2.03
Supremo T3 CFR0780 126.49 129.54 3.05 1.29
Supremo T3 CFR0781 6.1 12.19 6.09 2.69
Supremo T3 CFR0781 51.82 62.48 10.66 7.92
Supremo T3 CFR0783 106.68 109.73 3.05 2.99
Supremo T3 CFR0785 18.29 25.91 7.62 6.21
Supremo T3 CFR0786 41.15 42.67 1.52 2.12
Supremo T3 CFR0788 39.62 44.2 4.58 10.06
Supremo T3 CFR0789 54.86 56.39 1.53 1.61
Supremo T3 CFR0790 NSV
Supremo T3 CFR0792 124.97 128.02 3.05 3.16
Supremo T3 CFR0793 108.2 112.78 4.58 5.94
Supremo T3 CFR0794 41.15 44.2 3.05 1.16
Supremo T3 CFR0795 41.15 44.2 3.05 2.66
Supremo T3 CFR0796 21.34 27.43 6.09 6.75
Supremo T3 CFR0800 15.24 24.38 9.14 12.95
Supremo T3 CFR0802 27.43 53.34 25.91 1.85
Supremo T3 CFR0802 79.25 86.87 7.62 1.89
Supremo T4 CFD0461 51 57 6 2.07
Supremo T4 CFD0461 63 66 3 6.25
Supremo T4 CFD0461 183 187 4 3.30
Supremo T4 CFD0465 130 158 28 2.35
Supremo T4 CFD0468 169 177 8 1.53
Supremo T4 CFD0469 125 127 2 2.65
Supremo T4 CFD0472 59 62 3 1.73
Supremo T4 CFD0472 117 126 9 3.44
Supremo T4 CFD0472 131 136 5 2.88
Supremo T4 CFD0478 186 195 9 3.28
Supremo T4 CFD0480 49 64 15 1.63
Supremo T4 CFD0482 54 60 6 8.89
Supremo T4 CFD0482 82 84 2 7.76
Supremo T4 CFD0482 116 123 7 0.90
Supremo T4 CFD0482 139 143 4 4.54
Supremo T4 CFD0485 165 167 2 4.53
Supremo T4 CFD0486 158 169 11 1.22
Supremo T4 CFD0486 190 195 5 3.72
Supremo T4 CFD0486 208 210 2 5.10
Supremo T4 CFD0487 50 59 9 0.96
Supremo T4 CFD0487 63 68 5 2.76
Supremo T4 CFD0488 215 217 2 4.53
Supremo T4 CFD0489 87 91 4 1.94
Supremo T4 CFD0489 101 116 15 2.54
Supremo T4 CFD0490 33 36 3 10.6
Supremo T4 CFD0490 42 46 4 3.57
Supremo T4 CFD0490 121 135 14 1.48
Supremo T4 CFD0490 144 164 20 2.39
Supremo T4 CFD0493 67 70 3 2.81
Supremo T4 CFD0494(3) 32 44 12 6.88
Supremo T4 CFD0495 130 133 3 2.11
Supremo T4 CFD0495 164 174 10 2.48
Supremo T4 CFD0495 195 203 8 4.49
Supremo T4 CFD0496 50 57 7 1.45
Supremo T4 CFD0496 70 74 4 1.90
Supremo T4 CFD0497 86 99 13 3.93
Supremo T4 CFD0498 93 96 3 1.78
Supremo T4 CFD0498 201 208 7 1.71
Supremo T4 CFD0498 230 232 2 8.89
Supremo T4 CFD0498 240 251 11 2.28
Supremo T4 CFD0499 92 99 7 1.85
Supremo T4 CFD0499 128 130 2 2.84
Supremo T4 CFD0499 161 164 3 3.03
Supremo T4 CFR0737 18.29 21.34 3.05 1.65
Supremo T4 CFR0738 NSV
Supremo T4 CFR0740 24.38 38.1 13.72 3.49
Supremo T4 CFR0740 51.82 54.86 3.04 2.76
Supremo T4 CFR0740 141.73 147.83 6.1 1.44
Supremo T4 CFR0742 Abandoned (re-drill with DDH in 2015)
Supremo T4 CFR0743 NSV
Supremo T4 CFR0744 4.57 7.62 3.05 3.08
Supremo T4 CFR0744 56.39 60.96 4.57 2.00
Supremo T4 CFR0744 108.2 114.3 6.1 2.38
Supremo T4 CFR0744 158.5 166.12 7.62 2.58
Supremo T4 CFR0746 NSV
Supremo T4 CFR0747 79.25 88.39 9.14 1.72
Supremo T4 CFR0749 NSV
Supremo T4 CFR0750 NSV
Supremo T4 CFR0751 39.62 42.67 3.05 5.93
Supremo T4 CFR0753 28.96 42.67 13.71 0.72
Supremo T4 CFR0753 163.07 166.12 3.05 7.04
Supremo T4 CFR0754 42.67 45.72 3.05 5.13
Supremo T4 CFR0757 62.48 64.01 1.53 5.97
Supremo T4 CFR0759 64.01 70.1 6.09 2.45
Supremo T4 CFR0759 91.44 96.01 4.57 4.18
Supremo T4 CFR0759 115.82 143.26 27.44 0.94
Supremo T4 CFR0760 73.15 76.2 3.05 4.88
Supremo T4 CFR0762 7.62 35.05 27.43 2.44
Supremo T4 CFR0764 60.96 62.48 1.52 6.53
Supremo T4 CFR0764 80.77 89.92 9.15 1.27
Supremo T4 CFR0764 100.58 109.73 9.15 0.94
Supremo T4 CFR0766 42.67 53.34 10.67 1.46
Supremo T4 CFR0766 60.96 65.53 4.57 2.71
Supremo T4 CFR0766 83.82 91.44 7.62 0.71
Supremo T4 CFR0767 21.34 42.67 21.33 2.59
Supremo T4 CFR0769 9.14 12.19 3.05 0.89
Supremo T4 CFR0770 112.78 114.3 1.52 1.50
Supremo T4 CFR0772 NSV
Supremo T4 CFR0773 41.15 59.44 18.29 2.52
Supremo T4 CFR0776 6.1 7.62 1.52 2.05
Supremo T4 CFR0779 30.48 48.77 18.29 1.34
Supremo T4 CFR0782 99.06 103.63 4.57 1.28
Supremo T4 CFR0784 NSV
Supremo T4 CFR0787 21.34 22.86 1.52 4.11
Supremo T4 CFR0787 181.36 184.4 3.04 2.67
Supremo T4 CFR0791 111.25 115.82 4.57 7.16
Supremo T4 CFR0798 0 9.14 9.14 0.6
Supremo T5 CFD0423 69 74 5 4.37
Supremo T5 CFD0425 209 213 4 2.56
Supremo T5 CFD0425 237 239 2 4.42
Supremo T5 CFD0426 71 77 6 10.25
Supremo T5 CFD0427 135 138 3 2.36
Supremo T5 CFD0427 159 161 2 4.01
Supremo T5 CFD0427 176 178 2 4.33
Supremo T5 CFD0427 187 189 2 2.55
Supremo T5 CFD0429(4) 184 188 4 3.13
Supremo T5 CFD0429 195 218 23 1.38
Supremo T5 CFD0431 223 224 1 2.33
Supremo T5 CFD0433 168 181 13 2.40
Supremo T5 CFD0433 220 224 4 1.51
Supremo T5 CFD0436 17 19 2 4.10
Supremo T5 CFD0436 40 46 6 4.31
Supremo T5 CFD0441 21 27 6 2.02
Supremo T5 CFD0441 34 37 3 2.17
Supremo T5 CFD0441 42 53 11 9.22
Supremo T5 CFD0443 128 136 8 1.37
Supremo T5 CFD0445 130 131 1 6.78
Supremo T5 CFD0447 129 137 8 1.56
Supremo T5 CFD0469 9 11 2 3.98
Supremo T5 CFD0475 31 39 8 3.90
Supremo T5 CFD0479 23 34 11 1.21
Supremo T5 CFD0479 40 44 4 1.36
Supremo T5 CFD0479 53 58 5 2.15
Supremo T5 CFD0479 80 82 2 2.73
Supremo T5 CFD0479 120 125 5 1.41
Supremo T5 CFD0479 140 147 7 0.84
Supremo T5 CFD0484 63 75 12 6.78
Supremo T5 CFD0484 124 125 1 5.52
Supremo T5 CFD0484 165 189 24 2.43
Supremo T5 CFD0484 197 214 17 1.55
Supremo T5 CFD0492 88 101 13 0.92
Supremo T5 CFR0727 NSV
Supremo T5 CFR0729 1.52 22.86 21.34 2.03
Supremo T5 CFR0729 117.35 123.44 6.09 4.29
Supremo T5 CFR0733 12.19 18.29 6.1 1.59
Supremo T5 CFR0733 71.63 76.2 4.57 2.97
Supremo T5 CFR0748 38.1 53.34 15.24 1.06
Supremo T5 CFR0748 77.72 86.87 9.15 1.16
Supremo T5 CFR0797 33.53 51.82 18.29 1.68
Supremo T5 CFR0799 53.34 56.39 3.05 1.38
Supremo T5 CFR0801 56.39 59.44 3.05 0.98
Supremo T5 CFR0803 73.15 82.3 9.15 1.72
Supremo T5 CFR0803 108.2 115.82 7.62 1.84
Supremo T5 CFR0803 164.59 166.12 1.53 3.43
Supremo T7 CFD0404 16 24 8 3.08
Supremo T7 CFD0404 52 60 8 1.98
Supremo T7 CFD0404 67 68 1 5.01
Supremo T7 CFD0406 18 25 7 2.44
Supremo T7 CFD0412 101 107 6 3.94
Supremo T7 CFD0412 218 224 6 3.46
Supremo T7 CFD0415 23 24 1 3.13
Supremo T7 CFD0417 31 46 15 1.06
Supremo T7 CFD0417 53 72 19 1.49
Supremo T7 CFD0420 61 62 1 2.96
Supremo T7 CFD0421 14 16 2 1.28
Supremo T7 CFD0422 5 10 5 1.11
Supremo T7 CFD0424 34 38 4 1.18
Supremo T7 CFR0668 144.78 147.83 3.05 2.86
Supremo T7 CFR0670 28.96 30.48 1.52 2.09
Supremo T7 CFR0672 97.54 111.25 13.71 1.08
Supremo T7 CFR0676 16.76 18.29 1.53 1.23
Supremo T7 CFR0681 NSV
1CFD0447 is the redrill of CFD0443 due to poor recovery
2CFD0487 is the redrill of CFD0480 due to poor recovery
3CFD0494 is the redrill of CFD0490 due to poor recovery
4CFD0429 is the redrill of CFD0425 due to poor recovery
*True width estimated at approximately 2/3 down-hole length.
Additional notes: 'CFD' drill hole prefixes equate to Diamond core holes, 'CFR' equate to RC drill holes. RC drill holes are sampled on 5' drill rod lengths then converted to metric for input into the drill database. NSV equals 'No Significant Value'.

All maps, sections and assay sheets associated with this news release can be viewed by clicking the following link: http://kaminak.com/news_releases/2015/index.php?&content_id=612

Feasibility and Environment Baseline Program Updates

As announced 28 July, 2014, the Company initiated a mining Feasibility Study on the Coffee Gold Project with a targeted completion date of end 2015 or early 2016. Drilling and related field programs ended in the last week of November 2014 and resumed in early February 2015. Drilling in 2015 will comprise ongoing resource delineation infill, condemnation drilling of areas containing proposed mine infrastructure, and geotechnical and hydrological drilling. Environmental and heritage baseline studies, and engineering studies into the optimal route and design of the access road, are also advancing as planned. All metallurgical sampling was completed in 2014 and composites are now at the Kappes Cassiday and Associates Laboratory undergoing leaching and other test work.

QA / QC

Kaminak's disclosure of a technical or scientific nature in this press release has been reviewed and approved by Tim Smith, P.Geo., Vice President Exploration of Kaminak Gold Corporation, who serves as a Qualified Person under the definition of National Instrument 43-101. Quality assurance and quality control procedures include the systematic insertion of blanks and standards into the drill sample string. Samples are placed in sealed bags and shipped directly to the ALS Minerals preparatory laboratory in Whitehorse prior to gold fire assay.

On behalf of the Board of Directors of Kaminak

Eira Thomas, President and CEO

Kaminak Gold Corporation

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this release.

Caution Concerning Forward-Looking Statements

Certain disclosures in this release, including management's assessment of the future potential of the Coffee Project and future exploration programs, constitute forward-looking statements that are subject to numerous risks, uncertainties and other factors relating to Kaminak's operations as a mineral exploration company that may cause future results to differ materially from those expressed or implied in such forward-looking statements, including risks as to the completion of the plans and projects. Readers are cautioned not to place undue reliance on forward-looking statements. Except as required by law, Kaminak expressly disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future event or otherwise.

The Company has not made a production decision, and the Company's strategic plan to develop a stand-alone heap leach operation is subject to the results of its Feasibility Study. Further, if and when the Company makes any production decision, it will disclose the basis of such decision in accordance with the requirements of National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101").

Cautionary Note concerning estimates of Inferred and Indicated Resources:

This news release uses the terms "Inferred Resources" and "Indicated Resources", which have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an Inferred and/or Indicated Mineral Resource will ever be upgraded to a higher category. Under Canadian rules, estimates of Inferred Resources may not form the basis of feasibility or other economic studies. Kaminak advises U.S. investors that while this term is recognized and required by Canadian regulations, the U.S. Securities and Exchange Commission does not recognize it. U.S. investors are cautioned not to assume that part or all of an Inferred and Indicated resource exists or is economically or legally minable.

Read the rest of the article at finance.yahoo.com

Kaminak Gold Corporation

EXPLORATION STAGE
CODE : KAM.V
ISIN : CA48356P2026
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Kaminak Gold is a gold exploration company based in Canada.

Kaminak Gold holds various exploration projects in Canada.

Its main exploration properties are CHURCHILL, NEEDLE LAKE, VOIGTBERG, MATRIX, CRY LAKE (NIZI CREEK), HEMLO NORTH, LACH, IME GOLD PROPERTY, WHITE DISTRICT, TBN PROJECT, BAKER LAKE PROJECT, COFFEE PROPERTY, SY GOLD PROPERTY, SAIL VMS PROPERTY and SHARPE LAKE in Canada.

Kaminak Gold is listed in Canada and in United States of America. Its market capitalisation is CA$ 501.9 millions as of today (US$ 385.0 millions, € 349.8 millions).

Its stock quote reached its lowest recent point on December 12, 2008 at CA$ 0.07, and its highest recent level on July 29, 2011 at CA$ 4.71.

Kaminak Gold has 186 573 847 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Kaminak Gold Corporation
6/4/2007and BCGold Corp Commission an Airborne Geophysical Survey ov...
Annual reports of Kaminak Gold Corporation
2007 annual report
Financings of Kaminak Gold Corporation
10/30/2015Closes C$22.5 Million Financing with Electrum Strategic Oppo...
9/5/2013Announces $2.5 Million Bought Deal Private Placement and Ext...
6/18/2013Announces Increase Of Previously Announced Bought Deal Priva...
6/18/2013Announces $4 Million Bought Deal Private Placement
10/11/2012Announces Closing of $12 Million Bought Deal Private Placeme...
3/3/2011Announces Closing of $11.5 Million Bought Deal Private Place...
2/16/2011Announces $10 Million Bought Deal Private Placement
7/29/2010Announces Closing of Bought Deal Equity Financing
7/12/2010Announces $10 Million Bought Deal Common Share And Flow-Thro...
7/15/2009Closes $500,000 Non-Brokered Flow-Through Private Placement
6/22/2009$500,000 Non-Brokered Flow-Through Private Placement
6/22/2009Increases Non-Brokered Private Placement
4/23/2008Receives Shares and Warrants from Corsa Capital Ltd.
Option Grants of Kaminak Gold Corporation
12/5/2008Grants 650,000 Stock Options
Nominations of Kaminak Gold Corporation
4/29/2013Appoints New Corporate Secretary
4/11/2013Appoints Director of Lands and Environment and Engages JDS E...
2/6/2013To Appoint Eira Thomas As President & CEO; Richard Hall And ...
6/8/2012Appoints Blair Lockhart Corporate Secretary; Kaminak Directo...
10/7/2011Appoints Jonathan Singh Interim CFO
4/12/2011Announces Election of Garth Kirkham to the Board of Director...
Project news of Kaminak Gold Corporation
1/28/2014Announces Updated Mineral Resource Estimate at Coffee Gold P...
11/20/2013Coffee Drilling Links Supremo T5 and T7 Gold Zones
10/10/2013Drills New Oxide Gold Discovery at Coffee
6/17/2013Drilling Confirms High Potential at Connector Zone and Exten...
5/17/2013and Tr'ondek Hwech'in First Nations Sign Exploration Coopera...
11/2/2012Presents at Vancouver Mining Exploration Group Luncheon
10/15/2012Drilling Connects the Supremo T5 and Double Double Gold Zone...
9/11/2012Drilling Successfully Connects Supremo T3 and T4 Gold Zones
7/9/2012Drilling Successfully Connects Supremo and Latte Gold Zones
6/4/2012Expands Supremo and Double Double Gold Zones: New Results i...
4/23/2012Drills New Gold Discovery At Supremo Zone: Results from T4 a...
4/2/2012Reports 90.4% Gold Recoveries from Simulated Heap Leach Test...
1/11/2012Extends High-Grade Supremo ‘T3 Zone’ ...
11/30/2011Expands Near-Surface Gold Zones at Kona: New Drill Results I...
10/11/2011Defines Extensive Soil Anomalies Along Newly Recognized Suga...
9/14/2011(Coffee Property)Drilling Increases Length of the Latte Gold Zone to 1350 met...
8/24/2011Drills High-Grade Gold at Supremo T3 Zone
8/9/2011Drills 74.9 g/t Au over 4m at Double Double: High-Grade Gold...
7/6/2011Begins Collecting 10,000 Soil Samples at Coffee Gold Project...
6/13/2011Drills High-Grade Gold at Latte Zone
3/15/2011(Coffee Property) 43-101 Technical Report on Coffee Gold Project, Yukon
3/14/2011(Coffee Property)Reports 97% Gold Recoveries from Initial Metallurgical Testi...
3/7/2011(Coffee Property)Announces Phase One Drill Plan for the 2011 Coffee Explorati...
1/12/2011(Coffee Property)Announces $15 Million Initial Phase 1 Budget for Coffee Gold...
8/11/2010(Coffee Property)Drills Third Gold Discovery on the Coffee Property: Double D...
8/5/2010(Coffee Property)Drilling Extends Supremo Gold Zone at Least 550m Along Trend...
5/26/2010(Coffee Property)Drills New Yukon Gold Discovery: First Hole Intersects 17.1 ...
5/3/2010(Coffee Property)Begins Drilling Coffee Gold Project
4/20/2010(Coffee Property)Mobilizes to the Coffee Property and Outlines Drill Strategy
3/29/2010(Coffee Property)Significantly Increases Coffee Gold Land Position; Acquires ...
10/27/2009(Coffee Property)Coffee Property Continues to Yield High-Grade Trenching Resu...
10/14/2009(Churchill)Options Churchill Project Non-Diamond Rights to Shear Minera...
10/8/2009(Coffee Property)Reports New High-Grade Gold Occurrences from the Coffee Prop...
9/24/2009(Tbn Project)Completes Airborne Geophysical Survey and Initiates Follow-U...
9/1/2009(Cry Lake (nizi Creek))’s Partner Proposes Drill Program on Cry Lake (Nizi Creek) G...
8/24/2009(Coffee Property)Identifies Additional Gold-in-Soil Trends on the Coffee Prop...
8/13/2009(White District)Reports New Gold Occurrences from Yukon’s White District: Tr...
7/7/2009(White District)Commences Trenching Program on White District Gold Propertie...
8/28/2008(Needle Lake) Commence Drilling at Needle Gold Property
8/6/2008(Cry Lake (nizi Creek))Options Nizi Creek Gold-Silver Property to Avasca Inc.
6/17/2008(Sy Gold Property)Partner Corsa Capital to Spend $350,000 at SY Gold Property,...
3/31/2008(Needle Lake) Reports New High-Grade Surface Occurrences from the Needle ...
1/18/2008(Voigtberg)Provides Joint Venture Updates on its British Columbia Gold ...
1/10/2008(Hemlo North) Identifies Favourable Alteration and Shearing on its Hemlo ...
8/20/2007(Voigtberg)and BCGold Commence Drill Program at Voigtberg Property, Nor...
6/20/2007Stakes 21,000 Acre Land Position in the Hemlo Greenstone Bel...
Corporate news of Kaminak Gold Corporation
7/12/2016Kaminak Receives Securityholder Approval of Acquisition by G...
6/9/2016Kaminak Commences Exploration at Coffee Gold Project, Yukon ...
5/26/2016Kaminak Announces Voting Results of Annual General Meeting
5/12/2016Kaminak Announces Acquisition Transaction with Goldcorp
1/21/2016Kaminak Announces Executive Management Changes Zara Boldt Ap...
1/21/2016Kaminak Announces Executive Management Changes
9/28/2015Kaminak Announces C$22.5 Million Investment by Electrum Stra...
9/23/2015Kaminak Increases Grade, Oxide Ounces and Indicated Resource...
9/23/2015Kaminak Increases Grade, Oxide Ounces and Indicated Resource...
9/16/2015Kaminak Announces New, Northern Access Road Route to Coffee ...
9/16/2015Kaminak Announces New, Northern Access Road Route to Coffee ...
8/13/2015Kaminak Reports 2015 Infill Drill Results from Coffee Gold P...
8/13/2015Kaminak Reports 2015 Infill Drill Results from Coffee Gold P...
7/30/2015Kaminak Reports Up to 85% Gold Recovery from Transitional Mi...
3/12/2015Kaminak Announces $21 Million, 2015 Coffee Project Feasibili...
3/12/2015Kaminak Announces $21 Million, 2015 Coffee Project Feasibili...
3/11/2015Kaminak Announces Closing of $21 Million Bought Deal Private...
3/11/2015Kaminak Announces Closing of $21 Million Bought Deal Private...
2/26/2015Yukon Ranks 1st in Mineral Potential and 9th Overall in the ...
2/19/2015IIROC Trading Resumption - KAM
2/19/2015Kaminak Gold Corporation Announces C$21 Million Bought Deal ...
2/18/2015IIROC Trading Halt - KAM
2/5/2015Kaminak Reports Infill Drill Results from the Supremo Deposi...
1/27/2015Kaminak Reports Infill Drill Results and Announces New Gold ...
1/20/2015Kaminak Reports High-Grade Infill Drill Results from the Dou...
1/13/2015Kaminak Reports Infill Drill Results from the Coffee Latte D...
1/13/2015Reports Infill Drill Results from the Coffee Latte Deposit
11/24/2014Kaminak Changes Fiscal Year End
11/24/2014Kaminak Changes Fiscal Year End
10/28/2014Kaminak Drilling Expands Kona North Discovery at Coffee 3.12...
10/28/2014Kaminak Drilling Expands Kona North Discovery at Coffee: 3.1...
9/30/2014Kaminak Announces Coffee Gold Project Feasibility Program Up...
9/15/2014Kaminak Grants Stock Options
2/3/2014Mourns the Loss of Dr. Craig Finnigan
12/2/2013Validates Heap Leach Process at Coffee Gold Project; Oxide G...
11/7/2013’s Coffee Infill Drilling Program at Latte Deposit Demonstra...
9/24/2013Announces Closing of $2.8 Million Bought Deal Private Placem...
9/19/2013Initiates Comprehensive Metallurgical Testwork Program at Co...
8/8/2013Drilling Extends Near-Surface Oxide Gold Mineralization Alon...
7/9/2013Announces Closing of $5 Million Bought Deal Private Placemen...
5/31/2013Adopts Advance Notice Policy and Amends Employee Stock Optio...
5/8/2013Drilling Extends Supremo T2; Multiple Gold-Bearing Structure...
4/15/2013Coffee Gold Project Yields New Drill Discoveries and Adds Hi...
1/10/2013Files NI 43-101 Technical Report for Coffee Gold Project
10/11/2012Announces Closing of $12 Million Bought Deal Private Placeme...
9/17/2012Announces $10 Million Bought Deal Private Placement and Exte...
9/5/2012Extends Supremo T3 Zone at Depth and Drills New Gold Discove...
5/31/2012Announces Closing of $6 Million Bought Deal Private Placemen...
5/11/2012Announces $5 Million Bought Deal Private Placement Proceeds ...
3/19/2012Begins Coffee Drill Program
2/2/2012Scheduled to Begin Coffee Drill Program in March: Fully Fun...
12/7/2011Options Michigan Potash Properties
6/6/2011RC Drilling at Supremo Intersects Mineralization Across the ...
7/12/2010Announces An Increase To Over-Allotment Option Of Equity Fin...
7/7/2010Webcast Presentation
6/10/2010Step-Out Drilling Extends Latte and Supremo Zones Along Tren...
6/7/2010Makes Second Yukon Gold Discovery: Latte Zone Yields 1.08 g/...
2/8/2010Receives CDN $2.2 Million From Warrant Exercises
1/14/2010Exhibiting, Presenting and Sponsoring Yukon Events at Upcomi...
10/15/2009Kaminak’s Partner Completes Drilling on Cry Lake, British Co...
9/22/2009Stakes 210 Additional Claims in the Yukon’s White District B...
9/14/2009BCGold Corp. Amend Agreement on Voigtberg Au-Cu Project, Nor...
8/10/2009Commences Exploration Program on the TBN Platinum-Palladium ...
6/10/2009Expands Yukon Gold Work Program to Accommodate Drilling
6/5/2009Stakes Platinum-Palladium Targets in the Thunder Bay Area, N...
5/20/2009Stakes Additional Claims in the White Gold District, Yukon T...
1/21/2009Presents Educational Workshop and Exhibits at Upcoming Vanco...
10/1/2008Seeks Approval for Share Buy-Back Program Through Normal Cou...
7/4/2008Closes Spin-out of Kivalliq Energy Corporation and Sharehold...
6/27/2008Receives Shareholder and Court approval for spin-out of Kiva...
6/23/2008Proposes Timetable for Closing of Spin-out Transaction and A...
5/9/2008Formalizes Agreement on Angilak Property with Nunavut Tunnga...
4/3/2008Featured in Financial Post Business Magazine
3/20/2008 Completes Warrant Exercise and Provides Corporate Update
3/10/2008Exhibit at the Paul van Eeden Investing in 2008 Conference
2/21/2008 Shareholders to Receive Shares in New Uranium Spin-out call...
1/31/2008Signs Landmark Agreement with Nunavut Tunngavik Incorporated...
1/15/2008 Commences Airborne Geophysical Surveys on Quebec Nickel Pro...
11/22/2007 Confirms copper-uranium-silver mineralization along the BOG...
11/15/2007Management Increases Share Position
11/5/2007Reports New Gold-Rich Surface Samples from Its YAT Copper-Ur...
10/3/2007Investment Workshop - Evaluating a Mineral Exploration Compa...
9/17/2007Partners Commence Exploration Programs on Three Separate Gol...
8/22/2007Options Needle Gold Property to TerraX Resource Corp.
7/18/2007Options SY Gold Property to Corsa Capital Ltd. and Signs Exp...
7/5/2007Begins Exploration Programs on Washburn and Yathkyed Project...
5/4/2006to receive up to $5,000,000 of additional geological data se...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (KAM.V)OTHER OTC (KMKGF)
2.69-1.47%2.07-1.43%
TSX-V
CA$ 2.69
07/19 15:53 -0.040
-1.47%
Prev close Open
2.73 2.72
Low High
2.69 2.74
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  2.69 -%
Volume 1 month var.
258,453 -%
24hGold TrendPower© : 18
Produces
Develops
Explores for Antimony - Copper - Diamonds - Gold - Lead - Molybdenum - Nickel - Palladium - Platinum - Silver - Uranium - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/4/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :