Lake Shore Gold Corporation

Published : January 27th, 2015

Lake Shore Gold Triples Minimum Strike Length of 144 Gap Zone Mineralization

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Lake Shore Gold Triples Minimum Strike Length of 144 Gap Zone Mineralization

TORONTO, ONTARIO--(Marketwired - Jan 27, 2015) -

  • Minimum dimensions of 144 Gap Zone extended to 350 m along strike and 350 m down dip with mineralization hosted in both wide bulk and narrow high-grade structures

  • Drilling to northeast extends mineralization 200 m to within 500 m of Thunder Creek Deposit (Key intercepts: 3.68 gpt over 18.0 m, including 5.27 gpt over 9.0 m, 3.80 gpt over 12.0 m, including 7.26 gpt over 4.8 m, 100.00 gpt over 0.40 m, 5.76 gpt over 4.1 m, 7.22 gpt over 3.0 m, 6.48 gpt over 2.0 and 5.11 gpt over 3.0 m)

  • Drilling near discovery hole Hwy-14-48 extends mineralization by at least 100 m down dip and 50 m to northeast and southwest, (Key intercepts: 6.56 gpt over 12.4 m, including 12.17 gpt over 5.0 m, 7.6 gpt over 11.2 m, 3.19 gpt over 25.8 m, including 5.71 gpt over 6.9 m, 6.66 gpt over 9.4 m, 7.05 gpt over 5.2m, 5.89 gpt over 6.7 m, 4.06 gpt over 15.0 m, 4.06 gpt over 10.9 m and 591 gpt over 0.5 m)

  • Six surface drills on site, 90,000 m of drilling planned in 2015

  • Exploration drift to support underground drill platforms advanced 50 m towards new zone, underground drilling to commence by mid-year with minimum 30,000 m planned in 2015.

Lake Shore Gold Corp. (LSG.TO)(NYSE MKT:LSG) ("Lake Shore Gold" or the "Company") today announced results from an additional 20 drill holes and one wedge hole (23,598 metres) at the Company's 144 Exploration Area ("144"). 144 is located immediately southwest of the Timmins West Mine Thunder Creek Deposit and covers about 4.0 kilometres of the same volcanic/ultramafic, intrusive/sedimentary contact (the "TC-144 Trend") that hosts both Thunder Creek and Timmins Deposit. The current drill program, launched in August, is largely focused on the area immediately adjacent to Thunder Creek (the "144 Gap"), where a new discovery was announced in October 2014.

Tony Makuch, President and CEO of Lake Shore Gold, commented: "The results being announced today are very exciting as they significantly expand the size of the 144 Gap Zone and position the Zone much closer to Thunder Creek than previously identified. Everything we have seen to date supports our view that the 144 Gap has the potential to add considerable new resources and introduce an important new component to our production profile. With six drills working on surface, our exploration drift advancing towards completion during the third quarter, and underground drilling expected to commence by mid-year, we expect to generate significant information and news flow about the 144 Gap Zone in 2015. Our target remains to establish an initial resource at the 144 Gap Zone for the end of the year."

Two holes (Hwy-14-63 and Hwy-14-70) were drilled to test the strike extension of the 144 Gap Zone approximately 200 m east of the previous east limit for the Zone and 500 m west of mine infrastructure at the Thunder Creek Deposit. Hwy-14-70 intersected the structure approximately 810 m below surface and close to the planned elevation for the new exploration drift. Among the results from this hole were 3.80 grams per tonne ("gpt") over 12.0 metres ("m"), including 7.26 gpt over 4.8 m, 6.66 gpt over 1.9 m and 3.68 gpt over 18.0 m, including 5.27 gpt over 9.0 m. Hwy-14-63 intercepted the structure approximately 150 m below Hwy-14-70 with results of 100 gpt over 0.4 m, 5.76 gpt over 4.1 m, 7.22 gpt over 3.0 m, 6.48 gpt over 2.0 m and 5.11 gpt over 3.0 m.

Nine holes and one wedge hole (Hwy-14-57, 58, 59, 65, 65W1, 71, 72, 73, 74 and 75) were drilled within, and immediately surrounding, the dimensions of the 144 Gap Zone reviewed in the Company's press release entitled, "Drilling at 144 Property Intersects Additional Wide, High-Grade Mineralization at New 144 Gap Zone," issued on November 13, 2014.

Holes Hwy-14-58, 65, 65W1 were drilled below the 144 Gap Zone and extended mineralization by approximately 100 m to depth. Among key intercepts were 6.56 gpt over 12.0 m, including 12.17 gpt over 5.0 m, 5.27 gpt over 1.6 m, 5.58 gpt over 6.0 m and 5.73 gpt over 4.3 m in Hwy-14-65 and 6.07 gpt over 2.9 m, 10.29 gpt over 2.0 m, 6.01 gpt over 3.9 m, 19.65 gpt over 2.0 m, 7.6 gpt over 11.2 m and 10.24 gpt over 1.9 m in Hwy-14-65W1.

Holes Hwy-14-57, 59, 72, 73, 74 and 75 were drilled in the east portion of 144 Gap Zone and expanded the limits by 50 m to the northeast. Key intercepts from these holes were 4.06 gpt over 15.0 m in Hwy-14-59, 4.71 gpt over 6.10m and 5.89 gpt over 6.70m in Hwy-14-72, 6.66 gpt over 9.4 m, 19.15 gpt over 2.2 m, including 102.5 gpt over 0.4 m in Hwy-14-73, 4.06 gpt over 10.9 m, 7.05 gpt over 5.2 m and 5.07 gpt over 3.0 m in Hwy-14-74 and 5.25 gpt over 6.6 m, 7.37 gpt over 2.5 m, and 157.04 gpt over 1.9, including 591 gpt over 0.5 m, in Hwy-14-75.

Hwy-14-71 was drilled near the previous west limit of the 144 Gap Zone and intersected 3.19 gpt over 25.8 m, including 5.71 gpt over 6.9 m. The results of this new hole extend the limits of the 144 Gap Zone by 50 m to the west.

The remaining eight holes were drilled mainly as widely spaced step outs to evaluate the extension of mineralization to depth with most encountering thick intervals of porphyry and local high-grade values which confirmed the extension of the mineralized system to depth.

Recent interpretations continue to suggest that the mineralization at 144 Gap is contained within a broad zone of hydrothermal alteration and deformation measuring up to 100 m wide and closely associated with syenite intrusions, quartz veining, pyrite, scheelite and/or galena and multiple occurrences of visible gold. The new results identify the 144 Gap Zone over minimum dimensions of 350 metres along strike and 350 metres down dip with mineralization contained in a combination of wide bulk and narrow high-grade structures.

Qualified Person

The Qualified Person ("QP") for Lake Shore Gold's drill program at the 144 is Eric Kallio, Senior Vice-President Exploration, P.Geo. Mr. Kallio, as a QP, has prepared or supervised the preparation of the scientific or technical information for the property and verified the data disclosed in this press release. Mr. Kallio is an employee of Lake Shore Gold.

Quality Control

Lake Shore Gold has implemented a quality-control program to ensure best practice in the sampling and analysis of the drill core. Assays have been completed using a standard fire assay with a 30-gram aliquot. For samples that return a value greater than 10 grams per tonne gold, the sample is fire assayed with a gravimetric finish. Select zones with visible gold are tested by pulp metallic analysis. NQ size drill core is saw cut and half the drill core is sampled in standard intervals. The remaining half of the core is stored in a secure location. The drill core is transported in security sealed bags for preparation at ALS Minerals Preparation facility located either in Sudbury, ON, or to Val d'Or Quebec and the pulps are subsequently shipped to the ALS Minerals assay laboratory facility in Val d'Or, Quebec (or rarely in North Vancouver, B.C for fire assay. These ALS Minerals facilities are all registered ISO 9001-2008 (CERT-0051527). The Val d'Or assay laboratory is SCC ISO/IEC 17025:2005 Accredited (#689) and the North Vancouver, BC assay laboratory is also SCC ISO/IEC 17025:2005 Accredited (#579).

About Lake Shore Gold

Lake Shore Gold is a Canadian-based gold producer with operations based in the Timmins Gold Camp of Northern Ontario. The Company produces gold from two mines, Timmins West and Bell Creek, with material being delivered for processing to the Bell Creek Mill. In addition to current mining and milling operations, the Company also has a number of highly prospective projects and exploration targets, all located in and around the Timmins Camp. The Company's common shares trade on the TSX and NYSE MKT under the symbol LSG.

FORWARD-LOOKING STATEMENTS

Certain statements in this press release relating to the Company's expected production levels, production growth, exploration activities, potential for increasing resources, project expenditures and business plans are "forward-looking statements" or "forward-looking information" within the meaning of certain securities laws, including under the provisions of Canadian provincial securities laws and under the United States Private Securities Litigation Reform Act of 1995 and are referred to herein as "forward-looking statements." The Company does not intend, and does not assume any obligation, to update these forward-looking statements. These forward-looking statements represent management's best judgment based on current facts and assumptions that management considers reasonable, including that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts, labour disturbances, interruption in transportation or utilities, or adverse weather conditions, that there are no material unanticipated variations in budgeted costs, that contractors will complete projects according to schedule, and that actual mineralization on properties will be consistent with models and will not be less than identified mineral reserves. The Company makes no representation that reasonable business people in possession of the same information would reach the same conclusions. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. In particular, delays in development or mining and fluctuations in the price of gold or in currency markets could prevent the Company from achieving its targets. Readers should not place undue reliance on forward-looking statements. More information about risks and uncertainties affecting the Company and its business is available in the Company's most recent Annual Information Form and other regulatory filings with the Canadian Securities Administrators, which are posted on sedar at www.sedar.com, or the Company's most recent Annual Report on Form 40-F and other regulatory filings with the Securities and Exchange Commission.

Table 1: List of Significant Composite Intervals From New Drilling
Highway 144 Project - Significant Assay Results
Hole Depth From To Interval Grade Comments
Number (m) (m) (m) (m) (gpt)
HWY-14-57 1386
934.40 943.00 8.60 3.01
1029.80 1035.00 5.20 2.81
incl. 1032.00 1034.00 2.00 4.65
HWY-14-59 1382
926.00 941.00 15.00 4.06
incl. 936.90 937.30 0.40 22.80 VG
HWY-14-62 1206
1013.60 1015.30 1.70 5.90
incl. 1015.00 1015.30 0.30 19.10
1042.50 1044.00 1.50 5.30
incl. 1042.50 1042.80 0.30 25.50
HWY-14-63 1480
974.00 976.00 2.00 20.02
incl. 975.00 975.40 0.40 100.00 fine seam of VG in MV flows
1091.00 1095.10 4.10 5.76 VG
incl. 1091.00 1094.00 3.00 7.22
1102.00 1104.00 2.00 6.48
1157.00 1160.00 3.00 5.11 VG
incl. 1158.40 1158.70 0.30 24.40 VG
HWY-14-65 1088
978.00 990.40 12.40 6.56 local VG
incl. 978.00 983.00 5.00 12.17
998.90 1000.50 1.60 5.27
1004.00 1010.00 6.00 5.58
incl. 1006.00 1007.00 1.00 23.30
1040.70 1045.00 4.30 5.73
incl. 1042.30 1042.80 0.50 23.60
1065.00 1067.50 2.50 4.78 VG
Hole Depth From To Interval Grade Comments
Number (m) (m) (m) (m) (gpt)
HWY-14-65W1 1225
968.30 971.20 2.90 6.07
978.00 980.00 2.00 10.29
incl. 978.90 979.20 0.30 61.70 VG
983.00 987.00 4.00 2.96
1009.40 1013.30 3.90 6.01
incl. 1009.90 1010.20 0.30 60.70 VG
1033.00 1035.00 2.00 19.65
1046.80 1058.00 11.20 7.60
incl. 1049.70 1050.60 0.90 66.20 VG
1069.00 1074.00 5.00 3.02
1080.00 1081.90 1.90 10.24
incl. 1080.50 1081.20 0.70 27.60
HWY-14-67 1082
933.50 935.90 2.40 4.53
incl. 934.90 935.90 1.00 7.62
1049.40 1050.30 0.90 3.85
HWY-14-68 1133
964.30 968.60 4.30 2.22
982.00 983.50 1.50 3.05
992.30 994.00 1.70 3.16
HWY-14-69 1113
970.50 973.40 2.90 3.78
incl. 972.50 973.40 0.90 8.69
1021.00 1022.60 1.60 2.83
incl. 1022.00 1022.60 0.60 7.36
HWY-14-70 1252
906.00 918.00 12.00 3.80
incl. 906.00 910.80 4.80 7.26
which incl. 906.50 907.00 0.50 25.00 VG
963.30 965.00 1.70 3.77
1002.00 1003.90 1.90 6.66
1030.00 1048.00 18.00 3.68
incl. 1030.00 1039.00 9.00 5.27
which incl. 1032.30 1033.00 0.70 32.80 VG
Hole Depth From To Interval Grade Comments
Number (m) (m) (m) (m) (gpt)
HWY-15-71 1224
994.70 1020.50 25.80 3.19
incl. 1010.60 1017.50 6.90 5.71
which incl. 1011.50 1012.00 0.50 27.90 VG
and incl. 1017.00 1017.50 0.50 27.40 VG
HWY-15-72 1149
986.20 992.30 6.10 4.71
1038.00 1044.70 6.70 5.89
incl. 1044.00 1044.70 0.70 39.00 VG
HWY-15-73 1152
956.20 957.90 1.70 5.51
964.20 973.60 9.40 6.66
incl. 965.20 967.20 2.00 23.05
1009.00 1011.20 2.20 19.15
incl. 1009.00 1009.40 0.40 102.50 VG
1020.20 1022.60 2.40 3.02
1141.90 1143.50 1.60 3.69
incl. 1142.40 1142.70 0.30 18.10 VG
HWY-15-74 1144
956.70 967.60 10.90 4.06 VG
1000.40 1005.60 5.20 7.05
incl. 1003.40 1005.60 2.20 12.60
1094.90 1097.90 3.00 5.07
HWY-15-75 1074
804.20 805.80 1.60 3.83
824.60 831.20 6.60 5.35
incl. 828.50 829.00 0.50 34.40
905.20 907.70 2.50 7.37
incl. 905.20 905.70 0.50 30.20 fine VG
917.50 919.40 1.90 157.04
incl. 917.80 918.30 0.50 591.00 fine VG
Notes:
1) Holes HWY-14-58, HWY-14-60, HWY-14-61, HWY-14-64, and HWY-14-66, returned lower grade assay values.
2) Hole HWY-14-61A was terminated prior to target due to excessive deviation.
3) Assays are reported uncut.
4) True widths are not reported at this time.

To view Figure 1: 144 Geology Plan – Location of New Drill Holes - http://media3.marketwire.com/docs/Figure1LSG.pdf

To view Figure 2: Cross Section – 144 Gap Geology Map - http://media3.marketwire.com/docs/Figure2_LSG.pdf

To view Figure 3: 3D Visual 144 Gap Zone (Looking Northwest) - http://media3.marketwire.com/docs/Figure3LSG.pdf

Read the rest of the article at finance.yahoo.com

Lake Shore Gold Corporation

PRODUCER
CODE : LSG.TO
ISIN : CA5107281084
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Lake Shore Gold is a gold producing company based in Canada.

Lake Shore Gold holds various exploration projects in Canada.

Its main asset in production is TIMMINS MINE in Canada and its main exploration properties are BELL CREEK, BLAKELOOK, THORNE, THUNDER CREEK, WEST TIMMINS and BAND ORE in Canada and LA BUFA, UNIVERSO, MONTAÑA DE ORO and LLUVIA DE ORO in Mexico.

Lake Shore Gold is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 956.5 millions as of today (US$ 734.7 millions, € 646.6 millions).

Its stock quote reached its lowest recent point on February 01, 2002 at CA$ 0.02, and its highest recent level on March 11, 2011 at CA$ 4.42.

Lake Shore Gold has 463 220 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Lake Shore Gold Corporation
2/28/2011Completes US$50 Million Corporate Revolving Credit Facility
7/28/2010Signs Term Sheet for Corporate Revolving Credit Facility of ...
2/16/2010Closing of Second Tranche of Flow-Through Financing
12/31/2009Announces Closing of First Tranche of Flow-Through Financing
12/4/2009Announces Closing of Private Placement Financing
2/19/2008 Announces Private Placement of $64.5 Million at 30% Premium...
Nominations of Lake Shore Gold Corporation
11/6/2013Lake Shore Gold Appoints Diane Francis to Board of Directors
3/19/2013Lake Shore Gold Announces Appointment of Philip C. Yee as Vi...
5/30/2008Announces Management Appointments
2/27/2007Appoints Hannu Virtanen as VP, Project Development
Financials of Lake Shore Gold Corporation
12/3/2013Lake Shore Gold Produces 16,700 Ounces in November, Company ...
11/6/2013Lake Shore Gold Reports Lower Costs, Improved Grades and Hig...
6/24/2013Lake Shore Gold Reports Improving Operating Performance, Com...
5/15/2013Lake Shore Gold Reports First Quarter 2013 Results
8/9/2012Lake Shore Gold Reports Strong Second Quarter Results
1/12/2012Reports 2011 Operating Results, Pours 26,550 Ounces in Fourt...
8/10/2011Announces Second Quarter 201 =?ISO-8859-1?Q?1=20Financial=20...
5/26/2011Announces First Quarter 2011 =?ISO-8859-1?Q?=20Results,=20In...
5/4/2011Announces First Quarter 2011 =?ISO-8859-1?Q?=20Production=20...
8/11/2010Continued Progress During Second Quarter 2010
5/15/2008Announces First Quarter 2008 Results
Project news of Lake Shore Gold Corporation
12/10/2013Lake Shore Gold Increases 2014 Production Guidance
3/19/2013Lake Shore Gold Reports Solid Progress in 2012, Company Near...
1/30/2013Lake Shore Gold Reaches Agreement to Sell Mexican Properties...
1/21/2013(Thunder Creek)Lake Shore Gold Discovers New Mineralization 850 Metres Sout...
7/26/2012Lake Shore Gold and Revolution Resources Amend Option Agreem...
6/14/2012Lake Shore Gold Completes Credit Facility Agreement for Up t...
6/7/2012Lake Shore Gold Announces Significant Extension of High-Grad...
5/28/2012Lake Shore Gold Resumes Mining Operations at Timmins West Mi...
4/12/2012Lake Shore Gold Enters Agreement for Credit Facility of Up t...
4/4/2012Lake Shore Gold Provides Update on Incident at Timmins West ...
4/3/2012Lake Shore Gold Corp. Reports on Incident at Timmins West Mi...
3/31/2012Lake Shore Gold Files Technical Report for Timmins West Mine
2/22/2012Lake Shore Gold Announces Large Increase in Resources at Gol...
10/14/2011(Timmins Mine)Reports Higher Commercial Production from Timmins Mine in Th...
8/22/2011Completes Acquisition of Fen =?ISO-8859-1?Q?n-Gib=20Project=...
8/16/2011(Bell Creek)Reports 400 Metre Extension of Gold Mineralization at Bell C...
6/30/2011(Band Ore)en Share Mining Corporation Acquires Band Ore Gold Property ...
5/5/2011to Acquire Fenn-Gib Project from Barrick Gold in Exchange fo...
5/2/2011Announces New Resources at =?ISO-8859-1?Q?=20Marlhill=20and=...
3/29/2011(Band Ore)to Acquire 19% of Golden Share Through Sale of 100% Interest
2/28/2011(Timmins Mine)Lake Shore Gold Discovers Significant New Gold Zone at 144 P...
2/24/2011(Timmins Mine)Intersects Wide, High-Grade Mineralization at Timmins Mine, ...
1/25/2011(Timmins Mine)Lake Shore Gold to Nearly Triple Gold Production in 2011
1/25/2011(Thunder Creek)Confirms Broad Mineralized Envelope With High-Grade Sections...
1/6/2011(Timmins Mine)Declares Commercial Production =?ISO-8859-1?Q?=20at=20Timmin...
12/1/2010(Bell Creek)Announces Initial Resource a Bell Creek Mine, Large Deposit ...
6/29/2010(Thunder Creek)Ramp Reaches & Intersects High-Grade Gold Mineralization
6/23/2010Intersects High-Grade Mineralization at Thorne...
5/4/2010(West Timmins)Advances Third Major Gold Target
4/1/2010(Ti-pa-haa-kaa-ning (tpk))Agrees to Sell 50% Interest in Ti-pa-haa-kaa-ning Gold Prope...
2/18/2010(Timmins Mine)Major Extensions to Timmins Mine Mineralization, Thunder Cre...
2/17/2010(Timmins Mine)Reports Results of Underground Exploration at 650-Level Test...
2/17/2010(Casa Berardi)Extends Casa Berardi "G Zone"
1/26/2010(Thunder Creek)Extends Thunder Creek to Depth, Confirms High-Grade Core and...
1/18/2010(Bell Creek)Continues to Define and Extend Large New Gold System at Bell...
11/6/2009(Bell Creek)Confirms Presence of Large New Gold System
10/29/2009(Timmins Mine)Results of Underground Drilling and Development at Timmins M...
10/7/2009Releases Updated National Instrument 43-101 Report for Timmi...
10/1/2009(Bell Creek)Reports Extension to High grade mineralization at Bell Creek
8/25/2009(Thunder Creek)Continues to Establish Large Gold System at Thunder Creek
8/24/2009Reports High-Grade Intercepts From Underground Drilling at T...
7/21/2009(Bell Creek)Discovers Substantial New High-Grade Extension at Bell Creek
7/7/2009(Bell Creek)Confirms Deep Extensions of Gold Mineralization at Bell Cree...
12/16/2008Significantly Extends Rusk Zone and Announces New High-Grade...
12/10/2008(Bell Creek)Significantly Extends Bell Creek Mineralization
7/10/2008(Bell Creek)Intersects New Gold Zone and Extends Mineralization at Bell ...
3/31/2008(Thunder Creek)Intersects 8.57 Grams Gold Per Tonne Over 9.00 Metres at the...
Corporate news of Lake Shore Gold Corporation
7/28/2016Lake Shore Bancorp posts 2Q profit
4/27/2016Lake Shore Bancorp posts 1Q profit
4/1/2016Tahoe Resources Inc. and Lake Shore Gold Corp. Complete Busi...
3/31/2016Lake Shore Gold Announces Shareholder Approval of Plan of Ar...
3/31/2016Lake Shore Gold Announces Filing of Annual Information Form ...
2/24/2016Lake Shore Gold reports 4Q loss
1/19/2016Lake Shore Gold Reports Strong 2015 Operating Cost Performan...
1/8/2016Lake Shore Gold Reports Full Year and Fourth Quarter 2015 Pr...
1/7/2016Lake Shore Gold (LSG) Jumps: Stock surges 10.1%
12/14/2015Is Oriental Financial Group Inc. (OFG) A Good Stock To Buy?
11/27/2015Lake Shore Gold Corp Ordinary Shares (Canada) (LSG): Are Hed...
10/29/2015Lake Shore Gold posts 3Q loss
10/16/2015Lake Shore Gold Announces Details of Nine Month and Third Qu...
10/14/2015Lake Shore Gold Produces 136,200 Ounces in First Nine Months...
9/18/2015Lake Shore Gold Completes Acquisition of Temex Resources Cor...
9/16/2015Lake Shore Gold Reports High-Grade Intersections From Initia...
9/14/2015Temex Shareholders Overwhelmingly Approve Arrangement Agreem...
8/14/2015Lake Shore Gold Acquires Additional Equity Interest in IDM M...
8/4/2015Lake Shore Gold Acquires Significant Equity Interest in IDM ...
7/31/2015Lake Shore Gold Enters Into Arrangement Agreement With Temex...
7/30/2015Lake Shore Gold posts 2Q profit
7/30/2015Lake Shore Gold Reports First Half and Second Quarter 2015 F...
7/28/2015Lake Shore Bancorp posts 2Q profit
7/17/2015Lake Shore Gold Announces Details of First Half and Second Q...
7/16/2015Lake Shore Gold Proposes to Acquire Temex Resources Corporat...
7/14/2015Lake Shore Gold Announces First Half and Second Quarter 2015...
7/8/2015Lake Shore Gold Produces 95,600 Ounces in First Half of 2015...
6/25/2015IIROC Trade Resumption - LSG
4/27/2015Lake Shore Gold Continues to Intersect Significant Gold Mine...
4/8/2015Lake Shore Gold Announces Details of Annual General Meeting ...
3/26/2015Lake Shore Gold posts 4Q loss
3/16/2015Lake Shore Gold Announces Details of Year-End and Fourth Qua...
3/14/2015Lake Shore Gold Announces 29% Increase in Ore Reserves
3/13/2015Lake Shore Gold Announces Details of Year-End and Fourth Qua...
3/3/2015Lake Shore Gold Identifies Thick, High-Grade Core of Gold Mi...
1/24/2014Lake Shore Gold's Preliminary 2013 Operating Cost Per Ounce ...
1/7/2014Lake Shore Gold Achieves Record Production of 134,600 Ounces...
12/16/2013Lake Shore Gold Extends Maturity of Standby Line of Credit a...
10/24/2013Announces Details of Third Quarter 2013 Conference Call and ...
10/9/2013Lake Shore Gold Reports Solid Third Quarter 2013 Operating R...
8/13/2013Lake Shore Gold Reports Record Production and Lower Operatin...
7/29/2013Announces Details of Second Quarter 2013 Conference Call and...
7/5/2013Lake Shore Gold Reports Record Production in Second Quarter ...
5/16/2013Lake Shore Gold Announces Results of Shareholders' Meeting
5/10/2013Lake Shore Gold Announces Amendments to Shareholder Meeting ...
5/9/2013Lake Shore Gold Completes Sale of Mexican Portfolio to Revol...
5/7/2013Announces Details of First Quarter 2013 Conference Call and ...
4/22/2013Lake Shore Gold to Hold Annual Meeting in Toronto on May 15,...
4/8/2013Lake Shore Gold Reports First Quarter 2013 Production of 23,...
3/28/2013(Bell Creek)Lake Shore Gold Files Bell Creek Mine Reserve Technical Repo...
3/12/2013Announces Details of Full Year and Fourth Quarter 2012 Confe...
2/25/2013Lake Shore Gold to Reduce Carrying Value of Assets
2/6/2013Lake Shore Gold Announces Management Change
2/1/2013Lake Shore Gold to Draw $35 Million Standby Line of Credit
1/28/2013Lake Shore Gold Announces Launch of Investor Webinar Series
1/11/2013Lake Shore Gold Announces Adoption of Corporate Governance M...
1/10/2013Achieves 2012 Production Target, Company Poised for Sharply ...
12/11/2012on Track for Strong Finish to 2012, Processing Capacity Incr...
11/8/2012Lake Shore Gold Reports Third Quarter 2012 Results, Company ...
10/25/2012Announces Details of Third Quarter 2012 Conference Call and ...
10/10/2012Lake Shore Gold Reports Third Quarter 2012 Production of 20,...
9/18/2012Announces Exercise of Underwriters' Over-Allotment Option fo...
9/11/2012Lake Shore Gold Announces Management Change
9/7/2012Completes C$90 Million Convertible Senior Unsecured Debentur...
8/16/2012Announces C$75 Million Convertible Senior Unsecured Debentur...
8/10/2012GoldPennyStars.com Profiles Alerted Penny Gold and Metals St...
7/13/2012Announces Details of Second Quarter 2012 Conference Call and...
7/4/2012Reports Strong Second Quarter Production of 24,426 Ounces of...
6/13/2012Lake Shore Gold Forecasts 2012 Cost Savings While Remaining ...
5/25/2012Lake Shore Gold Reports Smoke from Forest Fire Results in Pr...
5/18/2012Files Timmins West Mine Reserve Technical Report
5/10/2012Exceeds Targets and Achieves Continued Operating Improvement...
5/1/2012Lake Shore Gold Reports Significant New Drill Intercepts at ...
5/1/2012Reports Significant New Drill Intercepts at Fenn-Gib Open-Pi...
4/5/2012Lake Shore Gold announces filing of Gold River Trend Technic...
4/5/2012Lake Shore Gold Announces First Quarter 2012 Operating Resul...
4/2/2012Lake Shore Gold Announces Reserve Estimate for Timmins West ...
3/30/2012(Bell Creek)Lake Shore Gold Announces Large Increase in Measured and Ind...
3/26/2012Lake Shore Gold Announces Fourth Quarter and Full-Year 2011 ...
3/23/2012Announces Details of Fourth Quarter and Full-Year 2011 Confe...
3/8/2012Lake Shore Gold and Franco-Nevada Complete $50 Million Royal...
2/28/2012Lake Shore Gold Announces Results of Preliminary Economic As...
2/28/2012Announces Results of Preliminary Economic Assessment for Tim...
2/15/2012Lake Shore Gold Confirms Large-Scale Resource for Timmins We...
2/8/2012and Franco-Nevada Enter Agreement for $50 Million Royalty an...
1/17/2012(Thorne)Lake Shore Gold Announces New Extension at Thorne Property, ...
1/4/2012Lake Shore Gold Announces Filing of Fenn-Gib Technical Repor...
12/29/2011(Thunder Creek)Announces Filing of Thunder Creek Technical Report
12/14/2011Signs Formal Agreement for Option on Company's Mexican Explo...
11/28/2011Completes Sale of Land to Golden Share Mining for Significan...
9/15/2011Enters Into Letter Agreement for Option on Company's Mexican...
8/30/2011Reports Extensions of Gold Mineralization Along Strike and t...
8/5/2011Announces Details of Second Quarter 2011 Conference Call and...
7/29/2011U=2ES=2E Listing on NYSE A =?ISO-8859-1?Q?mex=20Approved,=20...
7/26/2011Continues to Define and Ex =?ISO-8859-1?Q?tend=20Mineralizat...
7/19/2011Releases Production Resultsfor Second Quarter and First Six-...
6/16/2011Reports Wide, High-Grade Intercepts from Near-Surface Drilli...
6/8/2011Announces Management Appointme =?ISO-8859-1?Q?nts,=20Creates...
3/14/2011Lake Shore Gold Achieves Major Milestones in 2010, on Track ...
2/1/2011Increases Interest in Northern Superior Resources Inc.
7/22/2010Confirms & Expands Mineral
5/27/2010Completes Sale of 50% Interest in Ti-pa-haa-kaa-ning JV
5/12/2010Changes to Board of Directors
5/5/2010Announces Continued Progress
4/27/2010Expands Resource Potential at Timmins Mine
3/11/20102009 Year End Results
12/17/2009Completes Acquisition of "Bell Creek West" Properties
12/15/2009Announces Management Changes
12/15/2009Added to S&P/TSX Composite Index
11/24/2009Announces Changes to Board of Directors
11/6/2009and West Timmins Mining Complete Business Combination
8/27/2009and West Timmins Agree to Business Combination
8/6/2009Advances Projects on Schedule and Budget and Achieves Explor...
6/24/2009Reports 12.75 Grams Per Tonne Over 83.40 Metres at Thunder C...
5/16/2008Announces Approval of Special Resolutions at Annual and Spec...
5/5/2008Comments on May 15, 2008 Shareholder Vote
4/16/2008Announces Revised Agreement With Hochschild Mining; Second P...
4/16/2008 Announces Management Changes
3/28/2008Announces 2007 Year End Results and Provides 2008 Outlook
3/24/2008Announces Management Changes
3/18/2008Announces Annual Meeting and Revised Date for Special Meetin...
2/25/2008 Completes Financing and Enters Into Strategic Alliance With...
7/17/2007Commences Drilling at Blakelock and Expands its Property Pos...
4/23/2007Completes Due Diligence on Bell Creek Acquisition
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (LSG.TO)Other OTC (LSGGF)
2.07+4.29%2.29-0.87%
TORONTO
CA$ 2.07
04/07 15:32 0.090
4.29%
Prev close Open
1.92 2.01
Low High
2.00 2.07
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  2.07 -0.481%
Volume 1 month var.
10,132,648 -0.481%
24hGold TrendPower© : 41
Produces Gold
Develops
Explores for Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/19/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.22+1.63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48-1.59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.84-1.31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.85-2.63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.83+0.78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :