ASX/Media Release
For Immediate Release - 24 December 2014
Lofin-2 drilling on-schedule, continued strong production
performance from the Oseil field
Highlights
Lofin-2 appraisal well has run and cemented 13-3/8 inch casing
Oseil Field continues to produce at over 3000 bopd, well ahead of forecast
Crude oil lifting of approximately 300,000 bbl scheduled for 26-27
December 2014
Lion Energy Limited (ASX "LIO") is pleased to announce the Lofin-2 appraisal well has reached 2295m MD and 13-3/8 inch casing has been run and cemented. The well, which was spudded on 31 October 2014, has a planned total depth of 5425m MD. Lofin-2 is located in the Seram (Non-Bula) PSC in Eastern Indonesia with Lion holding a 2.5% interest.
The well, operated by CITIC Seram Energy Ltd, has progressed smoothly to date and is on-schedule. The forward program is to drill 12-1/4 inch hole to approximately 3657m MD, at which point 9-5/8 inch casing will be set, prior to drilling ahead in 8-1/2 inch hole with the top of the primary objective, the Manusela Formation, expected at approximately 4514m MD. This objective section is forecast to be penetrated in early-February 2015.
Kim Morrison, Lion's CEO noted; "We are pleased with progress on this exciting appraisal well testing the large Lofin structure. The Lofin-1ST discovery well, drilled in 2012,
encountered a 160m hydrocarbon column in the Manusela carbonate objective without intersecting the water contact. Lofin-2 is designed to delineate the full extent of the hydrocarbon interval and has the potential to prove a material discovery for Lion."
Crude Oil Lifting: A final crude oil lifting for calendar year 2014 is scheduled for
26-27 December 2014, with an expected cargo of approximately 300,000bbl of crude oil. This will bring the calendar year 2014 lifting total to approximately
1,000,000 bbl. Lion has a 2.5% equity interest
Production: Average production to 30 November 2014 was 2838bopd, some
14% above Lion's internal forecast average for the calendar year of 2500 bopd.
Lion at a glance
x Transforming from a small Indonesian conventional oil and gas player to an Indonesian unconventional oil and gas pioneer.
x Leveraging synergies in conventional assets and access to both infrastructure and markets.
x New executive team and strategic investors with impressive track records for value creation in Indonesia.
x Well-funded to execute the 2014 business plan.
Contact
Lion Energy Limited
ABN 51 000 753 640
ASX Code: LIO
Ground Floor, 15 Rheola Street
West Perth
WA 6005, Australia
Post Box 512
West Perth Business Centre
WA 6872, Australia
Tel +61 8 9211 1500 | Fax +61 8 9211 1501 [email protected] www.lionenergy.com.au
Directors & Officers Russell Brimage Executive Chairman Kim Morrison Chief Executive Officer Stuart B Smith Executive Director Tom Soulsby Non-Executive Director Chris Newton Non-Executive Director Zane Lewis Company Secretary
For more information contact
Kim Morrison
+61 404 490 964 [email protected] Stuart Smith
+65 9820 3889
[email protected]
Zane Lewis
+61 400 007 900 [email protected]
A New Approach to Asian Energy Page 1 of 3
ASX/Media Release
For Immediate Release - 24 December 2014
Lofin Structure Overview and Resource Estimates
The Lofin Prospect is a thrust fold, four-way dip anticline, located 70 km to the west of the producing Oseil oilfield. The structure is approximately 4 km wide and 9 km in length with mapped vertical closure in excess of 790m.
The Lofin-1ST discovery well reached a total depth of
4427m MD and intersected 160m of the Manusela carbonate reservoir. After acidizing, the well flowed 15.7 mmscfgd of gas and 171 bopd of 36.1° API oil or condensate, with a flowing wellhead pressure of 4750 psi
Lofin-2 is a vertical well with planned total depth of approximately 5425m (17,800 feet) MD to fully penetrate the potential hydrocarbon column.
Resource estimates for the Lofin Prospect are set out below. Contingent resources are calculated for the section penetrated by Lofin-1ST. Prospective resources are calculated for the section below the Lofin-1ST TD with an oil and associated solution gas case shown.
Lofin Structure - Schematic Cross-section
LOFIN PROSPECT - RESOURCES
|
Gross (100%) PSC
|
Lion Net Working Interest7
|
(Manusela Formation)
|
(P90)
|
(P50)
|
(P10)
|
(P90)
|
(P50)
|
(P10)
|
ContingentResources1,2
|
1C
|
2C
|
3C
|
1C
|
2C
|
3C
|
Cond (mmbbl)
|
0.14
|
0.26
|
0.45
|
0.004
|
0.007
|
0.011
|
Gas (bcf)
|
13.9
|
25.8
|
45.6
|
0.348
|
0.645
|
1.14
|
Total Contingent Resources (mmboe)5,6
|
2.46
|
4.56
|
8.04
|
0.062
|
0.114
|
0.201
|
Prospective Resources3,4
|
Low
(P90)
|
Best
(P50)
|
High
(P10)
|
Low
(P90)
|
Best
(P50)
|
High
(P10)
|
Oil (mmbbl)
|
5.5
|
18.7
|
61.1
|
0.14
|
0.47
|
1.53
|
Gas (bcf)
|
7.5
|
24.9
|
81.8
|
0.19
|
0.62
|
2.05
|
Total Prospective Resources (mmboe)5,6
|
6.8
|
22.9
|
74.7
|
0.17
|
0.57
|
1.87
|
Notes:
1. Contingent resources are those quantities of petroleum estimated, as of a given date, to be potentially recoverable from known accumulations using established technology or technology under development, but which are not currently considered to be commercially recoverable due to one or more contingencies. Contingent resources have an associated chance of development (economic, regulatory, market and facility, corporate commitment or political risks). These estimates have not been risked for the chance of develop ment. There is no certainty that any portion of the contingent resources will be developed and, if developed, there is no certainty as to either the timing of such development or whether it will be commercially viable to produce any portion of the resources.
2. Contingent Resources as at 31 December 2013 from third party independent analysis and validated by Lion. Probabilistic method applied.
3. Prospective resources are those quantities of petroleum estimated, as of a given date, to be potentially recoverable from undiscovered accumulations by application of future development projects. Prospective resources have both an associated chance of discovery (geological chance of success or GCOS) and a chance of development (economic, regulatory, market and facility, corporate commitment or political risks). The chance of commerciality is the product of these two risk components. There is no certainty that any portion of the prospective resources will be discovered and, if discovered, there is no certainty that it will be developed or, if it is developed, there is no certainty as to either the timing of such development or whether it will be commercially viable to produce any portion of the resources.
4. Prospective Resources as at 30 October 2014 are based on Lion's internal assessment using parameters from the Lofin-1ST discovery well.
Probabilistic method applied.
5. mmboe is millions of barrels of oil equivalent, converted at a ratio of 6 Mcf:1 bbl.
6. Statistically aggregated.
7. Lion holds a 2.5% working interest, the net number shown is before Government 5.625% First Tranche Petroleum share
A New Approach to Asian Energy Page 2 of 3
ASX/Media Release
For Immediate Release - 24 December 2014
Competent Persons Statement: Qualified Petroleum Reserves and Resources Evaluator
Pursuant to the requirements of the ASX Listing Rules Chapter 5, the technical information, reserve and resource reporting provided in this document are based on and fairly represent information and supporting documentation that has been prepared and/or compiled by Mr Kim Morrison, Chief Executive Officer of Lion Energy Ltd. Mr Morrison holds a B.Sc. (Hons) in Geology and Geophysics from the University of Sydney and has more than 28 years of experience in exploration, appraisal and development of oil and gas resources -including evaluating petroleum reserves and resources. Mr Morrison is a member of the American Association of Petroleum Geologists (AAPG). Mr Morrison consents to the release of this announcement and to the inclusion of the matters based on the information in the form and context in which it appears.
Glossary
|
bbl: barrels
|
mbbl: thousand barrels
|
PSC: Production Sharing Contract
|
bcf: billion cubic feet
bopd: barrels oil per day
|
mmbbl: million barrels
mmboe: million barrels oil equivalent
|
ST: sidetrack
tcf: trillion cubic
|
MD: measured depth
|
mmscfgd: Million standard cubic feet of gas per day
|
About Lion
Lion Energy Ltd is an ASX listed oil & gas exploration & production company focused on Indonesia, where it has been operating
for some 15 years. It has two existing conventional Production Sharing Contracts (PSC's) - Seram and South Block A - and an early mover position in the fledgling Indonesian unconventional industry via four Joint Study Applications.
Lion's leadership team has vast experience in the south-east Asian oil and gas industry, particularly Indonesia. In its January
2014 recapitalisation, two Indonesian strategic investors, Risco Energy and Tower Energy, became substantial shareholders of the company.
A New Approach to Asian Energy Page 3 of 3