Copper Creek Ventures

Published : January 17th, 2013

Los Azules Copper Project Continues to Grow

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Marketwire
 
 
McEwen Mining Inc.
NYSE: MUX
TSX: MUX
Other Recent News | Printer Friendly Version

January 17, 2013
Los Azules Copper Project Continues to Grow
Potential New Parallel Trend Emerging

Mineralization Extending to Depth & to the East
TORONTO, ONTARIO--(Marketwire - Jan. 17, 2013) - McEwen Mining Inc. (NYSE:MUX)(TSX:MUX) today announced that its exploration efforts at the Los Azules Copper Project in San Juan Province, Argentina, continues to show significant potential to increase the size of the resource. The first ten drill holes completed and assayed have been successful in extending the mineralization both laterally to the east and to depth. In addition, the drilling appears to have identified a parallel mineralized trend to the southwest of the main part of the existing resource.

Exploration Highlights

--  A possible parallel mineralized trend may be emerging southwest of the
    resource. Good grades over long intervals have been intersected,
    highlights of which include 0.61% copper over 160 meters and 0.49%
    copper over 329 meters both in Hole 1291, 0.87% copper over 69 meters in
    Hole 12101 and 0.44% copper over 529 meters in Hole 1299, with each hole
    ending in mineralization. 

--  Drill hole 1294 successfully extended the known copper mineralization
    200 meters below the limits of the current resource. The total
    intersection of the hole assayed 0.47% copper over 610 meters meters and
    included 0.95% copper over 68 meters and 0.65% copper over 100 meters. A
    second drill hole, 1299, assayed 0.44% copper over 529 meters. This
    drill hole ended approximately 600 meters below the resource outline. 

--  Drill hole 1289 was designed to target new mineralization further to the
    east. It was successful and returned 0.44% copper over 147 meters. This
    hole was drilled 150 meters east of any prior drilling.  

--  The Company expects to release an updated resource estimate for Los
    Azules which incorporates these recent results in Mid-February.
 
TABLE 1. LOS AZULES EXPLORATION HIGHLIGHTS

----------------------------------------------------------------------------
                        From            To         Thickness   Copper Grade 
Hole                    (m)            (m)            (m)           (%)     
----------------------------------------------------------------------------
1291                     72            232            160          0.61     
And                     562           890.5          328.5         0.49     
  including             790           890.5          100.5         0.71     
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
1294                    252           861.9          609.9         0.47     
  including             268            336            68           0.95     
  Including             560            660            100          0.65     
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
1299                    546           1074.6         528.6         0.44     
----------------------------------------------------------------------------
 
The Company was successful in starting drilling in October, two months earlier than prior seasons. In addition, the drilling has consistently achieved drill hole depths greater than 700 meters with Hole 1299 drilled to a depth of 1,075 meters. Significantly, all of the deeper drill holes ended in mineralization. Drilling will continue to focus on expanding the resource. This season's exploration program is on track to achieve its objective of completing 15,000 meters of drilling by the end of April.

A table of all 10 drill hole assay results is provided below in Table 2. A drill hole location map (Exhibit 1) and cross sections of the Los Azules resource (Exhibits 2, 3 and 4) are provided below.

Earlier this month, the company hired BMO Capital Markets to market Los Azules.

About the Los Azules Copper Project

Los Azules is a large copper porphyry system located in western San Juan Province within a belt of porphyry copper deposits that straddles the Chilean/Argentine border. This belt contains some of the world's largest copper deposits, including Codelco's El Teniente and Andina mines, Anglo American's Los Bronces mine, Antofagasta PLC's Los Pelambres mine and Xstrata's El Pachon project, among others. Los Azules is one of the world's largest, highest grade, undeveloped copper-porphyry deposits not owned by a major base metal company.

The mineral resources for Los Azules were calculated in June 2012 and are summarized in the table below with a cut-off grade of 0.35% copper.

----------------------------------------------------------------------------
                                         Contained                          
 Mineral Resource    Tonnes    Copper      Copper       Gold       Silver   
     Category      (millions)    (%)      (MM lbs)   grams/tonne grams/tonne
----------------------------------------------------------------------------
     Indicated        323       0.65        4.6         0.07         1.8    
     Inferred         948       0.52        10.8        0.06         1.8    
----------------------------------------------------------------------------
 
About McEwen Mining (www.mcewenmining.com)

The goal of McEwen Mining is to qualify for inclusion in the S&P 500 by 2015 by creating a high growth, low-cost, mid-tier gold producer focused in the Americas. McEwen Mining's principal assets consist of the San Jose Mine in Santa Cruz, Argentina (49% interest); the El Gallo Complex in Sinaloa, Mexico; the Gold Bar Project in Nevada, US; the Los Azules Project in San Juan, Argentina and a large portfolio of exploration properties in Argentina, Nevada and Mexico.

McEwen Mining has 300,605,735 shares issued and outstanding. Rob McEwen, Chairman, President and Chief Owner, owns approximately 25% of the shares of the Company. As of December 31, 2012, McEwen Mining had cash and liquid assets of approximately US$70 million and is debt free.

Technical Information

James K. Duff, Senior Consultant to the Company and a Registered Member in good standing of the Society for Mining, Metallurgy and Exploration, who is a Qualified Person as defined by National Instrument 43-101 ("NI 43-101") has reviewed and approved the technical contents of this news release. Bruce Davis, PhD, FAusIMM, who is a Qualified Person as defined by NI 43-101 and responsible for the quality control for the assaying of the Los Azules drill core has reviewed the assay quality control information. All samples were collected in accordance with industry standards. Splits from the drill core samples were submitted to the laboratory of Alex Stewart International in Mendoza, Argentina for fire assay and ICP analysis. Accuracy of results is tested through the systematic inclusion of standards, blanks and check assays.

For additional information about the Los Azules project see the Technical Report titled "Los Azules Porphyry Copper Project, San Juan Province, Argentina" dated August 1, 2012, with an effective date of June 15, 2012, prepared by D. Ernest Winkler, P.Eng, Robert Sim, P.Geo, Bruce Davis, PhD, FAusIMM and James K. Duff, P.Geo, all of whom are qualified persons and all of whom are independent of McEwen Mining, each as defined by NI 43-101. The foregoing report is available under the Corporation's profile on SEDAR (www.sedar.com).

Cautionary Note to U.S. Investors

McEwen Mining reports its resource estimates in accordance with standards of the Canadian Institute of Mining, Metallurgy and Petroleum referred to in Canadian National Instrument 43-101 (NI 43-101). These standards are different from the standards generally permitted in reports filed with the SEC. Under NI 43-101, McEwen Mining reports measured, indicated and inferred resources, measurements which are generally not permitted in filings made with the SEC. According to Canadian NI 43-101 criteria, the estimation of measured resources and indicated resources involve greater uncertainty as to their economic feasibility than the estimation of proven and probable reserves. Under SEC Industry Guide 7 criteria, measured, indicated and inferred resources are considered Mineralized Material. The SEC considers that in addition to greater uncertainty as to the economic feasibility of Mineralized Material compared to proven and probable reserves, there is also greater uncertainty as to the existence of Mineralized Material. U.S. investors are cautioned not to assume that measured or indicated resources will be converted into economically mineable reserves. The estimation of inferred resources involves far greater uncertainty as to their existence and economic viability than the estimation of other categories of resources.

Caution Concerning Forward-Looking Statements

This press release contains certain forward-looking statements and information, including "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. The forward-looking statements and information expressed, as at the date of this press release, McEwen Mining Inc.'s (the "Company") estimates, forecasts, projections, expectations or beliefs as to future events and results. Forward-looking statements and information are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties, risks and contingencies, and there can be no assurance that such statements and information will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements and information. Risks and uncertainties that could cause results or future events to differ materially from current expectations expressed or implied by the forward-looking statements and information include, but are not limited to, risks related to the cost of transferring or otherwise allocating funds between operating jurisdictions, factors associated with fluctuations in the market price of precious metals, mining industry risks, political, economic, social and security risks associated with foreign operations, risks associated with the construction of mining operations and commencement of production and the projected costs thereof, risks related to litigation, property title, the state of the capital markets, environmental risks and hazards, uncertainty as to calculation of mineral resources and reserves and other risks. Readers should not place undue reliance on forward-looking statements or information included herein, which speak only as of the date hereof. The Company undertakes no obligation to reissue or update forward-looking statements or information as a result of new information or events after the date hereof except as may be required by law. See McEwen Mining's Annual Report on Form 10-K for the fiscal year ended December 31, 2011 and other filings with the Securities and Exchange Commission, under the caption "Risk Factors", for additional information on risks, uncertainties and other factors relating to the forward-looking statements and information regarding the Company. All forward-looking statements and information made in this news release are qualified by this cautionary statement.

Table 2 - Summary of Drill Hole Results for the First Half of the 2012/13 Drill Season

----------------------------------------------------------------------------
                                                                            
                                  From  To  Thickness Cu                    
 Hole Northing Easting     Dip    (m)   (m)    (m)    (%)        Zone       
----------------------------------------------------------------------------
 1284 6558652  2383287 90 degrees 0    52      52     -      Overburden    
----------------------------------------------------------------------------
                                                           Mixed oxide and  
                                                            weak secondary  
                                   52   74      22   0.19     enrichment    
                                 -------------------------------------------
                                                               Primary      
                                                           chalcopyrite in  
                                                            fractures with  
                                   74   380    306   0.19   minor bornite   
                                 -------------------------------------------
                                                               Primary      
                                                           chalcopyrite and 
                                                              bornite in    
                                  380   464     84   0.38     fractures     
                                 -------------------------------------------
                                                               Primary      
                                                           chalcopyrite and 
                                                              bornite in    
                                  464   580    116   0.25     fractures     
                                 -------------------------------------------
                                                               Primary      
                                                           chalcopyrite and 
                                                              bornite in    
                                  580 1022.5  442.5  0.37     fractures     
                                 -------------------------------------------
                                 Infill hole completed to target depth.     
                                 Average core recovery was 96%.             
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
 1285 6558327  2383437 90 degrees 0   41.5    41.5    -      Overburden    
----------------------------------------------------------------------------
                                  41.5  60     18.5  0.05    Leached cap    
                                 -------------------------------------------
                                   60   162    102   0.18  Transition zone  
                                 -------------------------------------------
                                                               Primary      
                                                             chalcopyrite   
                                                            greater than  
                                                            greater than  
                                                              bornite in    
                                  162   430    268   0.14     fractures     
                                 -------------------------------------------
                                                               Primary      
                                                             chalcopyrite   
                                                            greater than  
                                                            greater than  
                                                              bornite in    
                                  430   484     54   0.45     fractures     
                                 -------------------------------------------
                                                               Primary      
                                                             chalcopyrite   
                                                            greater than  
                                                            greater than  
                                                              bornite in    
                                  484   666    182   0.23     fractures     
                                 -------------------------------------------
                                                               Primary      
                                                             chalcopyrite   
                                                            greater than  
                                                            greater than  
                                                              bornite in    
                                  666   736     70   0.35     fractures     
                                 -------------------------------------------
                                 Infill hole completed to target depth.     
                                 Average core recovery was 89%.             
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
 1286 6558138  2383470 90 degrees 0    40      40     -      Overburden    
----------------------------------------------------------------------------
                                   40   106     66   0.05    Leached cap    
                                 -------------------------------------------
                                                          Partially enriched
                                                             chalcopyrite   
                                                            greater than  
                                  106   264    158   0.22     chalcocite    
                                 -------------------------------------------
                                                               Primary      
                                                           chalcopyrite in  
                                                          fractures greater 
                                                          than greater than 
                                  264  335.5   71.5  0.12   disseminations  
                                 -------------------------------------------
                                 Infill hole lost at 335.5 m before reaching
                                 target depth. Average core recovery was    
                                 86%.                                       
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
 1287 6558148  2383002 90 degrees 0     8      8      -      Overburden    
----------------------------------------------------------------------------
                                   8    76      68   0.06    Leached cap    
                                 -------------------------------------------
                                                               Primary      
                                                             chalcopyrite   
                                                            greater than  
                                                            greater than  
                                                              bornite in    
                                   76  618.1  542.1  0.11     fractures     
                                 -------------------------------------------
                                 Step-out hole completed to target depth.   
                                 Average core recovery was 94%.             
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
 1288 6558378  2382797 90 degrees 0   13.5    13.5    -      Overburden    
----------------------------------------------------------------------------
                                  13.5  126   112.5  0.05    Leached cap    
                                 -------------------------------------------
                                                               Primary      
                                                             chalcopyrite   
                                                            greater than  
                                                            greater than  
                                                              bornite in    
                                  126   740    614   0.11     fractures     
                                 -------------------------------------------
                                                               Primary      
                                                             chalcopyrite   
                                                            greater than  
                                                            greater than  
                                                              bornite in    
                                  740  823.2   83.2  0.33     fractures     
                                 -------------------------------------------
                                 Step-out hole completed to target depth.   
                                 Average core recovery was 96%.             
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
 1289 6559201  2383700 90 degrees 0    40      40     -      Overburden    
----------------------------------------------------------------------------
                                   40   166    126   0.02    Leached cap    
                                 -------------------------------------------
                                                          Chalcopyrite with 
                                                              minor weak    
                                                              secondary     
                                  166   220     54   0.28     enrichment    
                                 -------------------------------------------
                                                               Primary      
                                                          chalcopyrite with 
                                  220   367    147   0.44  minor chalcocite 
                                 -------------------------------------------
                                 Step-out hole lost at 367 m before reaching
                                 target zone. Average core recovery was 81%.
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
 1291 6558852  2382903 90 degrees 0    55      55     -      Overburden    
----------------------------------------------------------------------------
                                   55   72      17   0.03    Leached cap    
                                 -------------------------------------------
                                                         Enriched chalcocite
                                                            greater than  
                                   72   232    160   0.61    chalcopyrite   
                                 -------------------------------------------
                                                               Primary      
                                                             chalcopyrite   
                                                            greater than  
                                                            greater than  
                                                           greater than   
                                  232   562    330   0.18      bornite      
                                 -------------------------------------------
                                                               Primary      
                                                           chalcopyrite and 
                                                           bornite greater  
                                  562   790    228   0.40  than chalcocite  
                                 -------------------------------------------
                                                               Primary      
                                                           chalcopyrite and 
                                                           bornite greater  
                                  790  890.5  100.5  0.71  than chalcocite  
                                 -------------------------------------------
                                 Step-out hole completed to target depth.   
                                 Average core recovery was 97%.             
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
 1294 6558292  2383212 90 degrees 0   62.2    62.2    -      Overburden    
----------------------------------------------------------------------------
                                                           Mixed chalcocite 
                                                         and chalcopyrite in
                                  62.2  74     11.8  0.53  transition zone  
                                 -------------------------------------------
                                                           Weak chalcocite  
                                                          enrichment greater
                                                          than greater than 
                                                            greater than  
                                   74   252    178   0.12    chalcopyrite   
                                 -------------------------------------------
                                                               Primary      
                                                             chalcopyrite   
                                                            greater than  
                                                         bornite and primary
                                  252  861.9  609.9  0.47     chalcocite    
                                 -------------------------------------------
                                 Hole completed to target depth. Average    
                                 core recovery was 88%.                     
                                 Twin of hole 1279 from prior season.       
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
 1299 6558984  2383001 90 degrees 0    60      60     -      Overburden    
----------------------------------------------------------------------------
                                   60   78      18   0.08    Leached cap    
                                 -------------------------------------------
                                                           Transition zone  
                                                          with chalcopyrite 
                                                            greater than  
                                                            greater than  
                                   78   94      16   0.55     chalcocite    
                                 -------------------------------------------
                                                               Primary      
                                                           chalcopyrite and 
                                   94   546    452   0.25      bornite      
                                 -------------------------------------------
                                                               Primary      
                                                           chalcopyrite in  
                                                             veinlets and   
                                  546 1074.6  528.6  0.44     fractures     
                                 -------------------------------------------
                                 Step-out hole completed to target depth.   
                                 Average core recovery was 92%.             
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
                                                         Reverse circulation
12101 6558167  2383218 90 degrees 0    168    168     -      pre-collar    
----------------------------------------------------------------------------
                                                              Secondary     
                                                              chalcocite    
                                  168   237     69   0.87     enrichment    
                                 -------------------------------------------
                                 Step-out hole lost at 237 m before reaching
                                 target zone. Average core recovery was 75%.
----------------------------------------------------------------------------
 
To view the figures associated with this release, please visit the following link: http://media3.marketwire.com/docs/mcewlink1.pdf
The NYSE and TSX have not reviewed and do not accept responsibility for the adequacy or accuracy of the contents of this news release, which has been prepared by management of McEwen Mining Inc.

CONTACT INFORMATION:
McEwen Mining Inc.
Jenya Meshcheryakova
Investor Relations
(647) 258-0395 ext 410 or Toll Free: (866) 441-0690
Fax: (647) 258-0408
info@mcewenmining.com
www.mcewenmining.com
INDUSTRY: Manufacturing and Production - Mining and Metals

If you no longer want to receive announcements from us, please do not reply to this e-mail. Instead simply click .
Data and Statistics for these countries : Argentina | Mexico | All
Gold and Silver Prices for these countries : Argentina | Mexico | All

Copper Creek Ventures

CODE : CPV.V
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Copper Creek is a copper exploration company based in Canada.

Copper Creek is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 13.1 millions as of today (US$ 10.2 millions, € 8.4 millions).

Its stock quote reached its highest recent level on August 20, 2010 at CA$ 2.30, and its lowest recent point on February 28, 2014 at CA$ 0.01.

Copper Creek has 33 480 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Copper Creek Ventures
2/6/2013How to Profit From A Potential Doubling in Copper Prices
2/4/2013Copper – Upside Breakout. Gold/Silver To Follow?
4/17/2012Gold, Silver and Copper Stocks Investing Strategie
4/1/2012Dr Copper suggests, its the longs that are the Gamblers
6/12/2011Commodity Wrap: Wheat, Copper look bearish
5/21/2011Copper Stocks Gleaming in Gold's Glow
5/19/2011Copper is Talking, Massive Infrastructure Projects to Boost ...
Project news of Copper Creek Ventures
12/17/2013Reed Copper Project November Development Highlights
12/11/2013Exploration Company Drills 24 m of 3.26% Copper
10/22/2013Tower Provides Rabbit North Exploration Update; Assays up to...
10/16/2013Equitas Acquires Copper \226 Gold Project C...
10/4/2013Tower Discovers New Porphyry Copper Mineralized System at JD...
9/26/2013BRR Webcast Sipa Intersects Thick Primary Copper Sulphides
9/19/2013TSX Venture Company: Sheslay Copper Gold Porphyry Project Dr...
8/6/2013Lower initial capital cost and significant smelting capacity...
7/23/2013Avrupa resumes drilling at Monte da Bela Vista
7/22/2013Diamond Drilling Commences at Oxy's Bore Copper Prospect
6/10/2013Ivanplats files Mining Right Application for its Platreef p...
6/4/2013Astorius Resources Acquires Hautete Claim In The Prolific Ba...
5/28/2013Thaduna Copper Project - Drilling Update
5/25/2013Venture Copper Company Expects Production by Q4 2013
5/21/2013SolGold - New Ecuadoran Mining Bill Lifts Cascabel Copper Go...
5/15/2013McEwen Mining's Los Azules Copper Project Continues to Grow!
5/9/2013Project Update =2D HALLS CREEK COPPER PROJECT
4/18/2013Development of Ivanplats' Kamoa copper discovery not affecte...
4/11/2013Ivanplats reaches agreement on upgrading of a third hydroele...
3/28/2013McEwen Mining Inc=2E: Los Azules Copper Project Exploration ...
2/19/2013North Announces Results of 2012 Exploration Program=2C Redst...
1/17/2013New independent resource estimate more than doubles high-gr...
1/17/2013Los Azules Copper Project Continues to Grow
10/30/2012Halls Creek Copper Project Joint Venture
10/22/2012Drilling To Commence At El Secreto Gold, Silver And Copper P...
10/11/2012BRR Broadcast - KBL Mining delivers additonal high grade cop...
10/10/2012Pilot Gold announces Preliminary Economic Assessment results...
9/19/2012Pilot Gold reports 5.94 g/t gold, 12.6 g/t silver and 0.53% ...
9/10/2012Boseto Copper Project Officially Opened
9/4/2012New Copper-Gold Discovery at Lorena
8/21/2012Boxxer Updates Activities On DOK Copper-Gold Molybdenum Proj...
8/16/2012Finance News Network Interview - KBL reveals new copper and ...
8/15/2012Joe Exploration
8/10/2012Cobriza Intersects 292 metres of 0.33% Copper Equivalent* at...
8/3/2012Boxxer Enters Letter Of Intent To Acquire 23 Mineral Claims ...
8/1/2012Pilot Gold reports 0.64 g/t gold and 0.52% copper over 134.9...
7/20/2012Thick High Grade Copper Intersected at Mango
7/18/2012New Hana Signs Definitive Agreement to Option the Formerly P...
7/18/2012Pilot Mountain Tungsten - Copper Project Update Presentation
7/12/2012Cobriza Intersects 142 metres of 0.51% Copper Equivalent* at...
7/11/2012Focus Acquires Porphyry Copper-Molybdenum Project, Peru; His...
7/3/2012Extensive Drilling Programme to Commence at Black Hill Silve...
6/25/2012[cuy_announcements] New Copper Discovery at Wilkins
6/22/2012VMS Acquires Large Land Package Adjacent to the Reed Copper ...
6/4/2012Boseto Copper Project Commissioning & Dev Plan Updates
5/25/2012Boxxer Commences Drilling On Its East Breccia Copper Propert...
5/14/2012North Reviews Historical Resource Estimate At Redstone Prope...
5/9/2012RAINBOW EXPANDS BIG STRIKE LAND PACKAGE 4.4% COPPER SHOWING ...
5/2/201229% Increase in Contained Copper at Plutus Deposit
5/1/2012North Announces Exploration Program at Redstone Property=2C ...
4/30/2012Credence Copper Revival: Junior Teaches Old Arizona Mine Ne...
4/26/2012North Provides Clarity Regarding Permitting of Carmacks Proj...
4/19/2012Camino Begins Soil Sampling Program at El Secreto Gold, Silv...
3/19/2012NORTHISLE ANNOUNCES START OF AN INDUCED POLARIZATION SURVEY ...
3/12/2012[pressrelease] Nama Copper/Cobalt Exploration Project, Zambi...
3/1/2012North Announces Design Changes At Carmacks Copper Mine
2/21/2012Camino Signs Letter Of Intent For El Secreto Gold, Silver A...
2/8/2012Pilot Gold reports first resource for the Halilaga copper-go...
2/1/2012Commencement of Feasibility Study Update for Carmacks Copper...
12/14/2011Octagon Capital issues site visit report on Oracle Ridge Cop...
12/5/2011Calibre Announces Start of 5,000 Metre Drill Program at Rosi...
11/24/2011Ca=F1ariaco Norte Copper Project Update
10/14/2011Quadra FNX Announces A 9% Increase In Q3 2011 Copper Product...
8/31/2011Pilot Gold Returns 0=2E48 G/T Gold And 0=2E64% Copper Over 1...
8/24/2011Kiska Cuts Long Gold and Copper Intersections, Whistler Proj...
7/27/2011/ ANDOVER REPORTS 16.5 METER INTERCEPT OF 6.6 % COPPER EQUIV...
7/25/2011Resource Stocks=e2?? Stacking The Odds With Copper And Gold
6/29/2011Status Update - Ca=F1ariaco Norte Copper Project
6/16/2011Boxxer Options Second Canadian Copper-Molybdenum-Silver Prop...
Corporate news of Copper Creek Ventures
12/14/2013Global Economic Indicator
12/5/2013Uranium | Diamonds | Copper
11/20/2013Astorius Resources Commences Geophysical Survey on its Babin...
11/14/2013Columbus Copper
11/4/2013Week in Review: Uranium / Copper / Mexico
10/23/2013Columbus Copper
9/23/2013McEwen Mining Announces Updated Preliminary Economic Assessm...
9/17/2013Columbus Copper
9/2/2013Long-Term Chart
9/2/201363 metres at 1.1% Copper in Primary Copper Sulphide
8/23/2013What Does a Secular Bull Market Look Like.
8/16/2013Kings Documentary
8/15/2013Stocks Begin to Breakout
8/14/2013Joe Sampling Program
8/9/2013Breakout
7/25/2013Smart Money Making A Huge Bet On Copper
7/16/2013More Shallow Copper Results at 7B
7/16/2013Hello / Heavy copper PCB
6/26/2013Focus Options Aurora Project to Red Copper Resources
6/20/2013Thickest Copper Intersection to Date at Enigma
6/17/2013North Deposit Drilling Intersects Multiple Zones of Minerali...
6/11/2013Columbus Copper
6/8/2013Nexvu Capital Blog: World Copper Fact Book 2012
6/6/2013Significant Primary Sulphide Copper Intersections at Thaduna
5/30/2013Columbus Copper
5/8/2013Columbus Copper
5/8/2013North Announces Loan Agreement
5/6/2013TAD Acquires the Iskut Copper Gold Prospect in BC
4/21/2013Nexvu Capital Blog: Copper - Buy=2C Sell=2C Hold=3F
4/16/2013Nexvu Capital Blog: Copper versus Gold
3/23/2013Nexvu Capital Blog: Copper Update - The History of Copper in...
3/11/2013Nexvu Capital Blog: Copper Update - Junior Performance Disco...
2/19/2013Cascabel Copper Porphyry Earn-In Agreement Re-negotiated
2/8/2013McEwen Grows Los Azules Copper Count - by The Northern Miner
1/29/2013North and Yukon Energy Corporation Sign Letter Of Intent
12/11/2012Extensive Copper Mineralisation Confirmed at Mount Angelo No...
11/14/2012Bloodwood Delivers Strong Copper and Gold Results
11/9/2012BRR Broadcast - Mineral Hill Copper-Gold Results
11/8/2012Petrology Confirms Porphry Copper-Gold at Crater Mountain
11/5/2012Kiska receives Thorn Phase 2 Drilling Results from Brixton I...
11/1/2012North Completes 2012 Feasibility Study Update For Carmacks
10/30/2012NCU - NORTH DEPOSIT MINERALIZATION REMAINS OPEN INTERSECTING...
9/26/2012Crater Mountain Porphyry Copper-Gold Mineralisation
9/3/2012BRR Broadcast - New Copper Gold Lode Confirmed
9/3/2012BRR Webcast - Enigma Copper Update
8/10/2012[cuy_announcements] Wilkins Copper Update
8/8/2012Infographic=3A Copper Part II =2D Supply and Demand
8/8/2012Boxxer Intersects 2.32% Copper, 0.01% Molybdenum And 31.2g/T...
8/8/2012North Appoints LeClair and Koutsouras to Board and Grants Op...
7/20/2012North Mining Provides Corporate Update
7/19/2012[cuy_announcements] Assays received for Wilkins Copper Gold ...
7/17/2012Infographic=3A Copper Part 1 =2D History and Uses
6/28/2012McEwen Mining Announces Resource Update at the Los Azules Co...
6/20/2012A Blind Creek Resources Ltd Exploration Team Finds 5 Metre W...
6/20/2012Best Copper Zone to Date Intersected at Crater Mountain, PNG
6/6/2012ALL ANOMALOUS GOLD AND COPPER AREAS AT CRATER
5/30/2012Ocean Park Drills 201.4 metres of 0.52% Copper at Adelita Pr...
5/10/2012McEwen Mining Expansion Drilling Intersects 0=2E53% Copper O...
5/3/2012Ocean Park Drills 105.2 metres of 1.03% Copper at Adelita Pr...
4/27/2012Gold Results on the Prince John Prospect
4/26/2012Internationa Enexco Further Drill Results From Contact Coppe...
4/23/2012North Files Consolidated Financial Statements and Annual Inf...
4/17/2012Best Copper Intersection Ever Recorded At Pilot Mountain
3/20/2012Excelsior Engages In=2DSitu Copper Recovery Permitting Exper...
3/16/2012North Mining to attend Mines and Money Hong Kong 2012
3/15/2012GOLD PORPHYRY ZONE FURTHER INDENTIFIED
3/14/2012Atui Porphyry Copper System Confirmed and Extended
3/8/2012North Adopts Shareholder Rights Plan
2/28/2012Morning Notes, U.S. Copper Opportunity
2/21/2012Boxxer Intersects Significant Copper-Gold-Silver Mineralizat...
2/20/2012Pilot Mt Tungsten - Copper Project - Further Drill Results
2/20/2012New Strategic Kalahari Copperbelt Prospecting Licences
2/9/2012New High Grade Copper-Gold-Silver-Molybdenum Discovery at Me...
2/6/2012Alliance Secures Option over Chilean Copper-Gold Properties
2/5/2012Pilot Mt Tungsten - Copper Project First Drill Results
2/4/2012North Mining Grants Stock Options
1/18/2012Higher Grade Copper Zone at Zeta NE confirmed by drilling
1/12/2012Corporate Update: Copper Joe Drilling, Acquisition and Priva...
1/12/2012Boss Drilling Program Intersects Significant Copper Minerali...
1/9/2012NCU - NORTH DEPOSIT CONTINUES TO EXPAND - NC1127 INTERSECTS ...
1/9/2012North Deposit Continues to Expand - NC1127 Intersects Minera...
11/30/2011Proposed Acquisition, Copper Joe Update, Issuance of Stock O...
10/24/2011Resource Update Leichardt Copper Project - Mt Isa
10/14/2011Boxxer Announces Airborne Survey Outlines Five Large Magneti...
9/6/2011Boxxer Drilling Intersects 19.1 Metres Of 0.76% Copper Equiv...
8/18/2011Brixton Intersects Gold, Silver and Copper Mineralization at...
8/16/2011NCU - NORTH DEPOSIT CONTINUES TO EXPAND, DRILLING MULTIPLE I...
8/4/2011Bloomsbury Minerals - copper research
7/26/2011Boxxer Intersects 15.3 Metres Of 0.61% Copper Equivalent At ...
6/13/2011Summer Drilling Program Begins, Gold and Copper Mineralizati...
5/19/2011Drilling Intersects 453.2 metres averaging 0.72 g/t Gold, 3....
5/10/2011Pilot Gold adds copper and silver to TV Tower gold property
5/3/2011Drilling Identifies New Copper Gold Targets and Expands Rain...
4/12/2011Golden Alliance Reports Cocha Copper-Silver-Gold Project Dri...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (CPV.V)FRANKFURT (DJ5.F)
0.390+1.30%0.255+1.59%
TSX-V
CA$ 0.390
04/30 16:59 0.010
1.3%
Prev close Open
0.385 0.445
Low High
0.390 0.445
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.390 -%
Volume 1 month var.
3,000 -%
24hGold TrendPower© : -44
Produces
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.49+0.13%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.76+1.29%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-0.92%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.59-0.38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.15+0.80%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-7.84%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.22+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.79-2.72%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 50.54+0.40%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :