Highlights
·
Tulkubash
mineralisation extended from a previous strike of 360 metres to 920 metres and
is still open towards the northeast. The mineralisation was extended by 80
metres towards the southwest and 480 metres towards the northeast.
·
Of the 20
holes drilled in the northwest extension (TNX), 19 drill holes intersected
mineralisation at the predicted depth*
·
9 holes
drilled in the southeastern extension (TSX) intersected mineralisation
approximately where predicted*
·
Selected results
include:
o TO756: 26.25m at 3.66 g/t Au, including 12.50m at 5.77 g/t Au
o
TO797: 23.75m at 5.46 g/t
Au
o TO7100: 23.75m at 4.40 g/t Au, including 10.00m at 6.39 g/t
Au
o
TO7111: 10.00m at 6.91 g/t
Au
o
T07114:
11.25m at 2.19 g/t Au
o
T07117: 6.25m at 8.58 g/t Au
o T07121: 11.25m at 8.21 g/t Au
Dekel Golan, CEO of Chaarat, commented: "We are very encouraged by these results as they
demonstrate the significant extension, potential and actual, of the Tulkubash zone which is the first ore body to be mined by Chaarat. The prospect of extended strike, as well as
improved predictability and continuity, which is effectively confirmed by this
drilling, will potentially enable Chaarat to increase
production from this low cost ore body and further improve its profit potential
for the early years of operation.
"We are confident that the scenario should
improve further with drilling along strike, especially to the north east of the
zone; drilling which will commence during the spring of next year. An updated resource and reserve estimate based on
the 2011 drilling will be released early in 2012."
*The results reported here are from the North and
South sections of the Tulkubash Zone. The results of
the drill holes from the Central section of the Tulkubash
were announced on 20th September, 2011. A map and longitudinal projection at
www.chaarat.com shows the Tulkubash mineralisation.