West African Resources Ltd.

Published : September 30th, 2015

Management Discussion & Analysis

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Management Discussion & Analysis

d74c1095fdb404ab085b30.pdf



West African Resources Limited


ABN 70 121 539 375


MANAGEMENT'S DISCUSSION AND ANALYSIS (MD&A)

for the three months ended 30 June 2015


Registered Office


14 Southbourne Street

Scarborough WA 6019


Australia


Principal place of business


14 Southbourne Street

Scarborough WA 6019 Australia

Ph: +61 (8) 9481 7344

Fax: +61 (8) 9481 7355


Website www.westafricanresources.com Email [email protected]



GENERAL


Presented below is a discussion of the activities, results of operations and financial condition of West African Resources Ltd. ('West African' or the 'Company') for the three month period ended 30 June 2015 ('Q415'), compared to the same periods in the preceding year. This management discussion and analysis ('MD&A') was prepared using information available as of 29 September 2015 and should be read in conjunction with the Company's audited consolidated financial statements for the twelve month period ended 30 June 2015 and notes thereto. These audited consolidated financial statements (the 'Financial Statements') are prepared in accordance with International Financial Reporting Standards ('IFRS'). The Financial Statements include the accounts of the Company and its subsidiaries. All monetary amounts referred to herein are in Australian dollars unless otherwise stated.


Additional information relating to the Company can be found on the SEDAR website at www.sedar.com, on the Company's website at www.westafricanresources.com.


FORWARD LOOKING STATEMENTS


This MD&A contains certain forward-looking information and forward-looking statements as defined in applicable securities laws. These statements relate to future events or future performance. All statements other than statements of historical fact are forward-looking statements. The use of any of the words 'anticipate', 'plan', 'continue', 'estimate', 'expect', 'may', 'will', 'project', 'predict', 'potential', 'should', 'believe' and similar expressions is intended to identify forward-looking statements. These statements involve known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in such forward-looking statements. These statements speak only as of the date of management's discussion and analysis. Inherent in forward-looking statements are risks and uncertainties beyond the Company's ability to predict or control, as described herein. Actual results and developments are likely to differ, and may differ materially, from those expressed or implied by the forward-looking statements contained in this management's discussion and analysis. Such statements are based on a number of assumptions which may prove to be incorrect, including, but not limited to, assumptions about general business and economic conditions, interest rates and foreign exchange rates, the timing of the receipt of regulatory and governmental approvals for projects, ability to attract and retain skilled staff, the impact of changes in foreign exchange rates on costs, market competition, the accuracy of resource estimates (including, with respect to size, grade and recoverability) and the geological, operational and price assumptions on which these are based, tax benefits and tax rates, and ongoing relations with employees and with business partners. The reader is cautioned that the foregoing list of important factors and assumptions is not exhaustive. Events or circumstances could cause actual results to differ materially from those estimated or projected and expressed in, or implied by, these forward-looking statements. The Company undertakes no obligation to update publicly or otherwise revise any forward-looking statements or the foregoing list of factors, whether as a result of new information or future events or otherwise.


TSX-V disclaimer


Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.



CORPORATE OVERVIEW


West African is a mineral exploration company focused on building shareholder value through the identification, acquisition, assessment and development of mineral resource projects. The Company's portfolio includes mineral rights in a gold project in Burkina Faso.


The Company trades on the Australian Securities Exchange ('ASX') and the TSX Venture Exchange ('TSX') (with effect from January 2014) under the symbol 'WAF' and warrants trading on the TSX under the symbol 'WAF.WT'. The Company is a reporting issuer in Canada in the provinces of British Columbia, Alberta, Saskatchewan and Ontario.


OPERATIONS HIGHLIGHTS


West African Resources Limited (ASX: WAF) is pleased to report activities on its 100%-owned and 100%- earning gold and copper-cold projects in Burkina Faso, West Africa, for the quarter ending 30 June 2015.


Outstanding Pre-Feasibility Study for Mankarga 5 Gold Project:

A summary of the base case is stated below assuming a 100% project at a gold price of $1,300/oz1. All amounts are in US dollars.

  • Production of 69,000oz pa for first 3 years, 49,000oz pa for life of mine, 7 year life of mine

  • Cash costs $428/oz for 3 years, $635/oz life of mine

  • All-in cash costs of $538/oz for 3 years, $749/oz life of mine

  • Pre-tax IRR of 63% with 14-month payback, post-tax IRR of 50% with 16-month payback

  • Pre-tax cash flow of $146m, post-tax cash flow of $118m after initial and sustaining capital costs

  • Pre-tax NPV5% of $117m, Post-tax NPV5% of $86m

  • Probable Ore reserve of 440,000oz, life of mine strip ratio 2:1

  • Potential to upgrade in-pit Inferred Resources currently treated as waste in mining schedule

  • Nearby drill ready oxide targets with potential to add to the base case


    Feasibility Study progressing rapidly

  • FS commenced - Mintrex appointed lead consultant

  • Study Manager appointed - Mr Lyndon Hopkins

  • Nick Harch appointed to advise on debt financing and hedging arrangements, project financing discussions proceeding in parallel with the FS

  • Aircore drilling commenced to add significant low-cost ounces to FS economics

  • FS and Company working capital fully-funded by Macquarie Bank

  • NI 43-101 Technical Report for the PFS has been completed, see website or www.sedar.com

    Corporate

  • Mark Connelly appointed Non-Executive Chairman


    June 2015 Quarter Summary

  • 7,868m drilled


  • $1.391m Exploration and Development Expenditure

  • $0.193m Administration Costs

  • $3.5m cash at bank at 30 June 2015


September 2015 Quarter Plans


Timeline of Key Deliverables

for the Mankarga 5 Project

2015

2016

Q1

Q2

Q3

Q4

Q1

Q2

Q3

Q4

Feasibility Study

Enviro Social Impact Assessment (ESIA)

Exploration & Resource Upgrade Drilling

Resource/Reserve Upgrade

Metallurgical Test Work

Project Financing

Enviro Permit Application

Mining Permit Application

Detailed Engineering

Construction

Gold Production


MINERAL PROJECTS


Burkina Faso, West Africa


The majority of West African's exploration activities since listing the Company on ASX in 2010 have been focused on Burkina Faso, located in the Sahel region of West Africa. The Sahel is a transition zone between the Sahara Desert to the north and the savannas to the south, and stretching the full width of the continent, having a semi-arid climate.


The area now known as Burkina Faso was ruled by the Mossi kingdoms from medieval times until France claimed the region in 1896 when it became known as Upper Volta. In 1960 the Republic of Upper Volta was granted autonomy by France and in 1987 the name of the country was changed to Burkina Faso.


Most of central Burkina Faso lies on a savanna plateau, 200 to 300 meters above sea level. Some key characteristics of Burkina include:

  • Average annual rainfall: ~100 cm in the south; ~25 cm in the north and northeast.

  • Population: 17.8 million (2013 est.) with a growth rate of approximately 3%.

  • Language: French and Mòoré

  • Average population density: approximately 51.4 people per square kilometer with concentrations in urban areas approximately 80 people per square kilometer.

  • Ethnicity: The country is generally regarded as an ethnically integrated, secular state, its population belonging to two major West African cultural groups - the Voltaic and the Mande. The 60% of Burkinabe are Muslim with 25% Christian but most also adhere to traditional African religions.

  • Education: Compulsory until the age of 16; however, only about 80.3% of Burkina's primary school age children are enrolled in primary school. Of those enrolled, about 41.7% complete primary school.

  • Government: Parliamentary Republic. Gained independence from France in 1960. Follows the French model of civil law based on a constitution adopted in 1991.


  • Economy: GDP per capita (PPP) of $1,400 (2012 est.); Real GDP growth of 8% (2012 est.) (4.2% in 2011); Inflation rate of 3.8% (2012 est.) (2.8% in 2011). Mining and the agricultural sectors (primarily cattle and cotton) are the main sources of growth. Approximately 80% of the population relies on subsistence agriculture, with only a small fraction directly involved in industry and services.


    Burkina Faso is working to expand its economy by developing its mineral resources, particularly gold, improving its infrastructure, making its agricultural and livestock sectors more productive and competitive, and stabilizing supplies and prices of food grains. Gold has reportedly become the country's top export commodity.


    In 2011, gold earned Burkina Faso 127 billion CFA (~$267 million), in comparison with 440 billion CFA

    (~$926 million) for the four-year period between 2007 and 2011, accounting for 64.7 percent of all exports and 8 percent of GDP. Production rose from 23 tonnes in 2010 to 32 tonnes in 2011.


    Gold Exploration in Burkina Faso


    Burkina Faso is located between Ghana and Mali and is home to approximately 30% of the Birimian greenstone belts of West Africa. The Birimian greenstone belts of West Africa have long been a focus for gold explorers and they host several world-class deposits. Exploration and development activity in Burkina Faso has accelerated significantly in the last 10 years, with several projects now having entered the production phase, including IAMGOLD's Essakane mine, High River Gold's Taparko-Boroum mine, and Semafo's Mana mine.


    West African's Projects


    Mankarga 5 Heap Leach Gold Project


    Auger drilling at Mankarga 1 (M1) prospect delivered high-grade results 500m northwest of the Mankarga 5 Mineral Resource (Figure 1). Significant high-grade auger assays, with a peak result of 3,851 ppb Au (3.85g/t Au), were returned from multiple parallel zones along strike and parallel with historic RC and Diamond drilling, and artisanal workings. Results occurred over a 1.5km mineralised trend, with potential indicated in regional auger drilling for repeat parallel structures to the west. The results confirm an updated interpretation based on detailed prospect mapping showing parallel and linking mineralised zones.

    Drilling is continuing to the west of M1 over newly identified gold zones and to the south over the M2 prospect. Significant results are presented below in Table 1 and shown in Figure 1.


    Table 1: Mankarga 1 Significant Results from Auger Drilling

    Hole

    From

    To

    Int

    Au ppb

    Au g/t

    Dip

    Azi

    East

    North

    RL

    TLA3578

    3

    6

    3

    3043

    3.04

    -90

    0

    741284

    1337945

    277

    TLA3584

    3

    6

    3

    544

    0.54

    -90

    0

    741125

    1337785

    277

    TLA3621

    4

    7

    3

    412

    0.41

    -90

    0

    741267

    1337502

    296

    TLA3636

    3

    6

    3

    3851

    3.85

    -90

    0

    741391

    1337343

    296

    TLA3675

    3

    6

    3

    649

    0.65

    -90

    0

    741320

    1337414

    297

    TLA3705

    2

    5

    3

    404

    0.40

    -90

    0

    741603

    1337414

    295

    TLA3753

    4

    7

    3

    744

    0.74

    -90

    0

    741656

    1337184

    292

    TLA3788

    2

    5

    3

    472

    0.47

    -90

    0

    741620

    1336725

    292

    TLA3808

    4

    7

    3

    642

    0.64

    -90

    0

    741691

    1336654

    289


    The results from the recent auger drilling show that the geochemical signature over known mineralisation is subtle and discreet, with only seven samples greater than 160ppb Au within the proposed starter pit outline. Results along strike of the M5 resource demonstrate there is significant potential to add more oxide tonnes to the heap leach starter project and extend the current PFS mine life of seven years.


    Following the end of the quarter, RC drilling at the M1 prospect intercepted oxide mineralisation beneath historic artisanal workings with two scissor holes ending in mineralisation (Figure 3). Shallow first pass RC drilling is being completed with an Aircore rig drilling to blade refusal as such TAC0657 and TAC0658 both ended in quartz veining returning 8m at 1.5g/t Au and 6m at 1.3g/t Au respectively. These results are up dip of historic RC hole TAN10-RC-23, drilled in 2010, which returned high-grade results of 2m at 25g/t Au from 58m. It is expected that oxide mineralisation from M1 will exhibit similar metallurgical characteristics to M5 oxides, therefore will be amenable to heap leach processing.

    None of the gold mineralisation at the M1 prospect is currently included the project resource inventory. M1 mineralisation will be modelled and incorporated in a resource update later this year, and subsequently added to the mine schedule. Any additional higher grade oxide tonnes will have a positive impact on the project economics. Initial results include:

    • TAC0656: 2m at 0.78g/t Au from surface

    • TAC0656: 1m at 0.74g/t Au from 6m

    • TAC0657: 8m at 1.45g/t Au from 25m, ending in mineralisation

    • TAC0658: 6m at 1.32g/t Au from 21m, ending in mineralisation

    • TAC0659: 1m at 0.65g/t Au from surface

      Infill RC drilling was also completed at the northeastern end of the proposed starter pit at M5 (Figure 1). Results from infill drilling will enable Inferred Resources currently treated as waste the study mine plan to be upgraded to Indicated status and incorporated in the mine schedule. Significant results include:

    • TAC0518: 2m at 0.68g/t Au from 7m

      • and 2m at 1.01g/t Au from 12m

      • and 2m at 2.6g/t Au from 20m

      • and 1m at 0.54g/t Au from 35m

    • TAC0520: 10m at 2.88g/t Au from 7m

      • and 5m at 0.69g/t Au from 24m

    • TAC0521: 18m at 1.02g/t Au from 1m


      Figure 1: Mankarga 1 & 5 Summary Plan


      Figure 2: Mankarga 1 Drill Section Summary



      2015 PFS Highlights


      An updated Pre-Feasibility Study for an oxide heap leach starter project at Mankarga 5 was completed and released in May. It was prepared in accordance with the requirements of both the Australian 2012 JORC Code and Canadian NI 43-101. The report is filed on SEDAR and on the Company's website. A summary of the base case is stated below assuming a 100% project at a gold price of US$1,300/oz. All amounts are in US dollars.

      • Production of 69,000oz pa for first 3 years, 49,000oz pa for life of mine, 7 year life of mine

      • Cash costs $428/oz for 3 years, $635/oz life of mine

      • All-in cash costs of $538/oz for 3 years, $749/oz life of mine

      • Pre-tax IRR of 63% with 14-month payback, post-tax IRR of 50% with 16-month payback

      • Pre-tax cash flow of $146m, post-tax cash flow of $118m after initial and sustaining capital costs

      • Pre-tax NPV5% of $117m, Post-tax NPV5% of $86m

      • Probable Ore reserve of 440,000oz, life of mine strip ratio 2:1

      • Potential to upgrade in-pit Inferred Resources currently treated as waste in mining schedule

      • Nearby drill ready oxide targets with potential to add to the base case


      Table 2: Economic Summary

      Pre-Tax (100%)

      $1,100/oz

      $1,300/oz

      $1,500/oz

      NPV0% ($M)

      $79

      $146

      $208

      NPV5% ($M)

      $60

      $117

      $169

      IRR %

      39%

      63%

      81%

      Payback (Months)

      21

      14

      11

      After-Tax (90%*)

      $1,100/oz

      $1,300/oz

      $1,500/oz

      NPV0% ($M)

      $58

      $110

      $156

      NPV5% ($M)

      $42

      $86

      $125

      IRR %

      30%

      50%

      66%

      Payback (Months)

      26

      16

      13

      * Allows for 10% free carried Government interest


      Table 3: Mankarga5 April 2015 Resource

      Cut-off

      Indicated Resource

      Inferred Resource

      (Au g/t)

      Tonnes

      Grade

      Au Oz

      Tonnes

      Grade

      Au Oz

      (Au g/t)

      (Au g/t)

      Oxide

      0.5

      7,200,000

      1.2

      273,000

      800,000

      0.8

      20,000

      1

      3,100,000

      1.8

      180,000

      200,000

      1.2

      7,000

      Transitional

      0.5

      2,300,000

      1.2

      89,000

      500,000

      0.9

      13,000

      1

      1,000,000

      1.9

      60,000

      200,000

      1.3

      6,000

      Fresh

      0.5

      9,500,000

      1.2

      377,000

      39,100,000

      1.0

      1,320,000

      1

      4,200,000

      1.9

      256,000

      14,800,000

      1.6

      778,000

      Total

      0.5

      19,000,000

      1.2

      736,000

      40,400,000

      1.0

      1,350,000

      1

      8,400,000

      1.8

      495,000

      15,200,000

      1.6

      791,000


      Table 4: Mankarga5 May 2015 Ore Reserve


      Category

      Strongly

      Oxidised

      Moderately

      Oxidised

      Transition

      Fresh

      Total

      Mt

      Au g/t

      Au

      Mt

      Au g/t

      Au

      Mt

      Au

      Au

      Mt

      Au

      Au

      Mt

      Au

      Au

      koz

      koz

      g/t

      koz

      g/t

      koz

      g/t

      koz

      Probable

      3.0

      1.10

      96

      5.4

      1.04

      183

      1.3

      1.46

      63

      1.5

      2.11

      98

      11.2

      1.22

      440



      Cautionary Note About Mineral Resources:


      Mineral Resources that are not mineral reserves do not have demonstrated economic viability. Mineral resource estimates do not account for mineability, selectivity, mining loss and dilution. These mineral resource estimates include inferred mineral resources that are normally considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. There is also no certainty that these inferred mineral resources will be converted to measured and indicated categories through further drilling, or into mineral reserves, once economic considerations are applied.

      Production targets for the proposed heap leach starter project referred to in this announcement were first released to the ASX and TSXV on 23 February 2015. They are preliminary and there is no certainty that the production targets, or the forecast financial information derived from the production targets, will be realised. All material assumptions underpinning production targets or forecast financial information derived from production targets continue to apply and have not materially changed.


      Feasibility Study Update

      A Feasibility Study (FS) for a heap leach starter project at the Mankarga 5 commenced during the quarter. The FS will be prepared in accordance with the requirements of both the Australian 2012 JORC Code and Canadian NI 43-101 and will be completed by Q3 2015 and is being completed in parallel with project financing negotiations.

      The Company appointed Perth-based consulting firm Mintrex Pty Ltd as lead consultant to manage the FS. Mintrex has a team of engineering professionals, headed by Mr Tom Kendall, with significant experience in project management services and skills to design, build and commission mining plants.

      Lyndon Hopkins was appointed Study Manager. His immediate responsibility will be leading the Mankarga 5 FS, building on the positive outcome of the Pre-Feasibility Study announced in February 2015.

      Mr Hopkins is a geologist with more than 20 years' experience in gold exploration, development and production. West African will add further operational and corporate strength to the management team and board over the coming months.

      Resource upgrade drilling has commenced, targeting drilling in-pit Inferred Mineral Resources. Some 0.7Mt of Inferred material grading 1.0g/t Au containing 21,000 ounces was included in the PFS pit design and is currently treated as waste. Infill drilling will upgrade this material from Inferred to Indicated category, which will make a positive impact on the project economics and reduced strip ratio.


      Metallurgical test work is in progress at ALS Ammtec in Perth. More than 4 tonnes of mostly oxide core was airfreighted to ALS in the first quarter of 2015. The company expects to complete the test work program in Q3 CY15

      Project Financing


      The project will generate strong early cash flow with a payback period of 14 months at US$1,300 gold, and average annual production of 69,000 ounces a year for the first three years (ASX, TSXV: 23/2/2015). The Company intends to finance the development of Mankarga 5 predominantly with senior debt to minimise equity dilution and maximise returns for shareholders.

      The Company has engaged Nick Harch to undertake project finance discussions with potential lenders. Nick is Managing Director of resource investment advisory firm Orimco Pty Ltd and was formerly an Executive Director with Macquarie Bank.

      Permitting

      During the quarter, West African appointed Knight Piesold Pty Ltd (KP) to monitor and assess the studies required to meet the environmental legislation requirements for the Mining Permit application. KP has previous experience in Burkina Faso and will utilise the services of local consultancy INGRID (L'Institut de Gestion des Risques Miniers et du Developpment) as well as other consultants in various disciplines to undertake the studies and the preparation of the documents required for the project's approval. Field work is ongoing, and the company expects to complete the ESIA and NIE by late July 2015.


      Exploration Upside


      West African acquired the Tanlouka Permit in January 2014 and has focussed entirely on expanding and improving existing resources, and completing economic studies. There are a number of drill-ready prospects within a short trucking distance from the starter project which have potential to add further plant feed to the starter project which have had little attention from the Company to date. Nearby prospects include Mankarga 1, Mankarga 2, Manesse, Tanwaka, Goudré and Moktedu (Figure 3).

      Mankarga 1 is the most advanced prospect and located approximately 500m northwest of the Mankarga 5 Mineral Resource. WAF geologists are completing detailed prospect and structural mapping of the area at the time of reporting. Mankarga 1 comprises similar rock types and stratigraphy to Mankarga 5, however the major difference is in the orientation of mineralised trends north-northwest, in contrast to Mankarga 5 which trends northeast. Mineralisation is hosted with steeply dipping quartz veining which has been subject to significant artisanal mining activity (Figure 4) with pits down to 30m depth. Channel Resources drilled approximately 23 RC holes and 5 Diamond holes in the area. Mineralisation is structurally complex therefore detailed auger drilling will be completed during the quarter on a 20m by 100m grid, oriented perpendicular to the main mineralised trends. Significant results from historic drilling at Mankarga 1 are shown in Table 3 below.

      In Q1FY16 high-grade results from first-pass shallow oxide RC drilling has been discovered at the Mankarga 3 prospect, with highlights including:-

  • Potential to add ounces and increase grade for heap leach starter project; and

  • Follow-up RC and Diamond drilling planned to commence in late October 15 following the wet- season

To date the Company has done very little work outside the Mankarga 5 resource area and the new gold discovery at M3 will boost the already robust economics of the heap leach starter project. This discovery at


M3 is located less than 2km from the proposed starter pit. Completion of the Feasibility Study will be extended to Q4 CY15 to allow new oxide mineralisation from M1 and M3 zones to be incorporated into the resource inventory and mine plan.

None of the recently discovered gold mineralisation at the M3 prospect is currently included the project resource inventory. M3 mineralisation will be followed-up with closer spaced drilling in late October 2015, modelled and incorporated in a resource update later this year. Any additional higher grade oxide tonnes will have a positive impact on the project economics. First pass shallow RC drilling targeting oxide mineralisation at M3 has been completed, with initial results including:


  • TAC0833: 15m at 0.83g/t Au from 20m

  • TAC0995: 6m at 1.88g/t Au from 40m ending in mineralisation

  • TAC0996: 32m at 5.02g/t Au including 13m at 7.14g/t Au from 2m

  • TAC1024: 9m at 1.11g/t Au from 19m

  • TAC1025: 7m at 1.09g/t Au from 27m ending in mineralisation


Follow-up RC drilling is planned to commence in October after the current rainy season. This drilling will test mineralisation with RC hammer and Diamond core drilling. An updated cross-section of through the M3 zone and a summary plan showing results from recent drilling is shown below in Figures 1 and 2, with results presented in Table 1 and 2.


Figure 3 - Project Location surrounding exploration prospects and deposits



OTHER PROJECTS


No work was completed during the quarter in the Company's other projects.


CORPORATE


In June, Mark Connelly was appointed Non-Executive Chairman of West African Resources.


Mr Connelly is the former Managing Director and Chief Executive Officer of Papillon Resources Limited, a Perth based Company with a Mali gold project, which recently merged with Vancouver-based B2Gold Corp in a US$570 million deal. Prior to this he was Chief Operating Officer of Endeavour Mining Corporation following its merger with Adamus Resources Limited where he was Managing Director and CEO.

Mr Connelly has more than 27 years of experience in the mining industry, and has held senior executive positions with Newmont Mining Corporation and Inmet Mining Corporation. He has extensive experience in financing, development, construction and operation of mining projects in a variety of commodities including gold, base metals and other resources in West Africa, Australia, North America and Europe.

Mr Connelly replaces Mr Francis Harper, who has resigned from the board. West African Managing Director Richard Hyde said Mr Connelly would provide important skills to the Company during its transition from developer to producer.

West African Resources had $3.5m cash at bank as at June 30 2015. The company is fully funded by Macquarie Bank (ASX, TSXV: 22/12/14) to complete a Feasibility Study for a heap leach starter project by Q3 CY15, which will incorporate any positive results from ongoing exploration programs.


Qual ified/Competent Pe r son's S tateme nt


Information in this announcement relating to the Pre-Feasibility Study has been prepared by and compiled under the supervision of Dr Leon Lorenzen, an Independent Consultant and Director of Mintrex Pty Ltd, who is a Fellow of the Australian Institute of Mining and Metallurgy (CP) and Fellow of the Institution of Engineers Australia. Dr Lorenzen has sufficient experience which is relevant to and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person (or 'CP') as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code) and a Qualified Person under Canadian National Instrument 43-101. Dr Lorenzen has reviewed the contents of this news release and consents to the inclusion in this announcement of all technical statements based on his information in the form and context in which they appear.


Information in this announcement that relates to exploration results and mineral resources is based on, and fairly represents, information and supporting documentation prepared by Mr Brian Wolfe, an independent consultant specialising in mineral resource estimation, evaluation and exploration. Mr Wolfe is a Member of the Australian Institute of Geoscientists. Mr Wolfe has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person (or 'CP') as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code) and a Qualified Person under Canadian National Instrument 43-101. Mr Wolfe has reviewed the contents of this news release and consents to the inclusion in this announcement of all technical statements based on his information in the form and context in which they appear.


Information in this announcement that relates to exploration results and mineral resources is based on, and fairly represents, information and supporting documentation prepared by Mr Nigel Spicer, an independent consultant specialising in mining engineering. Mr Spicer is a Member of the Institute of Material, Mining and Metallurgy and the Australian Institute of Mining and Metallurgy. Mr Spicer has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person (or 'CP') as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code) and a Qualified Person under Canadian National Instrument 43-101. Mr Spicer has reviewed the contents of this news release and consents to the inclusion in this announcement of all technical statements based on his information in the form and context in which they appear.

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Australia | Burkina Faso | Canada | France | Ghana | Mali | All
Gold and Silver Prices for these countries : Australia | Burkina Faso | Canada | France | Ghana | Mali | All

West African Resources Ltd.

EXPLORATION STAGE
CODE : WAF.AX
ISIN : AU000000WAF6
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

West African Resources is a exploration company based in Australia.

Its main exploration properties are MARANDET in Niger and BOULSA in Burkina Faso.

West African Resources is listed in Australia. Its market capitalisation is AU$ 641.6 millions as of today (US$ 412.1 millions, € 386.7 millions).

Its stock quote reached its lowest recent point on February 26, 2016 at AU$ 0.05, and its highest recent level on November 19, 2021 at AU$ 1.47.

West African Resources has 484 249 984 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of West African Resources Ltd.
7/25/2016in The Australian
Financings of West African Resources Ltd.
8/18/2016Issue of securities
8/18/2016ISSUE OF SECURITIES WITHOUT A DISCLOSURE DOCUMENT
3/25/2011$7 Million Capital RaisingUser-Agent: ExpressionEngine 1.6.9
Nominations of West African Resources Ltd.
2/28/2014Appointment of Colin Jones as Non-Executive Director
Financials of West African Resources Ltd.
10/31/2016Quarterly Activities and Cashflow Report
7/29/2016June 2016 Quarterly Activities Report
5/2/2016March 2016 Quarterly Activities Report
2/14/2016December 2015 Quarter Interim Financial Report
Project news of West African Resources Ltd.
9/14/2016hits 10m at 18.33g/t Au including 1m at 165.14g/t at M1 Sout...
8/1/2016(Tanlouka)Upgrades Mineral Resources as at Tanlouka
2/1/2016West African hits 19m at 1.9g/t Au from 40m, including 3m at...
10/15/2015West African commences drilling at M3 gold discovery
8/16/2015New gold zone returns up to 13g/t Au in auger drilling
6/18/2015Outstanding results at Mankarga 1 prospect – Up to 4g/t Au i...
2/19/2014Acquires Heap Leach Plant Targeting Gold Production 2015
1/20/2014Completes Acquisition of Channel Resources
12/13/2013Channel Receives Final Court Approval for Arrangement With W...
9/26/2013Channel Resources and West African Resources
5/18/2011Further high-grade results at MokteduUser-Agent: ExpressionE...
3/20/2011New high grade gold discoveryUser-Agent: ExpressionEngine 1....
Corporate news of West African Resources Ltd.
7/31/2017June 2017 Quarterly Activities and Cashflow Report
8/25/2016West African Resources Repays US$5m Loan Facility
8/1/2016West African Upgrades Mineral Resources as at Tanlouka
7/27/2016West African hits 41m at 2.2 g/t Au including 8m at 5.7 g/t ...
7/20/2016Clarus Securities initiates coverage on West African Resourc...
7/17/2016West African hits 1107g/t Au at M1 South
6/16/2016West African hits visible gold at 175m, confirms depth poten...
5/13/2016March 2016 Quarter Interim Financial Report
5/13/2016March 2016 Quarter Management Discussion & Analysis
5/11/2016West African hits 14m at 8.7g/t Au from 75m including 1m at ...
5/5/2016West African hits 6m at 9.2g/t Au from 15m at M1 South
4/26/2016Notice of General Meeting/Proxy Form
4/26/2016Section 708 Notice
4/20/2016West African hits 9m at 9.7g/t Au from 112m, including 1m at...
4/13/2016Trading Halt
4/5/2016West African hits 96.3g/t Au at M1 North
12/23/2015Becoming a substantial holder for WAF
12/21/2015Preliminary metallurgical recoveries average 97.5% at M1 and...
12/14/201515m at 1.2g/t Au including 7m at 2.2g/t Au from 4m at M3
9/30/2015Management Discussion & Analysis
9/30/2015Annual Report
9/18/2015Company Update
9/1/2015Final Director’s Interest Notice x 2
7/31/2015June Quarterly Activities Report
6/17/2015West African extends M5 by 1.5km, up to 0.63g/t Au in Auger
10/6/2014West African Resources Limited 72m at 2.2 g/t Au Including 7...
8/19/2014West African Resources Limited 15m at 5.9 g/t Au including 5...
8/12/2014West African Resources Limited Finds Extension of Mankarga 5...
8/6/2014West African Resources Limited West African Oxide Drilling 2...
12/6/2013Acquisition by West African Resources Approved
8/14/2013Letter of Intent for the Acquisition of Channel Resources by...
10/9/2012Hartleys initiates coverage on West African Resources (ASX: ...
7/29/2011June 2011 Quarterly ReportUser-Agent: ExpressionEngine 1.6.9
4/27/2011March 2011 Quarterly ReportUser-Agent: ExpressionEngine 1.6....
1/31/2011December 2010 Quarterly ReportUser-Agent: ExpressionEngine 1...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (WAF.AX)
1.33+0.00%
AUSTRALIA
AU$ 1.33
04/18 11:00 -
0%
Prev close Open
1.33 1.32
Low High
1.31 1.34
Year l/h YTD var.
0.830 -  1.42 35.71%
52 week l/h 52 week var.
0.665 -  1.42 31.03%
Volume 1 month var.
3,545,481 30.39%
24hGold TrendPower© : 9
Produces
Develops
Explores for Gold - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202454.97%
2023-27.23%1.220.77
2022-10.98%1.440.96
202126.32%1.470.72
2020143.02%1.230.40
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.69-0.39%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+6.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+7.89%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :