Marathon gold Corp

Published : September 09th, 2015

Marathon Deposit Strike Length Doubles to 850 Meters, Valentine Lake Gold Camp, Newfoundland

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Gold | Gold Mine | Growth |

Marathon Deposit Strike Length Doubles to 850 Meters, Valentine Lake Gold Camp, Newfoundland

TORONTO , Sept. 9, 2015 /CNW/ - Marathon Gold Corporation ("Marathon" or the "Company") (MOZ.TO) today announced the very positive results of step-out drilling that has increased the strike length of the Marathon Deposit by 100% to over 850 meters (Figure 1). The Marathon Deposit remains open along strike in both directions and also to depth. The new drilling stepped-out more than 400 meters to the southwest ("SW") of previous drilling and the current SW end of the Marathon Deposit open pit resource (Figure 1). The new and widely spaced drilling intersected good intervals of gold-bearing multiple-stacked quartz-tourmaline-pyrite ("QTP") veining (Table 1). This new veining is identical in style to the gold-bearing QTP veining found along an 18km strike length that includes the Leprechaun, Sprite, Victory as well as Marathon Gold Deposits.

Highlights (true thickness):

  • Best intercepts in drill holes collared up to 400 meters SW of the Marathon Deposit's current open pit resource included: 3.62 g/t Au over 9.1 meters in MA-15-062; 3.18 g/t Au over 8.4 meters 3.41 g/t Au over 6.3 meters and 3.16 g/t Au over 4.9 meters in MA-15-063; and 6.34 g/t Au over 5.3 meters in MA-15-061.

  • Previous drill holes into the Marathon Deposit that required lengthening intersected 3.73 g/t Au over 9.0 meters with 12.88 g/t Au over 1.5 meters in MA-14-016, and 1.61 g/t Au over 13.6 meters with 2.47 g/t Au over 6.0 meters and 2.08 g/t Au over 2.6 meters in MA-15-028.

  • Near surface drilling to further extend the western hanging-wall of the Marathon Deposit's current open pit resource was successful in intersecting 2.51 g/t Au over 2.3 meters in MA-15-059 and 1.85 g/t Au over 2.1 meters in MA-15-058.

  • Drilling to the northeast ("NE") of the Marathon Deposit's current open pit resource, immediately adjacent to the Valentine Thrust Fault, was successful in intersecting thin zones of QTP veining with 2.81 g/t Au over 2.1 meters in MA-15-052. This drilling was designed to test an eastern corridor of mineralization adjacent to the thrust contact.  The Marathon Deposit main trend was not tested during the current drilling campaign as this mineralized trend strikes under a large bog and will be best drilled during the winter.

  • The strike length of the Marathon Deposit has expanded by 100% to more than 850 meters and now remains open to both the SW and NE as well as to depth. The strike of the main Marathon mineralized corridor extends to the NE and SW beneath bog and overburden (Figure 1). The Leprechaun Deposit, located 7 kilometers to the SW, has a strike length of 960 meters. The Leprechaun Deposit is much more drill defined than the Marathon Deposit and has a Measured & Indicated ("M&I") resource of 775,000 ounces grading 2.28 g/t and Inferred resource containing 140,000 ounces grading 2.79 g/t. The Marathon Deposit has a M&I resource of 195,600 ounces and Inferred containing 23,800 ounces grading 2.64 g/t, which does not include the new summer 2015 drilling. Several highly-prospective, extensions of the Marathon Deposit remain untested along strike. These targets will be drilled when winter ground conditions allow for better access.

"The doubling of the strike length of the Marathon Deposit with very limited drilling and in less than a year since it was discovered is extremely exciting. This success further proves the validity of our exploration strategy and potential for more open-pit and underground resource growth along the length of the Valentine Lake Thrust Fault," said Phillip Walford , President and CEO of Marathon . "It also means that we are closing in on the critical mass we need to proceed with economic studies as we move along to the ultimate goal of development of a gold mine. The more we drill the more gold-bearing QTP veining we intersect and the bigger the gold resources grow at the Valentine Gold Camp."

TABLE 1: Significant assay intervals from the Marathon Zone drill holes MA-15-050, MA-15-052, MA-15-058 to MA-15-065 and extended drill holes MA-14-016 and MA-15-028.

DDH

Section

From

To

Core

Length

True

Width

(TT)

Gold g/t

(Uncut)

MA-15-050

17060

34

39

5

3.5

2.28



62

66

4

2.8

0.90



69

72

3

2.1

1.09



86

89

3

2.1

1.38

MA-15-052

18270

91

94

3

2.1

2.81

MA-15-058

17200

23

26

3

2.1

1.85



109

112

3

2.1

1.31

MA-15-059

17200

4.69

8

3.3

2.3

2.51



59

62

3

2.1

1.47

MA-15-060

16800

58

61

3

2.1

0.94



93

100

7

4.9

2.54

MA-15-061

17060

110

117

7

5.3

6.34

including


110

111

1

0.8

41.90

MA-15-062

16800

193

206

13

9.1

3.62

including


195

196

1

0.7

19.63

including


203

204

1

0.7

13.14

MA-15-063

16850

30

39

9

6.3

3.41

including


33

35

2

1.4

12.97



50

54

4

2.8

1.28



86

98

12

8.4

3.18

including


89

91

2

1.4

11.10



104

107

3

2.1

1.33



130

133

3

2.1

2.36



192

199

7

4.9

3.16

including


192

193

1

0.7

16.67

MA-15-064

16750

162

165

3

2.1

0.84



175

179

4

2.8

4.29

MA-15-065

16700

136

139

3

2.3

3.52



206

209

3

2.3

2.04



219

222

3

2.3

1.13

MA-14-016_Ext

17330

145

157

12

9.0

3.73

including


147

149

2

1.5

12.88



165

168

3

2.3

2.13



206

209

3

2.3

2.85

MA-15-028_Ext

17170

235

251

16

13.6

1.61

including


235

242

7

6.0

2.47

including


247

250

3

2.6

2.08

* TT-Denotes true thickness
**No significant intervals in MA-15-049, 051, and 053-057

All of the samples were fire assayed at Eastern Analytical Laboratory Ltd., in Springdale, Newfoundland .

Marathon Gold Corporation acknowledges the financial support of the JEA Program, Department of Natural Resources, Government of Newfoundland and Labrador .

Sherry Dunsworth , M.Sc., P. Geo., VP of Exploration, Marathon's Qualified Person, has reviewed the contents for accuracy and has approved this press release on behalf of Marathon .

About Marathon Gold Corporation

Marathon is a Toronto based gold resource company focused on its 100% owned Valentine Gold Camp located in central Newfoundland . The Valentine Gold Camp currently hosts four near-surface, mainly pit-shell constrained, gold resources totaling 1,060,100 oz. gold at 2.20 g/t (Measured & Indicated) and 200,000 oz. gold at 2.83 g/t (Inferred), ( April 2015 ). These resources, open along strike and to depth, cover less than 6% of the total length of the highly prospective Valentine Lake Thrust Fault and associated splay faults which host the majority of the gold mineralization within the property. Certain of Marathon's exploration expenditures at its mineral properties in Newfoundland are funded by the Government of Newfoundland and Labrador through its Junior Exploration Assistance program. For more information please visit www.marathon-gold.com

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATIONExcept for statements of historical fact relating to Marathon Gold Corporation, certain information contained herein constitutes "forward-looking statements". Forward-looking statements include statements that are predictive in nature, depend upon or refer to future events or conditions, or include words such as "expects", "anticipates", "plans", "believes", "considers", "intends", "targets", or negative versions thereof and other similar expressions, or future or conditional verbs such as "may", "will", "should", "would" and "could". We provide forward-looking statements for the purpose of conveying information about our current expectations and plans relating to the future and readers are cautioned that such statements may not be appropriate for other purposes.  By its nature, this information is subject to inherent risks and uncertainties that may be general or specific and which give rise to the possibility that expectations, forecasts, predictions, projections or conclusions will not prove to be accurate, that assumptions may not be correct and that objectives, strategic goals and priorities will not be achieved. These risks and uncertainties include but are not limited to those identified and reported in Marathon Gold Corporation's public filings, which may be accessed at www.sedar.com.  Other than as specifically required by law, we undertake no obligation to update any forward-looking statement to reflect events or circumstances after the date on which such statement is made, or to reflect the occurrence of unanticipated events, whether as a result of new information, future events, results or otherwise.

SOURCE Marathon Gold Corporation

Image with caption: "Figure 1: Location of step-out drilling up to 400m meters SW of the current Marathon deposit open pit resource as well as the drilling along the western margin and to the NE along strike of the Marathon deposit, Valentine Gold Camp. (CNW Group/Marathon Gold Corporation)". Image available at: http://photos.newswire.ca/images/download/20150909_C7497_PHOTO_EN_492723.jpg

Read the rest of the article at finance.yahoo.com

Marathon gold Corp

EXPLORATION STAGE
CODE : MOZ.TO
ISIN : CA56580Q1028
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Marathon Gold is a gold exploration company based in Canada.

Its main exploration properties are GOLDEN CHEST in USA and VALENTINE LAKE (LEPRECHAUN) in Canada.

Marathon Gold is listed in Canada. Its market capitalisation is CA$ 64.1 millions as of today (US$ 51.2 millions, € 48.6 millions).

Its stock quote reached its highest recent level on December 02, 2010 at CA$ 5.25, and its lowest recent point on November 27, 2015 at CA$ 0.11.

Marathon Gold has 118 660 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Marathon gold Corp
11/22/2018Marathon Gold advances Marathon deposit with more drilling, ...
Financings of Marathon gold Corp
6/30/2015Closes First Tranche of $3.5M Financing
6/30/2015Closes First Tranche of $3.5M Financing
6/23/2015Announces $3.5 M Financing
5/12/2014Announces Closing of the First Tranche of Private Placement
4/22/2014Announces $2.5 M Financing
Financials of Marathon gold Corp
11/12/2013Announces 2013 Q3 Financial Results
11/12/2012Announces 2012 Q3 Financial Results
11/12/2012Announces 2012 Q3 Financial Results
11/12/2012Announces 2012 Q3 Financial Results
3/29/2011Announces 2010 Financial Results
Project news of Marathon gold Corp
1/31/2012(Valentine Lake (leprechaun))Marathon Gold Hits New Gold Intersections with the Start of ...
8/25/2011(Valentine Lake (leprechaun))Marathon Discovers New Gold Bearing Quartz Veins with Grab S...
4/1/2011(Valentine Lake (leprechaun))Marathon Gold Hits 9.68 g/t Au over 12.8m (TW) including 23....
Corporate news of Marathon gold Corp
1/14/2016Marathon's Valentine Gold Camp Update and Q1 Plans
11/27/2015Marathon Gold Announces Closing of Flow-Through Financing
10/26/2015Marathon Defines 3 km Gold Corridor at the Victory Deposit A...
10/6/2015Exploration Success Continues at the Marathon Deposit; 8.89 ...
9/15/2015Marathon Discovers New High-Grade Gold Zone 550 Meters NE of...
9/9/2015Marathon Deposit Strike Length Doubles to 850 Meters, Valent...
8/10/2015Marathon Gold Announces Q2 2015 Financial Results
3/30/2015Deposit Continues to Expand in Advance of Resource Update, V...
3/2/2015Marathon Hits 3.02 g/t Au over 32.9 meters (TT) in Step-Out ...
2/17/2015The Marathon Gold Zone is now over 350m in Strike Length and...
2/17/2015The Marathon Gold Zone is now over 350m in Strike Length and...
2/2/2015Step out Drilling expands the strike length of the Marathon ...
1/12/2015Marathon Gold Step-Out Drills 2.11g/t Au over 27.5 meters (T...
1/7/2015Marathon Zone Continues Expanding with 2.01 g/t Au over 40.8...
1/7/2015Zone Continues Expanding with 2.01 g/t Au over 40.8 meters (...
12/10/2014Zone Growing with 4.13 g/t Au over 9.9m (TT) and 1.75 g/t A...
12/10/2014Marathon Zone Growing with 4.13 g/t Au over 9.9m (TT) and 1....
12/3/2014Marathon Reports High Metallurgical Process Recoveries of 92...
12/3/2014Reports High Metallurgical Process Recoveries of 92.8% to 95...
11/25/2014Zone Expanding with 2.74 g/t Au over 24.2m (TT), 2.71 g/t Au...
11/25/2014Marathon Zone Expanding with 2.74 g/t Au over 24.2m (TT), 2....
11/14/2014Marathon Gold Announces Q3 2014 Financial Results
11/4/2014Marathon Drills 4.14 g/t Au over 11.4 meters (TT) and 3.05 g...
11/4/2014Drills 4.14 g/t Au over 11.4 meters (TT) and 3.05 g/t Au ove...
10/30/2014Drills 1.71 g/t Au over 44.4 m (TT) in the Newly Discovered ...
10/30/2014Marathon Drills 1.71 g/t Au over 44.4 m (TT) in the Newly Di...
10/8/2014Marathon Announces Discovery of New High-Grade Gold Zone in ...
9/15/2014Marathon's Summer Drilling in the Sprite Zone Confirms Near ...
9/15/2014Summer Drilling in the Sprite Zone Confirms Near Surface Gol...
9/4/2014More Positive Results from Marathon's Rainbow and Sprite Zon...
9/4/2014More Positive Results from Marathon's Rainbow and Sprite Zon...
8/21/2014Marathon Gold Announces Closing of C$4.4 Million Equity Fina...
8/15/2014Marathon Gold Announces Q2 2014 Financial Results
8/5/2014Rambler Continues Its Investment in Marathon Gold
7/31/2014Marathon Gold Announces $3.0 Million Bought Deal, Unit and F...
7/23/2014Discovers New Gold Mineralized Trends over 2 Km at the Sprit...
7/10/2014Trenching and Prospecting Expands the Strike Length of the S...
6/24/2014Hits Gold in Channels 300m North of Leprechaun with 6.19 g/t...
6/18/2014discovers multiple high-grade mineralized veins 300 meters n...
4/17/2014Completes Successful Sprite Zone Winter Drilling Program, Va...
4/1/2014Drilling Expands the Sprite Zone with High-Grade, Near Surfa...
3/24/2014continues to succeed with drilling at the Sprite Area 2.53 g...
2/19/2014Drills New Gold Zone at Sprite Hitting 2.20 g/t Au over 16.8...
2/10/2014Announces Closing of Private Placement and Extension of Dril...
1/27/2014Hits Multiple Gold Intervals in Shallow Drilling at the Vict...
1/27/2014Hits Multiple Gold Intervals in Shallow Drilling at the Vict...
1/13/2014Launches 2014 Drilling Program at the Victory Gold Deposit
12/11/2013Completes Financing with Rambler and Announces Exploration P...
12/4/2013Enters into an Agreement With Rambler Metals and Mining to s...
11/27/2013Juniper Resources Exercise their Option from Marathon Gold t...
11/20/2013Step Out Channel Sampling at the Victory Gold Deposit Return...
4/3/2013Hits 4.14 g/t Au over 11.0 meters (TT) in Near-Surface Drill...
1/17/2013(Golden Chest)Reports NI- 43-101 Resource Estimate Update for the Golden C...
1/11/2013Intersects Near-Surface Gold Mineralization in the SW extens...
9/11/2012(Golden Chest)Extends High-Grade Gold Interval at the Golden Chest Mine, ...
9/8/2011Potential Open Pit Resource Continues to Expand at the Lepre...
8/30/2011Advances Resource Development with In-fill Drilling at the ...
6/9/2011(Golden Chest)Reports High Grade Drill Results from Golden Chest Mine, Ida...
3/29/2011Hits 9.68 g/t Au over 12.8m (TW) including 23.15 g/t Au over...
3/16/2011(Golden Chest)Announces High Grade Intercept of 33.0 g/t Gold Over 2.6 Met...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (MOZ.TO)
0.540-1.82%
TORONTO
CA$ 0.540
10/12 17:00 -0.010
-1.82%
Prev close Open
0.550 0.550
Low High
0.530 0.555
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
0.540 -  0.970 -37.93%
Volume 1 month var.
1,142,466 -%
24hGold TrendPower© : 27
Produces
Develops
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-27.03%
2023-30.19%1.200.69
2022-66.88%3.220.73
202110.73%3.732.13
202071.01%2.990.71
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :