March 2015 Quarterly Report

Quarterly Report for Shareholders

Period Ending 31 March 2015

HIGHLIGHTS

OPERATIONS

Gold Sales and Production - Gold sales for the quarter were 32,941 ounces with production of

30,939 ounces of gold.

Costs - Cash costs for the quarter were US$924 per ounce. All-in Sustaining Costs ("AISC")* for the quarter were US$1,080 per ounce. Due to market conditions, no credits for iron ore stockpiled during the quarter have been included in cash costs or AISC per ounce.

2015 Mine Plan - High grade Duckhead Stage 3 cutback to incorporate 20,000 ounces at a grade of

23.9 g/t from Main Lode into the second half of 2015 mine plan.

RESOURCE AND RESERVE DEVELOPMENT

Updated Resource and Reserve Statement - Updated resource and reserve statement highlights the long-term robustness of the Tucano Operation with average annual gold production ~185,000 ounces for the next 6 years (see Figure 2).

Exploration Strategy - Focus on near mine surface oxide targets that can be brought into the mining plan quickly, as per past successes with the Mirante and GAP pits. Continue to define Urucum underground resources with the current drilling program targeting a pre-feasibility study by year-end.

Tucano Mineral Resources - Increased by 401,000 ounces after depletion to 100.1 million tonnes

@ 1.67 g/t gold for 5.4 million ounces.

Tucano Ore Reserves - Decreased by 196,000 ounces after depletion to 25.7 million tonnes @ 1.57 g/t gold for 1.3 million ounces.

Duckhead - Resource extension and step out drilling results of up to 19.0 m @ 16.8 g/t gold

including 5.0 m @ 57.4 g/t gold.

Duckhead Gold Nose - A significant new drill result of 9.0 m @ 6.2 g/t gold from 5.5 m including 5.5 m @ 10.1 g/t gold located 1 km southeast of Duckhead open pit.

Urucum Underground - High grade drill results of up to 5.5 m @ 12.0 g/t gold including 1.7 m @

35.2 g/t gold, 1 m @ 78.9 g/t and additionally 12.0 m @ 3.3 g/t gold including 3.0 m @ 6.7 g/t gold in FD1397.

CORPORATE

Gold Sales - Gold sales totalled 32,941 ounces at an average cash price received of US$1,224 per ounce.

Cash and Bullion - Cash and bullion as at 31 March 2015 totalled $57 million (bullion valued at

US$0.77 and US$1,206 per ounce).

Dividend - On 16 April, the Company paid a dividend of 1 cent per share.

Cost Reduction Initiative - An ongoing strategic review of the Tucano mine site's operating costs has included a workforce reduction of ~20%, which comprised 73 company personnel and 150 contracted positions. The savings from this initiative will be realised for the remainder of the year. Other cost reduction measures will be rolled out during 2015.

Corporate Strategy - Corporate strategy has been expanded to include the acquisition of a value accretive gold producing asset or merger with another company holding such an asset.

Guidance - Guidance for full year gold sales of 170,000 - 190,000 ounces remains in place; however, June quarter guidance has been modified to 36,000 - 40,000 ounces (from 40,000 - 46,000 ounces). This deferral of ounces into the second half of 2015 is as a result of the late arrival of new earthmoving equipment and the diversion in the current quarter of a portion of the earthmoving fleet to commence mining the high grade, low cost Duckhead ore body which will be processed during the second half.

*AISC has been calculated in accordance with the World Gold Council's Guidance Note on Non-GAAP metrics released 27

June 2013.


Beadell's Managing Director commented "Whilst material movement of ore and waste for the first half are below expectations, our full year production and cost guidance remains in place as the arrival of new earthmoving equipment will ensure substantial gains throughout the second half coupled with the high grade Duckhead ore, now included in the mine plan.

Now that we have a good grip on the operations at Tucano, which I believe will become evident during the second half of 2015, our corporate strategy has been expanded to include the pursuit of a value accretive producing gold asset or transaction with like-minded gold companies. This will achieve our goal of becoming a relevant multi asset gold producer focused on robust returns. We will be disciplined and patient with any potential transaction."

Peter Bowler

Managing Director

24 April 2015

OPERATIONS

TUCANO GOLD MINE (100%)

Production Summary

Unit

Mar 2015

Quarter

Dec 2014

Quarter

Mar 2014

Quarter

Total Waste Moved

tonnes

3,784,666

3,949,016

2,883,265

Marginal Ore Stockpiled

tonnes

108,667

130,901

89,874

Gold Ore Mined

tonnes

604,295

1,347,286

308,681

Gold Ore Milled

tonnes

941,854

1,185,343

1,018,840

Head Grade

g/t

1.14

1.70

1.10

Plant Recovery

%

90.0%

91.0%

90.0%

Total Gold Recovered

ounces

30,939

59,180

32,507

Total Gold Sold

ounces

32,941

54,892

38,757

Cash Costs and All-In Sustaining Costs

Unit

Mar 2015

Quarter

Dec 2014

Quarter

Mar 2014

Quarter

On-Site Production Costs

US$/ounce

856

571

576

On-Site G&A Costs

US$/ounce

68

29

57

By-Product Credits*

US$/ounce

0

-26

-9

Cash Costs

US$/ounce

924

574

624

Royalties

US$/ounce

28

19

17

On-Site Corporate Costs

US$/ounce

17

20

18

Exploration Costs (Sustaining)

US$/ounce

2

7

47

Capitalised Stripping Costs (Sustaining)

US$/ounce

107

0

142

Capital Expenditure (Sustaining)

US$/ounce

2

18

21

All-In Sustaining Costs**

US$/ounce

1,080

638

869



* No credits for iron ore stockpiled during the March 2015 quarter have been included in cash costs or AISC per ounce.

** AISC has been calculated in accordance with the World Gold Council's Guidance Note on Non-GAAP metrics released 27 June

2013 and in accordance with this Guidance Note, gold ounces sold are used as the denominator in the cost per ounce calculations. Production costs are inclusive of the effects of ore stockpile and GIC inventory movements.

MARCH 2015 QUARTERLY REPORT 2

Production

Gold recovered in the March quarter totalled
30,939 ounces at the Tucano CIL gold plant in Brazil. The March 2015 to December 2014 quaterly comparison is impacted by reduced volumes of high grade Duckhead ore to be accessed in the second half.
The March quarter year-on-year comparison for total materal mined shows an improvement of
37%. In comparing the March 2015 quarter to the
December 2014 quarter, there is a reduction of
17%, primarily due to the onset of the wet season in Janaury and to the delayed delivery of the new mining fleet ordered by the recently appointed mining contractor. The delayed equipment was specific for earth moving during the wet season.
Additional to this, the first ever SAG Mill re-line at Tucano occurred during the quarter, which took eight days, twice as long as planned, equating to
~2,000 ounces of unbudgeted lost production.
An ongoing strategic review of the Tucano mine site operating costs has included a workforce reduction of ~20%, which included 73 company personnel and 150 contracted positions. The savings from this initiative will be realised for the remainder of the year. Further identified cost control measures will continue to be rolled out in
2015.

Mining

For the March 2015 quarter, 4,497,629 tonnes of ore and waste were mined and moved, an improvement over the March 2014 quarter of 37%.
In the March quarter, the primary mining fleet was relocated to the Urucum mining area as the Duckhead Stage 2 pit was nearing completion. This resulted in waste material mined for March
2015 quarter at 96% of the December 2014 quarter.
While the primary mining fleet at Urucum was establishing long term digging faces, low grade ore was taken before access to the higher grade planned ore blocks can begin. During this period, the mill feed also included a higher percentage of low grade stockpiled ore, resulting in a lower quarter on quarter mill feed grade.

Processing

During the quarter, the CIL plant throughput was
941,854 tonnes of predominantly oxide ore, which equates to an annualised rate of 3.8 million tonnes. The key reason for this reduction of throughput during the quarter was the first ever SAG Mill re-line at Tucano, which took eight days equating to 100,000 tonnes of lost plant throughput. The mill feed grade for the quarter was at 1.14 g/t and the process plant recovery for the period was 90%.
Gold ore stockpiles at the end of March totalled
4.9 million tonnes @ 0.77 g/t gold for 121,000 ounces plus marginal stockpiles of 1.5 million tonnes @ 0.45 g/t gold for 21,000 ounces. Total stockpiles, including marginal stockpiles, totalled
6.3 million tonnes @ 0.70 g/t gold for 142,000
ounces.

RESOURCE AND RESERVE DEVELOPMENT

BRAZIL

Tucano resource and reserves were updated as at
31 December 2014 (see ASX release 7 April
2015). Tucano Mineral resources total 100.1 million tonnes @ 1.67 g/t gold for 5.4 million ounces. Ore reserves total 25.7 million tonnes @
1.57 g/t gold for 1.3 million ounces.
A total of 572,000 resource ounces (+12%) were added and 171,000 ounces (-3%) were depleted by mill feed at Tucano. Significant additions to the Tucano resources and reserves in 2014 were sourced from near surface oxide discoveries at Mirante, Tap C3, Tap C3N, Gap, MTL and Urucum West.
Ore reserves decreased by 367,000 ounces (-22%) due to the complete removal of previously anticipated iron ore revenue removing 313,000 ounces (-19%) and reduced gold price assumptions from US$1,200 to US$1,050, depletion by mill feed of 171,000 ounces (-10%) and additions of 117,000 ounces (+7%).
The new Tucano ore reserve includes a robust
6-year open pit mine plan at significantly increased margins due to the reduced open pit strip ratio from 12.7:1 to 7.5:1, a 41% improvement and increased grade from 1.58 g/t to 1.77 g/t, a 12% improvement.
The Urucum open pit has been optimised shallower to allow previously reported deeper

MARCH 2015 QUARTERLY REPORT 3



open pit reserves, now excluded, to be accessed from underground. These reserves will be reinstated as underground reserves subject to the pending Urucum Underground prefeasibility study.
Duckhead Main Lode and Hangingwall Lode current ore reserve is 0.14 million tonnes @ 6.80 g/t gold for 31,000 ounces.

2.0

Gold Reserves

(in million ounces)

1.8

1.6

1.4

1.2

1.0

0.18

0.78 g/t

SR = 0:1

0.23

0.31

0.87 g/t

SR = 0:1

0.20

0.18

0.31

0.83 g/t

SR = 0:1

0.37

0.13

0.78 g/t

SR = 0:1

0.8

1.56 g/t

SR = 12.4:1

1.58 g/t

SR = 12.4:1

0.6

0.4

1.04

1.70 g/t

SR = 7:1

1.26 1.18 1.17

1.77 g/t

SR = 7.5:1

0.2

-

2011

2012

2013

2014

Open Pit Reserve

Effect from Iron Ore Credits

Stockpile Reserve

Cumulative Mill Depletion


Figure 1. Tucano Reserve changes from 2011 to 2014

220

Tucano 6-year Open Pit Production Profile

209*

200

180

181

184*

174* 177*

188*

160

140

120

100

80

60

40

20

-

2015 2016 2017 2018 2019 2020

Gold recovered (000' ounces)

* Long term estimates, subject to changes

Figure 2. Tucano Open Pit Life of Mine production schedule

MARCH 2015 QUARTERLY REPORT 4


In the March quarter, five drill rigs were operating on double shift. A total of 35,140 m of drilling was completed, comprising 27,535 m of grade control RC drilling and 7,605 m of exploration / resource delineation drilling.
At Urucum underground, three Diamond rigs have accelerated the pre-feasibility drilling and continue to produce strong high grade drill results of up to

5.5 m @ 12.0 g/t gold, including 1.7 m @ 35.2

g/t gold and 1 m @ 78.9 g/t (see ASX release 16

April 2015).
Exploration and resource extension drilling along the Duckhead Mine Corridor also continued to produce positive results of up to 19.0 m @ 16.8 g/t gold including 5.0 m @ 57.4 g/t from Main Lode and 9.0 m @ 6.2 g/t gold including 5.5 m @ 10.1 g/t gold from the newly named Gold Nose deposit (see ASX release 16 April 2015).

Figure 3. Tucano Mine Corridor showing location of Gap, Tap C3 North, Tap D1 and Urucum

Duckhead Mine Corridor (100%)

Resource extension drilling of the Duckhead Main Lode as well as exploration of the Duckhead Near Mine area continued during the quarter.
A significant new drill result was received from the newly named Gold Nose prospect of 9.0 m @ 6.2 g/t gold from 5.5 m including 5.5 m @ 10.1 g/t gold in FDVM153. The result is located on the very eastern end of the 400 m long Gold Nose anomaly located 1 km southeast of the Duckhead open pit (see Figure 4). The new result is located within in-situ oxide saprolite material below 5.5 m of barren colluvium overburden and remains untested at depth and along strike.
Resource extension and step out RC drilling was completed on the Main Lode below the open pit limits. Results up to 19.0 m @ 16.8 g/t gold including 5.0 m @ 57.4 g/t from 36.0 m in FVM520 highlight the strong continuity of the very high grade core of mineralisation and will form part of the Stage 3 open pit cutback at Duckhead. Other significant results include 9.0 m @ 6.7 g/t gold from 49.0 m including 2.0 m @ 23.5 g/t gold in FVM524 and 5.0 m @ 6.0 g/t gold from 49.0 m including 2.0 m @ 11.6 g/t gold.
A small first pass program of RC drilling was completed at Goosebumps with a best result of
1.0 m @ 9.4 g/t gold from 8 m in FVM542.

MARCH 2015 QUARTERLY REPORT 5



Figure 4. Duckhead Mine Corridor.

Urucum Underground

Surface Diamond drilling targeting the Urucum Underground accelerated in the March 2015 quarter with three Diamond rigs on double shift. Results from several new drill holes were received (see ASX release 16 April 2015). New results received in the March quarter include;

FD1396 - Lode 1 2.0 m @ 8.2 g/t gold and

1.2 m @ 4.7 g/t gold, Lode 2 4.0 m @ 4.0 g/t gold, 34 m @ 1.8 g/t gold including 7.0 m @
4.6 g/t

FD1397 - Lode 1 5.5 m @ 12.0 g/t gold including 1.7 m @ 35.2 g/t gold and 1.0 m @

78.9 g/t gold, Lode 2 12.0 m @ 3.3 g/t gold
including 3.0 m @ 6.7 g/t

FD1401 - Lode 1 7.8 m @ 6.4 g/t gold including 3.8 m @ 12.5 g/t gold, Lode 2 17.1 m @ 1.5 g/t including 9 m @ 2.5 g/t gold

The Diamond drilling is targeting the Urucum North part of the 3.0 million ounces Urucum deposit
where deeper wide spaced drilling to date has defined a large resource below the yet to be mined Urucum North open pit. Optimisation studies to determine the depth of the open pit / underground cross over position resulted in the Urucum North open pit being shallowed and overall reserves temporarily reduced while the Urucum prefeasibility drilling and study is completed (see ASX release 7 April 2015). The Urucum Pre- Feasibility Study ("PFS") drilling has been extended and will be completed in the June Quarter, with results of the PFS to be completed and released in the second half of 2015.
The Urucum Underground drilling is focussed on two continuous subparallel lodes at Urucum North named Lode 1 and Lode 2. Both lodes form sub- vertical ore shoots in excess of 800 m strike bounded by cross cutting pegmatite intrusions to the north and south (see Figure 5).

MARCH 2015 QUARTERLY REPORT 6



Figure 5. Urucum Lode 1 longsection showing location of new Diamond drill results.

EXPLORATION

BRAZIL

Tucano Regional

Compilation and repocessing of all geophysical datasets will be completed in the June quarter prior to target ranking and implementation of follow up exploration programs.
Tenement applications at Mutum and Sucuriju are awaiting grant before further field activities can be completed.

Tartaruga Project (100%)

No work was completed.

WESTERN AUSTRALIA

Tropicana East Project (100%)

No work completed.

Zanthus Project (100%)

No work completed. Tenement holdings have been reduced by 50%.

Balladonia Project (100%)

No work completed. Tenement holdings have been reduced by 75%. E69/2041 was relinquished.

CORPORATE & FINANCE

Gold Sales

Gold sales totalled 32,941 ounces in the March quarter. The average cash price received was US$1,224 per ounce.

Cash & Bullion

Cash and bullion as at 31 March 2015 totalled

$57 million (bullion valued at A$1.00 = US$0.77 and US$1,206 per ounce) (see Figure 6). This balance includes the machinery lease facility relating to the mining fleet sold to MACA Ltd and

will be repaid from this cash & bullion over time totalling ~$15 million.

Capital and Exploration Expenditure

Non-sustaining capital expenditure for the quarter was $1.5 million and was largely associated with construction of the long term West Pond and North Mill Pond tailings dams.
Non-sustaining exploration expenditure for the quarter was $2.5 million.

MARCH 2015 QUARTERLY REPORT 7

140

March 2015 Quarter Cash Movements

in A$ million

120

52 39

100

80

60

40

20

73

Bullion

$23 M

Cash

$50 M

7

4 3 4

11 57

Bullion

$7 M

Cash

$50 M

-

Bank Finance


Figure 6. March 2015 Quarter Cash Movements.
producing gold asset. The focus will be on robust
During the quarter, the Company announced that the US$60 million Bridge Loan with Santander was restructured into an unhedged 3-year Facility with Banco Santander and Banco Itaú.
The Facility is secured by the Company's Tucano Mining Concession and is repayable in 12 equal quarterly instalments starting from 15 April 2015. Interest payments of USD LIBOR + 3% per annum on the outstanding balance are also payable quarterly.

Currency Movements

It is important to note that throughout the last three months from 1 January 2015, the Brazilian Real has weakened against the US Dollar by 20% compared with the Australian Dollar that has weakened 7% against the US Dollar over the same period. As with Australian gold producers this currency movement has aided significantly, and to a greater extent, to the profitability of the operation.

Corporate Strategy

The Company has adopted a strategy to benefit from the well understood benefits of a gold business managing multiple operating gold mines. Now that the Tucano gold mine has established itself as a reliable cash flow generating centre, Beadell is in a strong position to strive for more consistent quarter on quarter production by the acquisition or merger of a value accretive
returns in well understood jurisdictions. A patient approach will ensure the successful execution of Beadell's corporate strategy.

CY2015 Guidance

Guidance for full year gold sales of 170,000 -
190,000 ounces remains in place along with AISC guidance between US$810 - US$890 per ounce. Planning on incorporating a modest cutback of the high grade Duckhead pit into the 2015 Mine plan is complete and is now included in this guidance. It is anticipated this will contribute ~20,000 ounces of low cost gold to the production profile. As a result of this inclusion, guidance for the remainder of the year is as follows:

CY2015

Quarter

CY2015

Gold Sales Guidance

June 2015

36,000 - 40,000 ounces

September 2015

44,000 - 48,000 ounces

December 2015

56,000 - 60,000 ounces

Dividend Payment

On 16 April, the Company paid an unfranked dividend of 1 cent per share payable in Australian dollars. The record date for receiving the dividend was 31 March.

Beadell's Annual General Meeting

Annual General Meeting to be held at the King

MARCH 2015 QUARTERLY REPORT

ASX Code: BDR

Directors and Senior Management: Craig Readhead Non-Exec. Chairman Mike Donaldson Non-Exec. Director Ross Kestel Non-Exec. Director Peter Bowler Managing Director

Rob Watkins Exec. Director Geology
Greg Barrett CFO/ Company Secretary Boyd Timler Chief Operating Officer Luis Abadi General Manager - Brazil

Corporate Details:

Issued capital: 798,657,280 ordinary shares

(as at 31 March 2015)

ABN 50 125 222 291

Head Office:

Level 2, 16 Ord Street West Perth 6005
PO Box 542 West Perth 6872
Tel: +61 8 9429 0800
Fax: +61 8 9481 3176
www.beadellresources.com.au

For further details: Peter Bowler

Tel: +61 8 9429 0801
Email: [email protected]

Greg Barrett

Tel: +61 8 9429 0803
Email: [email protected]

Competent Persons Statement

The information in this report relating to Mineral Resource, Open Pit Ore Reserves and Exploration Results are based on information compiled by Mr Robert Watkins who is a member of the Australasian Institute of Mining and Metallurgy and who has sufficient experience which is relevant to the styles of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Watkins is an Executive Director of Beadell Resources and consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information in this report relating to Open Pit Ore Reserves is based on information compiled by Mr Sjoerd Rein Duim who is a member of the Australasian Institute of Mining and Metallurgy and who has sufficient experience which is relevant to the styles of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Duim is a consultant who is employed by SRK Consulting and consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Mr Duim is responsible for the Tucano pit optimisations for Tap AB, Tap C and Urucum and final reporting of the pit design inventories for Tap AB, Tap C, Urucum and Duckhead.

The information in this report relating to Mineral Resources is based on information compiled by Mr Paul Tan who is a member of the Australasian Institute of Mining and Metallurgy and has sufficient exploration experience which is relevant to the various styles of mineralisation under consideration to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Tan is a full time employee of the Beadell Group and consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information is extracted from the reports entitled "Duckhead Exploration Update" created on 8 January

2015, "Annual Mineral Resource and Ore Reserve Update" created on 7 April 2015 and "Tucano Exploration

Update" created on 16 April 2015 and are available to view on www.beadellresources.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and, in the case of estimates of Mineral Resources or Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original market announcement.

MARCH 2015 QUARTERLY REPORT 9

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Australia | Brazil | All
Gold and Silver Prices for these countries : Australia | Brazil | All

Beadell Resources

DEVELOPMENT STAGE
CODE : BDR.AX
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Beadell res is a gold development stage company based in Australia.

Beadell res holds various exploration projects in Australia.

Its main assets in development are AMAPARI and TUCANO in Brazil and its main exploration properties are WEST MUSTRAVE PROJECT (HANDPUMP) and TROPICANA EAST in Australia.

Beadell res is listed in Australia. Its market capitalisation is AU$ 80.2 millions as of today (US$ 56.2 millions, € 50.2 millions).

Its stock quote reached its highest recent level on December 07, 2012 at AU$ 1.09, and its lowest recent point on December 28, 2018 at AU$ 0.04.

Beadell res has 1 233 430 016 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Beadell Resources
3/31/2010Updated Investor Presentation
Annual reports of Beadell Resources
Annual Report 2009
Financings of Beadell Resources
4/1/2010Institutional and Private Placement to Raise $57.0 million
Option Grants of Beadell Resources
2/1/2012ASX Announcement: Dividend Policy
Nominations of Beadell Resources
9/5/2016Change of Director's Interest Notice
Project news of Beadell Resources
4/24/2012(Tropicana East)ASX Announcement: Tropicana East - Hercules Drill Results
4/3/2012(Tucano)ASX Announcement: High Grade Drill Results - Tucano
1/31/2012ASX Announcement: Urucum Deeps High Grade Intersection
8/30/2011ASX Announcement: Maiden Iron Ore Resource on Beadell's Mini...
5/5/2011(Tucano)ASX Announcement: Government Approvals Received - Tucano
4/5/2011(Tucano)ASX Announcement: Tucano Gold Ore Reserve
3/31/2011Company Review - Beadell Resources Limited
12/1/2010(Tropicana East)ASX Announcement: New Discovery in Tropicana Belt 30m @ 8.3 ...
7/26/2010(Tucano)Outstanding Drill Results at Tucano
6/1/2010Tucano Definitive Feasibility Study Commences
4/13/2010(Amapari)Acquisition of Amapari Gold Mine and Iron Ore Royalty Comple...
3/2/2010(West Mustrave Project (handpump))West Musgrave Gold Discovery Update
1/28/2010(Amapari)Acquisition of Amapari Gold Mine
1/7/2010(West Mustrave Project (handpump))West Musgrave Gold Discovery Confirmed 60 m @ 0.9 gpt gold
1/5/2010High Grade Gold Discovery Confirmed 192 6 gpt gold
9/23/2009(Tropicana East)Hercules Drilling Results - Tropicana East Project
7/1/2009(West Mustrave Project (handpump))Anglo American Option and Joint Venture Agreement
Corporate news of Beadell Resources
5/18/2016Chairman's Address to Shareholders
5/16/2016Cancellation of Employee Options
11/24/2015Investor Presentation - November 2015
10/27/2015Urucum Preliminary Conceptual Underground Mine Design
10/5/2015Quarterly Production Update
9/17/2015Maiden Urucum Underground Mineral Resource
9/2/2015Operational Update
8/28/20152015 Interim Financial Report
8/28/20152015 Half Year Results
8/2/2015Investor Presentation - Diggers and Dealers 2015
7/13/2015Duckhead Operational Update
6/15/2015Urucum Underground Update
4/24/2015March 2015 Quarterly Report
4/17/2015Annual Report to shareholders
4/16/2015Tucano Exploration Update
4/7/2015Annual Mineral Resource and Ore Reserve Update
4/7/2015Quarterly Production Update
3/27/2015Dividend Follow-Up Letter (to AUS Residents only)
3/13/2015Letter to Shareholders
3/10/2015Currency Update
2/26/2015Maiden Dividend and 2014 Financial Year Results
2/26/20152014 4E and Full Year Statutory Accounts
11/12/2014Tucano Drill Results
11/9/2014MACA Partnership Commences
11/6/2014Change of Director's Interest Notice
10/23/2014Mining Partnership Agreement with MACA Limited
3/25/20142013 Financial Year Results
3/24/20142014 Guidance Upgrade and Production Update
2/8/2013BMO Conference Participation
4/26/2012ASX Announcement: Quarterly Report March 2012
3/6/2012ASX Announcement: Capital Raising Completed
2/29/2012ASX Announcement: Ross Kestel Joins Board
1/25/2012ASX Announcement: Quarterly Report 31 December 2011
12/8/2011ASX Announcement: Iron Ore Strategic Review
10/27/2011ASX Announcement: Quarterly Report 30 September 2011
9/7/2011Investor Presentation: Deutsche Bank Gold Conference 7 Sept ...
5/16/2011(Tropicana East)ASX Announcement: Tropicana East Results 5m @ 4 gpt Gold
5/12/2011(Tucano)ASX Annoucement: Tucano Resource Drilling Target
5/10/2011(Tucano)ASX Announcement: Definitive Feasibility Study Completed - T...
4/28/2011ASX Announcement: Quarterly Report 31 March 2011
4/12/2011ASX Announcement: Investor Presentation - April 2011
3/23/2011(Tucano)ASX Announcement: Tucano Gold Results 14 m @ 19.9 gold
3/21/2011ASX Announcement: Potential Iron Ore Production from Gold Pl...
3/1/2011(Tucano)ASX Announcement: New Tucano Gold and Iron Ore Results
12/1/2010ASX Announcement: New Gold Inc's Shares Sold
8/6/2010Legal Settlement - William Creek
7/28/2010Quarter Report 30 June 2010
5/18/2010Share Purchase Plan & Shortfall Placement
5/6/2010Resource Drilling to Commence - Brazil
5/4/2010Share Purchase Plan Update
4/29/2010Quarterly Activities Report 31 March 2010
4/15/2010New Non Executive Chairman and Non Executive Director Appoin...
3/18/2010Anglo American Airborne Spectrem Anomalies Detected
1/29/2010Quarterly Activities Report 31 December 2009
12/18/2009BDR Media Coverage: Kalgoorlie Miner Thursday, 17 December 2...
12/17/2009Additional Mineralised Zones Intersected at West Musgrave
12/1/2009New Gold Soil Anomaly Tartaruga Brazil
11/25/2009Beadell AGM 25 November 2009
10/27/2009Quarterly Activities Report 30 September 2009
9/30/2009Anglo American Airborne Spectrum Survey Commences
8/31/2009Company Announcement
7/27/200930 June 2009 Quarterly Activities Report
7/23/2009Company Announcement. New Results - Tropicana East
6/30/2009Company Announcement
1/27/2009ASX Announcement - December 2008 Quarter Report
1/22/2009Company Announcement
1/20/2009SIGNIFICANT GOLD ANOMALY AT TROPICANA EAST
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (BDR.AX)
0.065+0.00%
AUSTRALIA
AU$ 0.065
06/29 02:35 -
0%
Prev close Open
0.065 0.062
Low High
0.062 0.067
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.065 -%
Volume 1 month var.
17,662,973 -%
24hGold TrendPower© : -26
Produces
Develops Gold
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.22+1.63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48-1.59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.84-1.31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.85-2.63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.83+0.78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :