Mines Management Inc.

Published : August 19th, 2010

Message - PR 10-06

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

FOR IMMEDIATE RELEASE RELEASE 10-06

MINES MANAGEMENT ANNOUNCES SECOND QUARTER
FINANCIAL AND OPERATING RESULTS

Spokane, Washington � August 18, 2010 � Mines Management, Inc. (NYSE-Amex: �MGN�, TSX: �MGT) is pleased to announce financial and operating results for the second quarter ending June 30, 2010.

In the second quarter of 2010:

  • The U.S. Forest Service (USFS) and the Montana Department of Environmental Quality (DEQ) continued formulating responses to public comments received on the Draft Environmental Impact Statement (DEIS) for the Montanore Project in 2009.

  • The Company�s exploration and corporate development team continued to explore additional resource opportunities in North America and Latin America.

  • The Company continued meetings with federal and state agencies, Montana legislators, local Lincoln County Commissioners, Libby City officials and residents.

  • The Company closed out the quarter at June 30, 2010 with $9.0 million of unrestricted cash and certificates of deposit.

  • The Company continued its program to reduce expenditures and conserve cash pending the completion of permitting.

The net cash operating expenditures for the six months ended June 30, 2010 was $3.6 million. The Company believes that it has sufficient working capital to complete the rehabilitation of the Libby adit and initiate delineation drilling at Montanore.

Advanced Exploration and Delineation Drilling Program

Second quarter operations included continued operations on the Montanore mine site water treatment system and maintaining the water level of the decline. Water from the decline is being treated on day shift at a rate of 350 gallons per minute which equates to approximately 72 gallons per minute of water infiltration from the formations. Ongoing water monitoring continues with respect to the water treatment in order to generate data which is used in monthly reports furnished to the Montana DEQ for monitoring purposes and for the hydrological data base that is currently under development through our hydrology contractor.

In April 2010, the Company awarded a contract to Mine Quarry Engineering Services (MQES) to develop an economic assessment of the project using the existing NI 43-101 resource report prepared by Mine Development Associates and to develop a Preliminary Economic Assessment (PEA) of the Montanore Project.

Engineering and geology work continues using existing information. Geology work has concentrated on the basic resource model in support of the NI 43-101 for the review being done by MQES. Engineering work is concentrated on the gathering and preparation of supporting documents and summarizing information for the MQES PEA study.

Permitting and Environmental

In the second quarter of 2010, the USFS and the Montana DEQ continued to respond to comments generated by the public and agencies on the DEIS, addressing wetlands, water quality, and waste characterization. The agencies have completed the development of alternatives for selection of the electrical transmission line corridor but are working to harmonize the preferred alternative between the USFS and Montana DEQ.

The Company finalized several technical support documents on hydrology, waste characterization and a water/balance chemical loading model that are currently under review by the agencies. The final revisions were based on previous comments generated by either the public or the agencies. Efforts continue on other technical documents and applications that are necessary for the environmental review process or agency approval. This includes air quality modifications, domestic waste water management, and other similar project environmental and permitting requirements.

The Company is working with the USFS and Montana DEQ on development of environmental mitigation (i.e. wetlands, sediment loading and fisheries) for the project. The Company is also working with the U.S. Army Corps of Engineers (ACOE) to develop mitigation of wetlands use under the ACOE�s 404 permitting process.

The Company continues to work with the agencies to refine overall project description to minimize environmental impacts analyzed in the DEIS. This will help in the reduction of costs associated with mitigation and monitoring activities that may be required for the project.

Financial and Operating Results

Mines Management, Inc. is an exploration stage company with a large silver-copper project, the Montanore Project, located in northwestern Montana. The Company continues to expense all of its expenditures with the exception of equipment and buildings, which are capitalized. The Company has no revenues from mining operations. Financial results of operations include primarily interest income, general and administrative expenses, permitting, project advancement and engineering expenses.

Quarter Ended June 30, 2010

The Company reported a net loss for the quarter ended June 30, 2010 of $1.2 million, or $0.05 per share, compared to a net loss of $1.9 million, or $0.08 per share, for the quarter ended June 30, 2009. The $0.7 million decrease in net loss in the second quarter of 2010 is attributable to (i) decreases in operating expenses of $0.1 million from the second quarter of 2009, principally in stock compensation included in general and administrative expenses, and (ii) a gain on warrant derivatives of $0.7 million offset by a decrease in interest income of $0.1 million.

Six Months Ended June 30, 2010

The Company reported a net loss for the six months ended June 30, 2010 of $4.6 million, or $0.20 per share, compared to a loss of $4.9 million or $0.22 per share for the six months ended June 30, 2009. The $0.3 million decrease in net loss from 2009 is attributable to the following items: (i) increased general and administrative costs of $0.7 million in 2010 primarily due to an increase in stock compensation due to options issued in January of 2010; (ii) increased legal, accounting and consulting costs of $0.1 million in 2010 due to fees associated with permitting issues; (iii) decreased technical services costs of $0.5 million in 2010 due to suspending site rehabilitation work in April 2009; and (iv) increased other income of $0.6 million in 2010 primarily due to a net gain in the fair market value of warrant derivatives.

Liquidity

During the six months ended June 30, 2010, the net cash used for operating activities was $3.6 million, which consisted largely of permitting and technical expenses associated with activities at the Montanore Project site.

We continue to reduce activity levels, including capital expenditures, until the timing for the receipt of the Record of Decision becomes more clear. We anticipate expenditures of approximately $3.6 million in the final six months of 2010, which we expect to consist of $2.1 million for general and administrative expenses and $1.5 million for ongoing expenses in preparation for the delineation drilling program, additional mine scoping studies, and responding to EIS comments. Depending on the amount and rate of progress with our permitting efforts and market conditions, the Company might seek additional financing before the end of 2010.

Mines Management, Inc. is a U.S. based mineral company focused on the acquisition and exploration of precious and base metals mineral deposits. The Company�s primary focus is on the advancement of the Montanore silver-copper project located in northwestern Montana, with a goal to ultimately become a new mid-tier producer of precious and base metals. As of August 18, 2010, the Company had 23,100,109 shares of common stock issued and outstanding.

FORWARD LOOKING STATEMENTS - Some information contained in or incorporated by reference into this release may contain forward looking statements as defined in the Private Securities Litigation Reform Act of 1995. These statements include, among other things, comments regarding further exploration and evaluation of the Montanore Project, including planned rehabilitation and extension of the Libby adit, drilling activities, feasibility determinations, engineering studies, environmental and permitting requirements, process and timing, and estimates of mineralized material and measured, indicated and inferred resources, financing needs, the markets for silver and copper, planned expenditures for the remainder of 2010, sources of financing, potential completion of a bankable feasibility study, results of the hydrological model and the effects thereof, and the search for potential exploration and development opportuni ty in the mining industry. The use of any of the words "anticipate," "estimate," "expect," "may," "project," "should," "believe," and similar expressions are intended to identify uncertainties. We believe the expectations reflected in those forward looking statements are reasonable. However, we cannot assure that the expectations will prove to be correct. Actual results could differ materially from those anticipated in these forward looking statements as a result of the factors set forth below, and other factors set forth and incorporated by reference elsewhere in documents filed by the Company with the U.S. Securities and Exchange Commission, and with other regulatory authorities, including worldwide economic and political events affecting the supply of and demand for silver and copper, and the availability and cost of financing for mining projects, volatility in the market price for silver and copper, financial market conditions and the availability of financing on accepta ble terms or on any terms, uncertainty regarding whether reserves will be established at Montanore, uncertainties associated with developing new mines, variations in ore grade and other characteristics affecting mining, crushing, milling and smelting and mineral recoveries, geological, technical, permitting, mining and processing problems, the availability, terms, conditions and timing of required governmental permits and approvals, uncertainty regarding future changes in applicable law or implementation of existing law, the availability of experienced employees, the factors discussed under "Risk Factors" in the Company�s Annual Report on Form 10-K for the period ending December 31, 2009.

#

Mines Management Inc.

DEVELOPMENT STAGE
CODE : MGN
ISIN : US6034321058
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Mines Management is a silver and copper development stage company based in United states of america.

Mines Management holds various exploration projects in USA.

Its main asset in development is MONTANORE (ROCK LAKE) in USA.

Mines Management is listed in Canada, in Germany and in United States of America. Its market capitalisation is US$ 38.4 millions as of today (€ 34.2 millions).

Its stock quote reached its highest recent level on January 10, 1997 at US$ 937.00, and its lowest recent point on February 08, 2002 at US$ 0.05.

Mines Management has 33 990 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Mines Management Inc.
2008 Annual report
Annual Report 2007
Financings of Mines Management Inc.
4/5/2011ANNOUNCES EXERCISE OF UNDERWRITER’S OVER-ALLOTMENT OPTION
3/14/2011MINES MANAGEMENT, INC. PRICES $15 MILLION PUBLIC OFFERING
3/3/2011COMMON STOCK OFFERING
2/11/2010announces extension and reprice of warrants
11/5/2007ANNOUNCES COMPLETION OFUS$10 MILLION PRIVATE PLACEMENT WITH ...
Nominations of Mines Management Inc.
10/1/2009Appoints Michael G. Rasmussen as Vice president or explorati...
12/20/2007 ANNOUNCES APPOINTMENTS TO ITS PROFESSIONAL STAFF AT THE MON...
Financials of Mines Management Inc.
5/3/2011YEAR-END EARNINGS RELEASE
4/26/2010Announces 2009 operating results
9/9/2009Second quarter financial and operating results
6/1/2009Announces first quarter results
4/8/2008Announces 2007 Year End Financial Results
11/15/2007Announces Third Quarter Earnings and Montanore Project Updat...
8/21/2007SECOND QUARTER RESULTS
5/17/2007 Announces First Quarter Results
Project news of Mines Management Inc.
12/16/2015Montana silver, copper mine clears key hurdle; lawsuit looms
8/19/20159:02 am Mines Management announces a favorable US court ruli...
2/4/2011(Montanore (rock Lake)) Technical Report For Montanore Silver-Copper Project
7/13/2009 Updates permitting activities at the Montanore project
3/2/2009(Montanore (rock Lake))ANNOUNCES RELEASE OF DRAFT ENVIRONMENTAL IMPACT STATEMENT .....
7/14/2008(Montanore (rock Lake))State of Montana Approves Montanore Hard Rock Mining Impact ...
11/19/2007(Montanore (rock Lake)) ANNOUNCES COMPLETION OF IMPORTANT MILESTONE IN MONTANORE PR...
11/9/2007(Montanore (rock Lake))PURCHASES UNDERLYING ROYALTY ON MONTANORE PROJECT
3/28/2007(Montanore (rock Lake))Files Preliminary Prospectus Supplement to Raise Gross Proce...
Corporate news of Mines Management Inc.
8/19/2016Mines Management Reports Second Quarter 2016 Financial Resul...
7/8/2016Mines Management's Compliance Plan Extended by NYSE MKT
5/24/2016What Hecla Really Gets With This Small Acquisition
5/24/2016Hecla to Acquire Mines Management
4/6/2016Mines Management's Compliance Plan Extended by NYSE MKT
4/5/2016Mines Management Reports 2015 Financial Results and Montanor...
3/21/2016Mines Management Engages Financial Advisor
2/12/2016The Latest: Mine developer says partial approval is enough
1/21/2016Mines Management's Compliance Plan Extended by NYSE MKT
1/21/2016Mines Management Inc.'s Compliance Plan Extended by NYSE MKT
12/21/2015Mines Management's Montanore Silver-Copper Project Receives ...
12/21/2015Mines Management Inc.'s Montanore Silver-Copper Project Rece...
12/18/2015Mines Management Reports Third Quarter 2015 Financial Result...
10/27/2015Mines Management Inc.'s Compliance Plan Approved and Extende...
10/9/2015Mines Management Raises Cash; Provides Update on Financial M...
10/9/2015Mines Management Inc. Raises Cash and Provides Update on Fin...
9/23/2015NYSE MKT Accepts Mines Management, Inc. Plan to Regain Compl...
8/21/2015Mines Management Reports Second Quarter 2015 Financial Resul...
8/21/2015Mines Management Inc. Reports Second Quarter 2015 Financial ...
8/20/2015Federal Court Rules in Favor of Mines Management Regarding C...
8/19/2015Federal Court Rules in Favor of Mines Management Regarding C...
8/18/2015Mines Management Inc. Announces Completion of Objection and ...
8/17/201510-Q for Mines Management, Inc.
7/8/2015Mines Management, Inc. Receives Notice from NYSE MKT
7/8/201510:03 am Mines Management receives a letter from the NYSE, i...
6/18/2015Mines Management Inc. Announces Voting Results of Annual Gen...
5/19/201510-Q for Mines Management, Inc.
4/7/2015Mines Management Inc. Reports 2014 Financial Results and Mon...
3/30/2015Mines Management Final Environmental Impact Statement Comple...
3/30/2015Mines Management Inc. Final Environmental Impact Statement C...
3/30/2015FINAL ENVIRONMENTAL IMPACT STATEMENT COMPLETED FOR MONTANORE...
2/25/2014AMENDED Mines Management, Inc. Press Release - PR 14-01
2/25/2014PR 14-01
11/28/2013PR 13-07 Revised
9/3/2013PR 13-06
6/15/2013PR 13-05
6/3/2013PR 13-04
5/7/2013PR 13-03
4/25/2013PR 13-02
3/22/2013Message - PR 13-01
4/10/2012Message - PR 12-03
9/8/20112011 Silver Summit Luncheon
8/19/2010Message - PR 10-06
5/3/2010World Moneyshow Las Vegas 2010 Conference Booth# 420
1/25/2010World Moneyshow Orlando 2010 Conference Booth# 813
11/17/2009Withdraws public offering of shares
11/12/2009ANNOUNCES COMMON STOCK OFFERING
8/11/2009To Host Silver Summit Lucheon
6/22/2009Shareholders approve stockholder rights plan
1/30/2009EXTENDS WARRANT EXPIRATION
5/28/2008ANNOUNCES 1ST QUARTER RESULTS
3/3/2008 STATE OF MONTANA CONFIRMS MONTANORE PROJECT'S 1993 OPERATIN...
9/7/20072007 FALL CONFERENCE SCHEDULE
5/9/2007ANNOUNCES EXCERCISE OF OVER-ALLOTMENT OPTION
4/20/2007Successful Closing of US$30 Million Unit Offering
3/26/2007Announces 2006 results
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AMEX (MGN)FRANKFURT (MM2.F)
1.13-10.32%9.47+0.00%
AMEX
US$ 1.13
09/13 16:00 -0.130
-10.32%
Prev close Open
1.26 1.13
Low High
- -
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  1.13 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : 3
Produces
Develops Copper - Silver
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 10/18/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :