Peregrine Diamonds Ltd.

Published : November 28th, 2017

Microdiamond Results Extend the High Grade CH-6 Kimberlite to 540 Metres Below Surface and Remains Open at Depth

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Microdiamond Results Extend the High Grade CH-6 Kimberlite to 540 Metres Below Surface and Remains Open at Depth

VANCOUVER, British Columbia, Nov. 28, 2017 (GLOBE NEWSWIRE) -- Peregrine Diamonds Ltd. (PGD.TO) (“Peregrine” or “the Company”) is pleased to report microdiamond results from the CH-6 kimberlite at its 100% owned Chidliak Diamond project (“Chidliak”) in Nunavut, Canada. The 2017 resource expansion drill program at the CH-6 kimberlite has confirmed that the high-grade CH-6 kimberlite extends from surface to 540 metres below surface (“mbs”), an additional 280 metres below the 260-metre depth of the current CH-6 Inferred Resource announced on April 7, 2017. The CH-6 kimberlite remains open below 540 mbs, the current limit of drilling.

Diamond sample data below 260 metres have a very similar grade and size frequency distribution as the kimberlite contained in the Inferred Resource. The results of the 2017 program will form the basis of a revised CH-6 resource estimate, with the expectation of extending the categorized resource base from a depth of 260 mbs to 540 mbs." data-reactid="12">Caustic fusion microdiamond results released today from the 2017 drill program match well with pre-2017 microdiamond results for the KIM-L High Grade (“KIM-L.HG”, estimated at 4.16 carats per tonne (“cpt”) in the Inferred Resource) and the KIM-L Normal Grade (“KIM-L.NG”, estimated at 2.12 cpt in the Inferred Resource) kimberlite units. The 2017 Diamond sample data below 260 metres have a very similar grade and size frequency distribution as the kimberlite contained in the Inferred Resource. The results of the 2017 program will form the basis of a revised CH-6 resource estimate, with the expectation of extending the categorized resource base from a depth of 260 mbs to 540 mbs.

Diamond size distribution, which has important implications for future Diamond valuations." data-reactid="13">Tom Peregoodoff, Peregrine’s President and Chief Executive Officer, commented: “The results we are releasing today confirm that the high-grade CH-6 kimberlite extends well below the current resource base of 260 metres. The microdiamond data from this years’ drilling clearly demonstrates that not only is the grade of this newly-defined extension of the CH-6 kimberlite very similar to that which we have previously defined, but also that we can expect the same macro Diamond size distribution, which has important implications for future Diamond valuations.

Diamond content of the CH-6 kimberlite, especially given the apparent increase in the KIM-L.HG unit which has an estimated Inferred Resource grade of 4.16 cpt. In addition, the presence of a very rare green Diamond bodes well for the presence of other rare, coloured diamonds that could have a significant impact on the overall average prices eventually received for diamonds recovered from the Chidliak project.”" data-reactid="14">The Peregrine team is now using this information as the basis for a new resource statement due in mid-February, in which we expect to add significantly to the overall Diamond content of the CH-6 kimberlite, especially given the apparent increase in the KIM-L.HG unit which has an estimated Inferred Resource grade of 4.16 cpt. In addition, the presence of a very rare green Diamond bodes well for the presence of other rare, coloured diamonds that could have a significant impact on the overall average prices eventually received for diamonds recovered from the Chidliak project.”

DIAMONDS RECOVERED FROM CH-6 BY CAUSTIC FUSION

As reported on September 21, 2017, 10 core holes drilled in the 2017 summer season intersected a total of 2,450 metres of CH-6 kimberlite. Microdiamond assay results for all 10 core holes of CH-6 kimberlite are presented in Table 1, and represent all the kimberlite drilled in the 2017 season. Assay results for prior years are presented in Table 2, for comparative purposes. All assays were completed by caustic fusion at the Saskatchewan Research Council Geoanalytical Laboratories (“SRC”).

The 2017 caustic fusion results support a coarse stone size distribution for all material sampled and reproduce Diamond recovery rates for the previously defined KIM-L.HG, KIM-L.NG, and KIM-C units at the CH-6 kimberlite (Tables 1 and 2). The Company reported +1.18 millimetres estimated resource grades of 4.16 cpt for KIM-L.HG and 2.12 cpt for KIM-L.NG on April 7, 2016. KIM-L.HG contains approximately double the amount of diamonds in each sieve class than occur in KIM-L.NG. The SRC recovered 213 diamonds weighing 9.32 carats in commercial Diamond sizes at +0.85 millimetres from the 1,936 kilograms of sample submitted in 2017, with KIM-L.HG reporting 2.1 times higher +0.85 millimetre Diamond content than KIM-L.NG (Table 1). Grade-size plots of 2017 and prior years’ caustic fusion results can be viewed here: https://www.pdiam.com/assets/docs/2017-11-chidliak-2017-microdiamond-results.pdf

TABLE 1: 2017 CH-6 CAUSTIC FUSION RESULTS

Unit* Sample Weight (dry kg)* Numbers of Diamonds According to Sieve Size Fraction (mm) Total Diamonds Carats

(+0.85

mm)
+0.106

-0.150
+0.150

-0.212
+0.212

-0.300
+0.300

-0.425
+0.425

-0.600
+0.60

-0.85
+0.85

-1.18
+1.18

-1.70
+1.70

-2.36
+2.36

-3.35
+3.35

-4.75
KIM-L.HG 867.45 1401 907 577 359 283 165 71 50 19 4 2 3838 5.892
KIM-L.NG 996.25 887 569 334 211 126 71 33 19 8 1 2 2261 3.283
KIM-C 72.75 54 40 25 14 6 1 2 1 1 0 0 144 0.145
Totals 1936.45 2342 1516 936 584 415 237 106 70 28 5 4 6243 9.32

* Sample aggregation by unit based on Figure 14.6 of NI 43-101 Report dated August 19, 2016.

TABLE 2: PRE-2017 CH-6 CAUSTIC FUSION RESULTS

Unit Sample Weight (dry kg) Numbers of Diamonds According to Sieve Size Fraction (mm) Total Diamonds Carats

(+0.85

mm)
+0.106

-0.150
+0.150

-0.212
+0.212

-0.300
+0.300

-0.425
+0.425

-0.600
+0.60

-0.85
+0.85

-1.18
+1.18

-1.70
+1.70

-2.36
+2.36

-3.35
+3.35

-4.75
KIM-L.HG 1239.9 2685 1562 995 685 381 262 142 73 29 7 2 6823 9.441
KIM-L.NG 2813.63 2698 1750 1109 706 416 259 119 71 15 9 4 7156 8.740
KIM-C 309.3 347 252 118 69 25 17 10 1 1 1 0 841 0.439
Totals 4362.83 5730 3564 2222 1460 822 538 271 145 45 17 6 14820 18.62

Colours reported by the SRC for diamonds larger than the 0.85 millimetre sieve size are given in Table 3. The CH-6 diamonds recovered in 2017 are dominated by white and off-white colours with very minor grey or brown colours, as was the case in previous years. Yellow colours are more prominent in the 2017 batch, which also included four fragments of a unique green Diamond recovered from one 8-kilogram sample. Reconstruction of the fragments produced a whole stone with dimensions of 2.4 x 1.7 x 0.8 millimetres. Green diamonds are rare, and those with saturated green body colours are exceptionally rare. Photos of the green Diamond can be viewed here: https://www.pdiam.com/assets/docs/2017-11-chidliak-2017-microdiamond-results.pdf

TABLE 3: COLOURS OF +0.85 MM CH-6 DIAMONDS RECOVERED BY CAUSTIC FUSION

Colour (+0.85 mm) Pre-2017 2017
Stones described (n=) 512 213
% White/Colourless 39 41
% Off White 45 32
% Yellow 14 25
% Grey and Brown 3 <1
% Green 0 <1

DISTRIBUTION OF KIM-L.HG AND OTHER UNITS

On September 21, 2017, the Company reported that two near-vertical core holes encountered typical CH-6 kimberlite to 532 mbs and 540 mbs respectively, beyond which the CH-6 pipe remains open at depth. The caustic fusion results reported in Table 1 permit fresh mapping of the distribution of the KIM-L.HG and KIM-L.NG units in core holes transecting the existing CH-6 resource (to 260 mbs), and extending to depths of 540 mbs. At depths shallower than 260 mbs, the 2017 results demonstrate that the KIM-L.HG unit extends beyond the volume represented in the existing resource model for KIM-L.HG. At depths beyond 260 mbs, KIM-L.HG is now recognized to 470 mbs and KIM-L.NG to 540 mbs, the latter representing the full depth range of kimberlite intersected to date at CH-6. The minor kimberlite unit KIM-C is recognized to 294 mbs in only one intersect drilled in 2017, and its distribution is consistent with the existing geological model for KIM-C. Currently all of unit KIM-C at CH-6 is defined as Target for Further Exploration (“TFFE”).

The Company expects that a forthcoming updated mineral resource for CH-6 will support an expanded distribution for the high-grade KIM-L.HG unit. The volume occupied by the KIM-L.NG unit will also expand, specifically at depths beyond 260 mbs. The Company expects to complete the upgraded resource calculation by mid-February 2018.

ON-SITE DENSE MEDIA SEPARATION PLANT

Planning for the construction of an on-site Dense Media Separation (“DMS”) plant has commenced. An on-site DMS plant would allow for the processing and recovery of diamonds at Chidliak, thus expediting the advancement of CH-6, CH-7, and other kimberlites to feasibility. The initial review is focusing on site selection for a 10 tonne per hour installation leading to final plant design and permitting.

Diamond mine at Chidliak. An on-site plant will enable the Company to effectively and efficiently take the existing Diamond resources at CH-6 and CH-7 through feasibility and allow us to add to this growing resource base through the bulk sampling of additional kimberlites, including CH-1, CH-44, and the 4 hectare, CH-31 kimberlite, which existing size frequency distribution data indicate have coarse Diamond size distributions and could form the basis of a Phase II Diamond development at Chidliak.”" data-reactid="38">Mr. Peregoodoff added: “The installation of an on-site DMS plant is the next step in our evolution towards a commercial Diamond mine at Chidliak. An on-site plant will enable the Company to effectively and efficiently take the existing Diamond resources at CH-6 and CH-7 through feasibility and allow us to add to this growing resource base through the bulk sampling of additional kimberlites, including CH-1, CH-44, and the 4 hectare, CH-31 kimberlite, which existing size frequency distribution data indicate have coarse Diamond size distributions and could form the basis of a Phase II Diamond development at Chidliak.”

More information regarding the DMS will be made available as plans progress.

QUALIFIED PERSONS

Diamond Resource Development Program at Chidliak. Mr. Alan O'Connor, Peregrine's Program Manager, Chidliak Resource Evaluation, is a Qualified Person and is responsible for the design and conduct of field programs at Chidliak. Dr. Jennifer Pell, Peregrine's Chief Geologist, is a Qualified Person and is responsible for geological characterization and microdiamond sampling of core drilled at Chidliak." data-reactid="41">Dr. Herman Grütter, Peregrine’s Vice President, Technical Services, is a Qualified Person and is responsible for the design of the Diamond Resource Development Program at Chidliak. Mr. Alan O'Connor, Peregrine's Program Manager, Chidliak Resource Evaluation, is a Qualified Person and is responsible for the design and conduct of field programs at Chidliak. Dr. Jennifer Pell, Peregrine's Chief Geologist, is a Qualified Person and is responsible for geological characterization and microdiamond sampling of core drilled at Chidliak.

Dr. Grütter, Mr. O’Connor, and Dr. Pell have reviewed this release and approve of its contents.

ABOUT PEREGRINE DIAMONDS

Diamond exploration and development company with assets located in northern Canada and Botswana." data-reactid="44">Peregrine Diamonds is a TSX-listed Diamond exploration and development company with assets located in northern Canada and Botswana.

Diamond Development (“CP1D”) has been completed. The PEA highlights that the CP1D represents a robust, high-margin, ten-year, open-pit mining project with very attractive economics, including after tax NPV of C$471 million, IRR of 29.8% and a two-year payback. An Inferred Mineral Resource of 11.39 million carats in 4.64 million tonnes of kimberlite at an average grade of 2.45 carats per tonne has been defined for a portion of the CH-6 kimberlite. An independent Diamond valuation by WWW International Diamond Consultants, of a 1,013 carat parcel of diamonds from CH-6, returned an average market price of US$213 per carat and modeled prices that range from a minimum of US$162 per carat to a high of US$236 per carat, with a base model price of US$188 per carat (all using the February 24, 2014 price book). In addition, a Target for Further Exploration (“TFFE”) of 2.34 to 3.75 million tonnes of kimberlite to a depth of 380 metres below surface has been identified at CH-6. An Inferred Mineral Resource of 4.23 million carats in 4.99 million tonnes of kimberlite at an average grade of 0.85 carats per tonne has been defined for a portion of the CH-7 kimberlite. An independent Diamond valuation by WWW International Diamond Consultants of a 735.75 carat parcel of diamonds from CH-7, returned an average market price of US$100 per carat and modelled prices that ranged from a minimum of US$94 per carat to a high of US$155 per carat, with a base model price of US$114 per carat (all using the February 1, 2016 price book). In addition, TFFE of 0.90 to 2.36 million tonnes for a depth range of 240 to 320 metres has been estimated for the CH-7 kimberlite. A TFFE of 1.27 to 3.19 million tonnes to 250 metres depth has been estimated for the CH-44 kimberlite pipe." data-reactid="45">Peregrine’s core asset is its 100-percent-owned, 277,997-hectare Chidliak Project, located 120 kilometres from Iqaluit, the capital of Nunavut, where 71 kimberlites have been discovered to date, with eight being potentially economic. A Preliminary Economic Assessment (“PEA”) of a Phase 1 Diamond Development (“CP1D”) has been completed. The PEA highlights that the CP1D represents a robust, high-margin, ten-year, open-pit mining project with very attractive economics, including after tax NPV of C$471 million, IRR of 29.8% and a two-year payback. An Inferred Mineral Resource of 11.39 million carats in 4.64 million tonnes of kimberlite at an average grade of 2.45 carats per tonne has been defined for a portion of the CH-6 kimberlite. An independent Diamond valuation by WWW International Diamond Consultants, of a 1,013 carat parcel of diamonds from CH-6, returned an average market price of US$213 per carat and modeled prices that range from a minimum of US$162 per carat to a high of US$236 per carat, with a base model price of US$188 per carat (all using the February 24, 2014 price book). In addition, a Target for Further Exploration (“TFFE”) of 2.34 to 3.75 million tonnes of kimberlite to a depth of 380 metres below surface has been identified at CH-6. An Inferred Mineral Resource of 4.23 million carats in 4.99 million tonnes of kimberlite at an average grade of 0.85 carats per tonne has been defined for a portion of the CH-7 kimberlite. An independent Diamond valuation by WWW International Diamond Consultants of a 735.75 carat parcel of diamonds from CH-7, returned an average market price of US$100 per carat and modelled prices that ranged from a minimum of US$94 per carat to a high of US$155 per carat, with a base model price of US$114 per carat (all using the February 1, 2016 price book). In addition, TFFE of 0.90 to 2.36 million tonnes for a depth range of 240 to 320 metres has been estimated for the CH-7 kimberlite. A TFFE of 1.27 to 3.19 million tonnes to 250 metres depth has been estimated for the CH-44 kimberlite pipe.

Additional details of the Chidliak 2016 PEA are available in a National Instrument (“NI”) 43-101 technical report titled “Preliminary Economic Assessment Technical Report on the Chidliak Project, Nunavut, Canada” and dated effective July 7, 2016, available on SEDAR and the Company’s website.

The Chidliak 2016 PEA is preliminary in nature and includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. There is no certainty that the PEA will be realized.

Diamond Project Northwest Territories, Canada NI 43-101 Technical Report” dated August 7, 2008, which are available on SEDAR and the Company’s website." data-reactid="48">For information on data verification, exploration information, and resource estimation procedures, see the NI 43-101 technical reports entitled “Mineral Resource Estimate for the Chidliak Project, Baffin Island, Nunavut” and dated effective June 3, 2016 and “Peregrine Diamonds Limited DO-27 Diamond Project Northwest Territories, Canada NI 43-101 Technical Report” dated August 7, 2008, which are available on SEDAR and the Company’s website.

The potential quantify and grade of TFFEs identified above are conceptual in nature as there has been insufficient exploration to define a Mineral Resource. It is uncertain whether further exploration will result in any of these tonnages being delineated as Mineral Resources.

Diamond Mine. The nine-hectare, 72.1%-owned DO-27 kimberlite located at Lac de Gras hosts an Indicated Mineral Resource of 18.2 million carats of diamonds in 19.5 million tonnes of kimberlite at a grade of 0.94 carats per tonne, and it is open at depth." data-reactid="50">Peregrine also controls the 8,494-hectare Lac de Gras Project in the Northwest Territories, located approximately 27 kilometres from the Diavik Diamond Mine. The nine-hectare, 72.1%-owned DO-27 kimberlite located at Lac de Gras hosts an Indicated Mineral Resource of 18.2 million carats of diamonds in 19.5 million tonnes of kimberlite at a grade of 0.94 carats per tonne, and it is open at depth.

For further information, please visit www.pdiam.com or contact Mr. Eric Friedland, Executive Chairman; Mr. Tom Peregoodoff, President and CEO; Dr. Herman Grütter, Vice President, Technical Services; or Peregrine Diamonds Investor Relations at 604-408-8880 or at investorrelations@pdiam.com.

Forward-Looking Statements

Diamond valuations, and future exploration and operating plans are forward-looking statements. These forward-looking statements reflect the current expectations or beliefs of the Company based on information currently available to the Company." data-reactid="53">This news release contains forward-looking statements within the meaning of Canadian securities legislation. All statements, other than statements of historical fact, that address activities, events, or developments that the Company believes, expects, or anticipates will or may occur in the future including, without limitation,proposed exploration and development programs, funding availability, anticipated exploration results, grade of diamonds and tonnage of material, resource estimates, anticipated Diamond valuations, and future exploration and operating plans are forward-looking statements. These forward-looking statements reflect the current expectations or beliefs of the Company based on information currently available to the Company.

Forward-looking statements are made based upon certain assumptions by the Company and other important factors that, if untrue, could cause the actual results, performances, or achievements of the Company to be materially different from future results, performances, or achievements expressed or implied by such statements. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which the Company will operate in the future, including the price of diamonds, anticipated costs, and ability to achieve goals. Certain important factors that could cause actual results, performances, or achievements to differ materially from those in the forward-looking statements include, but are not limited to: receipt of regulatory approvals; anticipated timelines for community consultations and the impact of those consultations on the regulatory approval process; market prices for rough diamonds and the potential impact on the Chidliak Project; and future exploration plans and objectives.

Diamond grade and kimberlite lithologies; variations in rates of recovery and breakage; variations in Diamond valuations and future Diamond prices; the state of world Diamond markets; reliability of mineral property titles; changes to regulations affecting the Company's activities; delays in obtaining or failure to obtain required project approvals; operational and infrastructure risk; and other risks involved in the Diamond exploration and development business. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results, or otherwise. Although the Company believes that the assumptions inherent in the forward-looking statements are reasonable, forward-looking statements are not guarantees of future performance and accordingly, undue reliance should not be put on such statements, due to their inherent uncertainty." data-reactid="55">Forward-looking statements are subject to a number of risks and uncertainties that may cause the actual results of the Company to differ materially from those discussed in the forward-looking statements and, even if such actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on, the Company. Factors that could cause actual results or events to differ materially from current expectations include, among other things: availability and cost of funds; timing and content of work programs; results of exploration activities; interpretation of drilling results and other geological data; risks relating to variations in the Diamond grade and kimberlite lithologies; variations in rates of recovery and breakage; variations in Diamond valuations and future Diamond prices; the state of world Diamond markets; reliability of mineral property titles; changes to regulations affecting the Company's activities; delays in obtaining or failure to obtain required project approvals; operational and infrastructure risk; and other risks involved in the Diamond exploration and development business. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results, or otherwise. Although the Company believes that the assumptions inherent in the forward-looking statements are reasonable, forward-looking statements are not guarantees of future performance and accordingly, undue reliance should not be put on such statements, due to their inherent uncertainty.

Read the rest of the article at https:
Data and Statistics for these countries : Botswana | Canada | Georgia | All
Gold and Silver Prices for these countries : Botswana | Canada | Georgia | All

Peregrine Diamonds Ltd.

EXPLORATION STAGE
CODE : PGD.TO
ISIN : CA7139161045
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Peregrine Diamonds is a diamonds development stage company based in Canada.

Peregrine Diamonds holds various exploration projects in Argentina and in Canada.

Its main exploration properties are LAC DE GRAS EAST, CROSSWELL RIVER PROPERTY, MACKAY LAKE WEST, WEIR RIVER PROPERTY, NANUQ, LAC DE GRAS WEST, PELLATT LAKE PROPERTY, MIRAGE BAY - BAFFIN ISLAND, FOXE BASIN BAFFIN ISLAND, WO PROPERTY & DO-27 KIMBERLITE, NANUQ NORTH, CHIDIAK-BAFFIN ISLAND, QILAQ and MACKAY LAKE in Canada and ALTAR PORPHYRY in Argentina.

Peregrine Diamonds is listed in Canada. Its market capitalisation is CA$ 79.7 millions as of today (US$ 61.3 millions, € 52.7 millions).

Its stock quote reached its highest recent level on October 02, 2009 at CA$ 4.65, and its lowest recent point on February 12, 2016 at CA$ 0.09.

Peregrine Diamonds has 339 329 984 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Peregrine Diamonds Ltd.
9/13/2018De Beers officially the new owner of Peregrine Diamonds
7/19/2018De Beers buys Canada's Peregrine Diamonds for $81 million
9/18/2007 bulk sample results from DO-27
8/1/2007Stockwatch article on some of Peregrine's 2007 diamond explo...
Financings of Peregrine Diamonds Ltd.
4/7/2015Reports on Warrant Exercise
6/5/2013Announces $3.5 Million Private Placement
10/25/2012Announces $10-Million Financing
12/8/2011Announces Closing of Rights Offering
Nominations of Peregrine Diamonds Ltd.
3/31/2017Announces Results of Voting for Election of Directors
2/2/2012Completes Chidliak Purchase and Announces Senior Management ...
Project news of Peregrine Diamonds Ltd.
6/3/2013Announces Completion of the CH-6 Kimberlite Bulk Sample Prog...
8/15/2012Provides Project Update and Discovers 61st Kimberlite at Chi...
3/1/2012Commences Lac De Gras Diamond Exploration Program
3/30/2011(Chidiak-baffin Island)Chidliak Joint Venture Approves $17.7 Million 2011 Diamond E...
2/24/2011(Chidiak-baffin Island)Announces Coarse Diamond Size Distribution in CH-20 Kimberli...
2/19/2008(Chidiak-baffin Island) Discovers Three Separate Areas with High Concentrations of ...
2/12/2008(Chidiak-baffin Island)Discovers Strong and Large Scale Uranium Anomalies on Baffin...
1/25/2008(Nanuq North) Nanuq North project
Corporate news of Peregrine Diamonds Ltd.
8/19/2016Peregrine Files Updated Technical Report for Chidliak Projec...
7/7/2016Peregrine Diamonds announces a positive Preliminary Economic...
6/20/2016Peregrine Files Updated Technical Report For Chidliak Projec...
5/17/2016Peregrine Announces Commencement of 2016 Drill Program in Bo...
5/5/2016Peregrine Announces Maiden Inferred Mineral Resource of 4.23...
4/7/2016PEREGRINE REPORTS 33% INCREASE IN CH-6 KIMBERLITE INFERRED D...
3/31/2016Peregrine Diamonds Reports Results of AGM
3/31/2016Peregrine Provides Botswana Exploration Program Update
1/28/2016Jan 28, 2016 Peregrine Diamonds Announces Closing Of Rights ...
1/22/2016Jan 22, 2016 Peregrine Announces Termination Of Chidliak Roy...
1/22/2016Peregrine Announces Termination of Chidliak Royalty
10/27/2015Canada's once-booming Arctic diamond sector loses luster
10/22/2015Oct 22, 2015 Peregrine to Commence Drilling Kimberlite Targe...
10/22/2015Peregrine to Commence Drilling Kimberlite Targets in Botswan...
9/9/2015Peregrine Provides Chidliak Update
7/31/2015Federal and Nunavut Governments to Fund Construction of Iqal...
7/21/2015Jul 21, 2015 Peregrine Provides Chidliak Bulk Sample Update ...
7/14/2015Jul 14, 2015 Peregrine Completes Botswana Transaction and Co...
7/14/2015Peregrine Completes Botswana Transaction and Commences 2015 ...
4/23/2015Apr 23, 2015 Peregrine Provides Update on 2015 Diamond Resou...
4/23/2015Peregrine Provides Update on 2015 Diamond Resource Developme...
4/7/2015Peregrine Reports on Warrant Exercise
3/30/2015Mar 30, 2015 Peregrine Diamonds Announces Acquisition Of Bot...
3/30/2015Peregrine Diamonds Announces Acquisition of Botswana Diamond...
3/30/2015Announces Acquisition of Botswana Diamond Exploration Compan...
3/27/2015Peregrine Diamonds Reports Results of AGM
3/24/2015Mar 24, 2015 Peregrine Diamonds Announces Transfer of Assets...
3/24/2015Peregrine Diamonds Announces Transfer of Assets to Peregrine...
3/24/2015Announces Transfer of Assets to Peregrine Exploration and Co...
3/23/2015Mar 23, 2015 Peregrine Provides Update on 2015 Diamond Resou...
3/23/2015Peregrine Provides Update on 2015 Diamond Resource Developme...
3/10/2015Mar 10, 2015 Peregrine Identifies New Zone with High Diamond...
3/10/2015Peregrine Identifies New Zone With High Diamond Counts at Ch...
3/10/2015Identifies New Zone With High Diamond Counts at Chidliak CH-...
2/25/2015Feb 24, 2015 Peregrine Files Updated Technical Report for Ch...
2/24/2015Files Updated Technical Report for Chidliak Project
2/12/2015Peregrine Diamonds Announces Corporate Reorganization and Ma...
1/27/2015Peregrine Clarifies January 26, 2015 News Release
1/26/2015Jan 26, 2015 Peregrine Reports 15% Increase In Ch-6 Kimberli...
1/26/2015Peregrine Reports 15% Increase in CH-6 Kimberlite Inferred D...
12/30/2014Dec 30, 2014 Peregrine Completes $2.19 Million Private Place...
12/30/2014Peregrine Completes $2.19 Million Private Placement
12/22/2014Dec 22, 2014 Peregrine Announces $2.19 Million Private Place...
12/22/2014Peregrine Announces $2.19 Million Private Placement
12/8/2014Dec 08, 2014 Peregrine Commences Chidliak Site Preparations ...
12/8/2014Peregrine Commences Chidliak Site Preparations for 2015 Diam...
10/24/2014Oct 24, 2014 Peregrine Diamonds Warrants to Begin Trading Mo...
9/2/2014Peregrine Provides Chidliak Diamond Project Update
7/24/2014Peregrine Files Technical Report for Lac de Gras Project and...
6/24/2014Peregrine Provides Chidliak Project Update and Encouraging D...
5/7/2014IIROC Trading Halt - PGD
5/7/2014IIROC Trade Resumption - PGD (all issues)
5/7/2014Peregrine Reports 7.47 Million Carat Inferred Resource for t...
10/23/2013Provides Update
10/11/2013De Beers Elects To Not Exercise Chidliak Option
7/29/2013Provides Corporate Update
6/21/2013Announces Closing of $3.5 Million Private Placement
4/23/2013Collects 508 Tonne Bulk Sample from CH-6
4/5/2013Media coverage of Peregrine Diamonds Ltd.
3/14/2013Peter Meredith Joins Peregrine Board
1/28/2013Announces $5 Million Work Plan at Chidliak, Commencement of ...
10/11/2012Closes Option Agreement and $2.5-Million Private Placement W...
9/5/2012De Beers Completes An Option To Joint Venture The Chidliak D...
8/29/2012Provides Corporate Update
7/24/2012Announces Discovery of 60th Kimberlite and Provides Chidliak...
4/24/2012Discovers Third Kimberlite This Year At Lac De Gras, Canada
4/16/2012Discovers Two Kimberlites at Lac de Gras, Canada
4/11/2012Commences Field Operations at Chidliak
4/2/2012Reports Tonnage Estimate and New Microdiamond Results for CH...
2/27/2012Reports New Microdiamond Results For CH-7 Kimberlite at Chid...
1/23/2012Announces 2012 Chidliak Program
1/18/2012Reports New Diamond Results From the CH-31 and CH-59 Kimberl...
12/20/2011Increases Ownership in Chidliak Diamond Project to 100 Perce...
11/29/2011Reports BHP Billiton is Reviewing its Diamonds Business
10/25/2011CH-28 Mini-Bulk Sample Returns Grade of 0.27 Carats Per Tonn...
10/6/2011Announces High Diamond Counts for CH-52 and CH-58 Kimberlite...
9/12/2011Comprehensive 2011 Field Program Sets Stage for 2012 Bulk Sa...
8/8/2011(Qilaq)Discovers Third Kimberlite at Qilaq; Pipe Size Estimated at ...
6/22/2011Discovers Three More Kimberlites at Chidliak
6/2/2011Discovers Four New Kimberlites and Completes 11,000 Line-Kil...
4/20/2011Discovers CH-51 Kimberlite at Chidliak
3/3/2011Confirms Coarse Diamond Size Distribution at the CH-1 Kimber...
2/22/2011Confirms Coarse Diamond Size Distribution in North and South...
7/26/2010Launches New Website
2/20/2009Announces Completion Of Rights Offering
2/21/2008Raise $5.0 Million
2/14/2008To Drill High Priority Kimberlite-Type Geophysical Anomalies...
12/17/2007Announces Modelled Values of US$43 to US$70 Per Carat for DO...
9/24/2007Discovers new diamondiferous Kimberlite Lithologies at DO-27
9/18/2007Teleconference Wednesday Sept 19 2007
9/18/20072007 DO-27 Bulk Sample Results Confirm Grade of Main Lobe at...
7/24/2007preliminary kimberlite scrubbing test results
7/10/2007Enters into a new Falcon™ system deployment agreement.
6/6/2007Final Total of 2,651 Tonnes of Kimberlite Recovered During 2...
4/18/2007Approximately 2,260 Tonnes of Kimberlite Recovered to Date i...
4/4/2007Northern Miner article on Peregrine Diamonds
3/21/2007Press Release March 21 2007
3/13/2007Stockwatch Article on Peregrine's Exploration Programs in th...
3/23/2006update on winter road and bulk sampling program at DO-27
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (PGD.TO)
0.235+0.00%
TORONTO
CA$ 0.235
09/14 10:30 -
0%
Prev close Open
0.235 0.235
Low High
0.235 0.235
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.235 -%
Volume 1 month var.
5,000 -%
24hGold TrendPower© : -26
Produces
Develops
Explores for Diamonds - Palladium - Platinum
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.94-1.53%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+0.00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.39-3.24%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.28+0.23%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.76-1.68%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.00-1.09%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :