Canadian Zinc Corp

Published : September 17th, 2015

Mineral Resources Increase at Prairie Creek Mine

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Antimony | Cadmium |

NEWS RELEASE

 For Immediate Release


MINERAL RESOURCES INCREASE AT PRAIRIE CREEK MINE

  • 2015 Drill Program Increases Measured & Indicated Resource Tonnage by 32%
  • Additional Resources From Newly Defined Stockwork Mineralization
Canadian Zinc Corporation
Suite 1710 - 650 West Georgia Street, Vancouver, BC, V6B 4N9

Tel: (604) 688-2001
Fax: (604) 688-2043
Toll free: 1-866-688-2001


czn@canadianzinc.com
www.canadianzinc.com


Stock Exchange: TSX
Stock Symbol: CZN
Stock Quote: Click Here

TwitterTwitter Updates

Vancouver, British Columbia, September 17, 2015 - Canadian Zinc Corporation (TSX: CZN; OTCQB: CZICF) (�?othe Company�?� or �?oCanadian Zinc�?�) reports that Mineral Resource tonnages at the Prairie Creek lead, zinc, silver mine, located in the Northwest Territories, have been significantly increased following the incorporation of the results from the 2015 exploration drilling program into a revised geological model and resource estimate.

New Mineral Resource Highlights

  • Total Measured and Indicated Mineral Resource tonnages for the Prairie Creek Mine increased by 32% to 8.7 million tonnes from 6.6 million tonnes (�?oMt�?�). Highlights of the changes include:
    • A 48% increase in the Main Quartz Vein Indicated Mineral Resource tonnage to 4.2 Mt grading 11.6% Pb, 9.2% Zn, 168 g/t Ag, from 2.8 Mt grading 12.8% Pb, 10.2% Zn and 193 g/t Ag;
    • A 40% increase in Stockwork Indicated Mineral Resource to 2.0 Mt grading 3.5% Pb, 6.6% Zn, 61 g/t Ag, from 1.40 Mt grading 4.0% Pb, 7.1% Zn and 63 g/t Ag;
    • A new Measured Mineral Resource has now been defined in Stockwork mineralization at 169,000 t grading 5.3% Pb, 12.6% Zn, 116 g/t Ag.
       
  • Total Inferred Resource tonnage remains unchanged with an increase in Stockwork replacing upgraded Main Quartz Vein resources.
    • A 100% increase in Stockwork Inferred Mineral Resource tonnage to 1.6 Mt grading 4.6% Pb, 6.2% Zn, 70 g/t Ag from 790,000 t grading 4.0% Pb, 4.7% Zn, 61 g/t Ag;
    • As Inferred Main Quartz Vein tonnes were converted to the Indicated category through detailed 2015 infill drilling, the Main Quartz Vein Inferred tonnage decreased to 5.3 Mt grading 8.7% Pb, 12.9% Zn, 199 g/t Ag from 6.1 Mt grading 10.4% Pb, 12.6% Zn and 195 g/t Ag.

�?oThe 2015 exploration drilling program has surpassed the objectives of upgrading the resource classifications and expanding the Measured and Indicated Mineral Resources which, upon conversion to Mineral Reserves, will demonstrate both a longer mine life and, perhaps more importantly, an increase in the higher grade Main Quartz Vein tonnages that can be incorporated into the earlier years of the Prairie Creek mine plan,�?� said Alan Taylor, Chief Operating Officer of Canadian Zinc.

The mineralization at Prairie Creek Mine occurs within three different styles namely; the Main Quartz Vein (�?oMQV�?�), which is a high grade steeply dipping fault structure that hosts the majority of mineralization; the Stockwork Zone (�?oSTK�?�), which is a series of narrow high grade base metal veins occurring at an oblique angle to the MQV; and the Stratabound Massive Sulphide (�?oSMS�?�), which occur as a thick pyrite-rich replacement-type deposit cut by the MQV.

The following table shows the September 2015 Mineral Resource Estimate by classification and mineralization style, and by overall totals, compared to the March 2015 estimate:

Mineral Resource Estimate by Style and Classification
  MARCH 2015 SEPTEMBER 2015
  TONNES Pb (%) Zn (%) Ag (g/t) TONNES Pb (%) Zn (%) Ag (g/t)
MQV    
Measured 1,279,000 11.6 13.2 211 1,313,000 11.5 13.2 211
Indicated 2,850,000 12.8 10.2 193 4,227,000 11.6 9.2 168
Inferred 6,132,000 10.4 12.6 194 5,269,000 8.7 12.9 199
STK    
Measured 0 0.0 0.0 0 169,000 5.3 12.6 116
Indicated 1,400,000 4.0 7.1 63 1,953,000 3.5 6.6 61
Inferred 790,000 4.0 4.7 61 1,610,000 4.6 6.2 70
SMS    
Measured 0 0.0 0.0 0 0 0.0 0.0 0
Indicated 1,060,000 5.4 10.8 55 1,042,000 5.2 10.8 54
Inferred 156,000 6.6 11.0 63 170,000 6.3 11.2 60
Mineral Resource Estimate by Classification
MQV+STK+SMS    
MEASURED (M) 1,279,000 13.2 11.6 211 1,482,000 10.8 13.2 200
INDICATED (I) 5,309,000 9.5 9.0 131 7,222,000 8.5 8.7 123
M + I 6,588,000 10.2 9.5 147 8,704,000 8.9 9.5 136
INFERRED 7,078,000 11.7 9.6 177 7,049,000 7.7 11.3 166
Notes:  Estimated at a cut-off grade of 8% Zn-Eq based on prices of US$1.00/lb for both zinc and lead and US$20/oz for silver, with average processing recovery factors of 78% for Zn, 89% for Pb and 93% for Ag, and average payables of 85% for Zn, 95% for Pb and 81% for Ag, at an exchange rate $1CD = $1USD.

As no additional exploration drilling was targeted on the Measured Mineral Resource of the MQV or the SMS mineralization these tonnages and grades remained more or less the same as previously estimated with minor variations resulting from the application of different modelling parameters only.

This Prairie Creek Mineral Resource estimate was completed by Gregory Z. Mosher, P.Geo., Qualified Person (�?oQP�?�) as defined by National Instrument 43-101 (�?oNI 43-101�?�) of AMC Mining Consultants (Canada) Ltd., (�?oAMC�?�). [This Mineral Resource estimate replaces the previous Mineral Resource estimate also undertaken by AMC and announced on March 26, 2015].

Key Assumptions, Parameters and Methods of Modelling in 2015 Resource Estimate

A single block model was revised to encompass the three mineral domains: MQV, STK and SMS. With the enhanced understanding of the geology acquired during the 2015 drill program the differing styles of mineralization between the MQV and STK have now been incorporated within the geological model by adjusting the size, shape and orientation of the search ellipses used for interpolation of resource blocks to better reflect the actual geological distribution of the mineralization.

In addition different compositing criteria were applied to all styles of mineralization. Block values were computed using ordinary kriging. Grades for silver, lead, zinc, copper, arsenic, cadmium, iron, mercury, lead oxide, antimony and zinc oxide were interpolated into the block model in a single pass: resources were subsequently classified on the basis of the number of supporting data and their distance from the block centroid. The mean distance of supporting data for classification of Indicated Resources for the MQV was expanded to 135m from a previous 100m due to a higher confidence level of the larger database. The mean distance of supporting data for the STK and SMS remained at 100m.

Prairie Creek Mine 2015 Exploration Drilling Program

The new Mineral Resource estimate at Prairie Creek incorporates the results from the recently completed underground exploration drilling program last reported August 11, 2015.

The underground drilling from the 870m decline was designed to test for new areas of mineralization near the north end of the existing mine workings and to further detail Inferred Resources, with the objective of converting part of the large Inferred Mineral Resource to the Indicated category for inclusion in mine economics. The drilling campaign, which commenced in late February 2015 and was completed in July 2015, comprised 5,484m of core drilling over 21 holes from three drill stations at the end of the decline from the 870m Level.

Summary

The results of the 2015 program have met the objective of upgrading the Mineral Resource classifications to enable development of a longer life of mine plan. The MQV Indicated Mineral Resource has increased by 48% and a large Inferred Mineral Resource awaits more infill drilling.

Drilling of the STK mineralization has demonstrated areas of higher grades, some of which are incorporated into the new Measured Resource, along with numerous significant individual drill intercepts, such as PCU-15-72 which graded 6.9% Pb, 12.0% Zn, 116 g/t Ag over 24.5m, that require follow up drilling.

The Prairie Creek Preliminary Feasibility Study completed in 2012 was based on a total Measured and Indicated Resource of 5.4 Mt grading 10.2% Pb, 10.8% Zn, 0.31% Cu, and 160 g/t Ag, most of which was converted to a Mineral Reserve of 5.2 Mt averaging 9.5% Pb, 9.4% Zn and 151 g/t Ag. The new September 2015 total Measured and Indicated Resource of 8.7 Mt represents a 60% increase from the M+I resource tonnage in the 2012 Preliminary Feasibility Study.

The new expanded Mineral Resource estimate will now form the basis around which an optimized mine plan will be designed and a new Mineral Reserve calculated.

About the Prairie Creek Mine

The Prairie Creek Mine contains a partially developed infrastructure including a 1,000 tonne per day flotation mill, workshops, accommodations, and support facilities. The Company holds a Type �?oA�?� Water Licence which, along with previously issued permits and licences, permits the operation of a mine at Prairie Creek. A positive Preliminary Feasibility Study was completed in 2012.

Throughout 2014/15 the Company has also been undertaking an Optimization Study as part of which AMC have been engaged to review the underground mine plan and focus on reducing the initial development, shorten the development schedule and optimize the underground mine operation in general. A number of key underground investigations to determine optimal mining methods have been completed and will be integrated into the new mine plan.

The Company also continues the Environmental Assessment process as part of its application to upgrade the access road into the Prairie Creek Mine for use on an all-season basis. An Addendum to the Developers Assessment Report for the all season road was recently submitted to the Mackenzie Valley Review Board.

Qualified Persons:

This press release has been reviewed and approved by Gregory Z. Mosher P.Geo., of AMC who is recognized as an Independent QP under NI 43-101 and by Alan Taylor P.Geo., COO & VP Exploration of Canadian Zinc and Kerry Cupit P..Geo., Project Geologist for Canadian Zinc, both of whom are Non-Independent QPs under NI 43-101.


For further information contact:

John F. Kearney
Chairman & Chief Executive
(
416) 362-6686
220 Bay Street
12th Floor

Toronto, ON M5J 2W4
Alan B. Taylor
Vice President Exploration & Chief Operating Officer
(
604) 688-2001
Suite 1710 - 650 West Georgia Street
Vancouver, BC V6B 4N9
Tollfree:1-866-688-2001
Steve Dawson
Vice President
Corporate Development
(416) 203-1418

220 Bay Street
12th Floor
Toronto, ON M5J 2W4

E-mail: invest@canadianzinc.com   Website: www.canadianzinc.com

Cautionary Statement �?" Forward-Looking Information

This press release contains certain forward-looking information, including, among other things, the expected completion of acquisitions and the advancement of mineral properties. This forward-looking information includes, or may be based upon, estimates, forecasts, and statements as to management�?Ts expectations with respect to, among other things, the completion of transactions, the issue of permits, the size and quality of mineral resources, future trends for the company, progress in development of mineral properties, future production and sales volumes, capital costs, mine production costs, demand and market outlook for metals, future metal prices and treatment and refining charges, the outcome of legal proceedings, the timing of exploration, development and mining activities, acquisition of shares in other companies and the financial results of the company. There can be no assurances that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Inferred mineral resources are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that mineral resources will be converted into mineral reserves.

Cautionary Note to United States Investors

The United States Securities and Exchange Commission (�?oSEC�?�) permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. We use certain terms in this press release, such as �?omeasured,�?� �?oindicated,�?� and �?oinferred�?� �?oresources,�?� which the SEC guidelines prohibit U.S. registered companies from including in their filings with the SEC.

 



This message was sent to .com from:

Canadian Zinc | invest@canadianzinc.com | Canadian Zinc Corporation | Suite 1710, 650 West Georgia Street | Vancouver, BC V6B 4N9, Canada

Email Marketing by iContact - Try It Free!

Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Canadian Zinc Corp

DEVELOPMENT STAGE
CODE : CZN.TO
ISIN : CA1368021053
CUSIP : 136802-10-5
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Canadian Zinc is a zinc and silver development stage company based in Canada.

Canadian Zinc develops zinc, silver and gold in Fiji.

Its main asset in development is TUVATU in Fiji and its main exploration property is PRAIRIE CREEK in Canada.

Canadian Zinc is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 30.6 millions as of today (US$ 23.2 millions, € 20.1 millions).

Its stock quote reached its highest recent level on February 20, 2004 at CA$ 2.04, and its lowest recent point on December 04, 2015 at CA$ 0.06.

Canadian Zinc has 265 920 016 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Canadian Zinc Corp
2007 Annual Report
Financings of Canadian Zinc Corp
7/7/2016Announces Closing of $10,200,000 FInancing
8/1/2014CZN Closes $15.8 Million Bought Deal Financing
8/2/2013ANNOUNCES C$4 MILLION BOUGHT DEAL FLOW-THROUGH PRIVATE PLAC...
Nominations of Canadian Zinc Corp
6/13/2013Reports on Election of Directors at Annual General Meeting o...
Financials of Canadian Zinc Corp
5/17/2016Reports Financial Results for Q1 2016 and Operations Update
3/31/2016CZN Reports Financial Results for 2015
11/13/2015Reports Results for Third Quarter 2015
8/14/2015Reports Financial Results for Second Quarter 2015
3/31/2015Reports Financial Results for Fiscal 2014
11/15/2013CZN Reports Financial Results for Third Quarter 2013
8/13/2013Reports Financial Results for Second Quarter 2013
5/13/2013Reports Financial Results for First Quarter 2013
3/20/2013REPORTS FINANCIAL RESULTS FOR FISCAL 2012
8/10/2012Reports Financial Results for Second Quarter 2012
3/16/2012Reports Financial Results for Fiscal 2011
3/17/2011Reports Financial Results for Fiscal 2010
11/17/20092009 Third Quarter Results
8/17/2009Reports Second Quarter 2009 Results
5/16/20092009 First Quarter Results
8/8/2008Reports Second Quarter 2008 Results
5/15/2008First Quarter Results
Project news of Canadian Zinc Corp
4/19/2017Drilling Extends Mineralization at Lemarchant, NFLD
9/15/2016CZN Modifies 2016 Preliminary Feasibility Study
1/21/2014Engineering and Procurement Contracts awarded for Prairie Cr...
12/12/2013Assay Results of 2013 Drill Program at South Tally Pond
12/9/2013(Prairie Creek)Assay Results of 2013 Drill Program at Prairie Creek
9/18/2013(Prairie Creek)Granted Water Licence for Prairie Creek Mine
6/21/2013(Prairie Creek)CZN RECEIVES PERMITS FOR OPERATION OF PRAIRIE CREEK MINE
3/25/2013(Prairie Creek)RECEIVES PROPOSED WATER QUALITY CONDITIONS IN DRAFT WATER LI...
3/18/2013(Prairie Creek)Receives Draft Water Licence and Permits for Operation of Pr...
1/15/2013to Drill South Tally Pond Project, Newfoundland
1/8/2013(Prairie Creek)oration: Permitting Progress for Prairie Creek Mine
8/28/2012(Prairie Creek)and Government of Northwest Territories Advance Co-operation...
6/14/2012(Prairie Creek)oration: Minister Confirms Environmental Impact Review Not R...
5/15/2012(Prairie Creek)oration: Additional Permits Approved for Prairie Creek Mine ...
10/3/2011(Prairie Creek)Reports Success With Prairie Creek Exploration Drilling
9/26/2011(Prairie Creek)oration: Environmental Assessment of Prairie Creek Mine Ente...
8/22/2011(Prairie Creek)and Government of the Northwest Territories Sign Socio-Econo...
6/19/2011(Prairie Creek)and Liidlii Kue First Nation Sign Impact and Benefits Agreem...
6/8/2011(Prairie Creek)oration: Exploration Drill Program Commences at Prairie Cree...
2/28/2011(Prairie Creek)oration: Prairie Creek Mine Feasibility Study Commissioned
2/2/2011(Prairie Creek)CZN Obtains Permit Extension
1/24/2011(Prairie Creek)CZN Signs Agreement with NDDB
1/21/2011(Prairie Creek)and Nahanni Butte Dene Band Sign Impact and Benefit Agreemen...
9/2/2009(Tuvatu)Diamond Drilling Commences at Tuvatu
7/21/2009(Prairie Creek)Federal Minister Visits Prairie Creek Mine
6/5/2009(Prairie Creek)Prairie Creek Metallurgical Results
5/20/2009(Tuvatu)Tuvatu gold project option
8/21/2008Permitting Update
7/22/2008(Prairie Creek)Prairie Creek Permitting Update
6/11/2008(Prairie Creek)Submits Permit Applications for Production at the Prairie Cr...
Corporate news of Canadian Zinc Corp
8/10/2017Reports Financial Results for Q2 and Provides Project Update...
7/15/2016DEH CHO DRUM - July 14, 2016 Public voices thoughts on road
7/7/2016JULY 7, 2016: CANADIAN ZINC ANNOUNCES CLOSING OF $10,200,000...
6/29/2016JUNE 29, 2016: CANADIAN ZINC ANNOUNCES FILING OF FINAL PROSP...
6/21/2016JUNE 21, 2016: CANADIAN ZINC REPORTS ON ANNUAL GENERAL MEETI...
6/16/2016JUNE 16, 2016: CANADIAN ZINC ANNOUNCES C$8.0 MILLION UNDERWR...
6/16/2016JUNE 16, 2016: CANADIAN ZINC PRICES $8-MILLION OVERNIGHT OFF...
6/15/2016JUNE 15, 2016: CANADIAN ZINC ANNOUNCES PUBLIC EQUITY OFFERIN...
5/30/2016Minco Press Release First Quarter 2016 Financial Results
5/27/20162016 First Quarter Managements Discussion and Analysis
5/24/2016MAY 24, 2016: CANADIAN ZINC ANNOUNCES NEW NOMINEES TO BOARD ...
1/25/2016JANUARY 25, 2016: UPDATE ON RESEARCH PROGRAM TO INVESTIGATE ...
1/25/2016Canadian Zinc provides update on research program to investi...
12/2/2015DECEMBER 2, 2015: RESEARCH FUNDING AWARDED TO CANADIAN ZINC ...
12/2/2015Research Funding awarded to Canadian Zinc to investigate cen...
10/24/2015Sandstorm Gold Provides Asset Updates
10/23/2015Sandstorm Gold Provides Asset Updates
9/17/2015SEPTEMBER 17, 2015: MINERAL RESOURCES INCREASE AT PRAIRIE CR...
9/17/2015Canadian Zinc Corporation : Mineral Resources Increase at Pr...
8/14/2015AUGUST 14, 2015: CANADIAN ZINC REPORTS FINANCIAL RESULTS FOR...
8/14/2015Canadian Zinc Reports Financial Results for Second Quarter 2...
8/11/2015AUGUST 11, 2015: UNDERGROUND DRILL PROGRAM AT PRAIRIE CREEK ...
8/11/2015Canadian Zinc Corporation: Underground Drill Program at Prai...
3/31/2015MARCH 31, 2015: CANADIAN ZINC REPORTS FINANCIAL RESULTS FOR ...
3/31/2015Canadian Zinc Reports Financial Results for Fiscal 2014
3/26/2015MARCH 26, 2015: NEW MINERAL RESOURCE UPDATE AT PRAIRIE CREEK...
3/26/2015(Prairie Creek)oration: New Mineral Resource Update at Prairie Creek Mine
1/29/20142014 Winter Drill Program Commences at South Tally Pond, NFL...
10/31/2013Drilling Extends Massive Sulphide Mineralization at Lemarcha...
10/31/2013oration: Drilling Extends Massive Sulphide Mineralization at...
9/16/2013Drill Program Underway for South Tally Pond, Newfoundland
9/12/2013and Messina Minerals Announce Agreement on Proposed Acquisit...
9/5/2013(Prairie Creek)CZN Receives Permits from Parks Canada for Prairie Creek Min...
9/4/2013(Prairie Creek)Commencing New Drill Program at Prairie Creek
8/20/2013Announces Closing of C$4 Million Bought Deal Flow-Through Pr...
8/1/2013announces C$4 million bought deal flow-through private place...
7/15/2013OtcbbJournal.com Sheds Light on Micro-Cap Companies Under th...
7/8/2013oration: Water Board Completes Regulatory Process; Water Lic...
5/31/2013Raises US$10.0 Million
5/10/2013oration: Annual General Meeting and Adoption of Advance Noti...
4/17/2013Completes Winter Drill Program at South Tally Pond
1/29/2013(Prairie Creek)First Operating Permit Received For Prairie Creek Mine:
1/25/2013CZN Submits Final Responses To Water Board Ahead Of Public H...
1/22/2013Submits Final Responses to Water Board Ahead of Public Heari...
1/15/2013to Drill Lemarchant Massive Sulphide Deposit at South Tally ...
10/31/2012Visit Canadian Zinc Booth # 418 Hard Assets San Francisco
9/24/2012Acquires Paragon Minerals Corporation
7/31/2012Announces Merger and Private Placement With Paragon Minerals...
6/27/2012(Prairie Creek)Reports Results of Prairie Creek Preliminary Feasibility Stu...
3/5/2012and Parks Canada Sign Renewed Memorandum of Understanding
2/29/2012Reports Significant Assay Results from Final Holes of 2011 D...
2/10/2012(Prairie Creek)Closes $4 Million Second Tranche of Zhongrun Private Placeme...
1/6/2012Announces the Closing of $5.1 Million Bought Deal Public Off...
12/30/2011Announces Closing of: $2.5 Million Private Placement of Flow...
12/9/2011Receives Environmental Approval
8/29/2011Federal Government Provides $3 Million Funding to Assist in ...
6/28/2011oration: Environmental Assessment Hearings Completed
3/26/2010Developers Assessment Report Filed
9/30/2009Vatukoula Finance - Operations Update
6/24/2009Gold Production Up at Vatukoula Mine
6/12/2009Vatukoula Approves Share Purchase
5/27/2009Normal Course Issuer Bid
2/24/20092009 Convention - Prospectors & Developers Association of Ca...
11/18/2008SULPHIDE VENT COMPLEX/FEEDER ZONE IDENTIFIED AT THE NORTH LE...
11/4/2008Memorandum of Understanding Signed With Nahanni Butte Dene B...
8/1/2008Memorandum Of Understanding Signed With Parks Canada
4/1/20082007 Year End Results
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (CZN.TO)FRANKFURT (SRS.F)
0.115+4.55%0.017-5.56%
TORONTO
CA$ 0.115
09/10 16:58 0.010
4.55%
Prev close Open
0.110 0.110
Low High
0.110 0.115
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.115 -%
Volume 1 month var.
122,370 -%
24hGold TrendPower© : 11
Produces
Develops Gold
Explores for Copper - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 10/18/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.22+1.63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48-1.59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.84-1.31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.85-2.63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.83+0.78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :