Forsys Metals Corp.

Published : June 13th, 2008

Mineralization Expansion and Grade Improvement at Valencia-Forsys Triples Drill Program

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Uranium |

Marketwire

 
 
Forsys Metals Corp.
TSX: FSY
FRANKFURT: F2T
Other Recent News

June 13, 2008
Mineralization Expansion and Grade Improvement at Valencia-Forsys Triples Drill Program
TORONTO, ONTARIO--(Marketwire - June 13, 2008) - Forsys Metals Corp. ("Forsys" or the "Company") (TSX:FSY)(FRANKFURT:F2T)(NSX:FSY) is pleased to announce the second set of percussion drilling results from the 2008 exploration campaign at the Company's 100% owned Valencia Uranium Deposit ("Valencia"). Drilling in the Valencia Southwest Zone and Transition Zone has confirmed additional mineralization to further expand the Valencia resource.

The second set of drilling in the Southwest Zone and Transition Zone consisted of 15 additional vertical holes, bringing the total current drilling campaign to 26 holes, of which all show uranium mineralization.

Based on the excellent results received to date, the Company has approved an expansion of the drilling program from 10,000 m to 30,000 m.

Results to date demonstrate the following:

- Deposit expansion and grade improvement remains on track;

- The ore body shows good mineralization below the current pit "cone", opening the Valencia main ore body to the south, southwest and southeast and at depth;

- Due to higher uranium mineralization in PD-025, the ore body has potential to open towards the west;

- PD-031 is well mineralized, opening the deposit at depth towards the north;

- The ore body footprint at 325 m depth (380 m elevation) could have an east-west extension of 200 m wide by 300 m long as compared to the current pit bottom which is 45 m wide by 75 m long (June 2007 NI 43-101 Technical Report);

- Holes encountered weak mineralization with grade above cut-off (0.06 Kg/T U308) from surface to high grade deep sections, which should reduce stripping cost.

Selected higher grade results of the drilling in the Southwest Zone and the Transition Zone are shown in the tables below. Refer to the Company's website at www.forsysmetals.com for the complete set of results for all 15 drill holes.

                Table 1: Southwest Zone Highlights
---------------------------------------------------------------------
               From        To            Interval              Grade
Hole             (m)       (m)                 (m)    (Kg/T eU3O8)(i)
---------------------------------------------------------------------
PD-012        98.90    346.20              247.30              0.170
Including    274.50    346.00               71.50              0.256
---------------------------------------------------------------------
PD-019       122.00    162.80               40.80              0.232
             267.00    341.70               73.90              0.250
---------------------------------------------------------------------
PD-023       206.10    298.10               92.00              0.157
Including    206.10    238.80               32.70              0.208
---------------------------------------------------------------------
PD-024        62.90    375.60              312.60              0.191
Including     62.90     95.00               32.10              0.288
Including     96.10    137.60               41.50              0.255
Including    204.30    223.10               18.80              0.297
Including    253.50    270.00               16.60              0.313
Including    310.70    319.20                8.50              0.320
---------------------------------------------------------------------
PD-025       225.60    324.20               98.60              0.384
Including    225.60    295.50               69.90              0.474
Including    247.50    295.10               47.60              0.539
---------------------------------------------------------------------

              Table 2: Transition Zone Highlights
---------------------------------------------------------------------
               From        To            Interval              Grade
Hole             (m)       (m)                 (m)    (Kg/T eU3O8)(i)
---------------------------------------------------------------------
PD-013         10.6     289.3               278.7              0.122
Including     61.80     81.50               19.70              0.319
Including    262.10    291.40               29.30              0.214
Including    324.10    346.60               22.50              0.200
---------------------------------------------------------------------
PD-018       267.80    322.70               54.90              0.297
Including    269.60    300.80               31.20              0.381
---------------------------------------------------------------------
PD-020         0.00     50.80               50.80              0.109
              51.50     58.80                7.30              0.847
              70.70    108.60               37.90              0.164
             110.60    169.70               59.10              0.204
             172.70    265.70               93.00              0.189
---------------------------------------------------------------------
PD-022         4.50     66.70               62.20              0.177
              69.30    101.90               32.60              0.147
             132.00    189.50               57.50              0.145
             226.50    230.80                4.30              0.263
---------------------------------------------------------------------
PD-026         9.60    140.00              130.40              0.194
             207.10    304.90               97.80              0.185
Including    253.00    292.60               39.60              0.229
---------------------------------------------------------------------
PD-031       158.40    337.30              178.90              0.192
Including    161.20    199.20               38.00              0.203
Including    210.60    231.00               20.40              0.215
Including    239.40    244.90                5.50              0.222
             258.40    305.40               47.00              0.309
Including    264.70    292.00               27.30              0.425
---------------------------------------------------------------------

(i) The results in this news release are reported as equivalent U308
    ("eU308"). The Company has calculated a correlation between grade
    thickness product of gamma counts (counts per second) collected by
    down hole geophysical methods and the grade thickness product of
    chemical assays from the Company's drill hole library (otherwise 
    known as GT Chem and GT Rad). That correlation has been established
    with over 100 GT intervals and is used to calculate eU308 in the
    percussion drill holes from gamma probe survey with a resulting
    correlation coefficient of 0.99 (estimation of confidence level).
 
Results from holes 21 and 27 through to 30 are pending, and will be reported in upcoming news releases.

Dr. Roger Laine, Chief Geologist of Forsys, is the designated Qualified Person responsible for all of Forsys' exploration programs as well as the person responsible for the contents of this news release.

On Behalf of the Board of Directors of Forsys Metals Corp

Duane Parnham, President and CEO

For further information visit our web site at www.forsysmetals.com.

Sedar Profile #00008536

Forward-Looking Information

This press release contains "forward-looking information" including statements and information regarding exploration results. Such forward-looking information reflects the current expectations or beliefs of the Company. Forward-looking information is subject to a number of risks, assumptions and uncertainties that may cause the actual results of the Company to differ materially from those discussed herein, including the possibility that future exploration results will not be consistent with the announced results or the Company's expectations, the resource/reserve and grade of the ore body may not be upgraded, the uncertainties involved in interpreting exploration results and other inherent risks in the mineral exploration and development industry. Such forward-looking information speaks only as of the date on which it is made and, unless required by applicable securities laws, the Company undertakes no obligation to update any forward-looking information, whether as a result of new information, future events or results or otherwise.

Shares Outstanding: 77,076,898


The Toronto Stock Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

CONTACT INFORMATION:

Forsys Metals Corp.
Bruce Hall
Chief Communications Officer
(905) 844-4646
Email: bhall@forsysmetals.com

or

In Namibia
Forsys Metals Corp.
+264 61 219 462
Email: wrn@forsysmetals.com
Website: www.forsysmetals.com

INDUSTRY: Manufacturing and Production - Mining and Metals

Footer

.

Forsys Metals Corp.

DEVELOPMENT STAGE
CODE : FSY.TO
ISIN : CA34660G1046
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Forsys Metals is a zinc and copper exploration company based in Canada.

Forsys Metals develops zinc, copper and uranium in Namibia, and holds various exploration projects in Namibia.

Its main asset in development is VALENCIA URANIUM in Namibia and its main exploration properties are OMARURU, ELBE PROJECT, ONDUNDU and NAMIBPLAAS in Namibia.

Forsys Metals is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 134.2 millions as of today (US$ 107.3 millions, € 94.0 millions).

Its stock quote reached its highest recent level on April 20, 2007 at CA$ 9.94, and its lowest recent point on June 30, 2016 at CA$ 0.05.

Forsys Metals has 145 910 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Forsys Metals Corp.
2008 Annual Report
Annual Report 2007
Financings of Forsys Metals Corp.
11/28/2011Announces Completion of Private Placement
Nominations of Forsys Metals Corp.
8/15/2012Appoints Martin Hirsch as Chief Geologist
6/11/2012Appoints Director Finance and Establishes Office in Perth
7/28/2008Appoints Valencia General Manager
3/7/2008Appoints New Chief Financial Officer
Financials of Forsys Metals Corp.
8/15/2011Announces Second Quarter 2011 Financial and Operational Resu...
Project news of Forsys Metals Corp.
9/28/2012(Namibplaas)Announces: Updated Namibplaas Resource
3/26/2012(Namibplaas)Completes Acquisition of Remaining 30% Interest in Namibplaa...
2/1/2012(Ondundu)to Retain Control of The Ondundu Gold Project
10/24/2011(Namibplaas)Announces Agreement to Acquire Remaining 30% of Namibplaas U...
2/2/2011(Namibplaas)Announces Additional Positive Namibplaas Drilling Results an...
3/31/2010(Ondundu)TECHNICAL REPORT ON THE ONDUNDU GOLD PROJECT EPL3195, NAMIB...
8/21/2008(Valencia Uranium)Valencia Uranium Project, Namibia Mining Licence Granted
8/6/2008(Valencia Uranium) Confirms Deeper Uranium Mineralization at Valencia
7/22/2008(Valencia Uranium) Continues Drilling at Valencia Expanding Pit Bottom and Ove...
6/27/2008(Valencia Uranium) Adds Fourth Drill Rig to Test North Anomaly at Valencia
6/13/2008(Valencia Uranium)Mineralization Expansion and Grade Improvement at Valencia-F...
6/4/2008(Valencia Uranium)Receives Environmental Clearance for Valencia
4/29/2008(Valencia Uranium) Expands Uranium Zones at Valencia
4/1/2008(Ondundu)Increases Ownership of Ondundu Gold Project in Namibia to 90...
2/13/2008(Valencia Uranium)Announces Joly Zone Trenching Results
1/29/2008(Valencia Uranium) Provides Joly Zone Update
1/14/2008(Valencia Uranium)Reports Drilling Results and Resumes Drilling at Valencia
3/26/2007(Valencia Uranium)Significant Increase for the Valencia Uranium Resource
Corporate news of Forsys Metals Corp.
9/14/2015Forsys Metals Announces Non-Brokered Private Placement Updat...
8/12/2015Forsys Metals Announces Non-Brokered Private Placement
3/18/2015Forsys Releases Feasibility Study Results for Norasa Uranium...
11/26/2014Forsys Provides Norasa Uranium Project Feasibility Study Upd...
10/29/2014Forsys Closes $2.4 Million Private Placement
10/9/2014Forsys Provides Update on Private Placement & Progress on th...
7/7/2014Forsys Metals Initiates Feasibility Study for Norasa Uranium...
5/23/2014Forsys Announces Annual and Special Meeting Voting Results
3/27/2014Forsys Files Updated NI 43-101 Technical Report on Norasa Ur...
3/20/2014Forsys Adopts Advance Notice Policy for Director Nominations...
10/7/2013Provides Updated Mineral Resource Estimate for Its Norasa Ur...
5/2/2013(Valencia Uranium)Announces Results of Positive Engineering Cost Study for Its...
3/19/2013Reports Positive Exploration Drilling Results and Confirms H...
1/23/2013Significant New Exploration Results at Recently Discovered V...
1/26/2012(Namibplaas)Announces Additional High Grade Zones from Namibplaas Phase ...
10/5/2011Enters Into Share Subscription Agreement to Raise C$8,000,00...
9/15/2011(Namibplaas)Announces Maiden Resource Statement Namibplaas Project-Namib...
8/10/2011Announces Up to 92% Recoveries from Heap Leach Laboratory Te...
7/11/2011(Namibplaas)Announces Discovery of Extensive High Grade Zones From Ongoi...
5/15/2011Proposed Changes to Namibian Mineral Policy Will Not Affect ...
3/3/2011Announces Settlement Agreement With GFI and George Forrest
12/11/2008Corporate Quarterly Update
11/14/2008George Forrest International Afrique S.P.R.L. to Acquire For...
9/16/2008Corporate Quarterly Update
6/27/2008Clarifying Press Release-Mineral Resource and Mineral Reserv...
6/16/2008Corporate Quarterly Update
4/23/2008Clarifies Uranium Project on Track
4/11/2008Namibia to Build Second Desalination Plant for Uranium Mines
3/6/2008Prepares for Contract Mining at Valencia
2/25/2008Receives Water Permits
2/6/2008Uranium Exploration Licences Renewed
3/23/2007Completes Acquisition of Remaining 10% of Valencia Uranium D...
2/28/2007Completes $47.5 Million Financing
2/26/2007Acquires 70% of Ancash Investments and 5 Additional Uranium ...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (FSY.TO)FRANKFURT (F2T.F)
0.920-1.08%0.625-0.32%
TORONTO
CA$ 0.920
04/17 17:00 -0.010
-1.08%
Prev close Open
0.930 0.935
Low High
0.920 0.960
Year l/h YTD var.
0.750 -  1.11 22.67%
52 week l/h 52 week var.
0.300 -  1.11 109.09%
Volume 1 month var.
151,288 1.10%
24hGold TrendPower© : 12
Produces
Develops Uranium
Explores for Copper - Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 6/18/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202448.39%
202324.00%0.670.30
2022-39.02%1.010.39
2021173.33%1.300.26
2020114.29%0.330.06
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.32%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.89-1.36%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55-0.72%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.36-3.28%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.64+2.69%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+7.89%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+6.25%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.67-0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03-2.94%Trend Power :