Maximus Resources Limited

Published : February 16th, 2015

Monax Mining Limited: Millers Creek Exploration Update

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Australia | Copper | Gold | Iron |

Monax Mining Limited: Millers Creek Exploration Update

For Immediate Release

Exploration Office Unit 2, 81 Harrison Road Dudley Park

SA 5008

ABN: 96 110 336 733

Tel: +61 8 8245 4900

Fax: +61 8 8245 4999

www.monaxmining.com.au

For Immediate Release
Friday 13 February, 2015

ASX RELEASE

Millers Creek Exploration Update

HIGHLIGHTS

Farm-In Agreement signed.

Drilling planned to commence late March 2015.

Monax Mining Limited ("Monax") (ASX:MOX) announced today the signing of a Farm-In Agreement with Maximus Resources Limited ("Maximus") (ASX:MXR) over four tenements located within the Woomera Prohibited Area (WPA) in northern South Australia.
The four tenements above, plus one Monax Alliance tenement, comprise the Millers Creek
Designated Project ("Millers Creek DP") totalling 2402km2 (Figure 1).
The Millers Creek DP is a joint project between Monax and its strategic alliance partner, a wholly-owned subsidiary of major Chilean copper producer Antofagasta plc ("Antofagasta"), via Monax's own wholly-owned subsidiary, Monax Alliance Pty Ltd ("Alliance").
Initial geophysical data modelling, based on the 2013/2014 Department of State Development- funded 1km x 1km gravity survey, outlined four priority iron-oxide copper-gold (IOCG) targets and several lesser ranked prospects (Figure 2).
Alliance undertook detailed gravity surveys at four areas shown in Figure 2. After a review of the newly acquired gravity data, Alliance completed a detailed heli-borne magnetic survey over the Oliffes Dam area to assist with modelling depth to basement and provide better quality magnetic data to assist with locating potential drill holes.
Alliance completed a successful Aboriginal heritage clearance survey in mid-2014 and Maximus signed a Native Title Agreement with the Arabana People allowing access for drilling at the Oliffes Dam target. The drill hole is located within the WPA and drilling will commence in late March 2015 after all statutory approvals are received.
Alliance will complete one hole at the Oliffes Dam target, with drilling expected to take 4-5 weeks to complete.

"Alliance is excited by the Oliffes Dam target and looks forward to the upcoming drilling program," Monax Mining Managing Director, Mr Gary Ferris, said today.

Page | 1

"The Oliffes Dam drill hole is located in an under-explored zone between the Olympic Dam and Prominent Hill mines and if Alliance intersects IOCG style alteration and/or mineralisation, this will increase the prospectivity of this region" he said.

"We are excited to have such a supportive partner in Antofagasta who has funded all exploration to date initially under the recently concluded strategic alliance and now as a Designated Project" he said.

Farm-In Agreement

Under the terms of the Farm-In Agreement with Maximus, Alliance can earn an 80% interest in
the Project by spending US$3 million over three years. Alliance will be the operator of the JV.
If Alliance has earned an 80% interest in the Project, Maximus can elect to either:
(a) Enter into a Joint Venture ("JV") with Alliance, with each party contributing to ongoing expenditures in accordance with their respective JV interests; or
(b) Sell its 20% interest in the Project to Alliance for $US4.5 million. Maximus will retain a
2% net smelter royalty (NSR) which Alliance has the option to purchase for $US4 million
at any time up to a decision to mine.
If, after earning its 80% interest, Alliance fails to contribute to an approved work program prior to the completion of a feasibility study, Maximus will be appointed Project Manager.
If either party elects not to contribute to JV expenditure they will be diluted using an industry standard formula. If a party's JV interest dilutes to less than 10%, the diluting party's JV interest will automatically convert to a 2% NSR, which the non-diluting party can elect to purchase for
$US4 million.
If Alliance withdraws from the Agreement before spending US$3 million, Alliance will have no interest in the Maximus Tenements.

Background - Designated Project

Alliance is a wholly-owned subsidiary of Monax Mining Limited, and was established as the operational vehicle of the strategic alliance between Monax and Antofagasta.

Under the terms of the alliance, which commenced in November 2011 and was successfully completed in November 2014, Antofagasta committed approximately US$1.4 million to the alliance over three years for target-generation within South Australia.

Properties identified as a project of interest became Designated Projects ("DP"). whereupon

Antofagasta acquired a 51% interest and Monax a 49% interest in the project.

Antofagasta has the option to earn an additional 19% of any DP (for a cumulative 70% interest) by spending US$4 million within three years. Upon completion of this stage, Antofagasta will make a cash payment (success fee) to Monax of US$3 million.
Upon vesting its interests at 70% Antofagasta and 30% Monax, both parties have the right to maintain their interest by contributing to exploration or development costs pro rata, or dilute in accordance with a standard dilution formula.
Monax currently has two DP's (Millers Creek and Musgrave) which are wholly funded by
Antofagasta (see Figure 1).

Gary Ferris

Page | 2

Managing Director, Monax Mining

Ph: (08) 8245 4900

Email: [email protected]

The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr G M Ferris, who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Ferris is employed full time by the Company as Managing Director and, has a minimum of five years relevant experience in the style of mineralisation and type of deposit under consideration and qualifies as a Competent Person as defined in the 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" Mr Ferris consents to the inclusion of the information in this report in the form and context in which it appears.

Plate 1. Landscape within area of proposed drilling at Millers Creek.

Page | 3

130 132

- ELA 1997/00E1L5A5 2014/0043

134

136° 138°

26 ELA 1997/00190

Musgrave

Designated Project

- ELA 1997/00245

ELA 2013100168 c

LA 2013/00169

ELA 2013100170

Musgrave

MoNAX

M I NING LI MITED

28

A S r A A

ELA 2014/177 ....

-----------....._. ...------

Western Gawler Craton

ELA 2014/194

EL 5199

GREAT AUSTRALIAN 8/GHT

34" Main road

Rallway

Town

d Lake

lron Oxide CopperGold deposi!

- Deslgnated Projects

- Monax Exploration Ucence

Monax Exploration Ucence Appllcation

- Alhance Exploration I.Jcence

- FMG Exporation Licooce

Kangaroo lsland c_:

Edrth bUiih

EL5353 {

'41 oKmi$COI

r ......,.,

1:::1 Alìance Exploration Licence Application

L 4581

- Farm-ln Agreement - Western Areas Ud

0= == ---=::::OI Okm

Location of Monax Projects including the Millers Creek Designated Project.

Page 14


Figure 2. Background reduced to pole (RTP) magnetic image for Millers Creek DP,

further processed with a high pass filter, highlighting shorter wavelength features. 2013

WPA gravity survey data merged with open file gravity data with old pre 1970 data deleted is shown as contours (5gu/0.5 Mgal contours).

Page | 5

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Australia | All
Gold and Silver Prices for these countries : Australia | All

Maximus Resources Limited

PRODUCER
CODE : MXR.AX
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Maximus is a gold producing company based in Australia.

Maximus holds various exploration projects in Australia.

Its main asset in production is SELLHEIM in Australia and its main exploration properties are YANDAL, BRID IN HAND and ADELAIDE HILLS in Australia.

Maximus is listed in Australia and in Germany. Its market capitalisation is AU$ 92.8 millions as of today (US$ 60.2 millions, € 56.5 millions).

Its stock quote reached its lowest recent point on December 11, 2018 at AU$ 0.00, and its highest recent level on September 18, 2020 at AU$ 0.23.

Maximus has 2 441 019 904 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Project news of Maximus Resources Limited
11/1/2016Maiden Gold Resource at Eagles Nest deposit in WA
9/5/2016Acquisition of Burbanks Gold Processing Facility Completed
4/14/2016Notice of change of interests of substanial holder
2/1/2016Spargoville drilling delivers high grade gold results
10/27/2015Spargoville exploration update
10/26/2015Eagles Nest exploration review highlights potential 19,000 o...
10/19/2015Maximus confirms multiple significant new gold anomalies adj...
9/22/2015Maximus identifies significant new gold anomalies adjacent t...
3/25/2015Monax Mining Limited: Millers Creek drilling commenced
1/30/2014SA's Maximus re-acquiring tenements around its flagship Narn...
7/19/2013(Adelaide Hills)$4 million cash boost through sale of Adelaide Hills holding...
7/29/2011Good results at Narndee (WA) project for Maximus
4/28/2011UPDATE ON MAXIMUS' DELORAINE GOLD PROJECT IN SOUTH AUSTRALIA
8/3/2010(Adelaide Hills)in first drilling on two new gold targets in Adelaide Hills
2/24/2009(Sellheim)eyes profitable gold production in Queensland
8/8/2008(Brid In Hand)Adelaide Hills gold project moves a step closer to redevelop...
10/29/2007(Brid In Hand)New drilling extends strike length for Adel Hills gold proje...
9/25/2007(Brid In Hand)Gold at Bird-in-Hand
8/13/2007(Brid In Hand)High grade shallow gold for Maximus in old Adelaide Hills mi...
Corporate news of Maximus Resources Limited
8/1/2016Trading Halt
8/1/2016Quarterly Report for the period ending 30 June 2016
7/5/2016Exercise of Options - Appendix 3B
6/27/2016Exploration Update at Narndee Project
6/15/2016Lithium Exploration Update at Spargoville Project
5/30/2016Appendix 3Y – Change of Director's Interest Notice
5/23/2016Maximus Discovers High Grade Lithium in WA
5/18/2016Appendix 3B
5/16/2016Appendix 3B
5/16/2016Entitlement Issue - Notification of Shortfall
5/10/2016Closure of Non-Renounceable Entitlement Issue
5/2/2016Quarterly Report for the period ending 31 March 2016
4/26/2016Entitlement Issue Prospectus and Acceptance Form
4/20/2016Corporate Presentation
4/20/2016Eagles Nest Exploration Update in WA
4/18/2016Entitlement Issue Shareholder Letter
4/18/2016Entitlement Issue Replacement Prospectus
4/14/2016Notice of ceasing to be a substantial holder
4/14/2016Increased Placement Price to Sophisticated Investors
2/1/2016Quarterly Report for the period ending 31 December 2015
1/29/2016Spargoville Project results
12/22/2015Form 603 – Notice of initial substantial holder
12/21/2015Appendix 3Y – Change of Director's Interest Notice
12/13/2015Maximus Security Purchase Plan (SPP) Result
12/13/2015Appendix 3B - New issue announcement, application for quotat...
11/2/2015Quarterly Report for the period ending 30 September 2015
11/2/2015Appendix 4G: Key to Disclosures Corporate Governance Council...
10/27/2015Appendix 3B - New issue announcement, application for quotat...
10/27/2015Issue of Placement Shares – S708A Cleansing Notice
10/26/20152015 Annual Report
10/19/2015Notice of Annual General Meeting and proxy form
10/18/20152015 Annual Report, Notice of Meeting and Sample Proxy
8/31/2015Financial Report for the year ended 30 June 2015
8/6/2015Spargoville project farm-in agreement
8/6/2015MXR secures major farm-in on Spargoville gold project
8/3/2015Quarterly Report for the period ending 30 June 2015
3/24/2015Exploration commences on Maximus' highly prospective Millers...
3/22/2015Maximus commences airborne magnetic survey on Gawler Craton ...
3/2/2015Amended Financial Report for the half-year ended 31 December...
3/2/2015Financial Report for the half-year ended 31 December 2014
2/16/2015MXR secures US$3 million Farm-in Agreement on Gawler Craton-...
2/16/2015Monax Mining Limited: Millers Creek Exploration Update
2/11/2015Millers Creek Farm-In Agreement Signed
2/11/2015MXR: Maximus Secures US$3m Farm-In Deal
11/26/2014Chairman's address to the 2014 Annual General Meeting
11/26/2014Results of 2014 Annual General Meeting
2/10/2014MXR: ASX Annnouncement - Update
2/3/2014MXR:ASX Announcement - Update
12/11/2013MXR:ASX Announcement - Update
11/12/2013derisked for WA focus after first stage $1.5m cash payment f...
10/23/2013MXR ASX Announcement - Update
9/4/2013Updated Website
8/12/2013MXR ASX Announcement - Update
7/31/2013MXR ASX Announcement - Update
7/22/2013MXR ASX Announcements - 19/7/2013
3/18/2013WA's Narndee and SA's Woomera projects target of $1.5m capit...
12/13/2012Woomera access to explore granted to SA's Maximus and ERO
11/5/2012MXR:ASX Announcement Update - 31/10/2012
9/25/2012MXR ASX Announcments Update 25/9/2012
9/24/2012MXR ASX Announcments Update 21/9/2012
9/18/2012MXR ASX Announcments Update 18/9/2012
5/1/2012MXR ASX Announcments Update 30/4/2012
4/26/2012MXR ASX Announcments Update 26/04/2012
3/7/2012MXR ASX Announcments Update 6/3/12
2/21/2012MXR ASX Announcments Update 21/2/12
1/31/2012MXR ASX Announcments Update
8/4/2011Major review by Maximus of WA project identifies 18 signific...
5/10/2011Maximus raises $707,500 to progress Narndee gold prospects i...
7/12/2010New Adelaide Hills gold drilling program
8/26/2009$1.5m SPP for Adelaide Hills gold drilling
1/29/2009 outlines commercial production plans
1/20/2009Significant production increase tipped for North Queensland ...
1/19/2009 sets April date for full scale Queensland production
1/7/2009MXR AUDIO BROADCAST
11/25/2008 Internet "gold rush" as Maximus offers nuggets for electron...
11/21/2008COMMENCEMENT OF SELLHEIM GOLD NUGGET SALES
11/19/2008 gains key gold mining approvals in Queensland and SA
11/12/2008reports encouraging progress at Queensland gold project
10/2/2008Trial Gold production underway at Queensland project
9/19/2008EXCITING BULK-SAMPLING GOLD RESULTS
9/18/2008recommence work at WA uranium deposit
8/29/2008Highly encouraging bulk sampling results at Sellheim Gold Pr...
6/30/2008end-of-year update
6/10/2008reports abundant magnetite in first drillhole at Canegrass p...
5/9/2008Present at the Hard Assets Investment Conference in New York...
11/13/2007RESOURCE ESTIMATION COMMENCED AT SELLHIEM GOLD PROJECT
10/23/2007$9.5 million rights issue announced by Maximus
9/6/2007and Luzenac Australia in Adelaide Hills Talc Exploration Agr...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (MXR.AX)FRANKFURT (MMY.F)
0.038-9.52%75.50+0.00%
AUSTRALIA
AU$ 0.038
04/23 11:00 -
-9.52%
Prev close Open
0.042 0.040
Low High
0.038 0.040
Year l/h YTD var.
0.028 -  0.050 26.67%
52 week l/h 52 week var.
0.026 -  0.050 2.70%
Volume 1 month var.
372,170 26.67%
Produces Gold
Develops
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202435.71%
2023-30.00%0.040.03
2022-47.37%0.100.04
2021-50.97%0.200.06
2020244.44%0.230.03
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.73+0.26%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.11+2.21%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55-0.90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.47+3.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.25-3.42%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.79-3.76%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.57+0.84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :