Beach Petroleum

Published : October 07th, 2015

Monthly Drilling Report September 2015

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Australia | Fixed | Oil | Trap |

Monthly Drilling Report September 2015

Microsoft Word - ASX Release - Monthly Drilling Report - September 2015



For Immediate Release - 7 October 2015

Ref. #063/15


ASX Ltd

Companies Announcement Office Electronic Lodgement System


September 2015


AUSTRALIA - COOPER AND EROMANGA BASINS DEVELOPMENT

South Australian Gas

(Fixed Factor Area Joint Venture: Beach 20.21%, Santos 66.6% and operator, Origin 13.19%)

A six‐well development campaign is underway in the Tirrawarra and Gooranie fields, located approximately 50 kilometres north of Moomba, targeting gas and gas liquids in the Patchawarra Formation and oil in the Tirrawarra Sandstone. The campaign is being undertaken as a result of past drilling, which highlighted significant remaining potential within both gas and oil reservoirs, and findings from the detailed Patchawarra Formation study undertaken in 2011. Included in the program is one Permian source rock fracture stimulation per well, with the aim to test incremental well productivity. Tirrawarra‐86, the fourth well of the campaign, was cased and suspended following intersection of gas and oil pay in target zones in‐line with pre‐drill estimates. Tirrawarra‐87 is currently drilling ahead.


South Australian Oil

(Fixed Factor Area Joint Venture: Beach 20.21%, Santos 66.6% and operator, Origin 13.19%)

A five‐well campaign was completed in the greater Limestone Creek area, located approximately 50 kilometres south‐east of Moomba. Jena‐23, the last development well of the campaign, was drilled to develop booked reserves in the McKinlay Member and Mid‐Namur Sandstone. The well was cased and suspended following intersection of approximately two metres of net oil pay in the McKinlay Member. Beach elected not to participate in the first development well of the campaign, Seccante‐2.


EXPLORATION AND APPRAISAL


Ex PEL 104 / 111

(Beach 40%, Senex 60% and operator)

Spitfire‐7, located in PPL 258, is an oil appraisal well on the southern side of the Spitfire Field. The well is located approximately 450 metres west of Spitfire‐2 and approximately 500 metres south‐ west of Spitfire‐4, and targeted the Birkhead Formation. Spitfire‐7 was cased and suspended as a future oil producer following intersection of 6.6 metres of net oil pay within the target Birkhead Formation.


South Australian Oil

(Fixed Factor Area Joint Venture: Beach 20.21%, Santos 66.6% and operator, Origin 13.19%)

The five‐well campaign in the greater Limestone Creek area included two appraisal wells and one near field exploration well, which aimed to appraise additional oil reserves in the McKinlay Member and other secondary targets. The Calamia East‐1 near field exploration well was drilled up‐dip of Calamia West‐1 and targeted the McKinlay Member and Birkhead Formation. The well was cased and suspended following intersection of 1.7 metres of net oil pay in the McKinlay Member and

5.5 metres of net oil pay in the Birkhead / Hutton formations. Calamia East‐1 marked completion of the campaign, with Beach electing not to participate in the Biala‐16 appraisal well. There are no plans for follow‐up drilling in the near‐term.


Queensland Gas

(Beach 23.2%, Santos 60.06% and operator, Origin 16.74%)

The Windorah near‐field exploration program is proposed as a five‐well campaign to test simple four‐ way dip closures, as well as the potential for stratigraphic trap and basin centred gas plays across a large geographical area of the Windorah Trough, proximal to the Whanto Field. Whanto South West‐1, located in ATP 1189P approximately 110 kilometres north‐northeast of the Ballera gas processing plant, is the second well of the campaign. The results of Whanto South West‐1 were in‐line with pre‐drill estimates and the well will be cased and suspended upon completion of final logging. The outcome represents a new field discovery in the Whanto area.


The broader 2015 Windorah‐Marama development project includes well head connections in the Whanto, Mt Howitt and Toby fields to the existing Coonaberry gathering system. This will allow existing stranded fields to be brought online and connections for current development and near‐field exploration drilling outcomes. Pipelines associated with the 2015 Windorah‐Marama development project are expected to be completed in Q2 FY16.


Monthly Drilling Report - Period ending 06:00, 1 October 2015


Well

Participants

Progress and Summary

Primary Targets


Cooper Basin non‐operated

Tirrawarra‐86

BPT 20.21%

STO* 66.60%

ORG 13.19%

Drilling this month: 2,155 metres

Current Depth: 3,119 metres (total depth)

Status: Cased and suspended as a future Pe rmian gas producer

Patchawarra Formation Tirrawarra Sandstone

PPL 20

Gas development C/E Basin, SA


Tirrawarra‐87

BPT 20.21%

STO* 66.60%

ORG 13.19%

Drilling this month: 927 metres Current Depth: 927 metres

Status: Drilling ahead

Patchawarra Formation Tirrawarra Sandstone

PPL 20

Gas development C/E Basin, SA


Jena‐23

BPT 20.21%

STO* 66.60%

ORG 13.19%

Drilling this month: 1,340 metres

Current Depth: 1,340 metres (total depth)

Status: Cased and suspended as a future McKi nlay Me mber oil producer

McKinlay Me mber Mid‐Namur Sandstone

PPL 149

Oil development C/E Basin, SA


Spitfire‐7

BPT 40.00%

SXY* 60.00%

Drilling this month: 1,126 metres

Current Depth: 1,827 metres (total depth)

Status: Cased and suspended as a future Birkhead Formation oil producer

Birkhead Formation

PPL 258

Oil appraisal C/E Basin, SA


Calamia East‐1

BPT 20.21%

STO* 66.60%

ORG 13.19%

Drilling this month: 1,569 metres

Current Depth: 1,569 metres (total depth)

Status: Cased and suspended as a future McKi nlay Me mber and Birkhead / Hutton Formation oil producer

McKinlay Me mber Birkhead Formation

PPL 149

Oil exploration C/E Basin, SA


Whanto South West‐1

BPT 23.20%

STO* 60.06%

ORG 16.74%

Drilling this month: 1,962 metres Current Depth: 3,144 metres

Status: Drilling ahead

Toolachee Formation

ATP 1189P

Gas exploration C/E Basin, QLD


( * ) Operator

BPT Beach Energy Ltd STO Santos Ltd SXY Senex Energy Ltd ORG Origin Energy Ltd




Neil Gibbins

Acting Chief Executive Officer


For more information, contact the following on +61 8 8338 2833 Corporate

Neil Gibbins Acting Chief Executive Officer

Investor Relations

Derek Piper Investor Relations Manager

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Australia | All
Gold and Silver Prices for these countries : Australia | All

Beach Petroleum

CODE : BPT.AX
ISIN : AU000000BPT9
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Beach Petroleum is a exploration company based in Australia.

Beach Petroleum is listed in Australia and in Germany. Its market capitalisation is AU$ 3.0 billions as of today (US$ 1.9 billions, € 1.8 billions).

Its stock quote reached its lowest recent point on January 22, 2016 at AU$ 0.35, and its highest recent level on January 24, 2020 at AU$ 2.91.

Beach Petroleum has 1 873 810 048 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate news of Beach Petroleum
8/10/2016Lapse of Executive Incentive Rights
8/2/2016Sale of Queensland Oil Assets
7/6/2016Monthly Drilling Report June 2016
7/4/2016Lapse of Executive Incentive Rights
6/9/2016CFO Appointment
6/6/2016APPEA Conference Presentation
5/18/2016Change in substantial holding for COE
4/19/2016Ceasing to be a substantial holder
4/19/2016Ceasing to be a substantial holder
4/18/2016Beach Egypt Transaction Update
4/18/2016Beach Egypt Transaction Update
1/27/2016Update on Proposed Merger with Drillsearch
1/6/2016Monthly Drilling Report December 2015
11/25/2015Annual General Meeting Presentation
10/23/2015Presentation - Recommended Merger of Beach and Drillsearch
10/23/20152015 Beach Energy Ltd Corporate Governance Statement
10/23/2015Recommended Merger of Beach and Drillsearch
10/23/20152015 Beach Energy Ltd Annual Report
10/23/2015Notice of 2015 Annual General Meeting and Proxy Form
10/7/2015Monthly Drilling Report September 2015
10/6/2015Commencement of Operated Drilling Program
9/28/2015Appendix 3Y - Change of Director's Interest Notice
9/28/2015Beach Egypt Transaction Update
9/24/2015Appointment of Non-Executive Director
9/16/2015Update - Dividend/Distribution - BPT
9/16/2015Resignation of Managing Director
9/15/2015ATP 1056 Pre-emptive Rights
9/10/2015Ceasing to be a substantial holder
9/9/2015Becoming a substantial holder
8/24/2015Edited Transcript of BPT.AX earnings conference call or pres...
8/24/2015FY15 Full Year Results Presentation
8/24/2015Preliminary Final Results for the year ended 30-Jun-15 (4E)
8/21/2015Non-Cash Asset Impairments
8/21/20151P, 2P, 3P Reserves and 2C Contingent Resources at 30-Jun-15
8/19/2015Appointment of Acting CEO
8/17/2015FY15 Full Year Results Announcement and Conference Call
8/10/2015Acquisition of Interest in ATP 1056
8/10/2015Sale of Beach Egypt to Rockhopper
7/28/2015FY16 Guidance - Production Volumes and Capital Expenditure
7/20/2015Change in substantial holding
7/2/2015Lapse of Executive Incentive Rights
4/22/2015Quarterly Activities Report
4/7/2015Beach Energy Non-Deal Roadshow
4/1/2015Appointment of Non-Executive Director (Appendix 3X
3/29/2015Nappamerri Trough Natural Gas Project Update
3/19/2015Becoming a substantial holder
3/17/2015Becoming a substantial holder
3/17/2015Change in substantial holding
3/16/2015Becoming a substantial holder
3/12/2015Becoming a substantial holder
3/10/2015Notification of Issuer Redemption of Notes
3/5/2015Redemption of Convertible Notes
3/1/2015Letter to Shareholders
2/22/2015FY15 Half Year Results Presentation
2/22/2015Interim Report for the half year ended 31 December 2014
2/22/2015Cooper Basin NTNG Exploration Update
2/19/2015Change in substantial holding
2/19/2015Ceasing to be a substantial holder
2/18/2015FY15 Half Year Results Announcement and Conference Call
2/13/2015Non-Cash Asset Impairments
2/11/2015Change in substantial holding
8/10/2007SELLS 10% STAKE IN BASKER-MANTA-GUMMY PROJECT
8/10/2007BMG JV welcomes Itochu as a 20 percent participant
6/27/2007Marcoola-1 New Field Oil Discovery
6/1/2007NEW DISCOVERIES EXTEND BEACH PETROLEUM'S BODALLA SOUTH OILFI...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (BPT.AX)Berlin (BPS.BE)
1.62+0.00%0.0000
AUSTRALIA
AU$ 1.62
04/19 15:51 -
0%
Prev close Open
1.62 1.60
Low High
1.59 1.64
Year l/h YTD var.
1.53 -  1.92 -0.613%
52 week l/h 52 week var.
1.31 -  1.92 9.46%
Volume 1 month var.
7,763,372 -7.43%
24hGold TrendPower© : -31
Produces
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-3.12%
20234.51%1.721.29
202226.59%1.911.23
2021-30.19%2.041.01
2020-29.77%2.910.96
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.22+1.63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48-1.59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.84-1.31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.85-2.63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.83+0.78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :