Monument Mining Limited

Published : July 11th, 2016

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura

Vancouver, B.C., July 11, 2016, Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) 'Monument' or the 'Company' is pleased to announce that significant intercepts assay results have been received for the North of Alliance ('NOA') 7_8 deposit at the Burnakura Gold Project driven by Monument's fiscal 2016 exploration programs ('FY2016 Exploration Program'). The FY2016 Exploration Program includes infill and extensional drilling to update a resource statement that may potentially increase the life of mine for Burnakura Gold Project.

Highlight of the best intercepts and exploration progress at NOA7_8

HOLE ID From(m) To (m) Au g/t Interval Length /Grade
16MRC014 118 124 8.35 6.00m @ 8.35 g/t
16MRC023 82 94 7.16 12.00m @ 7.16 g/t
16MRC024 112 120 5.54 8.00m @ 5.54 g/t
16MRC027 104 110 5.32 6.00m @ 5.32 g/t
16MRC043 9 13 6.97 4.00m @ 6.97 g/t

The 2016 drilling at NOA was designed to extend the life of mine at the existing optimized pits at Alliance and New Alliance ('ANA') and Federal City deposits, and de-risk the early stage of gold production under heap leach and CIL processes at the Burnakura Gold Project. It included confirmation drilling to NOA North, encompassing NOA 7_8, NOA 6 and NOA 4, and to NOA South deposits NOA1 and NOA2 (Figure 1). The FY2016 Exploration Program also aimed to verify the continuity of mineralization under open pits down dip to connect infill data points for potential super pits or underground mining in the second stage of production that was carried out previously by the previous owner.

The FY2016 Exploration Program at NOA7_8 deposit was completed by June 2016 and comprised of 64 exploration holes for 8,532 meters RC drilling, plus one metallurgical hole for 129.4 meters DD drilling (Figure 2). As a result 6,746 assay results have been received to date (including QAQC samples), confirming the good continuity of the known mineralization envelopes and their extensions down-dip. A follow up economic study is ongoing to optimize the early stage mine plan. In the meantime, the Company is planning a deep drilling program to extend resources and investigate underground production potential to confirm the economics for longer term production.

Figure 1--Drill hole Location Plan for FY2016 Exploration Program in NOA deposits

Preliminary Interpretation Results and Deep Drilling Follow-up

Table 1 'Significant Drill Intercepts > 1.0g/t -- DD holes' is included in this news release, showing a breakdown of fire assay best intercept results completed by SGS Lab for intervals of mineralization greater than 1.0 g/t Au along with collar information for the RC drill holes (Table 2). The infill and extensional drilling was angled at around 60° towards the west, and has confirmed and allowed the Company to refine the understanding on the existing oxide and sulphide mineralized zones. Most of the significant intercepts come from infill drilling located in regions modeled previously as lower grade mineralization. This indicates that an upcoming resource model update should increase significantly the total Resource, while increasing the confidence in the geometry and grade continuity.

Table 2 in this news release shows the collar coordinates of highlighted exploration RC drilling in corresponding intercepts listed in the Table 1.

FY2016 drill holes, including the mineralized assay results greater than 1.0g/t Au at NOA7_8 highlighted at Figure 2 below, together with historical holes prior to FY2016, are being used as input data for the ongoing Resource estimation. The drill hole orientation for exploration drilling was designed to target perpendicular to mineralization for true thickness. The drill hole intercepts reported in this statement represent composited sample intervals obtained from drilling.

Figure 2 --Drill hole Collar Location Plan for NOA7_8 in FY2016, highlighting holes with composited assays greater than 1.0g/t

The available hard data information composed of historical drilling (1991-2013), BMGS Resource block model 2012, Rock Team Underground Mining Study 2012 and Monument drilling within FY2016 (highlighting significant assay results) were compiled and visualized in an integrated way, aiming to verify more closely the potential for underground mining mineralization at NOA7_8. The recent Monument drilling, even being predominantly shallower, provides important information evidencing the trends for gold spatial continuity.

Figure 3 presents a cross-section showing some of the significant intercepts listed in Table 1, together with the grade shell interpretation for the ongoing modelling. It could be observed that the recent Monument infill drilling has filled some information gaps, indicating in some cases a mineralization approximately matching the previously interpreted ore geometry however with much higher grade. In this and other sections it is clear that the mineralization is still open at depth. The mineralization is locally much thicker and consistently higher grade than modelled previously with the information then available.

Fault offsets may have displaced the mineralization, and or new pods may have been identified and should be investigated further. This is being better studied in the ongoing modelling. It is also clearly confirmed that the deposit mineralization is structurally controlled and there is a plunging of the high grades to north. The BMGS 2012 previous model is shown in 3D in Figure 4, indicating these gold high grade trends.

Figure 3 -- Cross-section 7011330mN (+/- 10m), showing significant intercepts for Monument (in green label) and historical holes, in relation to the current interpretation and pits (section trace shown in plan view)

Figure 4 -- Oblique view for block model and drilling in relation to actual (brown) and optimised (blue) pits

The study of the available information and ongoing resource modeling update based on the new drilling information has evidenced positive indications for the increase of mineralized volume and gold grade/ounces for a good part of NOA 7_8, in particular coming from the significant intercepts observed. It has also enhanced the strong potential for the continuity of deep mineralization in the central and north portions of NOA 7_8 deposit.

The completion of the resource modelling will provide the mining department with an indication of possible CIL addition to the earlier phases of the LOM, while providing more updated model indication of the underground potential for designing a further deep drilling program. This will bring a more accurate picture of the potential for both expansion of the optimized pit for CIL high grade purpose, and opportunities for deep drilling and underground development in the near future.

Roger Stangler, Chief Managing Geologist of the Company, MEng, MAusIMM, MAIG, has prepared, reviewed, supervised the preparation and approved the scientific and technical disclosure in the news release as a Qualified Person under NI43-101 standards.

About Monument

Monument Mining Limited (TSX-V:MMY, FSE:D7Q1) is an established Canadian gold producer that owns and operates the Selinsing Gold Mine in Malaysia. Its experienced management team is committed to growth and is advancing several exploration and development projects including the Mengapur Polymetallic Project, in Pahang State of Malaysia, and the Murchison Gold Projects comprising Burnakura, Gabanintha and Tuckanarra in the Murchison area of Western Australia. The Company employs approximately 240 people in both regions and is committed to the highest standards of environmental management, social responsibility, and health and safety for its employees and neighboring communities.

Robert F. Baldock, President and CEO
Monument Mining Limited
Suite 1580 -1100 Melville Street
Vancouver, BC V6E 4A6

FOR FURTHER INFORMATION visit the company web site at www.monumentmining.com or contact:

Richard Cushing, MMY Vancouver T: +1-604-638-1661 x102 [email protected]
Wolfgang Seybold, Axino GmbH T: +49 711-82-09-7211 [email protected]

'Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.'

Forward-Looking Statement

This news release includes statements containing forward-looking information about Monument, its business and future plans ('forward-looking statements'). Forward-looking statements are statements that involve expectations, plans, objectives or future events that are not historical facts and include the Company's plans with respect to its mineral projects and the timing and results of proposed programs and events referred to in this news release. Generally, forward-looking information can be identified by the use of forward-looking terminology such as 'plans', 'expects' or 'does not expect', 'is expected', 'budget', 'scheduled', 'estimates', 'forecasts', 'intends', 'anticipates' or 'does not anticipate', or 'believes', or variations of such words and phrases or state that certain actions, events or results 'may', 'could', 'would', 'might' or 'will be taken', 'occur' or 'be achieved'. The forward-looking statements in this news release are subject to various risks, uncertainties and other factors that could cause actual results or achievements to differ materially from those expressed or implied by the forward-looking statements. These risks and certain other factors include, without limitation: risks related to general business, economic, competitive, geopolitical and social uncertainties; uncertainties regarding the results of current exploration activities; uncertainties in the progress and timing of development activities; foreign operations risks; other risks inherent in the mining industry and other risks described in the management discussion and analysis of the Company and the technical reports on the Company's projects, all of which are available under the profile of the Company on SEDAR at www.sedar.com. Material factors and assumptions used to develop forward-looking statements in this news release include: expectations regarding the estimated cash cost per ounce of gold production and the estimated cash flows which may be generated from the operations, general economic factors and other factors that may be beyond the control of Monument; assumptions and expectations regarding the results of exploration on the Company's projects; assumptions regarding the future price of gold of other minerals; the timing and amount of estimated future production; the expected timing and results of development and exploration activities; costs of future activities; capital and operating expenditures; success of exploration activities; mining or processing issues; exchange rates; and all of the factors and assumptions described in the management discussion and analysis of the Company and the technical reports on the Company's projects, all of which are available under the profile of the Company on SEDAR at www.sedar.com. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company does not undertake to update any forward-looking statements, except in accordance with applicable securities laws.
MONUMENT MINING LIMITED
Table 1: Significant Drill Intercepts > 1.0g/t -- RC holes for 2015-2016 drilling programs in NOA 7_8

No. Hole_ID Hole Type *Interval Width (m) Intercept Grade Au (g/t) Intercept Description From (m) To (m) End of Hole Depth (m)
1 15MRC151 RC 5 1.16 5.00m @ 1.16 g/t 156 161 212
2 15MRC157 RC 7 1.06 7.00m @ 1.06 g/t 33 40 122
3 15MRC170 RC 3 1.22 3.00m @ 1.22 g/t 108 111 152
4 16MRC005 RC 4 4.77 4.00m @ 4.77 g/t 118 122 146
5 16MRC008 RC 4 2.62 4.00m @ 2.62 g/t 90 94 122
6 16MRC009 RC 4 2.59 4.00m @ 2.59 g/t 113 117 140
7 16MRC014 RC 6 8.35 6.00m @ 8.35 g/t 118 124 140
8 16MRC016 RC 3 2.95 3.00m @ 2.95 g/t 88 91 128
9 16MRC018 RC 3 1.18 3.00m @ 1.18 g/t 52 55 92
10 16MRC019 RC 7 2.79 7.00m @ 2.79 g/t 69 76 116
11 16MRC023 RC 3 3.94 3.00m @ 3.94 g/t 77 80 146
12 7.16 12.00m @ 7.16 g/t 82 94
12 16MRC024 RC 8 5.54 8.00m @ 5.54 g/t 112 120 146
13 16MRC027 RC 6 5.32 6.00m @ 5.32 g/t 104 110 140
14 16MRC028 RC 4 1.72 4.00m @ 1.72 g/t 16 20 164
6 1.71 6.00m @ 1.71 g/t 84 90
15 16MRC031 RC 3 4.03 3.00m @ 4.03 g/t 124 127 164
16 16MRC034 RC 9 1.74 9.00m @ 1.74 g/t 136 145 170
3 3.81 3.00m @ 3.81 g/t 148 151
17 16MRC036 RC 3 1.22 3.00m @ 1.22 g/t 129 132 182
18 16MRC037 RC 3 1.06 3.00m @ 1.06 g/t 92 95 122
19 16MRC040 RC 4 4.79 4.00m @ 4.79 g/t 67 71 116
20 16MRC043 RC 4 6.97 4.00m @ 6.97 g/t 9 13 38
21 16MRC047 RC 6 4.16 6.00m @ 4.16 g/t 92 98 134
3 3.37 3.00m @ 3.37 g/t 107 110
Note:
* Intercepts widths represent approximate true mineralization widths.

Drillholes with no significant assays (>=1 g/t Au): 15MDD002 (Metallurgical hole) - 15MRC152; 15MRC156; 15MRC158; 15MRC166;
16MRC001; 16MRC004; 16MRC006 ; 16MRC007; 16MRC010; 16MRC013; 16MRC015; 16MRC017; 16MRC020; 16MRC022;
16MRC025; 16MRC026; 16MRC029; 16MRC030; 16MRC032; 16MRC033; 16MRC035; 16MRC038; 16MRC039; 16MRC041;
16MRC042; 16MRC044; 16MRC046.

LEGEND: Gold (Au): SELECTION PARAMETERS:
1.0 to 3.0 g/t Bottom cut (g/t) 1.00
3.0 to 5.0 g/t Minimum Interval Length (m) 3.00
5.0 to 10.0 g/t Maximum Internal Dilution (m) 1.50

MONUMENT MINING LIMITED
Table 2: Significant Drill Intercepts: Collar coordinates in MGA94, Zone 50 grid

No. Project Hole ID Hole Type RTK DGPS Dip Azimuth
East North RL
1 NOA7_8 15MRC151 RC 645658.16 7011393.15 457.52 -59.2 271.3
2 NOA7_8 15MRC157 RC 645528.18 7011567.59 456.61 -59.7 273.3
3 NOA7_8 15MRC170 RC 645574.12 7011072.35 458.43 -60.5 271.3
4 NOA7_8 16MRC005 RC 645588.49 7011083.66 458.59 -56 269.4
5 NOA7_8 16MRC008 RC 645566.39 7011148.85 458.09 -59.1 270.8
6 NOA7_8 16MRC009 RC 645590.55 7011148.36 458.24 -59.5 268.2
7 NOA7_8 16MRC014 RC 645590.94 7011222.75 457.92 -59.9 271.9
8 NOA7_8 16MRC016 RC 645573.9 7011241.73 457.83 -56.1 270.2
9 NOA7_8 16MRC018 RC 645531.46 7011283.01 457.55 -60.4 271
10 NOA7_8 16MRC019 RC 645567.79 7011284.16 457.71 -60.3 270.9
11 NOA7_8 16MRC023 RC 645577.05 7011324.95 457.61 -59.5 269.8
12 NOA7_8 16MRC024 RC 645621.77 7011323.96 457.68 -60.5 269.8
13 NOA7_8 16MRC027 RC 645550.82 7011364.9 457.43 -59 270.1
14 NOA7_8 16MRC028 RC 645588.99 7011362.73 457.53 -59.8 269.9
15 NOA7_8 16MRC031 RC 645592.64 7011405.08 457.29 -58.9 269
16 NOA7_8 16MRC034 RC 645597.8 7011444.74 457.24 -60.2 269.2
17 NOA7_8 16MRC036 RC 645603.95 7011464.72 457.22 -59.2 270.1
18 NOA7_8 16MRC037 RC 645576.07 7011484.87 457.15 -59.3 269.5
19 NOA7_8 16MRC040 RC 645568.87 7011510.03 456.92 -53 270
20 NOA7_8 16MRC043 RC 645513.11 7011555 452.84 -55.6 269.6
21 NOA7_8 16MRC047 RC 645552.9 7011390.67 457.35 -58.6 269.7

Read the rest of the article at www.publicnow.com
Data and Statistics for these countries : Malaysia | All
Gold and Silver Prices for these countries : Malaysia | All

Monument Mining Limited

PRODUCER
CODE : MMY.V
ISIN : CA61531Y1051
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Monument Mining is a gold producing company based in Canada.

Its main asset in production is SELINSING in Malaysia and its main exploration properties are MENGAPUR and BUFFALO REEF in Malaysia.

Monument Mining is listed in Canada and in Germany. Its market capitalisation is CA$ 48.4 millions as of today (US$ 35.2 millions, € 33.0 millions).

Its stock quote reached its highest recent level on January 21, 2011 at CA$ 0.74, and its lowest recent point on April 09, 2020 at CA$ 0.04.

Monument Mining has 322 720 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Monument Mining Limited
2/13/2013Announces Closing of First Tranche of Brokered Private Place...
10/17/2012Announces Private Placement
10/12/2011Announces Private Placement of up to $70=2C000=2C000
8/12/2010Closes $13.0 Million Financing
7/22/2008Closes $38.1 M Private Placement and Convertible Note Financ...
Nominations of Monument Mining Limited
1/8/2014Receives Notice of Nominations for Election of Directors
1/8/2014Receives Notice of Nominations for Election of Directors
10/28/2013Appoints Executive General Manager, Monument Malaysia Group
9/20/2012Appoints Chief Operating Officer
6/29/2012Appoints Gerald Ruth to Board
1/25/2012Grants Share Purchase Options to its Directors
12/21/2011Appoints Graham Dickson as Chairman of the Board
6/9/2010Grants 1,600,000 options to CHF investor relation firm
6/9/2010Engages CHF in Investor Relations and Updates $12 Million Fi...
6/30/2009Appoints New Director
12/17/2008Appoints New Directors and Names George Brazier Chairman of ...
8/25/2008Appoints General Manager and Mine Manager
6/20/2008Appoints AXINO AG to provide Investor Relation Services (Rev...
Financials of Monument Mining Limited
11/29/2013Reports First Quarter Fiscal 2014 Results
5/30/2013Reports Third Quarter Fiscal 2013 Results
6/1/2012=E2??s 2012 Third Quarter Results
3/1/20122012 Second Quarter Results
1/5/2012=E2??s 2012 First Quarter Results
5/30/2011 2011 Third Quarter Results
5/9/2011 Third Quarter Production and Sales Results
3/1/2011 2011 Second Quarter Results
Project news of Monument Mining Limited
5/15/2013Central Australian Phosphate and Monument Mining to Establi...
5/1/2013s Its Interest In Central Australian Phosphate Limited
4/30/2013(Selinsing)s Selinsing and Buffalo Reef Resources
3/19/2013Abandons Earn=2DIn on Mersing Project
10/26/2012Attending Singapore and German Resource Conferences
10/25/2012(Selinsing)to Vigorously Defend Opportunistic Claim Filed Against Seli...
10/9/2012(Mengapur)Signs Harmonization Agreement on Mengapur Project
3/26/2012(Selinsing)Exposes Gold Thieves at Selinsing Gold Mine
2/21/2012(Mengapur)Closes Acquisition of 70% of the Mengapur Polymetalic Projec...
2/2/2012(Mengapur)Receives Final Acceptance from the TSX=2DV to Close the Meng...
12/3/2011(Mengapur)Enters into Definitive Agreement for Acquisition of 70% of ...
9/15/2011Grows Gold Project Pipeline
7/26/2011(Selinsing)Releases Positive Drill Results from Selinsing Property in M...
7/22/2011(Selinsing)to Expand Tailings Storage Facility at Selinsing Gold Mine i...
6/1/2011(Mengapur)Agrees to Acquire a 70% interest in the Mengapur Polymetalic...
5/29/2011(Buffalo Reef)REPORTS NI43-101 RESOURCES AT BUFFALLO REEF PROPERTY
3/3/2011(Selinsing)to Increase Gold Production
2/21/2010(Selinsing)Starts Commissioning CIL Circuit While Gravity Circuit is in...
11/4/2009(Selinsing)Pours First Gold From Gravity Circuit
9/1/2009(Selinsing)Obtains Power Connection at the Selinsing Gold Project and
7/20/2009(Selinsing)Commences Open-Pit Mining at the Selinsing Gold Project
2/11/2009(Buffalo Reef)Confirms Amended Plan for Gold Production from Phase I Gravi...
2/2/2009(Buffalo Reef)Releases Drill Results, Selinsing Developments and Director’...
3/7/2008(Buffalo Reef)Releases Positive Drill Results?Phase II Program at Buffalo ...
3/4/2008(Buffalo Reef)Positive Drill Results?Phase II Program at Buffalo Reef
2/7/2008(Buffalo Reef)'s Phase I Drill Program Confirms Previous Drill Results on ...
Corporate news of Monument Mining Limited
7/11/2016Monument Announces Significant Intercepts Assay Results at N...
6/13/2016Monument Collects Judgment and Adds Peter Kestel Personally ...
5/31/2016Monument Reports Third Quarter Fiscal 2016 Results
5/9/2016Monument Announces Not to Proceed with Matala
5/2/2016Monument Withdraws Technical Disclosure regarding Matala Pro...
4/11/2016Monument Announces Significant Intercepts Assay Results at B...
3/24/2016Monument Comments on Unusual Trading Activity
3/23/2016Monument files NI43-101Technical Report for Resource Estimat...
11/30/2015Monument Reports First Quarter Fiscal 2016 Results
11/21/2015Monument Mining Announces Results of Annual General Meeting ...
9/30/2015Monument Commissions Intec Pilot Plant at Selinsing
9/30/2015Monument's Fiscal 2015 Results
9/28/2015Monument Progresses Mine Development at Burnakura Site
8/17/2015Monument Murchison Gold Project Update
8/12/2015Monument Files Amended Technical Report for Murchison Gold P...
7/31/2015Monument Litigation Update
4/2/2015Monument files NI43-101Technical Report for Resource Estimat...
4/2/2015Monument files NI43-101 Technical Report for Resource Estima...
3/23/2015Monument Mining Announces Results of Annual General Meeting ...
3/8/2015Monument Reports Second Quarter Fiscal 2015 Results
2/27/2015Monument Reports Second Quarter Fiscal 2015 Results
2/27/2015Monument Delays Start-up of Iron and Copper Project at Menga...
2/18/2015Monument Announces Mineral Resource on Alliance/New Alliance...
2/16/2015Monument Files Claim Against Summer Empire Sdn. Bhd. and Kes...
2/13/2015Monument Announces Adjournment of Shah Alam High Court Trial...
2/7/2015Monument Issues Shares for Intec Transaction
2/6/2015Monument Issues Shares for Intec Transaction
2/2/2015Monument Secures Intec License to Exploit Sulphide Gold and ...
1/21/2015Monument Update Selinsing Litigation
1/20/2015Monument Update Selinsing Litigation
1/19/2015Monument Announce RC Assay Results from Federal City Drillin...
12/23/2014Monument Announces Termination of Proposed Transaction with ...
12/1/2014Monument Reports First Quarter Fiscal 2015 Results - Gold Pr...
11/30/2014Monument Reports First Quarter Fiscal 2015 Results
11/18/2014Monument Receives Order to Extend Time for Holding Annual Ge...
11/18/2014Monument Announces Second Round of RC Assay Results at Murch...
11/18/2014Extension of Closing Date for Proposed Transaction, 189 KB
11/17/2014Monument Extends Closing Date of Proposed Transaction with G...
11/12/2014Monument Completes Tuckanarra Gold Project Acquisition in We...
11/8/2014Monument to Extend Time for Holding Annual General Meeting
10/27/2014Monument Extends Close Date of Tuckanurra Acquisition
10/20/2014Monument Updates Selinsing Litigation
10/6/2014Monument Updates Selinsing Litigation
9/30/2014Monument's Fiscal 2014 Results
1/28/2014Files Lawsuit Against GoldMet and George Molyviatis to enfor...
1/28/2014Files Lawsuit Against GoldMet and George Molyviatis to enfor...
1/20/2014Warns Shareholders to Be Wary of the Dissident Group Attempt...
5/23/2013(Selinsing)Files Technical Report for Selinsing and Buffalo Reef
5/1/2013Reports Third Quarter Gold Production of 13=2C255 Ounces
4/24/2013Confirms Indicative Non=2DBinding Conditional Proposal to ac...
4/15/2013(Buffalo Reef)Starts Mining and Processing Oxide Materials at Buffalo Reef
4/2/2013Announces Results of Annual General Meeting of Shareholders
3/13/2013President and CEO to Speak at Hong Kong Conference
2/22/2013Settles Legal Disagreement
2/21/2013Welcomes Support from Major Shareholder
2/8/2013Further Comments on GoldMet Disclosure
2/8/2013Comments on GoldMet Disclosure=3A No Agreement Reached
1/17/2013Provides Update to Shareholders
1/11/2013Reports Record Second Quarter Gold Production of 15=2C902 Ou...
11/14/2012Has Engaged Mackie Research Capital Corporation as Financial...
11/10/2012to Extend Time for Holding Annual General Meeting
10/2/2012=E2??s 2012 Annual Results=3A Gross Revenue of $61.7 M with ...
8/24/2012(Mengapur)Confirms Historic Drilling Results at Mengapur Polymetalic P...
8/16/2012(Selinsing)Completed Selinsing Gold Plant Expansion
8/7/2012(Mengapur)Provides Updates on Mengapur Project and Private Placement
7/30/2012=E2??s 2012 Fourth Quarter Production Result
7/24/2012Received $12 Million through Exercise of Stock Purchase Warr...
6/19/2012and PLSB Working Together Harmonizing Oxide Magnetite Iron O...
5/14/2012=E2??s 2012 Third Quarter Production
5/9/2012Announces Senior Management Appointments
4/25/2012to Attend The INVEST 2012 Conference in Stuttgart
1/25/2012=E2??s 2012 Second Quarter Production
1/4/2012Announces Results of Annual and Special General Meeting of S...
12/20/2011Reminds Shareholders to Vote
12/16/2011(Mengapur)Discusses Mengapur Property Iron Ore Production Information
12/15/2011Provides Details of Annual General and Special Meeting
12/13/2011Annual General and Special Meeting Important Reminder
10/26/2011=E2??s 2012 First Quarter Production
9/29/2011=E2??s 2011 Annual Results
8/8/2011=E2??s 2011 Fourth Quarter Production and Sales Results
1/15/2010Fundamental Research Report Update #2
12/21/2009to Raise $12.0 M in Convertible Debenture and Forward Gold S...
9/18/2009to Issue Shares for Debt to Avocet Mining PLC
7/8/2009Moves to New Office
5/13/2009Releases Selinsing Gold Project Update
2/13/2009 Grants Stock Purchase Options to its Key Staff and Consulta...
12/24/2008Amends Selinsing Gold Project Construction Plan
9/24/2008Fundametal Initial Research Report
8/20/2008Announces TSXV’s Acceptance of its Ball Mill Acquisition fro...
8/15/2008Grants Stock Purchase Options to its Directors Officers unde...
8/8/2008Commences Action for Injunction and Damages
7/28/2008Closes Avocet Mill Transaction For Future Plant Upgrade
7/8/2008Acquires Package of Additional Adjacent Land - Update
6/20/2008Notice of Change of Business Address
5/26/2008Acquires Second Mill for Future Production Plant Upgrade
5/13/2008Monument Announces $38.0 M Capital Raising to Commence Plant...
1/21/2008Acquires Package of Additional Adjacent Land
10/25/2007 Q1 Project Development Update
9/13/2007Commences Exploration Program
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (MMY.V)FRANKFURT (D7Q1.F)
0.150+0.00%0.100-6.54%
TSX-V
CA$ 0.150
04/18 13:30 -
0%
Prev close Open
0.150 0.150
Low High
0.150 0.150
Year l/h YTD var.
0.130 -  0.195 -11.76%
52 week l/h 52 week var.
0.080 -  0.195 42.86%
Volume 1 month var.
140,165 -6.25%
24hGold TrendPower© : -40
Produces Gold
Develops
Explores for Copper - Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 3/19/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202411.11%
202392.86%0.150.07
2022-41.67%0.130.06
202133.33%0.210.09
2020125.00%0.120.04
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.68-0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.12+2.11%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.50+5.93%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.98+2.14%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+7.89%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.42-0.49%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03-2.94%Trend Power :