North American Palladium Provides Update on Mine Expansion Plan for LDI
Published : October 05, 2011
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

TORONTO, ONTARIO--(Marketwire - Oct. 5, 2011) - North American Palladium Ltd. ("NAP" or the "Company") (News - Market indicators)(NYSE Amex:PAL) today provided a technical update on its mine expansion plan for the Company's flagship Lac des Iles ("LDI") palladium mine in Northern Ontario. 

"I am very pleased with the significant progress made to date on the expansion of LDI, and that the updated mine plan capitalizes on the significant growth of the Offset Zone and the various scope changes we made to further enhance the expansion," said William J. Biggar, President and Chief Executive Officer.

Mr. Biggar continued: "I'm also confident that with the team and plan that we have in place, LDI is poised to become the lowest cost primary palladium producer in the world. With much of the surface infrastructure development nearing completion, and the mobilization of our shaft sinking contractor, we are on target to complete the first phase of the mine expansion in the fourth quarter of next year when the shaft will begin operating at a rate of 3,500 tonnes per day. This will allow us to gradually increase our production to the rate of 5,500 tonnes per day by 2015, at which point our production should increase to over 250,000 ounces per year at much lower cash costs, attributable to the higher volumes mined and the benefits of the developed infrastructure." 

"Our top priority at LDI is the completion of the Phase I shaft on schedule, while maintaining high standards in safety and a stable production profile during this transition phase," commented Greg Struble, Vice President and Chief Operating Officer. "We also recognize from last year's drilling success that our mining and development plans will continue to evolve as we factor in the exploration upside we recently identified. Our decisions will continue to be strategic in nature to maximize the mine's long term production and future operating cash flow potential. The updated mine plan has been specifically designed with these potential future expansions in mind, and to enhance our optionality should we identify other near term opportunities." 

Background

This internal update reflects further refinement to the Company's previously released 2010 Scoping Study which formed the structural foundation for the expansion work done to date. 

Specifically, the updated plan considers:

  • The increased wireframe of the Offset Zone (a 68% tonnage increase in measured and indicated resources);
  • Updated price assumptions for capital expenditures;
  • Additional infill drilling results; and
  • Newly available seismic information that has impacted certain details of the mine design. 

The expansion of LDI, which commenced in early 2010, was embarked upon to access the underground Offset Zone that currently contains an estimated total measured and indicated mineral resource of 2.5 million ounces of palladium. The expansion consists of installing a shaft (with a nameplate capacity of 7,000 tonnes per day), extending the ramp from the Roby Zone to the Offset Zone (to a depth of 1,380 metres), as well as all the necessary development work on surface and underground. The primary objective of the expansion is to transition from mining via ramp to mining via shaft while utilizing a large-scale bulk mining method which is expected to significantly lower operating costs once mining at full capacity from the shaft. 

To date, the Company has made significant progress with the shaft raiseboring and the mobilization for the shaft sinking activities as well as with the surface and underground development work. With the first phase of the project approximately 57% completed, NAP remains on schedule to commence production from the shaft in the fourth quarter of 2012 at an increased mining rate of 3,500 tonnes per day. The second phase entails sinking the shaft deeper and further increasing the mining rate to 5,500 tonnes per day in the first quarter of 2015. Once mining at that rate in 2015, production is expected to exceed 250,000 ounces of palladium, at cash costs forecasted to be approximately US$200 per ounce using current metal price assumptions.

More detailed information related to the Company's 2012 production metrics and operating costs will be released in January with NAP's annual guidance disclosure. 

Mining Method & Stope Design

Further assessment of bulk mining methods on the increased size of the Offset Zone, the surrounding expansion targets, along with an updated assessment of the geotechnical effects on the rockmass, led to a reconsideration of the main mining method to be used in the Offset Zone. A key objective in the internal study was to achieve the lowest cost and highest volume production method possible.

The selected mining method will be longhole stoping with primary and secondary stoping blocks. This method provides the best level of optionality within an overall extraction concept to allow modifications to the panel sizes as needed to best suit the deposit. The North and South sides of the Offset Zone will be predominantly mined on longitudinal retreat instead of the primary secondary extraction; however, this can be easily switched back to a primary secondary format if warranted by additional infill drilling success or improved economics. 

This combination of methods was selected for the Offset Zone due to the deposit's rock mass, which will support the large opening required for longhole stoping but not necessarily the long term openings associated with the super shrinkage method (the method envisaged in the 2010 Scoping Study). Upon further review, it became evident that the chosen mining method is better suited than super shrinkage given the size and geometry of the deposit, and will increase the Company's optionality to potentially access the other nearby mineralized zones by preventing ore sterilization which could have occurred under the super shrinkage scenario.

The geotechnical rock mechanics assessment reaffirmed LDI's superior rock quality, which is conducive to large-scale bulk mining method. However, the Company plans to backfill approximately half of the mine's mining panels to mitigate potential risks from the high stress on the sill pillars as well as strive for 100% recovery of the rib pillars. When mining is complete, the longhole stopes (primary panels) will be backfilled with cemented rock fill sourced from the surface backfill system and surface pit/development waste rock. Secondary stoping panels can be backfilled with mine development waste, hydraulic mill tails or a combination thereof. The longitudinal retreat blocks will be filled with a combination of cemented rockfill and waste rock.

The stope design will vary by mining panel, which will include a sublevel interval of 65 metres for larger stoping block tonnage (at a stope height of 70 metres), and the width (back span) of the primary and secondary stopes will be 35 metres (with additional support for the back of the secondary stopes).

The Company estimates that the total average operating cost once mining at full capacity from the shaft (including backfill) will be approximately $40 to $44 per tonne, which is comparable to the $43 per tonne presented in the 2010 Scoping Study.

Effective mining dilution is expected to be in the range of 5% to 10%, as compared to 10% in the 2010 Scoping Study. With the change of mining method to incorporate backfill, mining recovery is expected to improve from 90% in the 2010 Scoping Study to 95% to 100%. While mineralization in the LDI deposit is broadly disseminated, there is localized varibability in the grades of the mineralization that may allow for early stage selective mining to enhance palladium production.

There were no significant changes to the metallurgical assumptions for the Offset Zone mineralization, which continues to be comparable to the historical trends of the Roby Zone. However, recent process circuit modifications have incrementally raised the grade recovery curve across a broad range of head grades, therefore the Company continues to expect an 82% recovery for the expanded resource despite the lower grade from the original Scoping Study. 

See Figures 1-5 in the Appendix for the underground design schematic and plans related to development, stope design, backfill and productivity improvement, and Figure 6 for a visual of the surface development work associated with the mine expansion.

Capital Expenditures

The 2011 capital expenditure budget is $175 million. In 2012, capital expenditures are estimated to be in the range of $75 million to complete Phase I of the expansion enabling production from the shaft to commence in the fourth quarter of 2012. The 2012 budget includes underground infrastructure, the initial construction of a backfill system, completing the shaft sinking, ongoing development to meet the expanded resource, and additional exploration drilling at depth. The estimate includes a 10% contingency and also takes into account the industry-wide inflationary pressures on contract labour, building materials, equipment, fuel and consumables, as well as scope changes resulting in increased materials usage and infill drilling.

Mineral Resources

The updated plan was based on NAP's Offset Zone mineral resource estimate as published on June 13, 2011, which incorporated an additional 76,995 metres of drilling from the 2010 exploration program. The updated resource estimate for the Offset Zone also includes an increased palladium price assumption (US$475 per ounce) and a lowered cut-off grade (3.5 grams per tonne), which in conjunction with the new drill data, resulted in a 68% increase in tonnage, and a 41% increase in ounces to the previous calculation that formed the basis of the 2010 Scoping Study.

The following mineral resource calculation for the Offset Zone is current as of May 31, 2011:

OFFSET ZONE              
  Tonnes
(000's)
Pd
(g/t)
Pt
(g/t)
Au
(g/t)
Ni
(%)
Cu
(%)
Pd
(000's oz)
MEASURED 2,500 5.62 0.36 0.33 0.12 0.09 452
INDICATED 11,955 5.24 0.36 0.32 0.12 0.10 2,016
MEASURED & INDICATED 14,455 5.31 0.36 0.32 0.12 0.10 2,468
INFERRED 3,071 4.80 0.34 0.22 0.08 0.07 474
  1. Prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101") and the Canadian Institute of Mining, Metallurgy and Petroleum classification system. 
  2. The mineral resource estimate for the Offset Zone was prepared by Antoine Yassa, P.Geo. and Eugene Puritch, P.Eng. of P&E Mining Consultants Inc. both Independent Qualified Persons within the meaning of NI 43-101. The mineral resource calculation uses a minimum 3.5 g/t Pd resource block cut-off, Assays were capped at various levels depending on metal grade distributions. Resources were estimated to the 4070 Mine Level (-930 m elevation), a maximum depth of 1,430 m. The following metal price assumptions were used: US$475/oz palladium, US$1,500/oz platinum, US$1,100/oz gold, US$9.00/lb nickel, and US$3.00/lb copper. A US$/Cdn$ exchange rate of US$0.95 = CDN$1.00 was also applied.

The indicated resources which make up most of the mineral resources are located in the top and middle portion of the Offset Zone, while the inferred resources are located at depth. The Company intends to convert a portion of the Offset Zone resources into reserves in its next annual mineral reserve and resource update targeted for early second quarter of 2012.

Exploration Upside Potential

There remains significant upside potential from continued exploration of the Offset Zone, which remains open at depth and along strike. The Company's recent exploration accomplishments, which intersected significant mineralization close to the deepest limit of the current resource wireframe, as well as over 150 metres south of the shaft location, support management's view that the Offset Zone has potential to expand beyond the current resource wireframe. 

Furthermore, the current mine plan does not include the newly discovered parallel Cowboy, Outlaw, and Sheriff zones given insufficient drilling at this time. The underground infrastructure has been designed to allow future mining of these mineralized zones which can further increase LDI's production as the shaft has been sized for 7,000 tonnes per day and is further complemented by ramp access. 

Technical Information and Qualified Persons

The news release was prepared under the supervision of Kevin Small, P.Eng., Director of Technical Services, and Michel Bouchard, P.Geo., Vice President, Exploration and Development, who are Qualified Persons as defined by National Instrument 43-101, with input from Greg Struble, Vice President and Chief Operating Officer. 

Mineral resources are not mineral reserves and do not have demonstrated economic viability. NAP's mine plan includes measured, indicated and inferred mineral resources. Inferred mineral resources are considered too speculative geologically to have economic considerations applied to them that would enable such resources to be categorized as mineral reserves. There is no certainty that results anticipated by the 2010 preliminary economic assessment or this update will be realized.

About North American palladium

NAP is a Canadian precious metals company focused on growing its production of palladium and gold in mining-friendly jurisdictions. The Company's flagship mine, Lac des Iles, is one of the world's two primary palladium producers. NAP also owns and operates the Sleeping Giant gold mine, and the Vezza gold project located in the Abitibi region of Quebec. The Company has extensive landholdings adjacent to both its Lac des Iles and Sleeping Giant mines, and a number of exploration projects. NAP trades on the NYSE Amex under the symbol PAL and on the TSX under the symbol PDL.

Cautionary Note to U.S. Investors Concerning Estimates of Measured, Indicated and Inferred Resources

This press release uses the terms "Measured", "Indicated" and "Inferred" Resources. United States investors are advised that while such terms are recognized and required by Canadian regulations, the United States Securities and Exchange Commission does not recognize them. "Inferred Mineral Resources" have a great amount of uncertainty as to their existence, and as to their economic and legal feasibility. It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to a higher category. Under Canadian rules, estimates of Inferred Mineral Resources may not form the basis of feasibility or other economic studies. United States investors are cautioned not to assume that all or any part of Measured or Indicated Mineral Resources will ever be converted into Mineral Reserves. United States investors are also cautioned not to assume that all or any part of an Inferred Mineral Resource exists, or is economically or legally mineable.

Cautionary Statement on Forward Looking Information

Certain information included in this press release, including any information as to our future exploration, financial or operating performance and other statements that express management's expectations or estimates of future performance, constitute 'forward-looking statements' within the meaning of the 'safe harbor' provisions of the United States Private Securities Litigation Reform Act of 1995 and Canadian securities laws. The words 'expect', 'believe', 'will', 'intend', 'estimate' and similar expressions identify forward-looking statements. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties, risks and contingencies, including the possibility that drill programs will not yield the expected results, that operations at the Lac des Iles and Sleeping Giant mines may not proceed as planned, that Vezza and other properties can be successfully developed, and that metal prices, foreign exchange assumptions and operating costs may differ from management's expectations. The Company cautions the reader that such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause the actual financial results, performance or achievements of North American palladium to be materially different from the Company's estimated future results, performance or achievements expressed or implied by those forward-looking statements and that the forward-looking statements are not guarantees of future performance. These statements are also based on certain factors and assumptions. For more details on these estimates, risks, assumptions and factors, see the Company's most recent Form 40-F/Annual Information Form on file with the U.S. Securities and Exchange Commission and Canadian provincial securities regulatory authorities. The Company disclaims any obligation to update or revise any forward-looking statements, whether as a result of new information, events or otherwise, except as expressly required by law. Readers are cautioned not to put undue reliance on these forward-looking statements.

To view the Appendix of images associated with this release, please visit the following links:

To view "Figure 1: The underground design schematic of LDI," please visit the following link: 

http://media3.marketwire.com/docs/NAPFIG.jpg.

To view "Figure 2: Typical LDI Offset Zone Mining Level Development Plan," please visit the following link:

http://media3.marketwire.com/docs/NAPFIG2.jpg

To view "Figure 3: Stope Design," please visit the following link:

http://media3.marketwire.com/docs/NAPFIG3.jpg

To view "Figure 4: Backfill System," please visit the following link:

http://media3.marketwire.com/docs/NAPFIG4.jpg

To view "Figure 5: Productivity Improvement Plan," please visit the following link:

http://media3.marketwire.com/docs/NAPFIG5.jpg

To view "Figure 6: Surface development work associated with the mine expansion," please visit the following link:

http://media3.marketwire.com/docs/NAPFIG6.jpg



North American palladium Ltd.
Camilla Bartosiewicz
Manager, Investor Relations and Corporate Communications
416-360-7590 Ext. 7226
camilla@nap.com

North American Palladium Ltd

PRODUCER
CODE : PDL.TO
ISIN : CA6569121024
CUSIP : 656912102
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

North American Palladium is a palladium producing company based in Canada.

North American Palladium produces palladium, copper, gold, nickel and platinum in Canada, develops copper, gold, palladium and platinum in Finland, and holds various exploration projects in Canada.

Its main assets in production are LAC DES ILES and SLEEPING GIANT PROPERTY in Canada, its main asset in development is ARCTIC (SUHANKO) in Finland and its main exploration properties are TIB LAKE, DISCOVERY PROJECT, SHEBANDOWAN - BAND-ORE and ROARING RIVER in Canada.

North American Palladium is listed in Canada and in United States of America. Its market capitalisation is CA$ 1.1 billions as of today (US$ 871.6 millions, € 781.9 millions).

Its stock quote reached its highest recent level on June 01, 2012 at CA$ 996.00, and its lowest recent point on December 26, 2014 at CA$ 0.16.

North American Palladium has 58 130 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of North American Palladium Ltd
9/2/2011Aware of Potential Lawsuit
Annual reports of North American Palladium Ltd
2011 Annual Report - Digital Edition
2008 Annual report
Financings of North American Palladium Ltd
1/31/2014NAP - North American Palladium Completes First Tranche of Co...
1/30/2014NAP - North American Palladium Provides Pricing Update on Pr...
7/23/2013NAP - North American Palladium Announces Closing of Second $...
6/19/2013NAP - North American Palladium Announces Closing of First $1...
4/30/2012NAP - North American Palladium Completes C$35 Million Flow-T...
2/18/2011Completes C$22 Million Flow-Through Financing
1/28/2011Announces C$22 Million Financing of Flow-Through Shares
9/22/2009Announces C$35 Million Cross-Border Bought Deal Financing of...
9/22/2009Announces C$15 Million Bought Deal Financing of Flow-Through...
Nominations of North American Palladium Ltd
9/4/2013NAP - North American Palladium Appoints Chief Operating Offi...
3/21/2013NAP - North American Palladium Appoints Chief Executive Offi...
1/22/2013NAP - North American Palladium Appoints Chief Financial Offi...
9/14/2012NAP - North American Palladium Announces Appointment of Inte...
3/13/2008Appoints Vice President Exploration
Financials of North American Palladium Ltd
11/14/2013NAP - North American Palladium Announces Third Quarter 2013 ...
11/7/2012Announces Third Quarter 2012 Results
8/8/2012NAP - North American Palladium Announces Second Quarter 2012...
5/10/2012NAP - North American Palladium Announces First Quarter 2012 ...
8/11/2011Announces Second Quarter 2011 Results
5/10/2011NAP - North American Palladium Announces First Quarter 2011 ...
2/24/2011Fourth Quarter 2010 Results
8/13/2010Announces Second Quarter 2010 Results
5/11/2010Announces First Quarter 2010 Results
11/13/2009NAP Announces Third Quarter Results
2/25/2009Announces Fourth Quarter and Year Ended December 31, 2008 Re...
11/11/2008Reports Third Quarter 2008 Financial Results and Strong Liqu...
8/7/2008Announces Second Quarter 2008 Financial Results; Revenue Inc...
5/13/2008Announces First Quarter 2008 Financial Results; Net Income $...
3/19/2008 Announces Fourth Quarter and Year-End 2007 Financial Result...
3/7/2008Fourth Quarter and Year End 2007 Financial Results Conferenc...
11/6/2007Reports Third Quarter 2007 Financial Results
Project news of North American Palladium Ltd
12/23/2013(Lac Des Iles)NAP - North American Palladium Provides Update on Exploratio...
9/5/2013(Lac Des Iles)NAP - North American Palladium Provides Update on Exploratio...
2/19/2013Files Prefeasibility Study on LDI's Initial Offset Zone Rese...
1/31/2013(Lac Des Iles)NAP - North American Palladium Reports Excellent Exploration...
12/11/2012NAP - North American Palladium Provides Update on Exploratio...
8/8/2012NAP - North American Palladium Updates Palladium Mineral Res...
7/16/2012NAP - North American Palladium Provides Palladium Exploratio...
5/2/2012NAP - North American Palladium Receives Two Prestigious Awar...
1/30/2012(Lac Des Iles)Intersects High Grades Underground at LDI Mine and Reef-Styl...
10/5/2011(Lac Des Iles)NAP - North American Palladium Provides Update on Mine Expan...
9/14/2011(Lac Des Iles)NAP - North American Palladium Provides Palladium Exploratio...
7/12/2011(Sleeping Giant Property)NAP - North American Palladium Provides Gold Exploration Upd...
7/11/2011(Lac Des Iles)to Host Palladium Exploration Seminar and Live Webcast on Ju...
6/28/2011(Lac Des Iles)NAP - North American Palladium Provides Pall
1/20/2011(Lac Des Iles)Announces 2011 Guidance on Production, Capital Expenditures...
6/7/2010(Lac Des Iles)Provides LDI Exploration Update
5/27/2010(Lac Des Iles)Updates Resource Estimate for Offset Zone
4/6/2010(Sleeping Giant Property)Updates Reserves and Resources for Gold Division
9/18/2009(Lac Des Iles)Renewed Commitment to Exploration Delivers Results
6/26/2009(Lac Des Iles)Discovers New PGM Zone at Lac des Iles Mine
1/20/2009(Lac Des Iles)Increases Indicated Resource by 80 a Offset Zone, Plans Ag
7/17/2008Announces Second Quarter Production Results
4/29/2008Releases Infill Drilling Results for Offset High Grade Zone
4/23/2008Announces First Quarter 2008 Production Results
12/10/2007(Lac Des Iles)North American Palladium Earns 50% Interest in the Shebandow...
10/31/2007 Announces Scoping Study Results on Arctic Platinum Project ...
10/25/2007(Shebandowan - Band-ore)Files Initial NI 43-101 Compliant Mineral Resource Estimate ...
10/18/2007Reports Continued Improvement in Production Results for the ...
10/3/2007(Lac Des Iles)Reports Drilling Results at the Lac des Iles Mine
7/18/2007Report Second Quarter 2007 Production Results
French Corporate News of North American Palladium Ltd
1/17/2012NAP - North American Palladium annonce ses objectifs de prod...
Corporate news of North American Palladium Ltd
5/6/2016North American Palladium Reports Voting Results From 2016 An...
5/5/2016North American Palladium posts 1Q loss
5/5/2016North American Palladium Announces First Quarter 2016 Result...
4/8/2016North American Palladium Adopts Stock Option Plan
1/18/2016North American Palladium Announces Appointment of New Interi...
12/21/2015North American Palladium Announces Extension of Credit Facil...
9/30/2015North American Palladium cuts output forecast, jobs
9/30/2015North American Palladium Announces Workforce Reduction and R...
8/18/2015IIROC Trade Resumption - PDL.RT
8/18/2015IIROC Trading Halt - DIV.R; PDL.RT
8/12/2015North American Palladium Announces Management Changes
8/12/2015IIROC Trade Resumption - PDL
8/12/2015IIROC Trading Halt - PDL
8/6/2015North American Palladium Announces Completion of Recapitaliz...
7/29/2015North American Palladium posts 2Q loss
7/29/2015North American Palladium Announces Second Quarter 2015 Resul...
7/23/2015North American Palladium Announces Favourable Recommendation...
7/13/2015North American Palladium to Host Second Quarter 2015 Results...
6/19/2015North American Palladium to Proceed With Recapitalization Tr...
4/16/2015IIROC Trade Resumption - PDL
4/16/2015IIROC Trading Halt - PDL
4/15/2015North American Palladium Announces Recapitalization Transact...
4/12/2015Magnetar Increases Its Position in TransCanada
4/2/2015North American Palladium Announces Filing of Preliminary Eco...
3/26/2015North American Palladium to Attend Upcoming Investor Confere...
3/26/2015to Attend Upcoming Investor Conferences
1/12/2015Files Base Shelf Prospectus
2/20/2014NAP - North American Palladium Announces Year End 2013 Resul...
2/10/2014NAP - North American Palladium Completes Additional Issuance...
1/28/2014NAP - North American Palladium Provides Update on Proposed F...
1/13/2014NAP - North American Palladium Announces Proposed Financing
1/6/2014NAP - North American Palladium Announces 2014 Operating Guid...
12/2/2013NAP - North American Palladium Announces an Additional US$21...
11/21/2013NAP - North American Palladium Comments on Trading Activity
11/4/2013to Host Third Quarter 2013 Results Conference Call & Webcast...
11/4/2013to Host Third Quarter 2013 Results Conference Call & Webcast...
10/21/2013(Lac Des Iles)NAP - North American Palladium Commences Shaft Hoisting at L...
9/23/2013NAP - North American Palladium to Host Investor Day on Octob...
9/19/2013to Present at the 2013 Denver Gold Forum
8/8/2013NAP - North American Palladium Announces Second Quarter 2013...
6/7/2013Announces US$130 Million Debt Financing from Brookfield, $20...
5/10/2013NAP - North American Palladium Reports Voting Results from 2...
5/6/2013NAP - North American Palladium Announces First Quarter 2013 ...
4/30/2013NAP - North American Palladium Announces Favourable Recommen...
4/29/2013to Host First Quarter 2013 Results Conference Call & Webcast...
3/23/2013NAP - North American Palladium Announces the Sale of Its Gol...
3/15/2013NAP - North American Palladium Announces Adoption of Advance...
2/22/2013NAP - North American Palladium Announces Year End 2012 Resul...
2/19/2013NAP - North American Palladium Files Prefeasibility Study on...
2/13/2013NAP - North American Palladium Files Base Shelf Prospectus
2/6/2013to Host Year End 2012 Results Conference Call and Webcast on...
10/26/2012to Host Third Quarter 2012 Results Conference Call and Webca...
10/15/2012Announces Preliminary Third Quarter 2012 Production Results ...
7/31/2012NAP - North American Palladium Completes C$43 Million Offeri...
7/10/2012NAP - North American Palladium Announces C$43 Million Offeri...
7/9/2012NAP - North American Palladium Announces Preliminary Second ...
5/17/2012Corporate Video
5/10/2012AGM Invitation
4/12/2012NAP - North American Palladium Announces C$35 Million Financ...
4/10/2012NAP - North American Palladium Announces Preliminary First Q...
2/24/2012NAP - North American Palladium Appoints Head of Exploration
2/24/2012NAP - North American Palladium Announces Year End 2011 Resul...
2/9/2012to Host Fourth Quarter 2011 Results Conference Call and Webc...
1/17/2012NAP - North American Palladium Announces 2012 Guidance on Pr...
1/17/2012Announces 2012 Guidance on Production, Capital Expenditures ...
7/26/2011to Host Second Quarter 2011 Results Conference Call and Webc...
7/12/2011NAP - North American Palladium to Host Palladium Exploration...
6/13/2011s Palladium Mineral Resources
4/27/2011s Gold Mineral Reserves and Resources at Vezza Project a
4/26/2011to Host First Quarter 2011 Results Conference Call and Webca...
3/23/2011Adopts Shareholder Rights Plan
3/15/2011Added to S&P/TSX Composite Index
7/23/2010to Host Second Quar
4/26/2010Announces Exercise of Over-Allotment Option
4/20/2010to Acquire Vezza Gold Project From Agnico-Eagle
4/14/2010Restarts Palladium Production
3/15/2010Added to S&P/TSX Global Mining Index
1/25/2010Exploration Program Delivers Excellent Results at Offset and...
11/12/2009continues to achieve excellent drill results, expands size o...
10/7/2009 Pours First Gold at Sleeping Giant and Eliminates Royalty
9/10/2009to Webcast From Denver Gold Forum
9/2/2009Withdraws $50 Million Financing
8/27/2009Signs Option Agreement With Midland Exploration for Laflamme...
7/13/2009Announces New CFO
9/15/2008Announces New CEO
7/7/2008Settles Crusher Litigation Collects Additional $14=2E5 Milli...
5/7/2008Preliminary Economic Assessment Confirms Long Term Potential...
4/23/2008Added to S&P/TSX Global Mining Index
1/17/2008 Increases Annual Production by 21%
1/9/2008Closes Over-Allotment of Units
1/4/2008 Announces Increase in Over-Allotment Exercise
1/4/2008Announces Exercise of Over-Allotment Option
12/14/2007 Announces Closing of US$75 Million Offering
12/12/2007 Announces Increase in Unit Offering
12/11/2007 Prices Marketed Unit Offering
11/27/2007Announces Marketed Unit Offering
10/22/2007Reports Final Drill Results at Ahmavaara Deposit
10/11/2007Expands Exploration Activities
9/24/2007Arctic Platinum Project Infill Drilling Confirms Good Contin...
7/12/2007Infill Drilling at NAP's Ahmavaara Deposit at Suhanko Finlan...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (PDL.TO)AMEX (PAL)
19.73+0.00%400.00+0.00%
TORONTO
CA$ 19.73
12/16 16:00 -
0%
Prev close Open
19.73 19.73
Low High
19.73 19.74
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  19.73 -%
Volume 1 month var.
90,733 -%
24hGold TrendPower© : 8
Produces Copper - Gold - Nickel - Palladium - Platinum
Develops
Explores for Copper - Gold - Nickel - Palladium - Platinum
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/24/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.40+3.85%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.65-1.49%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.10+3.21%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.49-0.23%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :