Nevsun Resources Ltd

Published : June 18th, 2015

Nevsun Discovers New Massive Sulphide Deposit at Bisha

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Copper | Eritrea | Gold |

Nevsun Discovers New Massive Sulphide Deposit at Bisha

June 18, 2015

Nevsun Discovers New Massive Sulphide Deposit at Bisha

Nevsun Resources Ltd. (TSX:NSU) (NYSE MKT:NSU) (Nevsun or the Company) is pleased to announce assay results from a new massive sulphide discovery at the grassroots Asheli prospect on the Mogoraib River Exploration License located 20 kilometers southwest of the Bisha processing plant. The Asheli drilling is part of the 2015 Bisha regional exploration program which builds on the highly successful 2014 program.
HIGHLIGHTS

  • New greenfield volcanogenic massive sulphide discovery at Asheli
  • High grade massive sulphide intersections include:
    • MX-052: 2.29% Cu, 4.50% Zn, 0.45 g/t Au, 37 g/t Ag over 22.9 m
      Including 3.67% Cu, 8.04% Zn, 0.68 g/t Au, 50 g/t Ag over 7.4 m and 7.92% Cu, 3.89% Zn, 1.14 g/t Au, 101 g/t Ag over 2.9 m
    • MX-056: 1.26% Cu, 6.08% Zn, 0.28 g/t Au, 26 g/t Ag over 20.9 m including 1.71% Cu, 8.51% Zn, 0.37 g/t Au, 35 g/t Ag over 10.9 m
  • Deposit is associated with highly altered felsic volcanics and is open to expansion
  • Numerous untested geophysical targets along 4 km of similar stratigraphy

Nevsun CEO Cliff Davis commented, "We continue to have excellent results from our exploration programs at Bisha. The assays reported today demonstrate that the Bisha District hosts numerous deposits like other classic volcanogenic massive sulphide (VMS) camps worldwide. Our new greenfield discovery at Asheli is exciting in that it shows that the mineralizing systems on the Asheli trend are capable of producing high grade deposits with good thicknesses of massive sulphide. With over 4 kilometers of untested strike length with similar geology the potential for further discoveries on this trend looks very promising".

Asheli Prospect
The Asheli area was targeted for the initial drill testing of the over 5 kilometer long Asheli Trend which is characterized by an extensive highly siliceous felsic fragmental unit that has numerous geophysical (airborne VTEM and ground Transient EM (TEM)) anomalies associated with it. A previous operator of the project had drilled 10 short holes at Asheli targeting surface gossans that contained anomalous gold values (ASD-series of holes). These drill holes did not intersect any massive sulphide mineralization but did encounter narrow zones with minor chalcopyrite and sphalerite stringers. Bisha Mining Share Company (BMSC) re-evaluated the area by field mapping and completing a lithogeochemical analysis of the volcanic rocks. This work defined a 700 meter long zone of highly sericite and chlorite altered felsic volcanic stratigraphy associated with gossan zones enhancing the probability that a VMS deposit was likely to be found in the area.

Hole MX-044 drilled immediately below historical holes ASD-001 and ASD-003 which had tested a surface gold bearing gossan intersected the first indications of a new massive sulphide deposit. MX-044 returned 8.30 meters of massive sulphide grading 1.44% Cu, 4.00% Zn, 0.37 g/t Au, 27 g/t Ag. Follow-up drilling in hole MX-052 confirmed the new discovery with 22.90 meters of massive sulphide grading 2.29% Cu, 4.50% Zn, 0.45 g/t Au, 37 g/t Ag and similar results were encountered in hole MX-056 drilled approximately 100 meters above MX-052. The mineralization is associated with strongly chlorite and sericite altered felsic volcanics.

Chalcopyrite-rich zones in the massive sulphide produce strong borehole TEM responses and these responses are helping to guide the drilling of the deposit by allowing large over 100 meter step-outs in the initial drill evaluation. The zone remains open to expansion in a number of directions.
The Asheli discovery highlights the prospectivity of the Asheli Trend. With only 1 kilometer of the trend drill tested during this first phase of exploration and an additional 4 kilometers that has never been drill tested and having similar geology, the likelihood of further discoveries is high. Rainy season begins in mid-June and will require further work to be paused until later in the year.

Regional Exploration Program
The 2015 BMSC regional exploration program is currently focused on three main areas: expansion of the Harena deposit at depth and along strike; exploring the perimeter of the Bisha deposit at depth and along strike; and, evaluating regional targets on the Mogoraib River License at Asheli, Aderat and Tekewuda. Systematic surface and borehole TEM surveys in combination with geological and lithogeochemical modeling is being used to successfully guide the exploration effort.

Quality Assurance
A Quality Assurance/Quality Control program was part of the sampling program for the Asheli work. This program includes chain of custody protocols as well as systematic use of standards, duplicates and blank samples into the flow of samples produced by the sampling. All samples were prepared and analyzed at Bisha's on-site laboratory independently operated by SGS.

Drilling intercept lengths only are reported in the tables and text below.

Mr. Robert Foy P.Geo., BMSC's Exploration Manager, has been overseeing the drilling at Asheli and is a Qualified Person as defined by NI 43-101. Mr. Foy has reviewed the technical content of this press release and approved its dissemination.

Forward Looking Statements
The above contains forward-looking statements or forward-looking information within the meaning of the United States Private Securities Litigation Reform Act of 1995, and applicable Canadian securities laws. Forward-looking statements are frequently, but not always, identified by words such as "expects," "anticipates," "believes," "intends," "estimated," "potential," "possible" and similar expressions, or statements that events, conditions or results "will," "may," "could" or "should" occur or be achieved. Forward-looking statements are statements concerning the Company's current beliefs, plans and expectations about the future including but not limited to commercial production, future production of copper and related cash flows and are inherently uncertain. The actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking statements due to a variety of risks, uncertainties and other factors, including, without limitation, the risks that: (i) any of the assumptions in the historical resource estimates turn out to be incorrect, incomplete, or flawed in any respect; (ii) the methodologies and models used to prepare the resource and reserve estimates either underestimate or overestimate the resources or reserves due to hidden or unknown conditions, (iii) exploration activities or the mine operations are disrupted or suspended due to acts of god, internal conflicts in the country of Eritrea, unforeseen government actions or other events; (iv) the Company experiences the loss of key personnel; (v) the Company's operations or exploration activities are adversely affected by other political or military, or terrorist activities; (vi) the Company becomes involved in any material disputes with any of its key business partners, suppliers or customers; (vii) the Company is subjected to any hostile takeover or other unsolicited attempts to acquire control of the Company; (viii) the Company is subject to any adverse ruling in any of the pending litigation to which it is a party; (ix) the Company incurs unanticipated power interruptions or failures due to electrical circuit failures or inadequate fuel quality or supply required to effectively operate power generators for the plant or otherwise or costs or required repairs to the copper floatation plant; or (x) are associated with the speculative nature of exploration activities, periodic interruptions to exploration, failure of drilling, processing and mining equipment, the interpretation of drill results and the estimation of mineral resources and reserves, changes to exploration and project plans and parameters and other risks are more fully described in the Company's Annual Information Form for the fiscal year ended December 31, 2014, which is incorporated herein by reference. The Company's forward-looking statements are based on the beliefs, expectations and opinions of management on the date the statements are made and the Company assumes no obligation to update such forward-looking statements in the future, except as required by law. For the reasons set forth above, investors should not place undue reliance on the Company's forward-looking statements.
Further information concerning risks and uncertainties associated with these forward-looking statements and our business can be found in our Annual Information Form for the year ended December 31, 2014, which is available on the Company's website (www.nevsun.com), filed under our profile on SEDAR (www.sedar.com) and on EDGAR (www.sec.gov) under cover of Form 40-F

About Nevsun Resources Ltd.
Nevsun Resources Ltd. is a Vancouver-based mining company with an operating mine in Eritrea. Nevsun's 60%-owned Bisha Mine ranks as one of the highest grade open pit copper mines in the world. Nevsun has a strong balance sheet and future cash flows to grow shareholder value through exploration at Bisha and acquisition of additional mining assets.

NEVSUN RESOURCES LTD.
Cliff T. Davis
President & Chief Executive Officer

For further information, Contact:
Kin Communications
Tel: 604 684 6730
Toll free: 1 866 684 6730
Email: [email protected]
Website: www.nevsun.com

Hole ID

From

To

L (m)

Cu %

Zn %

Au
ppm

Ag
ppm

Rock
Type

MX-044

202.20

210.50

8.30

1.44

4.00

0.37

27

MSUL

includes

204.50

207.00

2.50

1.56

8.51

0.33

27

MSUL

MX-052

242.00

264.90

22.90

2.29

4.50

0.45

37

MSUL

includes

242.70

250.10

7.40

3.67

8.04

0.68

50

MSUL

and

255.00

264.90

9.90

1.99

3.38

0.36

39

MSUL

and

242.70

245.60

2.90

7.92

3.89

1.14

101

MSUL

and

259.90

261.80

1.90

5.62

2.53

0.37

66

MSUL

MX-056

142.10

163.00

20.90

1.26

6.08

0.28

26

MSUL

includes

142.10

153.00

10.90

1.71

8.51

0.37

35

MSUL

and

153.00

161.50

8.50

0.84

3.91

0.20

16

MSUL

Figure 1. Asheli - Drillhole Location Map


Assays are pending for holes MX-041 - 043; MX-045 - 051; MX-053 - 055; MX-057 - 058

Figure 2. Asheli Section 10300

Figure 3. Asheli Section 10400

Figure 4. Asheli Longitudinal Projection (Looking Northwest)


Assays are pending for holes MX-041 - 043; MX-045 - 051; MX-053 - 055; MX-057 - 058

Drill Collar Locations

HOLE
ID

UTM
Easting

UTM
Northing

Elevation

Depth
(m)

Azimuth

Dip

MX-041

319722

1704390

675

350

120

-50

MX-042

319713

1704286

676

350

120

-60

MX-043

319943

1704493

673

299

120

-55

MX-044

319629

1704138

678

335

120

-55

MX-045

320092

1704641

671

143

120

-55

MX-046

319529

1704000

679

291

120

-55

MX-047

320637

1705652

660

164

120

-55

MX-048

319521

1704198

677

410

120

-55

MX-049

319433

1704053

680

428

120

-60

MX-050

319361

1703843

682

440

120

-58

MX-051

319608

1704340

675

440

120

-60

MX-052

319580

1704068

677

356

120

-63

MX-053

319953

1704255

675

215

120

-58

MX-054

319476

1704126

681

503

120

-62

MX-055

320192

1704582

671

128

120

-55

MX-056

319623

1704042

679

209

120

-55

MX-057

319503

1704400

677

600

120

-68

MX-058

319478

1704222

677

600

120

-68

Note: Collar coordinates are in UTM WGS84 Zone37N
Assays are pending for holes MX-041 - 043; MX-045 - 051; MX-053 - 055; MX-057 - 058

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Eritrea | All
Gold and Silver Prices for these countries : Eritrea | All

Nevsun Resources Ltd

PRODUCER
CODE : NSU
CUSIP : 64156L
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Nevsun Res. is a zinc and gold development stage company based in Canada.

Nevsun Res. produces zinc, gold, copper and silver in Eritrea and in Ghana, develops gold in Mali, and holds various exploration projects in Mali.

Its main assets in production are BISHA in Eritrea and KUBI in Ghana, its main asset in development is TABAKOTO in Mali and its main exploration properties are KENIEBA SUD and SEGALA / DAR SALAM in Mali.

Nevsun Res. is listed in Canada and in United States of America. Its market capitalisation is US$ 1.3 billions as of today (€ 1.2 billions).

Its stock quote reached its lowest recent point on December 18, 2001 at US$ 0.04, and its highest recent level on November 07, 2003 at US$ 8.18.

Nevsun Res. has 301 869 984 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Nevsun Resources Ltd
Nevsun Files Annual Report
2009 Annual Report
2007 Annual Report
Nominations of Nevsun Resources Ltd
1/27/2014Nevsun Appoints New Executive
1/2/2014Nevsun Appoints New Director
6/12/2013Nevsun (TSX:NSU) Changes Chief Financial Officer
1/25/2013Nevsun Appoints New Executive
3/15/2012Nevsun Appoints New Director and Announces 2011 Results Rele...
8/19/2008MANAGEMENT APPOINTMENTS
Financials of Nevsun Resources Ltd
11/7/2013Nevsun (TSX:NSU) Announces Third Quarter 2013 Results
5/10/2013Nevsun Announces First Quarter 2013 Results
3/12/2013Nevsun Announces 2012 Financial Results Release Date and Ind...
11/8/2012Nevsun Reports Strong Third Quarter 2012 Financial Results
3/21/2012Nevsun 2011 Annual Financial Results
1/10/2012Nevsun's Fourth Quarter Operating Highlights
8/10/2011Nevsun Second Quarter 2011 Financial Results
5/12/2011Nevsun First Quarter 2011 Financial Results and Conference C...
3/28/2008ANNUAL FINANCIAL RESULTS
Project news of Nevsun Resources Ltd
2/18/2014Nevsun Increases Indicated Resource Tonnes by 29% and Contai...
1/29/2014Nevsun 2014 Outlook and Production Guidance
1/9/2014Nevsun Achieves Top End of 2013 Production Guidance
1/8/2014Nevsun Resources Featured in The Northern Miner
12/19/2013New Analysts Initiate Coverage on Nevsun Resources
12/2/2013Nevsun Announces Commercial Production on Bisha Copper Expan...
11/22/2013Nevsun Resources (TSX:NSU) Featured in Seeking Alpha
9/6/2013Nevsun Resources Photo Gallery Update
5/30/2013Nevsun Resources (TSX:NSU) Photo Gallery Update
5/23/2013Nevsun (TSX:NSU / NYSE MKT:NSU) Announces Drilling Results F...
3/28/2013Nevsun Resources Featured in The Northern Miner
3/27/2013Nevsun Resources Ltd. Approves Advance Notice Policy
2/21/2013Nevsun Expands on 2013 Exploration Plans at Bisha
1/31/2013PI Financial Initiates Coverage on Nevsun Resources
1/23/2013Nevsun 2013 Outlook and Production Guidance
1/9/2013Nevsun Exceeds Production Guidance and Extends Gold Producti...
10/10/2012Nevsun Closes Acquisition of Mogoraib Exploration License Ne...
10/9/2012Nevsun Announces Q3 Gold Production of 98,000 Ounces
7/9/2012Nevsun Announces Q2 Gold Production of 87,000 Ounces
6/18/2012Nevsun's Bisha Copper Expansion Project Update
2/15/2012Nevsun Drills 45m of 3.9% Copper Adjacent to Bisha Mine
2/7/2012Nevsun 2012 Outlook Including Production Guidance
11/24/2011Nevsun Resources Featured in The Globe and Mail
8/31/2011Nevsun Drills 30m of 8.55% Copper Adjacent to Bisha Mine
8/23/2011Nevsun Resources Ltd.: Bisha Purchase Arrangement Finalized
8/11/2011Nevsun Hits Stride at Bisha Mine in Eritrea
7/27/2011Nevsun Resources Mentioned in The Province
6/13/2011Nevsun Resources added to S&P/TSX index
5/20/2011Nevsun Resources in the News
5/4/2011Nevsun Resources (NSU-TSX, AMEX)
5/3/2011Nevsun Resources: Bisha Mine and Corporate Update
3/28/2011Nevsun Increases Mineable Reserves at Bisha by 40% Using Upd...
7/29/2009(Bisha)Bisha Project Financing - Major Condition Satisfied
7/16/2009(Bisha)closes Bisha financing
7/15/2009(Bisha)Bisha Project Finance Approvals - US$235 million
9/3/2008(Bisha)BISHA CONSTRUCTION UNDERWAY
5/21/2008(Tabakoto)Mali Assets Sale Closing
3/25/2008(Tabakoto)Tabakoto Sale
3/11/2008(Bisha)Bisha
3/3/2008(Bisha)Bisha update
2/25/2008(Bisha)BISHA Update
1/8/2008(Bisha)Bisha mining license issued
12/12/2007(Bisha)Bisha Mining Agreement Signed
9/5/2007(Tabakoto)Tabakoto Mine Operations Suspended
Corporate news of Nevsun Resources Ltd
7/28/2016Nevsun Exceeds H1 2016 Production Guidance and Beats Cash Co...
7/26/2016Nevsun Increases Bisha’s Exploration License Area Nearly Twe...
7/7/2016Nevsun Announces Q2 2016 Financial Results Release Date
6/23/2016Nevsun Resources Closes Reservoir Acquisition Creating A Div...
6/17/2016Nevsun Resources and Reservoir Minerals Receive Shareholder ...
1/26/2016Nevsun Provides Bisha Zinc Expansion Project Update
1/21/2016Nevsun Provides Bisha Zinc Expansion Project Update
12/1/2015Nevsun Continues to Intersect High Grade Mineralization at H...
10/8/2015Nevsun Announces Q2 2015 Financial Results Release Date
10/5/2015A Miner With Lots of Cash, A Profitable Mine, and a Healthy ...
9/16/2015Nevsun Further Expands Harena Mineralization
9/8/2015Nevsun Declares Third Quarterly Dividend of 2015
7/30/2015Nevsun misses 2Q profit forecasts
7/30/2015Nevsun Continues to Generate Free Cash Flow in Q2 2015
7/23/2015Automakers, concerned about giving data to Apple and Google,...
7/9/2015Nevsun Announces Q2 2015 Financial Results Release Date
6/18/2015Nevsun Discovers New Massive Sulphide Deposit at Bisha
6/17/2015Nevsun Provides Update on Human Rights
4/23/2015Nevsun Releases 2014 Corporate Social Responsibility Report
4/22/2015Nevsun Provides Zinc Expansion Project Update
4/22/20157:50 am Nevsun Resources provides zinc expansion project upd...
4/9/2015Nevsun Announces Q1 2015 Financial Results Release Date
3/30/2015Nevsun Announces Successful Bisha Plant Restart and Maintain...
3/25/2015Nevsun Announces Annual 2014 Financial Results
3/25/2015Nevsun Declares First Quarterly Dividend of 2015
3/25/2015Nevsun Provides an Update on Bisha Operations
3/25/2015Nevsun Provides Further Update on Operations
3/22/2015Nevsun Provides Further Update on Operations
3/16/2015Nevsun (NSU) Shuts Down Processing Plant at Bisha Mine - Ana...
3/13/2015Nevsun Provides an Update on Bisha Operations
3/9/2015Nevsun Declares First Quarterly Dividend of 2015
2/26/2015Nevsun Announces Annual 2014 Financial Results
12/17/2014Nevsun Extends Harena with Additional High Grade Drill Resul...
12/15/2014Nevsun Increases Quarterly Dividend by 14%
12/15/2014Nevsun Announces Full Power Plant Restoration at Bisha Opera...
12/8/2014Nevsun Update on Bisha Operations
11/21/2014Nevsun Comments on B.C. Lawsuit
11/20/2014Nevsun Response to Media Speculation
11/13/2014Nevsun Announces Additional Positive Exploration Drilling Re...
10/30/2014Nevsun Generates Strong Earnings and Cash Flow for Q3 2014
2/24/2014Nevsun Declares First Quarterly Dividend of 2014
2/19/2014Nevsun Resources Featured In Mining Weekly
1/31/2014Nevsun Resources Featured In Mining Weekly
1/6/2014Nevsun Announces Final 2013 Drilling Results from Northwest ...
11/20/2013Nevsun Publishes Corporate Social Responsibility Video
11/14/2013Nevsun (TSX:NSU) Declares Semi-Annual Dividend of US$0.07 Pe...
10/30/2013Nevsun (TSX:NSU) Provides Update on Bisha Copper Commissioni...
10/29/2013Nevsun (TSX:NSU) Announces Q3 2013 Results Release Date
10/21/2013Nevsun (TSX:NSU) Announces Further Drilling Results from Nor...
10/15/2013Nevsun (TSX:NSU) Announces First Ocean Shipment for Copper
10/10/2013Nevsun (TSX:NSU) Announces Q3 2013 Bisha Operating Results
9/4/2013Nevsun (TSX:NSU / NYSE MKT:NSU) Reports 75 m of 1.7% Copper ...
8/7/2013Nevsun (TSX:NSU / NYSE MKT:NSU) Announces Second Quarter 201...
7/31/2013Nevsun (TSX:NSU / NYSE MKT:NSU) Announces Q2 2013 Results Re...
7/16/2013Nevsun (TSX:NSU / NYSE MKT:NSU) Announces Voting Results
7/9/2013CORRECTION FROM SOURCE: Nevsun (TSX:NSU / NYSE MKT:NSU) Q2 2...
7/9/2013Nevsun Announces Q2 2013 Bisha Operating Results
6/17/2013Nevsun (TSX:NSU / NYSE MKT:NSU) Completes Copper Expansion P...
5/16/2013Nevsun Increases Semi-Annual Dividend 40% to US$0.07 Per Sha...
5/2/2013Nevsun to Release Q1 2013 Results May 9
4/19/2013Nevsun Releases 2012 Corporate Social Responsibility Report
4/9/2013Nevsun Announces Q1 2013 Bisha Operating Results
3/20/2013Nevsun 2012 Annual Results
1/21/2013Nevsun Provides Eritrea Update
1/11/2013Nevsun Comments on Human Rights Matters
9/7/2012Nevsun Files Bisha Mine NI 43-101 Technical Report, and Hire...
8/8/2012Nevsun Reports Strong Second Quarter 2012 Results, Further R...
8/1/2012Nevsun Acquires Exploration License and Resources Near Bisha...
7/24/2012Nevsun Announces Increased Base Metals Reserves
5/24/2012Watch Nevsun Transition into a Copper Mine!
5/15/2012Nevsun Declares Semi-Annual Dividend of US$0.05 Per Share
5/9/2012Nevsun Reports Strong First Quarter 2012 Financial Results, ...
5/1/2012Nevsun Announces Q1 2012 Results Release Date
4/11/2012Nevsun Announces Q1 2012 Bisha Operating Results
3/19/2012Nevsun Announces Share Repurchase Program
12/6/2011Mid-Day Breaking News From U308 Corp., Nevsun
12/6/2011Nevsun: Update on United Nations Actions Regarding Eritrea
10/6/2011Mid-Day Breaking News From Brookemont Capital and Nevsun Res...
10/6/2011Nevsun Q3 Operating Highlights
7/7/2011Nevsun Q2 Operating Highlights
7/1/2011Nevsun Corporate Update
6/14/2011Nevsun Reports No Significant Impact from Volcanic Eruption ...
6/9/2011Nevsun Announces Adoption of Shareholder Rights Plan
5/18/2011Nevsun Declares Inaugural Semi-Annual Dividend
5/16/2011Nevsun Resources Featured in Mining Weekly
4/30/2011Nevsun Resources Featured on Mineweb
4/6/2011Nevsun Q1 2011 Operating Highlights
4/1/2011Nevsun 2010 Annual Results and 2011 Outlook
3/2/2011Nevsun Drills 51M of 3.34 g/t Au at Harena Satellite Deposit
2/23/2011Nevsun Resources Featured in Mining Weekly
2/22/2011Nevsun Resources : Bisha Declares Commercial Production
2/23/2010Reports Increased Cash Flow Projections for 2011
8/14/20092nd Quarter Report
10/29/2007Finance Completed
10/29/2007Bisha update - Agreement for State participation Signed
10/18/2007announces CDN$15 MILLION FINANCING
9/17/2007Sale of Kubi Project
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AMEX (NSU)TORONTO (NSU.TO)
4.44+0.00%6.00+0.00%
AMEX
US$ 4.44
06/28 17:02 -
0%
Prev close Open
4.44 4.49
Low High
4.49 4.49
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  4.44 -%
Volume 1 month var.
9,878 -%
24hGold TrendPower© : -11
Produces Copper - Gold - Silver - Zinc
Develops Gold
Explores for Diamonds - Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :