New Discovery at Aurizon's Heva West Area Returns 1.7 Grams of Gold Per Tonne Over 96.5 Metres
Published : December 12, 2012
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Dec. 12, 2012) - Aurizon Mines Ltd. (News - Market indicators)(NYSE MKT:AZK) is pleased to announce results from the 2012 exploration program on the Heva and Hosco West Extension areas located 20 kilometres from Rouyn-Noranda, in north-western, Quebec.

"The drilling we have conducted at the Heva and Hosco West Extension areas this year has provided a high level of grade and thickness consistency and significantly improved our geological understanding of the property. We are pleased with the results obtained to date, and whilst we still have work to do in prioritizing the next drilling targets, our intended strategy to identify the extent of non-refractory gold mineralization on the property appears promising," said George Paspalas, Aurizon's President and CEO. "The objective in drilling at Heva is to identify sufficient non-refractory ounces to justify a staged development of the overall property with a lower risk and higher return initial project than the June 2012 Hosco Pit feasibility. We have now defined four distinct areas of mineralization within the area we were calling Heva, and have commenced work on a resource update incorporating this year's drilling results. We are also encouraged by the consistency of high grade refractory results obtained at the Hosco West Extension."

The objective of this drill program was to increase the inferred mineral resources in the Heva and Hosco West Extension areas near surface, and upgrade the depth potential where higher grades trends were present.

One hundred forty-three (143) holes totalling 53,234 metres have been completed in the 2012 drill program. Assay results for one hundred twenty one (121) holes have been obtained to date and twenty-two (22) holes are pending.

VDN trend

One of the new holes, JA-12-1112, has successfully identified a new discovery in the Heva West area called the VDN trend located north of the Cadillac Fault at the most western area of the Heva mineralized system. Mineralization starts near the bedrock contact, giving a broad mineralized interval of 1.7 grams of gold per tonne over a core length of 96.5 metres from 19.5 metres to 116 meters along the hole. The best results include the following intervals:

  • 3.8 grams of gold per tonne over 10.5 metres from 19.5 metres to 30.0 metres
  • 2.3 grams of gold per tonne over 25.0 metres from 71.0 metres to 96.0 metres
  • 3.7 grams of gold per tonne over 14.5 metres from 101.5 metres to 116.0 metres

Hole JA-12-1112 was collared 125 metres north of the Cadillac Fault following a north-west direction to cross cut perpendicularly a gold bearing vein set which is interpreted having a north-west orientation at surface. Free visible gold is commonly observed in the veins and fractures. The mineralization has been developed in a silicified and biotite rich fine grain sediment which is similar to what has been observed elsewhere in the Heva system, with no sulphide content observed.

Hole JA-12-1113, located 150 metres west of hole JA-12-1112, approximately on the same northing coordinate (see sketch attached), intersected a similar gold bearing structure. The best intersection returned grades of 7.6 grams of gold per tonne over 9.0 metres along the hole including 20.2 grams of gold per tonne over 3.1 metres along the hole.

An improved understanding of the exact orientation and geometry of this mineralized system is required, and different models are currently being evaluated. The mineralized intersection thickness should not be considered as "true width" at this stage, as additional drilling is required.

Heva and Heva East

The Heva area is located at the contact of the Cadillac Fault along a strike length of 950 metres. New results are concentrated inside the eastern side of the area, along a strike length of 400 metres, between sections 5400 and 5800.

Using a minimum cut-off parameter of 0.5 grams of gold per tonne over 5 metres between surface and a vertical depth of 200 metres, nine (9) holes returned between one and five mineralized intersections.

Using a cut-off grade of 3.0 grams of gold per tonne over a minimum true thickness of 3 metres, six (6) holes returned one to two positive intervals down to a maximum depth of 425 metres.

The following table includes the best results received to date from the Heva and Heva East areas (see sketch attached for location): A complete list of the drill results is also attached to this news release as Appendix A.

Zone/area Hole Section
 
(metres)
From
(metres)
To
(metres)
True
width
(metres)
Grade
(g/t Au)
Heva JA-12-1065 5443 410.0 413.4 3.0 8.9
  JA-12-1070 5624 267.0 271.5 3.9 13.8
        including 1.3 35.8
  JA-12-1086 5625 182.4 199.0 11.9 2.4
  JA-12-1088 5675 92.0 125 26.7 1.5
        including 3.0 5.0
  JA-12-1090 5723 96.0 124.5 27.2 2.7
        including 5.7 6.4
  JA-12-1106 5723 91.0 111.0 13.5 2.6
        including 3.8 4.7
Heva East JA-12-1092 6150 262.5 267.0 3.9 6.9

Mineralization is included inside a thick (10 to 60 metre-wide) strongly silicified and veined envelope with tourmaline, scheelite and a minor amount of pyrrhotite. Gold is found as free particles.

The new results from the eastern side of the deposit show for the first time, the expansion possibilities below 350 metres with results exceeding the minimum underground cut off parameters. At this depth, the mineralization footwall corresponds to a thick amphibolitized conglomerate unit.

Three hundred and fifty (350) metres eastward, following the Cadillac Break, two holes, spaced 100 metres apart, have intersected significant mineralization at a vertical depth of 225 meters, confirming the continuity of the Heva East Zone. The best result came from hole JA-12-1092, with an average of 6.9 grams of gold per tonne over 3.9 metres.

Hosco West

Of the five holes drilled to intersect the mineralization below 200 metres, three (3) holes returned intervals showing grades of between 4.0 and 8.5 grams of gold per tonne over a true width of between 3.0 and 11.0 metres. Mineralized intervals are located between 325 and 425 vertical meters and are still open in all directions.

The following table shows the best results from the Hosco West Extension area (see sketch attached for location): A complete list of the drill results is also attached to this news release at Appendix A.

Zone/area Hole Section
(metres)
From
(metres)
To
(metres)
True
width
(metres)
Grade
(g/t Au)
Hosco West Extension JA-12-1060 6753 444.0 456.0 11.4 4.0
  JA-12-1079 7050 375.9 379.5 3.0 8.4
      481.2 484.5 3.0 7.6
  JA-12-1080 6950 433.5 441.0 6.6 5.0

At Hosco West, gold is located in several strongly altered lenses with an assemblage of quartz-albite-biotite, including finely disseminated arsenopyrite, pyrrhotite and accessory quartz veins. These locally stacked lenses are located inside a 25 to 80 metre-wide gold bearing structure immediately south of the Cadillac Fault.

"The new results obtained during the recently completed drill program have extended the limits of the Heva and Hosco deposits laterally and down dip, creating the potential to define a mining operation on this part of the property," said Martin Demers, General Manager of Exploration.

Outlook

The objective of the 2012 exploration program was to identify sufficient non-refractory gold mineralization that could lead to a staged development of the Hosco mineral reserves and improve the overall economics of the feasibility study competed in June 2012. Following the receipt of the remaining assay results from the 53,000 metre drill program completed in September 2012, a mineral resource estimate will commence using a dual approach to evaluate the potential of an underground or an open pit operation, and should be completed in the first half of 2013. Metallurgical test work will be initiated for different mineralized zones.

Quality Control and Qualified Persons

Core assays are performed on core sawed in half, with a standard ALS Chemex preparation and fire assay on 30-gram preparations followed by atomic absorption finish. All assays above 10 grams of gold per tonne are replicated on the same pulp preparation using a gravity finish. Certified reference material, duplicates and blanks are inserted in the sample sequence for quality control and controlled at the core's reception. Assay checking on pulp and coarse rejects are carried out on approximately 15% of samples. For additional information on Quality Assurance and Quality control, please refer to the current technical report on the property titled, "NI 43-101 Technical Report - Feasibility Study of the Hosco Deposit - Joanna Gold Project for Aurizon Mines Ltd. June 5, 2012", filed on Sedar at www.sedar.com. Primary assaying is performed by ALS Chemex and check assays were carried out by Laboratoire d'Analyse Bourlamaque of Val d'Or.

Drill hole planning, implementation and the quality control program is supervised by Martin Demers P.Geo., General Manager of Exploration, a qualified person as defined by National Instrument 43-101. Mr. Demers is also responsible for the scientific and technical information in this news release.

Additional Information

One sketch is attached showing the Heva area. Detailed results from the additional holes are reported in the tables attached. All other information previously released on the property is available on the Aurizon website at www.aurizon.com.

To view accompanying sketch, visit the following link: http://media3.marketwire.com/docs/12_29_Sketch.jpg

About Aurizon

Aurizon is a gold producer with a growth strategy focused on developing its existing projects in the Abitibi region of north-western Quebec, one of the world's most favourable mining jurisdictions and prolific gold and base metal regions, and by increasing its asset base through accretive transactions. Aurizon shares trade on the Toronto Stock Exchange under the symbol "ARZ" and on the NYSE MKT under the symbol "AZK". Additional information on Aurizon and its properties is available on Aurizon's website at www.aurizon.com.

FORWARD LOOKING STATEMENTS AND INFORMATION

This news release contains "forward-looking statements" and "forward-looking information" within the meaning of applicable securities regulations in Canada and the United States (collectively, "forward-looking information"). The forward-looking information contained in this news release is based on information available to the Company as of the date of this news release. Except as required under applicable securities legislation, the Company does not intend, and does not assume any obligation, to update this forward-looking information. Forward-looking information includes, but is not limited to, statements with respect to the Company's expectations and estimates as to timing of a mineral resource estimate, anticipated effect of the completed drill results on the Heva and Hosco areas, the interpretation of those results, and timing and expectations of future work programs, outcomes of exploration programs and activities, the expansion possibilities of the Heva and Hosco mineral resources, the possibility for a staged development of the Heva and Hosco areas. Often, but not always, forward-looking information can be identified by the use of words such as "plans", "expects, "is expected", "budget", "scheduled", "estimates", forecasts", "intends", "anticipates", or "believes", or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might", or "will" be taken, occur or be achieved.

The forward-looking information contained in this news release is based on certain assumptions that the Company believes are reasonable, including, with respect to mineral resource estimates, the key assumptions and parameters on which such estimates are based, as set out in this news release and the technical report for the property, that the current price of and demand for gold will be sustained or will improve, the supply of gold will remaining stable, that the general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed on reasonable terms and that the Company will not experience any material accident, labour dispute, or failure of plant and equipment.

However, forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include, among others, the risk that any of the assumptions on which the forward looking information is based prove to be incorrect or invalid, the risk of unexpected variations in mineral resources and reserves, grade or recovery rates, of failure of plant, equipment or processes to operate as anticipated, of accidents, labour disputes, of unanticipated delays in obtaining governmental approvals or financing or in the completion of development or construction activities, risk that estimated costs, including costs of labour, equipment and materials, including power, are not as anticipated, of an undiscovered defect in title or other adverse claim, that results of exploration activities will be different than anticipated, that the future price of gold will decline, that the Canadian dollar will strengthen against the U.S. dollar, that mineral resources and reserves are not as estimated, that actual costs of restoration activities are greater than expected and that changes in project parameters as plans continue to be refined result in increased costs. There are a number of other risks and uncertainties associated with exploration, development and mining activities that may affect the reliability of the forward looking information herein, including those described in Aurizon's AIF and in Aurizon's Annual Report on Form 40-F ("40-F") filed with the United States Securities and Exchange Commission. The AIF and 40-F are available respectively on SEDAR at www.sedar.com and on EDGAR at www.sec.gov/. There may be factors in addition to those described herein or in the AIF or 40F that cause actions, events or results not to be as anticipated, estimated or intended. Readers are cautioned not to place undue reliance on forward-looking information due to the inherent uncertainty thereof.

CAUTIONARY NOTE TO US READERS

As a Canadian reporting issuer, the Company is subject to rules, policies and regulations issued by Canadian regulatory authorities and is required to provide detailed information regarding its properties including mineralization, drilling, sampling and analysis, security of samples and mineral resource and mineral reserve estimates. In addition, as a Canadian reporting issuer, the Company is required to describe mineral resources associated with its properties utilizing Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") definitions of "indicated" or "inferred", which categories of resources are recognized by Canadian regulations but are not recognized by the United States Securities and Exchange Commission ("SEC").

The SEC allows mining companies, in their filings with the SEC to disclose only those mineral deposits they can economically and legally extract or produce. Accordingly, information contained in this Report regarding our mineral deposits may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the United States federal securities laws and the rules and regulations of the Commission thereunder.

In particular, this Report uses the term "indicated" resources. U.S. readers are cautioned that while that term is recognized and required by Canadian regulations, the SEC does not recognize it. U.S. investors are cautioned not to assume that any part or all of mineral deposits in this category will ever be converted into mineral reserves.

This Report also uses the term "inferred" resources. U.S readers are cautioned that while this term is recognized and required by Canadian regulations, the SEC does not recognize it. "Inferred resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. U.S. readers are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable.

Appendix A

Heva West
From surface down to 100 metres : cut-off grade of 0.5 g/t over a minimum length of 5 metres
Hole E (m) From To Hole
length
(metres)
Grade
(g/t Au)
JA-12-1112 4795 19.5 116.0 96.5 1.7
    19.5 30.0 10.5 3.8
  incl. 19.5 25.0 5.5 6.2
    37.0 52.0 15.0 0.6
    71.0 96.0 25.0 2.3
  incl. 81.0 82.0 1.0 22.1
    101.5 116.0 14.5 3.7
  incl. 101.5 102.0 0.5 29.6
  incl. 115.0 116.0 1.0 25.3
           
JA-12-1113 4650 31.5 37.5 6.0 2.1
    60.0 69.0 9.0 7.6
  incl. 65.9 69.0 3.1 20.2
  incl. 66.0 67.0 1.0 29.2
  incl. 67.9 68.5 0.6 50.5
    138.0 143.2 5.2 1.1
Heva
From surface down to 200 metres : cut-off grade of 0.5 g/t over a minimum width of 5 metres
Hole E
(m)
From To Hole
length
(metres)
True
width
(metres)
Grade
(g/t Au)
JA-12-1070 5624 151.0 168.0 17.0 14.5 1.1
    180.0 205.0 25.0 21.5 0.9
JA-12-1086 5625 182.4 199.0 16.7 11.9 2.4
  incl. 182.4 189.5 7.2 5.1 3.1
JA-12-1088 5675 56.7 80.0 23.3 18.7 0.8
    92.0 125.0 33.0 26.7 1.5
  incl. 92.0 95.7 3.7 3.0 5.0
JA-12-1090 5723 73.5 90.0 16.5 15.7 0.9
    96.0 124.5 28.5 27.2 2.7
  incl. 99.0 116.0 17.0 16.2 3.8
  incl. 99.0 105.0 6.0 5.7 6.4
  incl. 104.0 105.0 1.0 1.0 12.7
JA-12-1106 5723 91.0 111.0 20.0 13.5 2.6
  incl. 91.0 96.7 5.7 3.8 4.7
  incl. 106.5 110.9 4.4 3.0 3.2
    117.0 131.7 14.7 10.0 1.6
Below 200 metres : cut-off grade of 3 g/t over a minimum width of 3 metres  
Hole E
(m)
From To Hole
length
(metres)
True
width
(metres)
Grade
(g/t Au)
JA-12-1062 5350 NS        
JA-12-1063 5350 NS        
JA-12-1064 5443 NS        
JA-12-1065 5443 376.5 379.9 3.4 3.0 3.2
  incl. 376.5 378.0 1.5 1.3 7.3
    410.0 413.4 3.4 3.0 8.9
  incl. 410.0 411.0 1.0 0.9 27.3
JA-12-1070 5624 267.0 271.5 4.5 3.9 13.8
  incl. 267.0 268.5 1.5 1.3 35.8
JA-12-1082 5250 NS        
JA-12-1083 5542 453.9 457.0 3.1 3.0 4.3
 NS*: No significant value
 
Heva East
From surface down to 200 metres : cut-off grade of 0.5 g/t over a minimum width of 5 metres
Hole E
(m)
From To Hole
Length
(metres)
True
width
(metres)
Grade
(g/t/Au)
JA-12-973 6303 165.0 174.0 9.0 7.8 1.5
  incl. 168.0 171.5 3.5 3.0 2.9
    238.5 249.0 10.5 9.2 0.9
JA-12-1071 5992 216.0 222.2 6.2 5.0 1.0
JA-12-1055 6252 84.0 96.0 12.0 11.0 0.8
    145.5 154.5 9.0 8.3 1.5
    168.5 174.0 5.5 5.0 1.1
    184.5 196.5 12.0 11.0 0.8
    202.5 207.9 5.4 5.0 0.9
JA-12-1073 6050 157.7 163.3 5.6 5.0 1.0
JA-12-1108 5800 NS        
Below 200 metres : cut-off grade of 3 g/t over a minimum width of 3 metres
Hole E
(m)
From To Hole
Length
True
width
(metres)
Grade
(g/t/Au)
JA-12-1053 6250 267.0 270.4 3.4 3.0 3.1
JA-12-1054 6250 267.8 271.5 3.7 3.0 2.9
  incl. 270.0 271.5 1.5 1.2 6.0
JA-12-1073 6054 NS        
JA-12-1092 6150 252.0 273.0 21.0 18.4 2.2
  incl. 262.5 267.0 4.5 3.9 6.9
NS*: No significant value
 
Hosco West Extension
Below 200 metres : cut-off grade of 3 g/t over a minimum width of 3 metres  
Hole E
(m)
From To Hole
Length
(metres)
True
width
(metres)
Grade
(g/t/Au)
JA-12-1060 6753 444.0 456.0 12.0 11.4 4.0
JA-12-1076 6902 NS        
JA-12-1078 7050 NS        
JA-12-1079 7050 375.9 379.5 3.6 3.0 8.4
  incl. 378.0 379.5 1.5 1.4 14.1
    481.2 484.5 3.3 3.0 7.6
  incl. 483.0 484.5 1.5 1.4 12.6
JA-12-1080 6950 433.5 441.0 7.5 6.6 5.0
  incl. 439.5 441.0 1.5 1.3 9.1
 NS*: No significant value

U.S. Registration (File 001-31893)

News Release Issue No. 29 - 2012



Aurizon Mines Ltd.
George Paspalas
President & CEO
(604) 687-6600
or
Aurizon Mines Ltd.
Martin Bergeron
Vice President Operations
(819) 874-4511
or
Aurizon Mines Ltd.
Investor Relations
jennifer.north@aurizon.com
or
Aurizon Mines Ltd.
(604) 687-6600 or Toll Free: 1-888-411-GOLD
(604) 687-3932 (FAX)
info@aurizon.com
www.aurizon.com
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Aurizon Mines Ltd

PRODUCER
CODE : ARZ.TO
ISIN : CA05155P1062
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Aurizon Mines is a gold producing company based in Canada.

Aurizon Mines holds various exploration projects in Canada.

Its main asset in production is CASA BERARDI in Canada, its main asset in development is JOANNA in Canada and its main exploration properties are DUVERNY, PATRIS, OPINACA, REX SOUTH, MARBAN MINE, KIPAWA, FAYOLLE and JOANNES in Canada.

Aurizon Mines is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 27.5 millions as of today (US$ 21.1 millions, € 18.3 millions).

Its stock quote reached its lowest recent point on December 31, 2001 at CA$ 0.21, and its highest recent level on September 16, 2016 at CA$ 8.75.

Aurizon Mines has 63 960 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Aurizon Mines Ltd
2008 Annual Report
2007 Annual Report
2005 Annual report
Financings of Aurizon Mines Ltd
2/2/2011AURIZON ANNOUNCES US$50 MILLION REVOLVING CREDIT FACILITY
Option Grants of Aurizon Mines Ltd
8/15/2011Grant of 600,000 options at 6,38
Nominations of Aurizon Mines Ltd
1/18/2013Aurizon Appoints a Special Committee to Evaluate Offer
8/26/2011Announces Vice President, Corporate Development Resignation
8/15/2011George Paspalas Joins Aurizon as Chief Executive Officer; Da...
6/27/2011Aurizon Announces Appointment of George Paspalas as Chief Ex...
Financials of Aurizon Mines Ltd
5/15/2013Aurizon Reports First Quarter 2013 Financial Results
3/14/2013Aurizon Reports 2012 Financial Results
11/8/2012Aurizon Reports Third Quarter 2012 Financial Results
8/9/2012Aurizon Reports Second Quarter 2012 Financial Results
5/10/2012Aurizon Reports First Quarter 2012 Financial Results
3/15/2012Aurizon Reports 2011 Financial Results
8/11/2011Aurizon Reports Second Quarter 2011 Results
5/16/2011AURIZON REPORTS FIRST QUARTER 2011 RESULTS
8/14/2009reports record revenues and cash flow in second quarter 2009
5/13/2009Reports Highlights Of First Quarter 2009 Results
3/11/2009Reports 2008 Financial Results
11/6/2008Third Quarter 2008 Results
11/6/2008Reports Highlights Of Third Quarter 2008 Results
8/8/2008Reports Highlights Of Second Quarter 2008 Results
5/7/2008Reports Highlights Of First Quarter 2008 Results
3/19/2008 Reports 2007 Financial Results
Project news of Aurizon Mines Ltd
5/3/2013(Casa Berardi)Aurizon Reports Status Update on Minor Discharge at Tailings...
5/2/2013(Casa Berardi)Aurizon Reports Minor Discharge at Tailings Facility at Casa...
3/25/2013(Casa Berardi)Aurizon Reports Accident at Casa Berardi Mine
2/15/2013(Casa Berardi)Aurizon Mines Ltd.: New Drill Results Highlight the Potentia...
12/12/2012New Discovery at Aurizon's Heva West Area Returns 1.7 Grams ...
9/6/2012Aurizon Mines Ltd.: New Drill Results Confirm High Grade Pot...
9/6/2012(Fayolle)Aurizon Announces an Updated Mineral Resource Estimate for F...
8/16/2012(Marban Mine)Aurizon Announces the Completion of the Marban Block Phase T...
7/30/2012(Casa Berardi)Aurizon Mines Ltd.: New Drill Results Confirm Continuity and...
7/20/2012(Joanna)Aurizon Files Feasibility Study of the Hosco Deposit
7/9/2012(Joanna)Aurizon Mines Ltd.: New Drill Results Expand the Heva Area a...
6/12/2012Aurizon Mines Ltd.: Marban's Phase Two Drill Program Results...
6/11/2012Aurizon Acquires Common Shares of Typhoon Exploration Inc.
6/6/2012(Joanna)Aurizon Receives Results of Feasibility Study for Joanna's H...
5/15/2012(Casa Berardi)Aurizon Mines Ltd.: New Drill Results Highlight the Potentia...
4/26/2012(Marban Mine)Aurizon Mines Ltd.: New Results at Marban Highlight Potentia...
4/20/2012(Joanna).: Higher Grade Mineralization Discovered on the Heva and Ho...
4/4/2012(Rex South)Aurizon Announces Results from the 2011 Exploration Program ...
3/1/2012(Marban Mine)Aurizon Mines Ltd.: Marban Eastern Down Dip Zone Returns 6.4...
3/1/2012(Casa Berardi)Reports Mineral Reserve Replenishment and Mineral Resource U...
9/22/2011(Marban Mine) Two New High Grade Gold Zones Discovered at Marban
9/9/2011(Casa Berardi)Aurizon Mines Ltd.: Drilling Confirms the Continuity and the...
8/31/2011(Fayolle)Aurizon Reports New High Grade Values at Fayolle
8/11/2011(Joanna)Aurizon Reports Joanna Feasibility Study Delayed, However Dr...
8/9/2011(Fayolle)Aurizon Reports Discovery of New Gold Bearing Trends Outside...
6/22/2011(Marban Mine) Deeper Drilling at Marban Reveals Added Upside With 5
6/13/2011(Joanna)Aurizon Increases the Hosco In-Pit Measured and Indicated Mi...
5/25/2011(Marban Mine)AURIZON REPORTS FURTHER RESULTS FROM MARBAN BLOCK
4/14/2011(Marban Mine)AURIZON REPORTS FURTHER DRILL RESULTS FROM MARBAN
3/13/2011(Casa Berardi)AURIZON REPORTS A 44% INCREASE IN MINERAL RESERVES FOR THE C...
2/15/2011(Rex South)AURIZON AND AZIMUT RE-EVALUATE TUNGSTEN VALUES ON THE COPPER...
1/21/2011(Marban Mine)AURIZON ANNOUNCES 9=2E06 GRAMS OF GOLD PER TONNE OVER 7=2E3 ...
1/11/2011AURIZON ANNOUNCES 2010 PRODUCTION RESULTS AND 2011 PLANS
9/1/2009Aurizon Intersects 18.9 Grams of Gold per Tonne Over 4.0 Met...
3/11/2009(Joanna) Infill Drilling Increases Mineral Resources at Joanna
2/20/2009(Casa Berardi)Reports Mineral Reserve Renewal And Mineral Resource Update ...
1/26/2009(Joanna): Grade and Thickness Confirmed Along the North Zone at Joan...
12/11/2008(Joanna)Infill Drilling Program Completed At Joanna 116 Grams Of Gol...
6/13/2008(Kipawa)Reports Additional Rare Earth And Uranium Results At Kipawa ...
5/12/2008(Joanna) Commissions Pre-Feasibility Study At Joanna
4/23/2008(Joanna) Reports Further Results From Its Joanna Property Including ...
4/2/2008(Casa Berardi)Provides Mineral Reserves And Resources Update
Corporate news of Aurizon Mines Ltd
5/30/2013Aurizon Announces Results of Hecla Arrangement Consideration...
5/28/2013Aurizon Announces Receipt of Investment Canada Act Approval
5/22/2013Aurizon Announces Change to Election Deadline to May 29, 201...
5/21/2013Aurizon Announces Extension of Election Deadline
5/10/2013Aurizon Receives Final Court Approval of Plan of Arrangement
5/9/2013Aurizon Securityholders Approve Plan of Arrangement
5/8/2013Aurizon Announces Preliminary Results of Hecla Arrangement C...
5/6/2013Aurizon Reminds Shareholders of Election Deadline
5/1/2013Aurizon Reminds Shareholders of Important Vote Deadline of M...
5/1/2013Reminds Shareholders of Important Vote Deadline of May 7, 20...
4/24/2013Announces That Leading Independent Proxy Advisory Firm Insti...
4/12/2013Aurizon Announces Special Meeting of Securityholders and Mai...
3/26/2013(Casa Berardi)Aurizon Mines Ltd.: Regular Operations Resume at Casa Berard...
3/20/2013Aurizon Comments on Expiry of Alamos Offer
3/19/2013Aurizon Responds to BCSC Decision to Cease Trade New Shareho...
3/18/2013Aurizon Reiterates Rejection of the Financially Inadequate A...
3/12/2013Aurizon Announces Hearing on New Shareholder Rights Plan
3/11/2013Aurizon Takes Steps to Ensure Equal Treatment of All Shareho...
2/15/2013(Casa Berardi)Aurizon Reports Mineral Reserve Replenishment and an Increas...
2/12/2013Aurizon Announces Hearing on Shareholder Rights Plan
2/8/2013Aurizon Mails Shareholder Rights Plan Materials
1/30/2013Aurizon Provides Update on Shareholder Rights Plan
1/15/2013Aurizon Responds to Unsolicited Offer
1/14/2013Alamos Gold Acquires Common Shares of Aurizon Mines
10/30/2012. Announces Third Quarter 2012 Conference Call & Webcast
9/7/2012Aurizon Announces an Updated Mineral Resource Estimate for t...
5/1/2012. Announces First Quarter 2012 Conference Call & Webcast
4/24/2012Aurizon Mines Ltd.: Preliminary Metallurgical Testwork at Ma...
3/31/2012Aurizon Releases Annual Disclosure Documents
3/9/2012. Announces 2011 Financial Results Conference Call & Webcast
1/11/2012Aurizon Announces Record 2011 Gold Production and 2012 Plans
12/8/2011Aurizon Grants Stock Options
12/8/2011Grants Stock Options
8/2/2011. Announces Second Quarter 2011 Conference Call & Webcast
11/30/2010Receives Award From Aemq
5/26/2010Options Azimut's Rex South Property
6/13/2008defines Gold Targets and Commences Exploration Program at Ki...
5/15/2008Andre Falzon Joins Aurizon's Board
3/15/2008deeply regrets
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (ARZ.TO)FRANKFURT (AUE.F)
0.430+10.26%2.95+5.85%
TORONTO
CA$ 0.430
08/09 16:50 0.040
10.26%
Prev close Open
0.390 0.395
Low High
0.395 0.510
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.430 -%
Volume 1 month var.
274,400 -%
24hGold TrendPower© : -44
Produces Gold
Develops Gold
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/11/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.22+1.63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48-1.59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.84-1.31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.85-2.63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.83+0.78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :