Huntmountain Resources

Published : December 17th, 2008

New High Grade Assays From La Josefina Gold-Silver Project

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

 

 

Press Release: December 17, 2008

HuntMountain Releases New High-Grade Assays From La Josefina
Gold-Silver
Project

(SPOKANE, WA) HuntMountain Resources Ltd. (OTCBB:HNTM)(Frankfurt:MPT) is pleased to release new high-grade assay results from twenty diamond core holes drilled within the Sinter, Veta Amanda, and Veta Sur targets at the La Josefina gold-silver project in Santa Cruz, Argentina.  The latest results include 1.0 meter (3.28 Ft) of 79.6 grams/tonne (g/t) (2.32 ounces/ton) gold and 14.2 g/t (0.41 oz/t) silver in Hole# SSI-D08-167 within the Sinter zone.  Additional selected high-grade intervals include:

HOLE

From

To

Interval

Gold

Silver

Gold Equiv.*

Cu

Pb

Zn

#

(m)

(m)

(m)

g/t

g/t

g/t

%

%

%

SINTER

 

 

 

 

 

 

 

 

 

SSI-D08-167

29.0

34.0

5.0

16.97

3.28

17.04

0.02

0.14

0.03

including

33.0

34.0

1.0

79.6

14.2

79.88

0.07

0.34

0.04

SSI-D08-107

171.7

172.8

1.1

0.53

45

1.44

6.88

0.17

0.05

 

 

 

 

 

 

 

 

 

 

VETA AMANDA

 

 

 

 

 

 

 

 

 

SVN-D08-091

177.8

178.35

0.55

1.315

115

3.62

12.55

Nil

0.03

and

187.6

188.4

0.8

7.48

22

7.92

0.14

0.14

0.08

 

 

 

 

 

 

 

 

 

 

VETA SUR

 

 

 

 

 

 

 

 

 

SVN-D08-129

123.0

132.1

9.1

0.97

136

3.68

0.14

2.91

0.93

including

123.0

128.5

5.5

1.22

142

4.06

0.19

4.37

0.92

SVN-D08-142

70.1

74.5

4.4

0.51

212

4.76

0.04

0.28

0.14

and

96.0

99.8

3.8

1.14

69

2.51

0.07

1.49

1.10

SVN-D08-144

98.8

103.3

4.5

5.64

253

10.69

0.11

6.94

2.60

including

98.8

102.4

3.6

6.96

306

13.09

0.13

8.16

2.99

SVN-D08-149

61.4

65.4

4.0

2.71

531

13.33

0.63

12.03

0.05

including

63.8

65.0

1.2

5.66

1518

36.02

1.13

2.36

0.04

SVN-D08-150

18.0

24.5

6.5

5.42

273

10.87

0.35

4.98

0.07

including

20.0

22.7

2.7

8.70

413

16.97

0.49

5.56

0.08

SVN-D08-153

37.2

43.6

6.4

3.22

71

4.55

0.13

0.97

0.15

including

37.2

39.0

1.8

9.39

150

12.39

0.19

0.93

0.15

SVN-D08-158

118.8

120.1

1.3

4.91

234

9.59

0.68

0.57

0.10

SVN-D08-160

23.9

27.3

3.4

2.97

182

6.62

0.16

1.75

0.07

*Calculated at Ag/Au=50.

A complete table of drill results from the La Josefina project can be obtained at www.huntmountain.com/pdf/LJresults.pdf and within the project Technical Report on the Company�s website.  The drill hole numbers associated with this press release are SSI-D08-107, -108, -111, -115, -119, -122, -161, -163, -165, -166, -167 within the Noreste/Sinter zone and SVN-D08-091, -129, -142, -144, -149, -150, -153, -158, -160 within the Veta Norte zone.

The latest results were received from exploratory drilling on the Sinter target and continued resource definition efforts along Veta Amanda and Veta Sur.  Work at Veta Amanda and Veta Sur remains focused on testing the extent of mineralization at depth and along strike to the southeast.

�We have covered a lot of ground over the past year, and these latest results confirm La Josefina�s great potential,� said Matt Hughes, HuntMountain�s Executive Vice President and COO.  �The current phase of drilling ended on December 1st, and the remaining core will be processed and shipped for assay prior to the holiday hiatus.  We plan to update the project�s technical report with a NI 43-101 compliant resource calculation in the first quarter of 2009.�

The current exploration phase will conclude with 37,605 meters drilled from 242 Diamond core holes that tested three of the four broader target zones identified by previous work conducted by Fomicruz S.E., the provincial mining company.  Assays have been received from 66% percent of the meters drilled.

The La Josefina Gold-Silver Project is located in the north-central portion of Santa Cruz Province in Patagonia�s highly-prospective Deseado Massif and comprises an area of over 52,770 hectares. The property encompasses multiple precious metal occurrences within a 10 km-long hydrothermal alteration belt that is 1-3 km wide.  The region hosts numerous precious metal mines in production and deposits under development.  HuntMountain entered into a partnership agreement with Fomicruz S.E., the provincial mining company, to earn a 91% interest upon completion of a positive feasibility study.

Certified sample preparation, gold and silver fire assay, and 28 element ICP analysis were carried out by ALS Chemex in Mendoza, Argentina and La Serena, Chile.  HuntMountain takes detailed digital photos of the entire core before it is cut by saw to half core which is assayed at ALS Chemex's La Serena laboratory. As part of quality assurance, quality control (QA/QC), HuntMountain has incorporated a detailed program of systematically introducing certified standards, blanks and duplicates into the sample stream. Half-core samples are being retained on site for verification and reference purposes. 

The qualified person who has reviewed this news release is James F. Ebisch, M.Sc. Geology. He is a Registered Professional Geologist in the state of Oregon (G #928).  The intervals of mineralization reported are not true widths.  Based upon the angle of intersection of the drill hole and the vein projection, the Company�s geological staff estimates that intervals average about eighty percent of true width.

HuntMountain Resources Ltd. is a U.S.-based junior exploration company engaged in acquiring, exploring and developing precious and base metals properties throughout North and South America. The Company currently controls and operates projects in Santa Cruz Argentina, Chihuahua Mexico, Nevada USA, and Quebec Canada.

This news release may contain forward-looking statements within the meaning of Section 27A of the Securities Act and Section 21E of the Exchange Act. Forward-looking statements are inherently subject to risks and uncertainties, many of which cannot be predicted with accuracy, and some of which might not even be anticipated. This news release is neither a prospectus nor an offer to sell securities or stocks in the company. It is intended for informational purposes only.

FOR FURTHER INFORMATION PLEASE CONTACT:
Steve Taylor, Director of Investor Relations
HuntMountain Resources
(509) 892-5287 phone
staylor@huntmountain.com
www.huntmountain.com

 

 

size=1 width="50%" noshade color=black align=center>

 

Huntmountain Resources

DEVELOPMENT STAGE
CODE : HNTM.OB
ISIN : US4468961028
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Huntmountain is a lead and zinc exploration company based in United states of america.

Huntmountain develops lead, zinc and gold in Argentina, and holds various exploration projects in Canada.

Its main asset in development is BAJO POBRE in Argentina and its main exploration properties are EL CAPITAN and DUN GLEN in Mexico, EL GATEADO in Argentina and LAC À L'EAU JAUNE and MALARTIC SURIMAU in Canada.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Nominations of Huntmountain Resources
6/12/2008Appoints Vice President of Corporate Development
3/6/2008 Announces Appointment of James A. Sabala to President
11/13/2007Appoints Bryn Harman Chief Financial Officer
10/9/2007Appoints Michael Mastor to Board of Directors
Project news of Huntmountain Resources
12/17/2008(La Josefina)New High Grade Assays From La Josefina Gold-Silver Project
11/12/2008(El Capitan)Enhances El Capitan Silver-Gold Project by Acquiring Histori...
9/30/2008(La Josefina)New High-Grade Assays From La Josefina Gold-Silver Project
9/9/2008Sierra Madre Exploration Returns High-Grade Silver, Base Met...
8/26/2008(La Josefina)Continues Run of High-Grade Results at La Josefina
8/19/2008(La Josefina)Additional High-Grade Gold-Silver Intercepts at La Josefina
8/13/2008(La Josefina)Drilling Extends High-Grade Zone at La Josefina Gold-Silver ...
7/16/2008(La Josefina)Identifies New High Grade Zone at La Josefina Gold-Silver Pr...
7/2/2008(La Josefina)Best Drill Results to Date at La Josefina Gold-Silver Projec...
6/30/2008Acquires High Grade Silver-Gold Prospect in Mexico?s Sierra ...
6/19/2008(La Josefina)La Josefina Drilling Forges Through Winter Season Based on S...
4/23/2008(La Josefina) La Josefina Drilling Continues to Hit Strong Gold and Silve...
2/19/2008(La Josefina)La Josefina Drilling Hits 19.9 g/t Gold and 2100 g/t Silver
7/30/2007(El Gateado)Discovers Gold Mineralization at its El Gateado Property
4/5/2007(Bajo Pobre)Finalizes Deal for the Bajo Pobre Gold Property in Argentina
Corporate news of Huntmountain Resources
6/24/2009HuntMountain Enters into Letter of Intent on Reverse Takeove...
11/25/2008San Francisco Hard Assets Conference
9/25/2008Interview on Korelin Economics Report
9/12/2008Exhibits at 6th Annual Silver Summit
2/11/2008HuntMountain Secures Surface Rights at La Josefina Gold-Silv...
2/5/2008HuntMountain Substantiates Historical Drill Results at La Jo...
12/4/2007 Argentine Exploration now in Full Swing
8/28/2007Strengthens Board and Hires VP of Investor Relations
8/8/2007 Finalizes Contract to Develop Argentine Gold Property
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
OTC BB (HNTM.OB)FRANKFURT (MPT.F)
0.030-72.73%0.103+0.00%
OTC BB
US$ 0.030
05/23 14:11 -0.080
-72.73%
Prev close Open
0.030 0.030
Low High
0.030 0.030
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.030 172.73%
Volume 1 month var.
1,268 172.73%
24hGold TrendPower© : -27
Produces
Develops Gold
Explores for Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/4/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :