Chart usGOLD   Chart usSILVER  
 
Food for thought
Those who cannot remember the past are condemned to repeat it.
George Santayana  
Search for :
LATEST NEWS  :
MINING STOCKS  :
Subscribe
Write Us
Add to Google
Search on Ebay :
PRECIOUS METALS (US $)
Gold 1367.604.80
Silver 22.17-0.04
Platinum 1460.500.00
Palladium 738.50-3.75
WORLD MARKETS
DOWJONES 15307-80
NASDAQ 3463-39
NIKKEI 15873245
ASX 5142-14
CAC 40 405115
DAX 853159
HUI 2573
XAU 97-3
CURRENCIES (€)
AUS $ 1.3325
CAN $ 1.3338
US $ 1.2843
GBP (£) 0.8544
Sw Fr 1.2576
YEN 132.4020
CURRENCIES ($)
AUS $ 1.0377
CAN $ 1.0384
Euro 0.7787
GBP (£) 0.6654
Sw Fr 0.9791
YEN 103.0880
RATIOS & INDEXES
Gold / Silver61.69
Gold / Oil14.24
Dowjones / Gold11.19
COMMODITIES
Copper 3.37-0.01
WTI Oil 96.05-0.11
Nat. Gas 4.200.01
Market Indices
Metal Prices
RSS
Precious Metals
Graph Generator
Statistics by Country
Statistics by Metals
Advertise on 24hGold
Projects on Google Earth
( 0 vote, 0/5 ) Print article
     
Tweet

Marketwire

 
 
Donner Metals Ltd.
TSX VENTURE:DON
FRANKFURT:D4M
Other Recent News

March 3, 2008
Donner Metals Ltd.: New High Grade Intersections Expand Zones at Bracemac and McLeod
VANCOUVER, BRITISH COLUMBIA--(Marketwire - March 3, 2008) - Mr. Harvey Keats, Chief Executive Officer of Donner Metals Ltd. (TSX VENTURE:DON)(FRANKFURT:D4M), reports the expansion of the Bracemac Key Tuffite Zone with four new high grade intersections in a series of step-out drill holes, up-dip and down-plunge from previously reported sulphide intersections. Also reported are zinc and copper-rich sulphides returned from step-out drilling at the New McLeod and West McLeod Zones.


Drilling Highlights
--------------------------------------------------------------------------
--------------------------------------------------------------------------
                                    Core
DDH                               Length
(Depth)          From        To  (metres)    % Zn    % Cu   g/t Ag  g/t Au
--------------------------------------------------------------------------
--------------------------------------------------------------------------
Bracemac Key
 Tuffite Zone
--------------------------------------------------------------------------
--------------------------------------------------------------------------
BRC-08-63      425.85    429.10     3.25     6.00    1.92    82.59    0.27
--------------------------------------------------------------------------
--------------------------------------------------------------------------
BRC-08-64      310.80    321.00    10.20    11.62    0.39    17.74    0.14
--------------------------------------------------------------------------
 including     310.80    316.30     5.50    17.67    0.67    26.51    0.17
--------------------------------------------------------------------------
--------------------------------------------------------------------------
BRC-08-65      254.20    256.70     2.50    29.84    0.04     6.62    0.03
--------------------------------------------------------------------------
--------------------------------------------------------------------------
BRC-08-66       279.5    282.75     3.25    18.96    1.12    27.19    0.13
--------------------------------------------------------------------------
--------------------------------------------------------------------------
New McLeod
 Zone
--------------------------------------------------------------------------
--------------------------------------------------------------------------
MC-07-31W1     868.30    871.30     3.00     0.42    1.50    24.27    0.74
--------------------------------------------------------------------------
--------------------------------------------------------------------------
MC-07-31W2     881.05    884.65     3.60    18.48    2.01    31.09    0.58
--------------------------------------------------------------------------
--------------------------------------------------------------------------
MC-07-33       821.40    823.40     2.00    13.96    0.67    19.03    0.75
--------------------------------------------------------------------------
--------------------------------------------------------------------------
West McLeod
 Zone
--------------------------------------------------------------------------
--------------------------------------------------------------------------
MC-07-30W1     582.24    584.48     2.24     0.89    2.77    12.23    0.05
--------------------------------------------------------------------------
--------------------------------------------------------------------------
 
Bracemac Area

Drill holes BRC-08-64, 65 and 66 were designed to test the up-dip extension of previously reported massive sulphides in the Bracemac Key Tuffite Zone. Drill hole BRC-08-64 was drilled 70 metres up-dip from BRC-07-47 (13.06% Zn, 2.09% Cu over 21.4 metres) and 30 metres west of BRC-07-53 (11.81% Zn, 1.01% Cu over 4.10 metres). BRC-08-65 was drilled 40 metres up-dip and to the east of BRC-08-64. Drill hole BRC-08-66 was drilled 30 metres west of BRC-08-64. The zone remains open up-dip.

One hole was drilled on the down-plunge extension of the Bracemac Key Tuffite Zone. BRC-08-63 was drilled 70 metres down-dip and to the west of BRC-07-60 (16.67% Zn, 0.41% Cu over 12.05 metres) and 50 metres west of BRC-07-61 (9.48% Zn, 2.81% Cu over 6.0 metres). The Bracemac Key Tuffite Zone remains open down-plunge.

McLeod Area

Two drill holes were completed to the east of the New McLeod Zone. Diamond drill hole MC-07-31W1 was drilled 35 metres east of MC-05-18W7 (18.5% Zn, 0.42% Cu over 11.59 metres) and MC-07-31W2 was drilled 65 metres east of MC-05-18W6 (9.62% Zn, 1.33% Cu over 32.22 metres) and 45 metres down-dip from MC-07-31W1. One hole was completed on the west side of the New McLeod Zone. MC-07-33 intersected the zone 80 metres to the west and up-dip from MC-05-18W4 (8.91% Zn, 1.88% Cu over 11.42 metres).

At the West McLeod Zone, MC-07-30W1 was completed as a wedge cut 25 metres up-dip from MC-07-30 (1.22% Zn, 3.00% Cu over 5.77 metres).

One stratigraphic hole, MC-05-20W1, was drilled 200 metres west and down-dip of the New McLeod Zone and intersected weakly mineralized Key Tuffite followed by strong alteration in the footwall.

Four drills are active on the Matagami Project with continued step-out drilling at Bracemac and McLeod. A total of 46,386 metres of diamond drilling has been completed since the project began in late 2006. Additional geological information, including maps and sections, is available at www.donnermetals.com.

The Matagami Project has an area of mutual interest of 4,750 square kilometres and presently includes 3,350 mineral claims covering 841 square kilometres. Taking advantage of Xstrata Zinc's extensive historical database, Donner and Xstrata Canada Corporation - Xstrata Zinc Canada Division (Xstrata Zinc) are using a combination of 3D data integration, innovative advanced technologies, new concepts and diamond drilling to explore for new deposits in this prolific mining camp.

The Matagami Mining Camp is a world-class mining district, with 18 known VMS deposits, including 10 past producers of varying sizes, including the giant Mattagami Lake Deposit (25.64 million tonnes of 8.2% Zn, 0.56% Cu, 20.91 g/t Ag and 0.41 g/t Au) discovered in 1957 and mined from 1963 to 1988. The area is host to historical production of 8.6 billion pounds of Zn and 853 million pounds of Cu and has established infrastructure including the town of Matagami, a railway, a paved road, and a 2,600 t/day mill owned by Xstrata Zinc.

Donner has the option to earn a 50% participating joint venture interest in the Matagami Project by incurring a total of $20 to $25 million of expenditures on exploration and related work on or before May 31, 2011. Upon earn-in by Donner, five separate joint ventures will be formed, covering the property and the area of interest. In each of the five joint venture areas, Xstrata Zinc has the option to earn back a 15% interest in each area by incurring up to $20 million on a feasibility study.

The Company's strategy is to explore for and discover zinc - copper deposits in the Matagami Camp and to leverage the general infrastructure and existing processing facilities within a known and well-established cost structure for developing VMS deposits. Donner's exploration objective is to investigate multiple stratigraphic horizons with potential for VMS mineralization including the prolific Key Tuffite horizon throughout the Matagami Camp. To date Donner has discovered new mineralization at Bracemac in the Upper Bracemac and Bracemac zones and the Key Tuffite horizon. In addition to delineation drilling at Old McLeod, Donner has discovered new mineralization at New McLeod and West McLeod at the Key Tuffite horizon at McLeod.

Supplementary Information

The field work on the Matagami Project is being carried out by project operator Xstrata Zinc Canada Division who is responsible for the sampling, submittal of samples for assay, assay verification and QA/QC. Assaying of samples reported in this news release was carried out and certified by ALS Chemex-Chimitec, of Val D'Or, Quebec (zinc, copper and silver by atomic absorption, and gold by standard fire assay procedures). Sample preparation was done by ALS Chemex of Val D'Or, Quebec. Robin Adair, VP of Exploration for the Company is the Qualified Person responsible for the technical information in this news release.

ON BEHALF OF THE BOARD OF DONNER METALS LTD.

Harvey Keats, Chief Executive Officer

To view Table 1 - New Results please click on the following link: http://media3.marketwire.com/docs/dontables.pdf


The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

CONTACT INFORMATION:

Donner Metals Ltd.
Harvey Keats
Chief Executive Officer
(604) 683-0564 or Toll Free: 1-800-909-8311
Fax: (604) 602-9311
Email: donner@bed-rock.com
Website: www.donnermetals.com

INDUSTRY: Manufacturing and Production - Mining and Metals

Footer

Tweet

Donner Metals Ltd.

EXPLORATION STAGE
CODE : DON.V
ISIN : CA2578751042
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Email Alert Add to Watchlist Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy
Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Donner Metals Ltd.
9/26/2009Donner Metals already looking to next big Matagami discovery
Annual reports of Donner Metals Ltd.
2008 Annual report
Annual Report 2007
Financings of Donner Metals Ltd.
11/14/2012Announces Closing of C$1,439,000 Final Tranche Private Place...
2/28/2012Increases Private Placement Financing
2/27/2012Announces C$10,000,000 Private Placement Financing
11/16/2011$440,000 Non-Brokered Private Placement Closes
11/10/2011$2,000,000 Brokered Private Placement Closes
10/27/2011Announces C$2,440,000 of Private Placement Financings
7/27/2011$3 Million Private Placement
7/25/2011Funds Received, Private Placement Closed
7/13/2011Financing News
12/21/2010$1,500,000 Private Placement Closes
2/15/2010Additional Private Placement Closings
11/16/2009Private Placements close
7/10/2009Private Placements Close
5/14/2009Non-Brokered Financing
5/8/2009Brokered private placement totaling $954,353 closes
4/8/2009Brokered Private Placement
4/8/2009Private Placement Totalling $901,595 Closes
3/17/2009Non-Brokered Financing
1/7/2008 $3.2 Million Private Placement Closed
12/17/2007 Private Placement Increased to $3.2 Million
Nominations of Donner Metals Ltd.
12/8/2010Appoints Vice President of Engineering
Project news of Donner Metals Ltd.
4/26/2011(Matagami)Completes Earn-In on the Matagami Project
3/6/2011(Matagami)Bracemac-McLeod Ramp Moves Past 660 Metres
2/10/2011(Pd1) Matagami Project Advances as the PD1 Deposit Moves to Feasi...
1/14/2011(Pd1)(angl) 1.74 MILLION TONNES GRADING 4.55% ZINC
11/15/2010(Matagami)2.35% Copper Over 8.9 Metres Intersected in the North Flank ...
10/4/2010(Matagami)Xstrata Zinc To Conduct Definition Drilling at PD1 Deposit
9/2/2010(Matagami)Receives a Positive Feasibility Study for the Bracemac-McLeo...
9/1/2010(Matagami)Inferred Resources at Bracemac-McLeod Expand by 2.07 Million...
7/12/2010(Matagami)Drilling Extends McLeod Deep Discovery
3/7/2010(Matagami)Bracemac-McLeod Update
2/16/2010(Matagami)McLeod Deep Discovery Expanded-7.50 Metres Grading 10.27% Zi...
11/23/2009(Matagami)Expanded Winter Drill Progam Initiated at Matagami
10/1/2009(Matagami)Bracemac-McLeod Feasibility Advances as Exploration Continue...
7/15/2009(Matagami) BRACEMAC-MCLEOD advances to feasibility
6/5/2009(Matagami)on BNN and Matagami Project Details
5/25/2009(Matagami)Drilling to Resume at Matagami; Scoping Study Nears Completi...
3/12/2009(Matagami)NEW DISCOVERY AT MATAGAMI²
2/26/2009(Matagami)BRACEMAC-MCLEOD NI 43-101 INDICATED RESOURCE: 3,623,000 TONN...
2/26/2009(Matagami)UPDATED BRACEMAC-MCLEOD NI 43-101
2/11/2009(Matagami)featured on Minesite.com
1/26/2009(Matagami)NI43-101 Resource
1/23/2009(Matagami)INITIAL BRACEMAC-MCLEOD NI43-101 INDICATED RESOURCE
11/12/2008(Matagami)Assays Return High-Grade Zincand Copper from the McLeod Disc...
10/27/2008(Matagami)Scoping Study Initiated as Latest Step-Out ...
9/5/2008Provides Initial Results From a Single Drill Hole Program on...
5/27/2008(Matagami)Four New High GradeIntersections at Bracemac/McLeod Includin...
5/9/2008(Matagami)13.47% Zinc, 2.33% Copper Over 6.95 Metres Intersected at Br...
4/11/2008High Grade Discovered Between Bracemac and McLeod
3/3/2008New High Grade Intersections Expand Zones at Bracemac and Mc...
1/9/2008 Drilling Intersects 9.48% Zinc and 2.81% Copper Over 6.00
11/26/2007DRILLING INTERSECTS MORE HIGH GRADE SULPHIDES AT BRACEMAC AN...
9/13/2007(South Voisey's Bay)Exploration Program Planned for South Voisey Bay Nickel-Copp...
Corporate news of Donner Metals Ltd.
10/22/2012Announces Results from Annual General Meeting, Head Office M...
10/22/2012Announces Results from Annual General Meeting, Head Office M...
7/13/2011Sandstorm Provides US$25 Million Senior Financing
11/29/2010Development of the Year!
10/23/2010Amendment to Warrant Terms
4/14/2010Definition Drill Program Completed at Bracemac-McLeod
2/3/2010$2,409,930 Financing Closed
1/30/2010Financing Increased
9/8/2009engineering contract and fast-tracked feasibility
8/24/2009Two Near Term Production Stories
6/22/2009Industrial Alliance Features Report on Donner Metals
5/19/2009A "Green Shoot" Rising
5/14/2009Is At The Starting Gate
4/14/2009Chinese zinc imports rise as domestic prices outperform LME ...
3/13/2009Xstrata and Donner Team Up to Exploit Matagami
2/26/2009Hotsheet
2/18/2009positioned for success
2/9/2009featured in Mining Journal
12/12/2008$1,048,000 Financing Closes
12/4/2008 AND XSTRATA ZINC CANADA WIN INTERNATIONAL EXPLORATION AWARD
11/25/2008$1.0 Million Financing
11/18/2008Donner Metals has fast-track potential says Reinhard
7/31/2008 Drilling Continues toDelineate and Expand Mineralization at...
8/1/2008Hotsheet for 7/31/2008
6/6/2008Hotsheet for 6/6/2008
6/6/2008$3.2 Million of Debentures Issued
5/28/2008$3 Million Debenture Offering
5/27/2008Hotsheet for 5/27/2008
4/11/2008Hotsheet for 4/11/2008
3/20/2008March Chairman's Letter
3/5/2008Hotsheet for 3/5/2008
2/1/2008Engages Mau Capital to Provide Investor Relations
1/8/2008Hotsheet for 1/8/2008
11/28/2007Expands Interest in Matagami Camp
11/8/2007Join us at the San Francisco Hard Assets Investment Conferen...
10/22/2007 Hotsheet for 10/21/2007
10/10/2007Corporate Update
8/2/20076 New Massive Sulphide =?ISO-8859-1?Q?=20Intersections,=20In...
6/14/2007New Zinc-Copper Discover 9.24% Zinc, 0.99% Copper Over 27.95...
6/7/2007Bracemac Yields Additional Results With New Mineralization I...
4/11/2007Copper-Rich Massive Sulphides Intersected in BRC-07-32 in th...
Comment this article
You must be logged in to comment an article8000 characters max.
 
Sign in
User : Password : Login
Sign In Forgot password?
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (DON.V)FRANKFURT (D4M.F)
0.120+9.09%0.101+8.60%
TSX-V
CA$ 0.120
05/22 15:59 0.010
9.09%
Prev close Open
0.110 0.120
Low High
0.120 0.120
Year l/h YTD var.
0.110 -  0.180 -33.33%
52 week l/h 52 week var.
0.110 -  0.200 -36.84%
Volume 1 month var.
900,450 -%
24hGold TrendPower© : -37
Produces
Develops
Explores for Copper - Gold - Nickel - Palladium - Platinum - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
TOP NEWSRELEASES
Annual variation
DateVariationHighLow
2013-40.00%
20120.00%0.270.16
2011-25.93%0.370.17
201012.50%0.370.18
2009200.00%0.280.08
 
5 years chart
 
3 months chart
 
3 months volume chart