Nevada Copper Corp.: North Deposit Mineralization Remains Open Intersecting 119 Feet at 1.67% Copper
Published : October 30, 2012
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Copper | Gold | Market | Senator | Silver | Utah | Water |

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Oct. 30, 2012) - Nevada Copper Corp. (News - Market indicators) ("Nevada Copper") is pleased to announce the remaining step-out and expansion drill results from its 100% owned Pumpkin Hollow Property located near Yerington, Nevada. The total drilling program consisted of ninety four (94) drill holes totaling 47,000 meters of which results totaling 44,000 meters were included in the recently released updated resource. As previously reported on September 7, 2012, the updated measured and indicated copper resource in the North, South, and Southeast deposits (the "Western Deposits") increased by over 1.1 billion pounds to 5.4 billion pounds.

The drill results reported below include the last three (3) holes drilled in the Western Deposits.

In the North deposit, drill hole NC12-36 continues to expand mineralization along the northwest edge. The hole targeted the expansion of the main mineralized zone down dip, intersecting 119.0 feet (36.3 meters), 84.1 feet (25.7 meters) true thickness, grading 1.67% copper, 0.288 g/t gold, and 5.7 g/t silver outside the current feasibility ultimate pit limit. Mineralization remains open to the north, down dip.

Drill hole NC12-35 was drilled in the northern part of the South deposit. Drill hole NC12-35 targeted deeper mineralization and intersected several zones, confirming the shallower zones and expanding the lower mineralized zone. The largest zone intersected, 490.0 feet (149.4 meters), 411.1 feet (125.3 meters) true thickness grading 0.27% copper.

Drill hole NC12-38 was drilled in the Southeast deposit to better define the copper mineralization in the deposit. The drilling confirmed and expanded the mineralization.

Gregory French, Vice President, Senior Project Manager, commented, "The assay results released today complete a very successful drill program that discovered new mineralization, re-classified mineral classes, and converted waste into mineralized material. Our recent drill program increased the measured and indicated copper resource in the Western Deposits by over 1.1 billion pounds to 5.4 billion pounds. The recent results from NC12-36 and the earlier reported NC12-34 which intersected 690 feet grading 1.17% copper demonstrate the further potential and open nature of the deposit. Whether it's down dip from NC12-36 or the large area around NC12-34, major areas remain open in the North Deposit. These holes are outside the current feasibility pit limits and were not included in the recent resource update. The newly discovered mineralization in the NC12-34 area will be a priority in future drilling."

NORTH DEPOSIT - Assays greater than 0.15% Cu
 
Drill Hole # From To Length Length True
Length
Copper Gold Silver Mo
  (m) (m) (m) (ft) (m) % (g/t) (g/t) (g/t)
NC12-36 258.6 265.2 6.6 21.5 4.7 0.21 0.010 0.6 0.002
  289.3 296.6 7.3 24.0 5.2 0.45 0.013 1.5 0.009
  367.6 382.8 15.2 50.0 10.7 0.30 0.040 1.6 0.005
  393.2 422.2 29.0 95.0 20.5 0.31 0.036 1.5 0.009
  428.2 434.3 6.1 20.0 4.3 0.27 0.031 1.3 0.008
  463.3 499.6 36.3 119.0 25.7 1.67 0.288 5.7 0.003
  507.5 514.5 7.0 23.0 4.9 0.27 0.066 2.0 0.003
  521.2 536.4 15.2 50.0 10.7 0.29 0.075 1.9 0.004
  550.2 556.3 6.1 20.0 4.3 0.91 0.033 3.1 0.005
 
SOUTH DEPOSIT - Assays greater than 0.15% Cu
 
Drill Hole # From To Length Length True
Length
Copper Gold Silver Fe
  (m) (m) (m) (ft) (m) % (g/t) (g/t) (%)
NC12-35 146.3 224.0 77.7 255.0 65.2 0.22 0.032 0.6 23.0
  231.6 381.0 149.4 490.0 125.3 0.27 0.047 1.4 20.1
  391.7 403.9 12.2 40.0 10.2 0.60 0.068 2.3 7.7
  417.6 452.6 35.0 115.0 29.4 0.34 0.037 1.2 5.6
  464.8 477.0 12.2 40.0 10.2 0.28 0.057 0.5 34.6
  484.9 507.5 22.6 74.0 18.9 0.20 0.031 0.5 35.7
 
SOUTHEAST DEPOSIT - Assays greater than 0.15% Cu
 
Drill Hole # From To Length Length True
Length
Copper Gold Silver Fe
  (m) (m) (m) (ft) (m) % (g/t) (g/t) (%)
NC12-38 74.6 97.5 22.9 75.0 11.5 0.61 0.171 3.0 39.4
  217.9 225.5 7.6 25.0 3.8 0.45 0.110 0.5 27.9

A cross section and plan maps with the respective drill hole locations are available at http://www.nevadacopper.com/i/pdf/121029nr-maps.pdf.

Follow Up Drill Program

A follow up drill program targeting the newly discovered mineralization of 690 feet (210.3 meters) grading 1.17% copper in drill hole NC12-34 is currently being planned. The mineralized zones are outside the current feasibility pit limits and were not included in the recent resource update reported on September 7, 2012. The drill results open up a very large prospective area where existing holes are shallow and the mineralized zones have not been drill tested. The nearest drill holes to the south and east are over 600 to 800 feet away.

Feasibility Study Update

Feasibility study work continues on schedule for a stand-alone high grade underground mine and mill as described in the News Release dated June 20, 2012. The production rate has been established at 6,500 tons per day, for an initial 12 year mine life. This feasibility study is well advanced with publication of results scheduled for release the week of November 19, 2012.

A separate, updated optimized feasibility study for an integrated open pit and underground operation ("Integrated Operation") which will incorporate the updated resource for the Western Deposits is scheduled for release by February 2013.

Shaft and Infrastructure Update

Work on the production-sized exploration shaft continues with a focus on surface facilities by Clark/Atkinson Construction. The foundation for the 12 foot double drum hoist is complete and arrangements are underway for installation and commissioning of the hoist. The concrete formwork for the sub-collar is in progress. Completion of the collar concrete is expected to coincide with delivery of the headframe steel in late November. Fabrication of the headframe structure by Utah Fabrication is approximately 32% complete and progressing well. Line power has now been established at the shaft construction site.

Permitting and Land Transfer Update

Nevada Copper continues to work toward receipt of State construction permits by the end of the first quarter of 2013. State Permit applications were submitted in July 2012 for both:

  1. A Stand-Alone High Grade Underground Mine and mill located entirely on private land; and,
  1. Integrated Operation and single process facility.

The three key state permits are the Water Pollution Control Permit ("WPCP") for mining, a WPCP for dewatering and a Reclamation Permit. The Nevada Division of Environmental Protection, Bureau of Mining Regulation and Reclamation ("NDEP-BMMR") has deemed the two WPCP'S complete and is in technical review on those two permits.

Another key permit is a Nevada Air Quality Permit which can be attained in approximately sixty (60) days. Either a County or City Special Use Permit would be required, subject to the outcome of the proposed Yerington Land Conveyance and Sustainable Development Act (the "Yerington Bill") and will be submitted in January 2013 to assure approval in the first quarter of 2013.

Permit reviews are being done concurrently with Congressional action on the Yerington Bill. The Yerington Bill would transfer 10,400 acres Bureau of Land Management ("BLM") administered federal lands to the City of Yerington, 3,800 of which would be needed for the Integrated Operation. Subject to successful passage of the Yerington Bill the Integrated Operation alternative could be implemented with the granting of State Permits.

The City of Yerington, Lyon County and Nevada Copper are working together and with the Nevada Congressional delegation on a daily basis to assure passage of the Yerington Bill in the 112th Congress, which will reconvene after the U.S. elections on November 6 and close late in 2012. Senate Majority Leader Harry Reid of Nevada has said that he will be able to pass this legislation in the 112th Congress. Senator Reid, Senator Dean Heller and Congressman Mark Amodei continue to have the Yerington Bill as one of their top priorities in this Congress. The Yerington Bill is supported by the entire Nevada Congressional delegation, co-sponsored by Nevada Congresswoman Shelley Berkley and Nevada Congressman Joe Heck in the U.S. House of Representatives.

As a contingency, if the Yerington Bill were not to pass, open pit operations could be permitted as a second phase to the first phase stand-alone high grade underground mine and mill. A pre-application consultation was held with BLM in early October and a Plan of Operations will be submitted to BLM in November 2012 to initiate that review process. If the Yerington Bill is passed, that process would not be required and would be suspended.

Qualification Statement

The Pumpkin Hollow drilling program is under the supervision of Gregory French, CPG #10708, and a Qualified Person as defined in Canadian National Instrument 43-101, who is responsible for the preparation of the technical information in this news release. All assaying and whole rock geochemistry is processed at the American Assay Laboratories (AAL) in Reno, Nevada. Samples are delivered from the project core logging facility to AAL by Nevada Copper or AAL personnel. A Quality Assurance and Quality Control Assay Protocol have been implemented whereby blanks and standards are inserted into the assay stream and check samples are sent to Chemex-Reno and Inspectorate-Reno laboratories.
For additional information about Nevada Copper please visit our website at www.nevadacopper.com.

NEVADA COPPER CORP.

Giulio T. Bonifacio, President & CEO

We seek safe habor.



Nevada Copper Corp.
Eugene Toffolo
VP, Investor Relations & Communications
604-683-8266 or Toll free: 1-877-648-8266
etoffolo@nevadacopper.com
or
Nevada Copper Corp.
Robert McKnight, P.Eng.
Executive Vice President & CFO
604-683-1309
bmcknight@nevadacopper.com
www.nevadacopper.com

Nevada Copper

DEVELOPMENT STAGE
CODE : NCU.TO
ISIN : CA64128F1099
CUSIP : 64128F
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Nevada Copper is a copper exploration company based in Canada.

Nevada Copper develops copper, gold, iron and silver in USA.

Its main asset in development is PUMPKIN HOLLOW in USA.

Nevada Copper is listed in Canada and in Germany. Its market capitalisation is CA$ 10.1 millions as of today (US$ 7.4 millions, € 6.9 millions).

Its stock quote reached its highest recent level on April 08, 2011 at CA$ 6.42, and its lowest recent point on March 15, 2024 at CA$ 0.06.

Nevada Copper has 88 170 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Nevada Copper
5/9/2019Nevada Copper inks $115m deal to construct Pumpkin Hollow
8/31/2018Nevada Copper shares jump on construction decision
5/16/2018Nevada copper provides positive update on drill program: int...
Financings of Nevada Copper
4/19/2016Amends Red Kite and Pala Loan Terms
4/27/2010Closes $23,7 Million Bough-Deal Private Placement Financing
4/9/2010$20.6 Million Bought-Deal Private Placement Financement
10/27/2009$11,250,000 Private Placement with Capstone Mining Corp.
Nominations of Nevada Copper
8/8/2013Appoints Director
2/28/2012Appoints New Director and Launches Project Website
Project news of Nevada Copper
9/9/2013Receives All Permits For Stage 1 Underground Mine
7/28/2011(Pumpkin Hollow)Obtains 100% of Water Needs for the Pumpkin Hollow Project
4/28/2011(Pumpkin Hollow)Provides Update on Feasibility Study & Engages Merit for Pre...
4/12/2011INTERSECTS 415 FEET OF 1.84% COPPER
3/31/2011(Pumpkin Hollow)s Mineral Resource Estimate and Clarifies Technical Disclosu...
2/8/2011S FEASIBILITY STUDY PROGRESS
8/4/2010(Pumpkin Hollow)Intersects 230 Feet of 1.46% Copper in The Open Pittable Nor...
7/8/2010(Pumpkin Hollow)E2 Deposit Drilling Intersects 145 Feet of 2.37% Copper and ...
6/16/2010(Pumpkin Hollow)Mineralization Remains Open at North Deposit: Intersecting 9...
5/27/2010(Pumpkin Hollow)Increases Drilling Program
5/18/2010(Pumpkin Hollow)Discovers Two New Zones Intersecting 275 Feet of 0.98% Coppe...
5/6/2010(Pumpkin Hollow)Step Out Drilling Expands the Open Pittable North Deposit: I...
4/23/2010(Pumpkin Hollow)Drills Over 650 Feet Of Greater Than 0.70% Copper In Three S...
2/16/2010(Pumpkin Hollow)Continues to Intersect High Grade Copper
1/21/2010(Pumpkin Hollow)Intersects 31.1 Meters of 2.45% Copper
1/14/2010Files NI 43-101 Preliminary Economic Assessment
12/8/2009(Pumpkin Hollow)Commences Pre-Feasibility & 25,000 Meter Drilling Program
8/25/2009(Pumpkin Hollow)Files resource update NI 43-101 on Sedar
7/15/2009(Pumpkin Hollow)Reports Significant Resource Increase to 9.3 Billion Pounds ...
Corporate news of Nevada Copper
6/9/2016Nevada Copper Closes Cdn$4.6 Million Equity Offering
6/3/2016Nevada Copper Closes Cdn$ 10.5 Million Financing With Red Ki...
6/1/2016Nevada Copper Solar Zoning Approved
5/27/2016Nevada Copper Annual Meeting Results
5/27/2016Nevada Copper Announces Red Kite Funding Commitment And Equi...
5/3/2016Nevada Copper and City of Yerington Advance Solar Zoning
4/22/2016Nevada Copper Announces Filing Of Amended Prospectus And Exe...
4/5/2016Nevada Copper Amends Red Kite and Pala Loan Terms
1/28/2016Nevada Copper Appoints Directors
11/3/2015Nevada Copper Intersects 105 Feet of 2.55% Copper in the Eas...
10/13/2015Nevada Copper Acquires Private Land & Completes Federal Land...
9/30/2015Nevada Copper Provides Corporate and Project Update
9/10/2015Nevada Copper Intersects 462 Feet of 0.64% Copper
8/21/2015IIROC Trade Resumption - NCU
8/21/2015Federal Land Conveyance Complete at Nevada Copper's Pumpkin ...
8/20/2015IIROC Trading Halt - NCU
8/17/2015Nevada Copper Fully Permitted
7/31/2015Nevada Copper Extends and Increases Bridge Loan Facility
7/31/2015Nevada Copper Receives Air Pollution Control Permit
7/17/2015Nevada Copper Receives Decision Record on Yerington Land Con...
7/15/2015Nevada Copper Intersects 448 Feet Grading 1.0% Copper
7/9/2015Nevada Copper Files Integrated Feasability Study on SEDAR
6/29/2015Nevada Copper Election of New Director and Annual Meeting Re...
6/24/2015Nevada Copper Continues to Expand Open Pit Mineralization In...
4/23/2015Nevada Copper Pumpkin Hollow Project Update
2/10/2015Nevada Copper Pumpkin Hollow Project Update
12/30/2014Nevada Copper Closes US$200 Million Loan Facility
12/22/2014President Signs National Defense Authorization Act That Incl...
12/3/2014Nevada Copper Project Update
11/4/2014Nevada Copper Project Update
7/30/2014Nevada Copper Advances Lyon County Bill
7/16/2014Nevada Copper Provides 2014 Update
7/2/2014Nevada Copper Provides Update & AGM Results
5/12/2014Nevada Copper Update on Lyon County Land Bill
1/23/2014NCU - Nevada Copper featured on KTVN - Channel 2 News
10/28/2013Announces Management Additions
10/9/2013Receives Additional US$15 Million Under Its US$200 Million S...
10/1/2013Announces $24 Million Equipment Financing
8/26/2013Receives Water Pollution Control Permit
7/16/2013Remaining Stage One Permits Issued for Public Comment
6/25/2013Receives Special Use Permit and Provides Update on Land Bill
6/17/2013North Deposit Drilling Intersects Multiple Zones of Minerali...
6/10/2013Receives Reclamation Permit
5/28/2013Provides Update on State Permits
5/7/2013s Lyon County Bill Status
4/23/2013(Pumpkin Hollow)to Proceed With Two-Stage Approach to Building Pumpkin Hollo...
4/17/2013s Permitting and Yerington Land Bill Status
4/17/2013s Permitting and Yerington Land Bill Status
3/28/2013Closes US$200 Million Loan Facility and Concentrate Off-Take...
3/11/2013North Deposit Mineralization Continues to Expand Intersectin...
2/15/2013-Permitting and Feasibility Study Update
1/3/2013Status of Congressional Action-Lyon County Land Bill
10/30/2012North Deposit Mineralization Remains Open Intersecting 119 F...
10/19/2012Files Resource Update NI 43-101 Technical Report on SEDAR
10/5/2012to Purchase 17.8% of Mercator Minerals
9/5/2012Governor Sandoval's Trade Mission to China and South Korea
8/9/2012Drilling Continues to Expand Shallow Mineralization in the S...
7/10/2012Submits Mine Development Permit Applications and Announces D...
6/20/2012-Project Update/Land Bill Passed by the House
6/5/2012s Permitting and Yerington Land Conveyance
5/29/2012Intersects 470 Feet at 0.73% Copper in the North Deposit
4/19/2012Provides an Update on House Subcommitee Hearing on Yerington...
4/10/2012Mineralization Continues to Expand in the North Deposit; Lan...
3/26/2012Announces Introduction of Land Conveyance Bill in the United...
3/13/2012Intersects 9.08% Copper in Open Pittable North Deposit
2/27/2012Appoints New Director & Launches Project Website
2/22/2012Breaks Ground on Underground Shaft
2/16/2012Announces Introduction Of Yerington Land Conveyance Bill
2/7/2012Files Feasibility Study on SEDAR
1/23/2012Announces Positive Feasibility Study Results
1/17/2012(Pumpkin Hollow)Hosts Conference Call to Discuss Pumpkin Hollow Definitive F...
1/9/2012North Deposit Continues to Expand-NC1127 Intersects Minerali...
12/16/2011Announces Selection of Underground Contractor
11/29/2011Coppper-Update on Underground Contractor Selection & Feasibi...
9/29/2011Annnounces Management Addition and Shaft Contract Update
9/19/2011-Feasibility Study Update and Land Transfer
9/7/2011Mineralization Continues to Expand, Intersecting Over 600 Fe...
8/16/2011North Deposit Continues to Expand, Drilling Multiple Interva...
6/14/2011Expands North Deposit Intersecting 785 Feet of 0.73% Copper ...
5/25/2011Steps Out and Drills 126 Feet of 1.26% Copper/Definitive Fea...
5/3/2011(Pumpkin Hollow)Intersects 1,164 Feet of 0.49% Copper in the Pumpkin Hollow ...
12/1/2009Robust Economic Results
12/1/2009Reports robust economic results
11/3/2009Capstone Mining Makes Strategic Investment in Nevada Copper
6/29/2009US$2,000,000 Convertible Debenture
5/2/2007Press Release: Augusta Files Q1 Financials - Negotiates Sale...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (NCU.TO)FRANKFURT (ZYT.F)
0.115+4.55%0.045-4.26%
TORONTO
CA$ 0.115
05/08 16:59 0.010
4.55%
Prev close Open
0.110 0.100
Low High
0.100 0.115
Year l/h YTD var.
0.060 -  0.140 -17.86%
52 week l/h 52 week var.
0.060 -  0.290 -62.90%
Volume 1 month var.
83,434 35.29%
24hGold TrendPower© : 20
Produces
Develops Copper - Gold - Silver
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 3/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
Annual variation
DateVariationHighLow
2024-11.54%0.140.06
2023-55.17%0.420.13
2022-53.23%0.790.20
2021327.59%1.220.07
2020-60.27%0.380.06
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.63+1.06%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.18+0.74%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.62+5.07%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64+1.15%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.85-2.10%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.50%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.84+0.00%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 50.56-0.82%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :