August 28, 2012

Obotan Gold Project Feasibility Study Demonstrates a Robust, Viable Project, Poised for Development

THIS NEWS RELEASE IS NOT FOR DISTRIBUTION IN THE UNITED STATES OR TO U.S. NEWS AGENCIES

Development of 220,000oz pa West African gold mine on track to commence in H1 2014, marking the first step in the creation of a substantial new West African gold producer

Highlights:

  • Independent NI 43-101 compliant Feasibility Study confirms a financially and technically robust mining operation at Obotan, with key outcomes including:
    • re-Tax NPV of US$614M and Post-tax NPV of US$387M, assuming a US$1,300/oz gold price, 5% discount rate and contract mining scenario (consistent with January 2012 Pre-feasibility Study)
      • Pre-tax IRR of 35% and post-tax IRR of 28%
      • Capital payback period of 2.9 years
    • At current prices of $1600/ounce,
      • Pre-tax NPV rises to US$1.07B and post-tax NPV to US$686M
      • Pre-tax IRR of 54% and post-tax IRR of 43%
      • Capital payback period of 2.0 years
    • Average production of 221,500 oz Au pa over the first five years
    • Total production of 2.26 million recovered oz Au over the 11.5 year mine life
    • Life-of-mine Project Revenue of US$2.9 billion
    • Estimated average life-of-mine cash operating costs of US$626/oz
    • Increased Proven and Probable Ore Reserves of 34.2Mt at 2.21g/t for 2.43Moz of gold across four deposits. This is a rise of 170,000 oz from the January 2012 Pre-feasibility Study.
    • Capital cost estimate of US$296.6M including a pre-strip mining cost of US$82.2M
  • Feasibility Study completed with a high level of cost estimates based on firm tenders from suppliers, and quotes from five mining contractors.
  • Final Investment Decision (FID) on track for Q4 2012, with interim Board approval to expedite engineering designs of key long-lead items.
  • At the end of July 2012, PMI had US$39m cash.
  • Environmental studies, Mining Lease Application and other statutory approvals on track to be finalized during Q4 2012.
  • A select group of leading international banks have provided detailed indicative offers to deliver debt financing facilities for the development of the Obotan Project.
  • PMI continues to focus exploration on tenements close to the Obotan Project, and the Kubi and Asanko exploration projects which offer potential to become future production centres.
  • Together with Obotan, these centres support the Company's medium-term objective of becoming a mid-tier West African gold producer.

PMI Gold Corporation (TSX-V: PMV, ASX: PVM - "PMI" or "the Company") is pleased to report positive results from the independent NI 43-101 Feasibility Study on its flagship 100%-owned Obotan Gold Project in Ghana, through its wholly-owned subsidiary Adansi Gold Company Ghana Limited ("Adansi"). The Feasibility Study has outlined a strong and viable gold project based on a gold price of $1300/ounce that will form the cornerstone of PMI's emerging West African gold production strategy.

The strong economics of the Obotan Project provide a solid investment case with the commencement of construction targeted during Q1 of 2013 to achieve first gold production from Obotan in 2014, conditional on obtaining all statutory approvals, Board Approval, and the finalization of financing arrangements.

The Feasibility Study commenced in the January 2012 Quarter and was completed by GR Engineering Services Limited ("GRES") with support and input from a range of internationally renowned consultancy groups including SRK, Orelogy, Knight Piesold and AERC. Cost estimates have been based on quotes from five mining contractors and firm tenders received from suppliers.

Further details of the Feasibility Study include:

  • Increased Proven and Probable Reserves of 34.2Mt at 2.21g/t for 2.43Moz of contained gold has been calculated. This represents a 13% increase in tonnage and 8% increase in contained gold compared with the maiden Proven and Probable Ore Reserve in the January 2012 Pre-feasibility Study (30.3Mt at 2.32g/t for 2.26Moz of gold). A 4.7% reduction in grade has been offset by the conversion of additional Inferred Resources to Indicated Resources then into reserves as a result of successful in-fill drilling programs. There are additional Inferred Resources within the open pit which have not been included in the Ore Reserve but which may be converted in future.
  • Life-of-mine production of 2.26M oz of recovered gold over an initial 11.5 year production life (exclusive of 1 year pre-strip operations). The waste-to-ore ratio has been reduced from 7.6 in the Pre-feasibility Study to 6.4 (including the pre-strip). Post pre-strip, the life of mine strip ration drops to 5.6:1.
  • Life-of-mine average cash operating costs are estimated at US$626/oz (excluding royalties, refining costs). Total cash operating costs are estimated at US$722/oz including royalties and refining costs, positioning the Obotan Project at the lower end of the global cash cost curve.

Commenting on the Feasibility Study results, PMI's Managing Director and CEO, Collin Ellison, said:

"We are very pleased with the results of the Obotan Feasibility Study, which clearly demonstrates the potential to develop a robust, long-term mining operation capable of delivering strong investment returns that will form the cornerstone of our emerging gold business in West Africa.

"We are currently continuing detailed design and engineering work, as well as assessing options to optimize capital and operating costs while we continue discussions with potential project financiers. This puts us firmly on track to make a development decision during the fourth Quarter of 2012, paving the way for us to secure project finance and commence development early next year."

"A select group of leading international banks have provided detailed indicative offers to deliver debt financing facilities and we are currently assessing these offers in conjunction with our advisors, Optimum Capital Pty Ltd, in order to determine the best combination of debt and equity funding to underpin project development. The Company has also made excellent progress with the statutory approvals process and is well placed to finalize its environmental approvals and secure the grant of a Mining Lease during the fourth Quarter of 2012.


"PMI is assembling a highly skilled technical team with extensive experience in developing gold projects in West Africa. This team will realize the Company's broader corporate objective of creating a substantial mid-tier gold producer in West Africa.

"The key elements of this strategy are already well advanced with over 85,000m of exploration drilling completed, focused on identifying potential additional oxide resources within economic trucking distance of the Obotan treatment plant, as well as progressing the Kubi Project as a potential second standalone operational centre and exploring the exciting Asanko Project, which covers a significant portion of the highly prospective Asankrangwa Gold Belt.

"These projects will deliver the second and third growth horizons for PMI Gold, building on the strong foundations established at Obotan."


Mineral Resources & Ore Reserves

NI43-101/JORC Code Compliant: SRK Resource Estimate (March 2012), based on 0.5 g/t Au lower cut-off grade
Deposit Measured Indicated Measured & indicated Inferred
Tonnes
(million)
Grade
(g/t Au)
Ounces
(million)
Tonnes
(million)
Grade
(g/t Au)
Ounces
(million)
Tonnes
(million)
Grade
(g/t Au)
Ounces
(million)
Tonnes
(million)
Grade
(g/t Au)
Ounces
(million)

Nkran

11.74 2.55 0.96 20.41 2.12 1.39 32.15 2.28 2.35 14.47 2.21 1.05

Adubiaso

1.50 2.98 0.14 2.67 2.41 0.21 4.17 2.59 0.35 1.25 1.91 0.08

Abore

2.33 1.78 0.13 3.70 1.53 0.18 6.03 1.60 0.31 3.92 1.50 0.19

Asuadai

n/a n/a n/a 2.44 1.28 0.10 2.44 1.28 0.10 2.00 1.33 0.08

TOTAL

15.57 2.47 1.23 29.21 2.00 1.88 44.79 2.16 3.11 21.91 1.99 1.40
(All resource numbers are rounded to 2 decimal places- 10,000 tonnes).

Following completion of mine optimization and planning, an updated Ore Reserve statement has been completed by Orelogy Mining Consultants, as outlined below:

NI43-101/JORC Code Compliant: Feasibility Study Obotan Ore Reserve
Class Tonnes (Mt) Grade (g/t Au) Contained Gold (Moz)
Proven 14.8 2.39 1.14
Probable 19.4 2.08 1.30
Total 34.2 2.21 2.43
Technical Notes:
  1. The Orelogy Mineral Reserve was estimated by construction of a block model within constraining wireframes based on Measured and Indicated resources.
  2. The Reserve is reported at lower a cut-off grade of 0.5g/t Au, which defines the continuous/semi-continuous mineralized zone potentially amenable to the low grade, bulk tonnage mining scenario currently being considered by PMI.
  3. The grades and Reserve tonnes have been modified by an average ore loss and mining dilution of 4.8% with a mining dilution grade of 0.0g/t gold
  4. An average metallurgical recovery of 92.8% was used in defining the optimal pit shell
  5. The Mineral Reserves are based on the March 2012 Mineral resource reports for the Nkran, Adubiaso, Abore and Asuadai deposits
  6. All tonnes reported are dry tonnes
  7. The base case pit optimization utilized a US$1,300/oz gold price
  8. Mineral Reserves are reported in accordance with the NI 43-101 & JORC.

This compares to the previous Ore Reserves (below) as reported in the Pre- Feasibility announcement.

NI43-101/JORC Code Compliant: Pre- Feasibility Obotan Ore Reserve
Class Tonnes (Mt) Grade (g/t Au) Contained Gold (Moz)
Proven 14.0 2.36 1.06
Probable 16.3 2.28 1.20
Total 30.3 2.32 2.26
(Any inconsistencies due to rounding).


Key Project Parameters

The Feasibility Study results demonstrate a technically robust mining operation with anticipated life-of-mine (LOM) parameters as follows:

Item Description / Estimate
Mining method Open Pit Mining
Processing rate 3Mtpa primary ore, 3.8Mtpa oxide ore
Metallurgical recovery 92.8% average
Total recovered gold 2.26 million oz
Mine Production Life 11.5 years
Cash operating costs $626/ oz
Pre-Production Capital Cost $296.6M
Pre-tax operating cashflow $953M
Life of Mine sustaining mine capital $35.6M
Construction commencement* 1st Quarter 2013
First production* End of 1st Quarter 2014
*Subject to Financial Investment Decision (FID) timing

Capital Cost Breakdown

Cost Area

US$ Million

Process Plant Direct $ 83.6
Infrastructure $ 49.2
Indirect $ 26.1
Spares and First Fills $ 8.9
Owners Costs $ 26.2
Pre-Strip $ 82.2
Mining Establishment $ 20.3
Initial Capital $ 296.6
Deferred & Sustaining Life of Mine Capital $ 35.6

Operating Cost Breakdown

Costs Total Cost
US$ Million
US$/t
Milled
US$/oz Au Recovered
Mining $ 850.4 $ 24.84 $ 376.5
Processing $ 473.1 $ 13.82 $ 209.4
General & Administration $ 90.6 $ 2.65 $ 40.1
Sub Total $ 1414.0 $ 41.31 $ 626.0
Bullion and Refining $ 12.1 $ 0.35 $ 5.3
Royalties $ 205.6 $ 6.01 $ 91.0
Total Operating Cost $ 1631.7 $ 47.67 $ 722.3

Proposed Plant Layout


Financial Evaluation

  @ U$1300 / ounce @ U$1600 / ounce
Project revenue $ 2.9 B $ 3.61 B
Project pre-tax cash flow $ 953 M $ 1.58 B
Project pre-tax NPV (5% discount rate) $ 614 M $ 1.07 B
Project pre-tax NPV (8% discount rate) $ 472 M $ 856 M
Project pre-tax IRR 35% 54%

Project Implementation

Subject to the Board of Directors' Financial Investment Decision (FID), key project milestones comprise;

Key Project Implementation Milestones - Targeted Dates
  CY2012 CY2013 CY2014
  1H 2H 1H 2H 1H 2H
Completion of Feasibility Study   ?        
Project Finance   ?        
Commencement of Construction     ?      
Mining Pre-strip     ?      
First Production         ?  

Foundations for a Substantial West African Gold Mining House

The completion of the Obotan Feasibility Study puts in place the foundations for development of PMI's first operating gold mine in Ghana, and represents the first step in the execution of the Company's broader growth strategy to become a substantial West African producer across multiple production centres.

The Company believes that its strategic 580km2 land-holding in the highly prospective Ashanti and Asankrangwa Gold Belts in south-west Ghana will support an aggressive organic growth strategy that has the potential to deliver this level of production in the medium term.

In order to realize this objective, PMI has completed over 85,000m of drilling to date on high priority regional targets within its three potential production hubs -- the Obotan, Kubi and Asanko projects. The three key objectives of this work are:

  • Obotan Project: To identify additional oxide resources within an economic trucking distance of Obotan, defined as the Obotan Exploration Area of Influence defined by a 15km radius of the proposed treatment facility at Obotan. Recent drilling has focused on prospects including Fromenda, Afiefiso and Kaniago (Adansi), with recent drilling at Fromenda returning excellent results and indicating the potential for the Fromenda Shear to host significant oxide gold mineralization. The Company is aiming to delineate JORC/NI43-101 compliant resources for some of these oxide prospects next year;
  • Kubi Project: To re-evaluate the existing resources (NI43-101/JORC compliant Measured resource of 0.66 million tonnes at 5.30 g/t Au for 112,000oz; Indicated resource of 0.66 million tonnes at 5.65g/t Au for 121,000oz; Inferred resource of 0.67 million tonnes at 5.31 g/t Au for 115,000oz) and assess the potential for new discoveries at the Kubi Project, located 60km south-west of Obotan, as the foundation for PMI's second production centre in south-west Ghana. Recent drilling has intersected significant zones of gold mineralization at the Kubi South Prospect, 1.5km south of the Kubi Main Deposit, highlighting the potential for economic mineralization to be discovered within close trucking distance of the Kubi Main Deposit. Kubi lies immediately along strike from the 60Moz (pre-mined) Obuasi goldfield owned by AngloGold Ashanti; and
  • Asanko Project: To discover significant new standalone gold deposits within the Asanko Project, which occupies a commanding position covering over 40 strike kilometres of the under-explored Asankrangwa Gold Belt, providing a strong pipeline of future exploration and development opportunities that could collectively justify the development of a third production centre for the Company.


PMI has this year established a significantly expanded in-house exploration project evaluation and development capability to enable it to unlock the value of its broader portfolio of projects in south-west Ghana and implement the strategies and programs required to realize these growth objectives.

Collin Ellison
On behalf of the Board,
Managing Director & CEO


For further information please contact:

Investor Relations Canada:
Rebecca Greco, Fig House Communications
P. +1 (416) 822-6483
E. fighouse@yahoo.com

Investor Relations Australia:
Nicholas Read/Paul Armstrong, Read Corporate
P. +61 8 9388 1474
M. +61 419 929 046

PMI Contact Canada:
Marion McGrath, Corporate Secretary
P. +1 (604) 684-6264
Toll-Free: 1 (888) 682-8089

PMI Contact Australia:
Collin Ellison, Managing Director & CEO
P. +61 8 6188 7900

or visit the PMI Gold Corporation website at www.pmigoldcorp.com


Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.


NI 43-101

Obotan Gold Project:


Feasibility Study Mineral Resources and Reserves Estimate:

Information that relates to Mineral Resources at the Obotan Gold Project is based on a resource estimate that has been carried out by Mr Peter Gleeson, a full time employee of SRK Consulting, Australia. Mr Gleeson is a Member of the Australian Institute of Geoscientists (MAIG). Information that relates to Mineral Reserves (for the Feasibility Study) at the Obotan Gold Project is based on a reserve estimate that has been carried out by Mr Ross Cheyne, a full time employee of Orelogy Mining Consultants. Mr Cheyne is a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM). Both have sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity undertaken to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC), and as a Qualified Person (by ROPO) as defined in terms of NI43-101 standards for resource estimate of gold. Mr Gleeson and Mr Cheyne have more than 5 years' experience in the field of exploration results and of resource/reserve estimation and consent to and approve the inclusion of matters based on information in the form and context in which it appears.

The Mineral Resource and Mineral Reserve estimates have been prepared in accordance with the 2010 Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards for Mineral Resources and Mineral Reserve as incorporated by reference in National Instrument 43-101 of the Canadian Securities Administrators, and is consistent with the Australasian Guidelines and Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (Revised December 2007) as prepared by the Joint Ore Reserves Committee of the AusIMM, AIG and MCA (JORC).

PMI will file a NI 43-101 compliant technical report on the Obotan Project outlining the Mineral Resources and Reserves Estimate and the result of the Feasibility Study. The report will be available on www.sedar.com within 45 days of the date of this press release. The NI 43-101 technical report will be authored by Peter Gleeson MAIG for SRK, Ross Cheyne FAusIMM, for Orelogy, and Gerry Neeling FAusIMM of GRES. These independent Qualified Persons have verified the data in this news release. Collin Ellison, President & CEO, MIMMM, C.Eng, is a "qualified person" within the definition of that term in NI 43-101, has supervised the preparation of the technical information contained in this news release.

Pre-Feasibility Study Mineral Reserves Estimates:

Information that relates to Pre-Feasibility Study Mineral Reserves as previously reported on the Obotan Gold Project is based on a reserve estimate that has been carried out by Mr Duncan Pratt, a full time employee of SRK Consulting, Australia. Mr Pratt (CP Mining) is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM) and has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC), and as a Qualified Person in terms of NI43-101. Mr Pratt consents to and approves the inclusion of matters based on information in the form and context in which it appears.

Technical Notes:
  1. The SRK Mineral Reserve was estimated by construction of a block model within constraining wireframes based on Measured and Indicated resources.
  2. The Reserve is reported at lower a cut-off grade of 0.5g/t Au, which defines the continuous/semi-continuous mineralized zone potentially amenable to the low grade, bulk tonnage mining scenario currently being considered by PMI.
  3. The grades and Reserve tonnes have been modified by a 95% mining recovery and a 5% allowance for mining dilution at 0.0g/t gold.
  4. At 93% metallurgical recovery for Oxide and Transitional material and 94.5% metallurgical recovery for Fresh material was used in defining the optimal pit shell
  5. The Mineral Reserves are based on the October 2011 Mineral resource reports for the Nkran, Adubiaso, Abore and Asuadai deposits
  6. All tonnes reported are dry tonnes
  7. The base case pit optimization utilized a US$1,300/oz gold price
  8. Mineral Reserves are reported in accordance with the NI 43-101 & JORC.

Kubi Gold Project:

The information that relates to Mineral Resources at the Kubi Main Deposit, Ghana, is based on a resource estimate that has been audited by Simon Meadows Smith, who is a full time employee of SEMS Exploration Services Ltd, Ghana. Simon Meadows Smith is a Member of the Institute of Materials, Minerals and Mining (IMO3), London and has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, and under NI43-101. Simon Meadows Smith consents to the inclusion in the presentation of the matters based on information in the form and context in which it appears.

Technical Notes:
  1. Resources figures for Kubi are based on a 2.0g/t Au cut-off grade
  2. Mineral Resources are reported in accordance with NI43-101 & JORC.

Exploration Results:

The information that relates to Exploration Results is based on information compiled by Thomas Amoah, who is employed by Adansi Gold Company (Gh) Ltd, a wholly owned subsidiary of PMI Gold Corporation. Mr Amoah, who is a Member of the Australian Institute of Geoscientists (MAIG), has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves'. Mr Amoah consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.

Scientific and technical information contained in this news release has been reviewed and approved by Thomas Amoah, MAIG, MSEG. a "qualified person" as defined under National Instrument 43-101. Field work was supervised by Mr Amoah (VP-Exploration). Drill cuttings were logged and sampled on site, with 3kg samples sent to the MinAnalytical prep laboratory on site, and analyzed for gold by fire assay-AA on a 50 gram sample charge or by screened metallics AA finish in MinAnalytical laboratory in Perth. Internal QC consisted of inserting both blanks and standards into the sample stream and multiple re-assays of selected anomalous samples. Where multiple assays were received for an interval, the final value reported was the screened metallic assay if available, or in lieu of that the average of the other results for the interval. Results from the QC program suggest that the reported results are accurate. Intercepts were calculated using either a minimum 0.1 g/t Au (Kaniago (Adansi) Prospect, Afiefiso Prospect and 513 Prospect) or 0.5 g/t Au (Fromenda Prospect) cut off at the beginning and the end of the intercept and allowing for no more than three consecutive metres of less than 0.1 g/t Au (Kaniago (Adansi) Prospect, Afiefiso Prospect and 513 Prospect) or 0.5 g/t Au (Fromenda Prospect) internal dilution. True widths are estimated at from 60% to 70% of the stated core length.

Forward-Looking Statements

This news release includes forward-looking statements or information. Forward-looking statements or information involve risks, uncertainties and other factors that could cause actual results, performances, prospects and opportunities to differ materially from those expressed or implied by such forward-looking statement. All statements other than statements of historical fact included in this release, including, without limitation, statements regarding future gold production; initial mine life; average annual gold production; forecast life of mine cash cost; initial capital cost; forecast operating parameters including ore mined, mill feed and recoveries; determination of a development decision for the Obotan Project; full production; and financial outcomes of the FS, including NPV, are forward-looking statements of information. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements or information. Important factors that could cause actual results to differ materially from the Company's plans or expectations include the actual results of current exploration activities; changes in gold prices; changes in exchange rates; possibility of equipment breakdowns, delays and availability; changes in mine plans; exploration cost overruns; unexpected increases in costs of equipment, steel, cement and consumables such as diesel and fuel oil; unexpected environmental liabilities or social charges; the unknown impact of the 10% windfall profit tax announced by the Government of Ghana; title defects; the failure of contract parties to perform the unavailability of capital and financing; adverse general economic, market or business conditions; regulatory changes; failure to receive necessary government or regulatory approvals; and other risks and factors detailed herein and from time to time in the filings made by the Company with securities regulators and stock exchanges, including in the section entitled "Risk Factors" in the Company's Annual Information Form dated September 20, 2011.

Any forward-looking statement or information only speaks as of the date on which it was made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or otherwise. Although the Company believes that the assumptions inherent in the forward-looking statements are reasonable, forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such.


Figure 1. Location of PMI Gold Corporation's Projects in Ghana



Figure 2. Obotan Gold Project -- Nkran, Adubiaso, Abore and Asuadai Deposit Locations

You can also view this News Release on our website at:
http://www.pmigoldcorp.com/s/News.asp?ReportID=544500

Home | Corporate | Projects | Investors | News | Contact Us | � 2012 PMI Gold Corporation (PMV) All rights reserved.
Data and Statistics for these countries : Australia | Canada | Ghana | All
Gold and Silver Prices for these countries : Australia | Canada | Ghana | All

PMI Gold Corporation

EXPLORATION STAGE
CODE : PMV.V
ISIN : CA7301531033
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

PMI Gold is a gold exploration company based in Canada.

PMI Gold holds various exploration projects in Ghana.

Its main exploration properties are GYIMIGYA & DUNKWA, KANIAGO, OBOTAN, EDUBIA, OFOASE, BANKAME and KUBI in Ghana.

PMI Gold is listed in Australia, in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 339.6 millions as of today (US$ 321.0 millions, € 236.3 millions).

Its stock quote reached its lowest recent point on November 28, 2008 at CA$ 0.01, and its highest recent level on February 24, 2012 at CA$ 1.46.

PMI Gold has 409 193 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of PMI Gold Corporation
10/4/2007Larry Myles Reports: Another Look at PMI Gold Corporation.
Annual reports of PMI Gold Corporation
2008 Annual report
Annual Report 2007
Financings of PMI Gold Corporation
11/13/2012Completes Equity Financing; Overallotment Option Exercised i...
10/10/2012Announces C$100 Million Equity Financing
3/15/2011Completes Short-Form Prospectus And Qualifies Exercise of Sp...
10/20/2009Private Placement for $3,645,500 Closes
9/30/2009$2.75 Million Private Placement Increased to $3.20 Million
8/25/2009$2.75 Million Private Placement, Drilling Program Expanded
6/16/2009Repricing of warrants
5/26/2009Private Placement, Drilling Program Expanded
3/3/2009announces two private placements
3/3/2009Private Placements Announced
2/19/2009US$20 Million Private Placement Announcement
2/19/2009Announces US$20 million private placement
8/11/2008Private Placement $1.0 Million/5 Million Units Announced
4/15/2008Reprices Brokered Private Placement
3/12/2008Non-Brokered Private Placement Closed Fiscal Advisory Agreem...
1/14/2008Private Placement Increased
11/27/2007Private Placement 10 Million Units - $2,800,000 Announced
Nominations of PMI Gold Corporation
9/9/2013Advises Appointment Of General Manager Corporate Developmen...
4/4/2013appoints Jim Askew as Chairman and Non-Executive Director
4/12/2011PMI Gold Corporation - Resignation of Director
9/15/2008New Board Appointments; Stock Option Announced
Project news of PMI Gold Corporation
2/6/2014Asanko Gold Inc. Completes Acquisition Of PMI Gold Corporati...
7/26/2013Targets Maiden Gold Resource for Dynamite Hill After Further...
7/19/2013(Obotan)Implements Multi-Pronged Strategy for Advancing the Obotan P...
6/6/2013Intersects High Grade Gold at Newly Discovered Dynamite Hill...
3/11/2013(Kubi)Regional Air Core Drilling Continues to Identify Anomalous G...
2/18/2013(Obotan)Obotan Project Update
9/26/2012(Obotan)to receive Mining Leases for Obotan Gold Project Another Imp...
9/26/2012(Obotan)to Receive Mining Leases for Obotan Gold Project
8/28/2012(Obotan)Obotan Gold Project Feasibility Study Demonstrates a Robust...
5/25/2011(Obotan)- Positive drilling results pave way for resource upgrade at...
5/4/2011PMI Gold Corporation - Extensive gold zones intersected in l...
3/2/2011(Obotan)DRILLING FLEET EXPANDED FOR AGGRESSIVE EXPLORATION PROGRAM -...
10/22/2009(Obotan)Retires Debt - Next Phase Kubi Drilling Commences - Obotan O...
9/9/2009(Kubi)New gold zone discovered at Kubi, Ghana
7/15/2009(Kubi)Change Of Control Approved By Shareholders Additional Drilli...
7/1/2009(Obotan)Updates Obotan Project, Ghana
9/23/2008(Kubi)Kubi License Area Increased In Ghana
6/3/2008(Kubi)Fiscal Agent Appointed for Kubi Gold Project Financing
4/10/2008Announces Positive Preliminary Assessment Scoping Study Resu...
8/29/2007Drills 44.5 Metres @ 2.61 G/T Au at Nkran, Ghana
Corporate news of PMI Gold Corporation
1/21/2014ISS and Glass Lewis Recommend Asanko and PMI Shareholders Vo...
1/7/2014Asanko and PMI Mail Joint Information Circular in Connection...
12/17/2013Asanko Gold To Acquire PMI To Create An Emerging Mid-Tier Go...
11/28/2013Announces Results of Annual and Special Meeting
10/24/2013Disclosure of CEO Remuneration
9/17/2013Announces Change of CEO
7/30/2013Quarter Activity Update for the period ended 30 June 2013
2/18/2013and Keegan Agree to Terminate Merger Plans
2/1/2013Quarter Activity Update - For the period ended 31 December 2...
1/24/2013And Keegan Mail Joint Information Circular In Connection Wit...
1/10/2013Anomalous Gold Intersected at PMI Gold's Diaso Prospect, Gh...
10/26/2012Quarter Activity Update for the Period Ended 30 September 20...
10/9/2012Announces "Overnight Marketed" Offering
9/26/2012Secures US$30m Standby Funding Facility Decision to Apply f...
9/19/2012(Obotan)Files National Instrument 43-101 Compliant Technical Report ...
4/30/2012(Obotan)Positive Drilling Results Show Potential for Fromenda Prospe...
4/19/2012(Obotan)New Discovery at Kaniago Strengthens Satellite Oxide Gold Po...
2/22/2012(Obotan)Announces Further Positive Resources Drill Results from its ...
10/14/2011(Obotan)- 270% Increase in Obotan Project Gold Resources, Ghana
5/10/2011PMI Gold appoints highly experienced geologist to lead aggre...
3/16/2010raises $7.5 m for Ghana gold work
12/11/2009 Warrant exercised / shares for debt issued
1/30/2009on Trafalgar capital Bridge Loan Facility
1/30/2009- updates Trafalgar bridge loan
1/5/2009- New Director Appointed/Debenture Shares Issued
11/20/2008- bridge loan extension-MacQuarrie returns as President
9/26/2008Kubi Mining Leases Extended For 20 Years
9/23/2008acquires two more concessions, Ghana
9/3/2008Private Placment Can$1,000,000 Closed; Private Investor Inc...
8/21/2008New Concession Acquired in Ghana
8/11/2008to raise $1 million privately
7/9/2008$3.5 Million Secured Loan Arranged Kubi Gold Project Purchas...
5/29/2008VTEM Survey Confirms New Drill Targets At Obotan
2/11/2008(audio) Korelin Daily Radio Inverview with Doug MacQuarrie
1/30/2008Option Of Bankame And Ofoase Concessions To Golden Lion Reso...
12/3/2007Golder Associates to Commence Kubi Gold Project Review
10/15/2007Acquires Nevsun's Kubi Gold Project, Ghana
9/17/2007to purchase Nevsun's Kubi Gold Project, Ghana
8/16/2007Acquires Rights to Purchase Edubia Lease, Ghana
1/13/2006(Obotan)ANALYSIS : Follow up N° 7
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (PMV.V)AUSTRALIA (PVM.AX)
0.830+0.00%0.3650
TSX-V
CA$ 0.830
11/29 10:25 -
0%
Prev close Open
0.830 -
Low High
0.830 0.830
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.830 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : -27
Produces
Develops
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 5/26/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :