Osisko Mining Corp.

Published : December 05th, 2017

Osisko Intersects 30 g/t Au Over 2.4 Metres at Windfall

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Osisko Intersects 30 g/t Au Over 2.4 Metres at Windfall

TORONTO, ONTARIO--(Marketwired - Dec 5, 2017) - Osisko Mining Inc. (OSK.TO) ("Osisko" or the "Corporation") is pleased to provide new results from the ongoing drill program at its 100% owned Windfall Lake gold project located in the Abitibi greenstone belt, Urban Township, Eeyou Istchee James Bay, Québec. The 800,000 metre drill program combines definition, expansion and exploration drilling in and around the main Windfall gold deposit and the adjacent Lynx deposit (located immediately NE of Windfall). Significant new analytical results from 52 intercepts in 40 drill holes focused on infill and expansion drilling in the Underdog, Caribou, Zone 27 and Mallard corridors of the Windfall deposit are presented below.

Highlights from the new results include: 30 g/t Au over 2.4 metres, in OSK-W-17-1141; 10.2 g/t Au over 5.4 metres in OSK-W-17-1125, 26.0 g/t Au over 2.2 metres in OSK-W-17-1125-W3 and 5.38 g/t Au over 9.0 metres in OSK-W-17-1186. Maps showing hole locations and full analytical results are available at www.osiskomining.com.

Hole No. From
(m)
To
(m)
Interval
(m)
Au
(g/t) uncut
Au
(g/t)
cut to
100
g/t
Zone Corridor
OSK-W-17-885-W2 1199.0 1201.0 2.0 10.8 FW0 FW Underdog
including 1199.0 1200.0 1.0 21.3
OSK-W-17-935 80.0 82.8 2.8 3.34 Mallard HW Mallard
including 82.0 82.8 0.8 9.71
OSK-W-17-1013 9.2 12.0 2.8 4.56 27 Zone 27
including 9.6 10.1 0.5 24.9
OSK-W-17-1025 94.9 96.9 2.0 4.17 TBD Caribou
OSK-W-17-1026 83.6 85.9 2.3 4.93 27 infill Zone 27
including 85.0 85.9 0.9 12.4
92.7 95.9 3.2 4.38 27 infill Zone 27
including 94.8 95.9 1.1 11.2
OSK-W-17-1028 727.5 729.5 2.0 6.77 Caribou Extn Caribou
OSK-W-17-1042 84.0 86.3 2.3 3.53 27 infill Zone 27
OSK-W-17-1050 39.7 41.7 2.0 11.2 Z27 Zone 27
OSK-W-17-1065 31.9 34.2 2.3 3.28 Mallard 2 Mallard
OSK-W-17-1066 214.5 216.5 2.0 4.21 Vein Caribou
OSK-W-17-1095 113.0 116.0 3.0 4.09 27 infill Zone 27
OSK-W-17-1105 468.0 470.0 2.0 3.42 New TBD
including 468.0 469.0 1.0 6.71
772.0 774.0 2.0 4.49 27 Zone 27
including 772.3 772.9 0.6 14.5
OSK-W-17-1125 753.6 759.0 5.4 10.2 FW2 Underdog
including 755.9 757.2 1.3 36.3
OSK-W-17-1125-W3 516.8 519.0 2.2 26.0 Wolf HW Caribou
including 517.5 518.2 0.7 80.5
OSK-W-17-1139 520.0 523.4 3.4 4.87 CN1 FW Caribou
including 521.6 521.9 0.3 19.8
OSK-W-17-1140 937.3 942.0 4.7 3.56 27 Zone 27
OSK-W-17-1141 59.4 61.8 2.4 30.0 27 infill Zone 27
including 59.4 61.0 1.6 44.7
71.7 74.0 2.3 8.04 27 infill Zone 27
including 73.4 74.0 0.6 28.0
OSK-W-17-1142 142.0 144.0 2.0 3.07 27 HW infill Zone 27
OSK-W-17-1147-W1 798.0 800.4 2.4 3.36 TBD Shear
909.0 911.0 2.0 3.94 TBD Caribou
OSK-W-17-1152 367.0 369.0 2.0 5.67 FW1 Underdog
including 368.0 368.6 0.6 16.6
OSK-W-17-1155 327.0 329.7 2.7 3.64 VNCR Mallard
including 329.0 329.7 0.7 12.9
OSK-W-17-1158 596.0 598.4 2.4 4.12 Caribou Extn Caribou
including 597.0 597.8 0.8 10.6
OSK-W-17-1168 544.0 546.6 2.6 3.99 VNCR Caribou
including 546.0 546.6 0.6 15.4
OSK-W-17-1179 742.8 745.5 2.7 4.56 New Underdog
including 742.8 743.7 0.9 11.6
OSK-W-17-1186 228.0 237.0 9.0 5.38 Caribou Caribou
including 229.1 229.6 0.5 28.4
including 236.0 237.0 1.0 23.6
863.0 866.0 3.0 15.7 FW3U Underdog
including 863.0 864.6 1.6 27.5
OSK-W-17-1188 147.5 149.9 2.4 3.09 27 Zone 27
including 148.9 149.9 1.0 6.97
167.8 169.8 2.0 3.28 27 infill Zone 27
OSK-W-17-1196 155.5 158.0 2.5 3.26 27 infill Zone 27
OSK-W-17-1209 236.4 239.2 2.8 4.68 FW4 Underdog
including 236.4 237.1 0.7 17.2
OSK-W-17-1212 215.0 217.0 2.0 6.87 Mallard Mallard
including 216.0 217.0 1.0 13.2
OSK-W-17-1220 197.7 202.0 4.3 4.63 27 infill Zone 27
OSK-W-17-1221 707.4 709.4 2.0 7.28 Caribou 1 Caribou
including 707.4 708.0 0.6 23.7
715.8 719.7 3.9 3.45 Caribou 1 Caribou
OSK-W-17-1224 70.3 73.1 2.8 15.7 Mallard 2 Mallard
including 72.7 73.1 0.4 44.2
OSK-W-17-1226 743.4 746.2 2.8 3.43 Caribou Extn Caribou
including 743.4 744.0 0.6 8.96
765.0 767.0 2.0 3.78 Caribou Extn Caribou
including 765.0 765.6 0.6 11.6
852.7 855.0 2.3 3.42 CN2 Caribou
OSK-W-17-1227 419.9 422.0 2.1 4.37 Vein Caribou
including 420.4 421.1 0.7 12.9
619.0 621.0 2.0 3.62 New TDB
OSK-W-17-1228 50.7 53.0 2.3 7.59 Vein Underdog
OSK-W-17-1232 149.0 151.5 2.5 5.50 27 infill Zone 27
183.0 186.0 3.0 3.99 27 infill Zone 27
OSK-W-17-1243 99.6 101.6 2.0 5.23 27 infill Zone 27
including 101.0 101.6 0.6 13.6
OSK-W-17-1246 34.5 39.9 5.4 5.62 27 HW infill Zone 27
OSK-W-17-1252 18.5 21.0 2.5 3.55 Mallard Mallard
including 19.3 20.3 1.0 8.74
OSK-W-17-1253 43.0 47.3 4.3 4.88 27 Z27
56.0 59.0 3.0 3.68 27 Z27

Notes:

  1. True widths are estimated at 65 - 80% of the reported core length interval. See "Quality Control" below.
  2. Definitions: FW = Foot Wall, HW = Hanging Wall, VNCR = Crustiform vein
Hole Number Azimuth
(o)
Dip
(o)
Length
(m)
UTM E UTM N Section
OSK-W-17-885-W2 334 -69 1229 452861 5434494 2850
OSK-W-17-935 327 -51 474 452025 5434827 2275
OSK-W-17-1013 333 -48 24 452246 5434866 2475
OSK-W-17-1025 330 -58 990 452486 5434439 2475
OSK-W-17-1026 129 -45 147 452119 5434787 2325
OSK-W-17-1028 326 -59 807 452860 5434814 3000
OSK-W-17-1042 146 -52 156 452119 5434786 2325
OSK-W-17-1050 148 -49 106 452053 5434749 2250
OSK-W-17-1065 334 -56 330 452290 5434903 2550
OSK-W-17-1066 332 -56 639 452488 5434436 2475
OSK-W-17-1095 147 -50 147 451959 5434734 2175
OSK-W-17-1105 328 -71 834 452920 5434843 3050
OSK-W-17-1125 331 -58 975 452563 5434568 2625
OSK-W-17-1125-W3 331 -58 1086 452563 5434568 2625
OSK-W-17-1139 333 -56 1092 452473 5434470 2500
OSK-W-17-1140 336 -55 975 453006 5434522 2975
OSK-W-17-1141 236 -65 252 452143 5434747 2325
OSK-W-17-1142 324 -45 275 452202 5434628 2325
OSK-W-17-1147-W1 335 -52 1212 453241 5434381 3125
OSK-W-17-1152 330 -53 885 451738 5434293 1750
OSK-W-17-1155 332 -71 477 452451 5435008 2725
OSK-W-17-1158 331 -59 696 453046 5434871 3175
OSK-W-17-1168 329 -57 717 453464 5435090 3650
OSK-W-17-1179 332 -57 777 451560 5434376 1650
OSK-W-17-1186 331 -54 984 452419 5434554 2475
OSK-W-17-1188 318 -57 201 452067 5434618 2200
OSK-W-17-1196 310 -59 210 452066 5434618 2200
OSK-W-17-1209 331 -60 429 451456 5434453 1600
OSK-W-17-1212 330 -62 324 452303 5434914 2550
OSK-W-17-1218 327 -62 405 453004 5435009 3225
OSK-W-17-1220 141 -47 303 452025 5434811 2275
OSK-W-17-1221 335 -51 1079 453082 5434544 3050
OSK-W-17-1224 333 -70 402 452304 5434914 2550
OSK-W-17-1226 331 -51 934 453371 5434726 3400
OSK-W-17-1227 329 -50 1164 453290 5434532 3225
OSK-W-17-1228 328 -59 657 451443 5434484 1600
OSK-W-17-1232 154 -47 351 452025 5434834 2275
OSK-W-17-1243 146 -49 189 452060 5434781 2275
OSK-W-17-1246 324 -50 191 452082 5434636 2225
OSK-W-17-1252 324 -46 231 452132 5434944 2400
OSK-W-17-1253 337 -52 186 452081 5434634 2225

OSK-W-17-885-W2 intersected FW0 FW within the Underdog Corridor returning 10.8 g/t Au over 2.0 metres. The interval is composed of trace pyrite stringers and 10% centimetre scale quartz veins hosted in a chloritized felsic intrusive dike.

OSK-W-17-935 intersected 3.34 g/t Au over 2.8 metres related to Mallard HW, within the Mallard Corridor. Mineralization is composed of trace disseminated pyrite and stringers hosted in a silicified and sericitized rhyolite.

OSK-W-17-1013 infilled Zone 27 with 4.56 g/t Au over 2.8 metres. Mineralization is composed of up to 6% pyrite stringers and 16% semi-massive pyrite with tourmaline in pervasive silica flooding zone hosted is a sericitized rhyolite.

OSK-W-17-1025 intersected 4.17 g/t Au over 2.0 metres. The interval is composed of trace pyrite dissemination and clusters in a silicified gabbro. This intersection does not correlate to a known zone.

OSK-W-17-1026 intersected Zone 27 returning 4.93 g/t Au over 2.3 metres and 4.38 g/t Au over 3.2 metres. Mineralization is composed of trace clustered and disseminated pyrite in a silicified and sericitized felsic intrusive.

OSK-W-17-1028 intersected 6.77 g/t Au over 2.0 metres. Mineralization consists of traces of disseminated pyrite and chalcopyrite in a chloritized andesite with 10% quartz-carbonate veins. This intersection does not correlate to a known zone.

OSK-W-17-1042 intersected 3.53 g/t Au over 2.3 metres in Zone 27. Mineralization is composed of 2% pyrite stringers, 1% disseminated pyrite, and a decimetre scale quartz vein within a sericitized, chloritized and slightly silicified felsic dyke.

OSK-W-17-1050 infilled Zone 27 with 11.2 g/t Au over 2.0 metres. Mineralization consists of trace disseminated and stringer pyrite in a sericitized rhyolite.

OSK-W-17-1065 intersected 3.28 g/t Au over 2.3 metres related to Mallard 2. The interval occurs in a faulted zone with silica and sericite alteration and traces of pyrite-tourmaline stringer, trace disseminated pyrite and 13% tourmaline-quartz centimetre scale veins.

OSK-W-17-1066 intersected 4.21 g/t Au over 2.0 metres within the Caribou Corridor. Mineralization is composed of 3% disseminated pyrite and 1% quartz vein with pyrite hosted in a chloritized and slightly sericitized andesite.

OSK-W-17-1095 intersected 4.09 g/t Au over 3.0 metres related to Zone 27. Mineralization is composed of 2% - 3% tourmaline-pyrite veins hosted in a partially bleached, slightly sericitized and silicified andesite.

OSK-W-17-1105 intersected two intervals: 3.42 g/t Au over 2.0 metres and 4.49 g/t Au over 2.0 metres. The first interval is a new zone within an area between Caribou and the Lynx zones, geometry is to be determined. Mineralization is composed of 2% pyrite stringers in strongly chloritized and sericitized andesite. The second interval is related to Zone 27. Mineralization is composed of 1% pyrite stringers and 3% pyrite in association with crustiform veins, hosted in a felsic porphyry dike with sericite, silica and carbonate alteration.

OSK-W-17-1125 intersected 10.2 g/t Au over 5.4 metres related to FW2 in the Underdog Corridor. Mineralization is composed of 10% pyrite stringers hosted in a bleached andesite with one centimetre scale tourmaline-pyrite veinlets.

OSK-W-17-1125-W3 intersected 26.0 g/t Au over 2.2 metres related to Wolf HW in the Caribou Corridor. Mineralization is composed of 10% pyrite stringers hosted in a sericitized, chloritized and slightly silicified andesite.

OSK-W-17-1139 intersected 4.87 g/t Au over 3.4 metres related to CN1 FW in the Caribou Corridor. The interval consists of 2% pyrite stringers, 10% centimeter scale quartz veins in an andesite with strong chlorite and carbonate alteration and slight sericitization.

OSK-W-17-1140 intersected 3.56 g/t Au over 4.7 metres related to Zone 27. Mineralization is composed up 10% pyrite stringers in a sericitized felsic porphyric dike.

OSK-W-17-1141 infilled Zone 27 intersecting 30.0 g/t Au over 2.4 metres and 8.04 g/t Au over 2.3 metres. Mineralization includes up to 8% pyrite, 5% tourmaline-pyrite stringers and 3% pyrite clusters hosted in a sericitized rhyolite with intense pervasive silica flooding.

OSK-W-17-1142 intersected 3.07 g/t Au over 2.0 metres related to Zone 27 HW. Mineralization is composed of 14% pyrite stringers over 10 centimetres with pervasive silica flooding hosted in a rhyolite.

OSK-W-17-1147-W1 intersected 3.36 g/t Au over 2.4 metres and 3.94 g/t Au over 2.0 metres. The first interval is composed of 1% disseminated pyrite, trace pyrite clusters in a sericitized and lightly silicified rhyolite. This intersection is not related to any known zone. The second interval is composed of 3% pyrite stringers and semi massive sulfides over 60 cm hosted in a felsic dike with pervasive silica flooding, within the Caribou Corridor.

OSK-W-17-1152 intersected 5.67g/t Au over 2.0 metres related to FW1 in Underdog Corridor. Mineralization is composed of up 20% pyrite stringers, and 2% disseminated sphalerite in a sericitized and strongly silicified andesite.

OSK-W-17-1155 intersected 3.64 g/t au over 2.7 metres related to the Mallard Corridor. Mineralization is composed of traces of pyrite and chalcopyrite in a crustiform vein hosted in an andesite with chlorite, sericite and carbonates alteration.

OSK-W-17-1158 intersected 4.12 g/t Au over 2.4 metres related to Zone 27. The interval is composed of 10% pyrite stringers and traces of tourmaline-pyrite veins and a centime scale quartz-tourmaline vein hosted in a sericitized and bleached andesite.

OSK-W-17-1168 intersected 3.99 g/t Au over 2.6 metres in the Caribou Corridor. Mineralization is related to a crustiform vein with 1% pyrite stringers in a silicified gabbro with fuchsite.

OSK-W-17-1179 intersected 4.56 g/t Au over 2.7 metres related to the Underdog Corridor. Mineralization is composed of 5% pyrite with pervasive silica flooding in a sericitized felsic porphyric dike. It is a new zone located in western part of Underdog Corridor.

OSK-W-17-1186 intersected 5.38 g/t Au over 9.0 metres related to Caribou and 15.7 g/t Au over 3.0 metres related to FW3U in the Underdog Corridor. The first interval is composed of 10% pyrite stringers in an altered felsic porphyry dike with intense pervasive silica flooding. The second interval is composed of 5% pyrite in pervasive silica flooding, 4% pyrite cluster and stringer, and 2% pyrite in carbonates veining hosted in a felsic porphyric dike.

OSK-W-17-1188 intersected 3.09 g/t Au over 2.4 metres and 3.28 g/t Au over 2.0 metres in the Zone 27 Corridor. The first interval is composed of traces of pyrite-tourmaline stringers in a sericitized felsic porphyric dike. The second interval, Zone 27 infill, is composed of up to 5% tourmaline stringers and traces of disseminated pyrite in a pervasive silica flooding zone hosted in a sericitized rhyolite and felsic porphyric dike.

OSK-W-17-1196 infilled Zone 27 intersecting 3.26 g/t Au over 2.5 metres. The interval is at the sericitized contact between gabbro and rhyolite injected by low core angle crustiform veins. Mineralization is composed of 10% pyrite stringers, 4% disseminated pyrite or in clusters, and minor quartz veining.

OSK-W-17-1209 intersected 4.68 g/t Au over 2.8 metres related to FW4 in the Underdog Corridor. Mineralization is composed of massive pyrite (up 80%) over 70 cm in an altered zone with intense pervasive flooding hosted in a sericitized felsic porphyric dike.

OSK-W-17-1212 intersected Mallard returning 6.87 g/t au over 2.0 metres. Mineralization consists of 3% pyrite-tourmaline stringers, 1% pyrite stringers and 1% pyrite clusters in a strongly sericitized andesite.

OSK-W-17-1220 infilled Zone 27 intersecting 4.63 g/t Au over 4.3 metres. Mineralization is composed of 3% disseminated pyrite, 2% pyrite stringers, in a sericitized and bleached felsic porphyric dike.

OSK-W-17-1221 intersected 7.28 g/t Au over 2.0 metres and 3.45 g/t au over 3.9 metres related to Caribou 1. Mineralization is composed of up 10% pyrite stringers (fracture controlled) and clusters in a sericitized, chloritized and slightly silicified andesite.

OSK-W-17-1224 intersected 15.7 g/t Au over 2.8 metres related to Mallard 2. Mineralization is in a sericitized and silicified felsic porphyric dike at contact with andesite, including a ptygmatic tourmaline-quartz vein with 5% pyrite over 0.4 metre and semi-massive pyrite (40%) over 1.8 metres related to a pervasive silica flooding zone.

OSK-W-17-1226 intersected three intervals within Caribou Corridor; 3.43 g/t Au over 2.8 metres, 3.78 g/t Au over 2.0 metres and 3.42 g/t au over 2.3 metres. The first interval is a new zone at a sericitized and silicified contact between rhyolite and felsic intrusive composed of 35% pyrite-tourmaline stringers and 1% sphalerite-pyrite stringers. The second and third intervals correspond with up to 3% disseminated pyrite and pyrite stringers in a sericitized and chloritized andesite.

OSK-W-17-1227 intersected 4.37 g/t Au over 2.1 metres and 3.62 g/t Au over 2.0 metres. The first interval corresponds with 1% pyrite stringers and 4% pyrite-quartz-carbonate veins in a sheared and sericitized andesite. The second interval, can be related to the Main zone north-east extension (or south-west extension of Lynx), geometry remains to be determined. Mineralization is composed of 6% pyrite, traces of chalcopyrite and sphalerite in association with silica flooding and quartz-tourmaline veins hosted in a small quartz porphyry dike.

OSK-W-17-1228 intersected 7.59 g/t Au over 2.3 metres in the Underdog Corridor. Mineralization is composed of 2% pyrite in quartz-carbonates veins, trace pyrite stingers and metre scale quartz-carbonate veins hosted in a sericitized and strongly silicified rhyolite.

OSK-W-17-1232 infilled Zone 27 intersecting 5.50 g/t Au over 2.5 metres and 3.99 g/t Au over 3.0 metres. Mineralization is composed of up to 2% disseminated pyrite, 5% pyrite stringers and 2% tourmaline-pyrite veins in a strongly sericitized and bleached andesite. The second interval corresponds with 7% pyrite stringers in a sericitized felsic porphyric dike.

OSK-W-17-1243 infilled Zone 27 returning 5.23 g/t Au over 2.0 metres. Mineralization is composed of up to 7% pyrite stringers in a strongly sericitized to lightly silicified felsic porphyric dike.

OSK-W-17-1246 intersected Z27 HW with 5.62 g/t Au over 5.4 metres. Mineralization is composed of 3% irregular pyrite stringers, 2% disseminated pyrite in a strongly sericitized and chloritized felsic porphyry dike.

OSK-W-17-1252 intersected 3.55 g/t Au over 2.5 metres related to Mallard. Mineralization is composed of 25% pyrite stringers with locally clustered pyrite in a pervasive silica flooding zone hosted in a sericitized and silicified rhyolite.

OSK-W-17-1253 infilled Zone 27 with 4.88 g/t Au over 4.3 metres and 3.68 g/t au over 3.0 metres. Mineralization consists in up to 4% pyrite stringers and 5% pyrite clusters in a sericitized felsic dike.

Qualified Person

The scientific and technical content of this news release has been reviewed, prepared and approved by Mr. Louis Grenier, M.Sc.A., P.Geo. (OGQ 800), Project Manager of the Windfall Lake gold project, who is a "Qualified Person" as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").

Quality Control and Reporting Protocols

True widths determinations are estimated at 65-80% of the reported core length intervals for most of the zones. Assays are uncut except where indicated. Intercepts occur within geological confines of major zones but have not been correlated to individual vein domains at this time. Reported intervals include minimum weighted averages of 3.0 g/t Au diluted over core lengths of at least 2.0 metres. All NQ core assays reported were obtained by either 1-kilogram screen fire assay or standard 50-gram fire-assaying-AA finish or gravimetric finish at ALS Laboratories in Val d'Or, Québec, Thunder Bay and Sudbury, Ontario or Vancouver, British Colombia or Bureau Veritas in Timmins, Ontario. The 1-kilogram screen assay method is selected by the geologist when samples contain coarse gold or present a higher percentage of pyrite than surrounding intervals. Selected samples are also analyzed for multi-elements, including silver, using an Aqua Regia-ICP-AES method at ALS Laboratories. Drill program design, Quality Assurance/Quality Control ("QA/QC") and interpretation of results is performed by qualified persons employing a QA/QC program consistent with NI 43-101 and industry best practices. Standards and blanks are included with every 20 samples for QA/QC purposes by the Corporation as well as the lab. Approximately 5% of sample pulps are sent to secondary laboratories for check assay.

About the Windfall Lake Gold Deposit

The Windfall Lake gold deposit is located between Val-d'Or and Chibougamau in the Abitibi region of Québec, Canada. The mineral resource defined by the previous operator comprises 2,762,000 tonnes at 8.42 g/t Au (748.000 ounces) in the indicated category and 3,512,000 tonnes at 7.62 g/t Au (860,000 ounces) in the inferred category (sourced from a technical report dated June 10, 2015 entitled "Preliminary Economic Assessment of the Windfall Lake Gold Property, Québec, Canada" with an effective date of April 28, 2015, prepared in accordance with NI 43-101). The Windfall Lake gold deposit is currently one of the highest grade resource-stage gold projects in Canada. The bulk of the mineralization occurs in the Main Zone, a southwest/northeast trending zone of stacked mineralized lenses, measuring approximately 600 metres wide and at least 1.400 metres long. The deposit is well defined from surface to a depth of 500 metres, and remains open along strike and at depth. Mineralization has been identified only 30 metres from surface in some areas and as deep as 870 metres in others, with significant potential to extend mineralization up and down-plunge and at depth.

About Osisko Mining Inc.

Osisko is a mineral exploration company focused on the acquisition, exploration, and development of precious metal resource properties in Canada. Osisko holds a 100% in the high-grade Windfall Lake gold deposit located between Val-d'Or and Chibougamau in Québec and holds a 100% undivided interest in a large area of claims in the surrounding Urban Barry area and nearby Quevillon area (over 3,300 square kilometres), a 100% interest in the Marban project located in the heart of Québec's prolific Abitibi gold mining district, and properties in the Larder Lake Mining Division in northeast Ontario, including the Jonpol and Garrcon deposits on the Garrison property, the Buffonta past producing mine and the Gold Pike mine property. The Corporation also holds interests and options in a number of additional properties in northern Quebec and Ontario. Osisko continues to be well financed with approximately $220 million in cash and investments.

Cautionary Note Regarding Forward-Looking Information

This news release contains "forward-looking information" within the meaning of the applicable Canadian securities legislation that is based on expectations, estimates, projections and interpretations as at the date of this news release. The information in this news release about the Windfall Lake gold deposit being one of the highest grade resource-stage gold projects in Canada; the current 800,000 metre drill program; the significance of new results from the ongoing drill program at the Windfall Lake gold project; the significance of assay results presented in this press release; the type of drilling included in the drill program (definition drilling, expansion drilling to the NE of the main deposit and adjacent Lynx deposit, and exploration drilling on the greater deposit and Urban-Barry project area); potential mineralization; the potential to extend mineralization up and down-plunge and at depth at the Windfall Lake gold deposit; the ability to realize upon any mineralization in a manner that is economic; the ability to complete any proposed exploration activities and the results of such activities, including the continuity or extension of any mineralization; and any other information herein that is not a historical fact may be "forward-looking information". Any statement that involves discussions with respect to predictions, expectations, interpretations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "interpreted", "management's view", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking information and are intended to identify forward-looking information. This forward-looking information is based on reasonable assumptions and estimates of management of the Corporation at the time it was made. This involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Osisko to be materially different from any future results, performance or achievements expressed or implied by such forward-looking information.
Such factors include, among others, risks relating to the ability of exploration activities (including drill results) to accurately predict mineralization; errors in management's geological modelling; the ability of Osisko to complete further exploration activities, including drilling; property interests in the Windfall Lake gold project; the ability of the Corporation to obtain required approvals and complete transactions on terms announced; the results of exploration activities; risks relating to mining activities; the global economic climate; metal prices; dilution; environmental risks; and community and non-governmental actions. Although the forward-looking information contained in this news release is based upon what management believes, or believed at the time, to be reasonable assumptions. Osisko cannot assure shareholders and prospective purchasers of securities of the Corporation that actual results will be consistent with such forward-looking information, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither Osisko nor any other person assumes responsibility for the accuracy and completeness of any such forward-looking information, Osisko does not undertake, and assumes no obligation, to update or revise any such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except as may be required by law.

Read the rest of the article at https:
Data and Statistics for these countries : Canada | Colombia | Georgia | All
Gold and Silver Prices for these countries : Canada | Colombia | Georgia | All

Osisko Mining Corp.

PRODUCER
CODE : OSK.TO
ISIN : CA6882781009
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Osisko Mining is a gold producing company based in Canada.

Osisko Mining holds various exploration projects in Argentina, in Brazil and in Canada.

Its main asset in production is MALARTIC in Canada and its main exploration properties are GOLDBORO, SLEITAT, JC - SMART SKARNS, HAMMOND REEF, MALARTIC CHL GOLD PROPERTY, DUPARQUET and CLEMENT LAKE in Canada, EL POTOSI and SANTA CLARA / CERRO BONITO in El Salvador, CERRO CONDORINI and COAL CREEK in Peru, CASTELO DOS SONHOS in Brazil and FAMATINA in Argentina.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Osisko Mining Corp.
12/20/2018Osisko Mining reports 39% higher grade than resource model a...
Annual reports of Osisko Mining Corp.
2008 Annual report
Financings of Osisko Mining Corp.
8/31/2011Osisko Announces an Increase in Caterpillar Lease Financing ...
8/31/2011Announces an Increase in Caterpillar Lease Financing Facilit...
11/18/2009Strengthens Balance Sheet With $241 M Proceeds From Exercise...
6/30/2009Closes $10.64 Million Flow-Through Financing
4/17/2006Announces C10$ million "bought deal" financing
Nominations of Osisko Mining Corp.
5/10/2013Anounces Election of Directors
4/17/2012Nominates Michele Darling to Board of Directors
3/14/2012Appoints Gary Sugar to Board of Directors
2/2/2012Board Member Resigns
9/16/2011Osisko Appoints Richard Ross to Board of Directors
9/15/2011Appoints Richard Ross to Board of Directors
8/22/2011Director Resigns
Financials of Osisko Mining Corp.
2/14/2014Provides Notice of Fourth Quarter and Year End 2013 Results ...
8/1/2013Reports Second Quarter 2013 Results
7/15/2013Provides Notice of Second Quarter 2013 Operating and Financi...
5/9/2013Reports First Quarter 2013 Results
4/29/2013Provides Notice of First Quarter 2013 Financial Results Rele...
2/21/2013Reports Fourth Quarter and Year-End 2012 Results
11/13/2012Reports Third Quarter 2012 Results
7/5/2012Produces 92,003 Ounces Au in Second Quarter
5/9/2012Provides Notice of First Quarter 2012 Financial Results Rele...
2/27/2012Q4 2011 Net Profit of $37.8 Million
1/16/2012Provides Notice of Fourth Quarter and Year-End 2011 Financia...
8/11/2011Releases Second Quarter 2011 Results
5/16/2011Osisko Releases First Quarter 2011 Results
5/14/2011Osisko Releases First Quarter 2011 Results
2/28/2011Releases Year-End Financial Results and Review of 2010
11/6/2009Releases Third Quarter 2009 Results
8/11/2009Releases Second Quarter 2009 Results
Project news of Osisko Mining Corp.
7/26/2017OSK Osisko Mining drills 2.7 m of 57 g/t Au at Windfall
2/21/2014Intersects 2.26 g/t Gold Over 128 Metres at Kirkland Lake
2/7/2014(Malartic)Commences 2014 Canadian Malartic Exploration Program
2/6/2014(Malartic)Reports Record January Production at Canadian Malartic
12/4/2013Intersects 61.6 Metres Averaging 1.44 g/t Au at Bidgood
11/21/2013(Malartic)Canadian Malartic Mine Produces Millionth Ounce
10/23/2013GLOBAL'S NEVADA PROJECTS ATTRACT STRONG THIRD PARTY INTEREST...
7/10/2013(Malartic)Deposits Study Reporting Local and Regional Economic Impact ...
1/30/2013Intersects 5.5 g/t Au Over 54.0 Metres at Upper Beaver
12/10/2012(Malartic)Reports November Production From Canadian Malartic
11/12/2012Announces Friendly Acquisition of Queenston
10/11/2012(Malartic)Canadian Malartic Mine Produces Half Millionth Ounce
10/10/2012(Malartic)Reports Record Quarterly Production from Canadian Malartic
9/6/2012(Malartic)Reports Record Monthly Production from Canadian Malartic
7/26/2012Acquires Common Shares of Bowmore Exploration Ltd=2E
5/17/2012(Malartic)Canadian Malartic Mill Returns to Operation
5/10/2012(Malartic)Reports Fire Damage at Canadian Malartic Mill Limited to Cyc...
1/30/2012(Famatina)s Status of Famatina Exploration Project
12/22/2011and DIOS Discover New Gold Showings on the AU33 WEST Project
11/28/2011TSX.V Company Adjacent to Osisko Property - 3 Minute Video
9/29/2011(Goldboro)Orex to Pursue Exploration Work on Goldboro Gold Project
9/8/2011(Malartic)Intersects 1.23 g/t Au Over 172 Metres at Barnat Extension
8/31/2011Osisko and EMSE Sign Agreement for Development of Famatina P...
8/31/2011(Famatina)and EMSE Sign Agreement for Development of Famatina Project ...
8/11/2011(Goldboro)Goldboro Gold Project Drill Assay Results Identify Extension...
8/5/2011Osisko Buys Back a 1% Royalty Interest on Canadian Malartic ...
8/5/2011(Malartic)Buys Back a 1% Royalty Interest on Canadian Malartic Propert...
6/21/2011Osisko Declares Commercial Production at Canadian Malartic
6/21/2011(Malartic)Declares Commercial Production at Canadian Malartic
6/17/2011Osisko Submits Notice of Termination in Duparquet Project
6/17/2011(Duparquet)Submits Notice of Termination in Duparquet Project
6/14/2011(Malartic)Intersects 1.50 g/t Au Over 63.6 Metres at Jeffrey Zone
6/13/2011(Duparquet)et Clifton Star annoncent une estimation de ressources pour ...
6/13/2011(Duparquet)and Clifton Star Release Resource Estimate for the Beattie D...
6/1/2011(Malartic)Officially Inaugurates the Canadian Malartic Mine
6/1/2011Osisko Officially Inaugurates the Canadian Malartic Mine
5/2/2011(Malartic)Announces Revised Mine Production Plan at Canadian Malartic
4/21/2011(Goldboro)Orex Exploration Inc.: Drilling Campaign Has Begun at Goldbo...
4/20/2011Osisko Mining Corporation - Drilling campaign has begun at G...
4/20/2011Osisko Mining Corporation - Drilling campaign has begun at G...
4/13/2011(Malartic)Pours First Gold at Canadian Malartic Mine
3/31/2011(Malartic)Increases Gold Reserve at Canadian Malartic to 10=2E7 Millio...
3/29/2011(Malartic)Exercises Buy Out Option in Canadian Malartic Net Smelter Ro...
2/28/2011(Malartic) Découverte de minéralisation de type Canadian Malartic
2/24/2011(Hammond Reef)Reports 124 Metres Averaging 0.73 g/t Au in Southeast Extens...
1/29/2011(Malartic)Osisko Reports Significant New Intersections at Barnat Exten...
1/25/2011(Malartic)Reports Significant New Intersections at Barnat Extension, I...
12/21/2009(Malartic)Provides Update on Construction and Development Progress at ...
12/14/2009(Malartic)Releases New Resource Estimate for Canadian Malartic Project
10/20/2009(Malartic) Intersects New Gold Mineralization on the Malartic CHL Prop...
9/14/2009(Malartic)Intersects 1.20 g/t Au Over 86.9 Metres at Jeffrey Zone
9/1/2009(Malartic)Osisko Mining Corporation: Construction Activities at Canadi...
8/20/2009(Malartic)Quebec Government Authorizes Construction of Osisko's Canadi...
2/26/2009(Malartic) Preliminary Metallurgical Results on Barnat
1/26/2009(Malartic)Announces Inferred Resource Estimate for South Barnat Deposi...
12/3/2008(Malartic) Intersects 102 Metres Averaging 3.21 g/t Au at South Barnat
Corporate news of Osisko Mining Corp.
2/13/2014Mails Letter to Shareholders Regarding Inadequate Goldcorp O...
2/5/2014Provides Corporate Update
1/29/2014Commences Legal Proceeding to Restrain Misuse of Confidentia...
1/29/2014Announces Filing and Mailing of Directors' Circular and Reco...
1/20/2014Reports Preliminary Fourth Quarter 2013 Production
1/15/2014Responds to Unsolicited Proposal From Goldcorp Inc=2E
1/13/2014Responds to Announcement by Goldcorp
12/16/2013Completes Long-Term Debt Renegotiation
10/24/2013Provides Notice of Third Quarter 2013 Operating and Financia...
7/30/2013Enhances Financial Flexibility by Improving Long-Term Debt T...
7/5/2013Intercepts 68 Metres Averaging 1=2E26 =?ISO-8859-1?Q?=20g/t=...
7/2/2013Receives Final $30 Million Payment from Kirkland Lake Gold
4/29/2013Corporate Update
4/17/2013Comments on Trading Activities
4/9/2013(Malartic)Previews Q1 2013 Canadian Malartic Operating Results
3/21/2013Discovers Two New Gold-Copper Zones at Upper Beaver
2/19/2013(Malartic)Receives Modified Operating Parameters at Canadian Malartic
2/19/2013(Malartic)s Reserves at Canadian Malartic
2/11/2013Denis Cimon Receives the 2013 Mineral Processor of the Year
1/29/2013(Hammond Reef)Provides Resource Update for Hammond Reef Project
1/24/2013(Malartic)Previews Q4 2012 Canadian Malartic Operating Results and 201...
11/12/2012(Malartic)Reports Record Monthly Throughput at Canadian Malartic
10/15/2012Founder Retires
10/9/2012Acquires Ground in Emerging Gold Belt in Mexico and Identifi...
10/3/2012Deposits the Second Tranche of itsFinancial Guarantee Coveri...
8/3/2012Secondary Crusher Installation Completed
7/24/2012Acquisition of Subscription Receipts of Druk Capital Partner...
5/16/2012Enhances Credit Agreement With CPPIB
5/14/2012(Malartic)Provides Update on Canadian Malartic
5/10/2012(Malartic)Reports Fire at Canadian Malartic Milling Plant
4/3/2012and Metis Nation of Ontario Sign Memorandum of Understanding
3/12/2012Brings First Half of Secondary Crusher Online
3/1/2012Announces Record Date for Annual Meeting
2/16/2012Canadian gold producer Osisko Mining Corporation joins Globa...
1/12/2012(Malartic)Previews Q4 2011 Canadian Malartic Operating Results
1/3/2012Responds to Below Market Price Offer for 5 Million Shares On...
12/14/2011Osisko Comments on Trading of Common Shares
12/14/2011Comments on Trading of Common Shares
10/8/2011President Sean Roosen Named Ernst & Young 2011 Quebec Entrep...
6/17/2011(Duparquet)met fin =E0 sa participation au projet Duparquet
6/13/2011Osisko and Clifton Star Release Resource Estimate for the Be...
5/14/2011Osisko publie ses r=E9sultats du premier trismestre de 2011
5/12/2011Annual and Special Meeting of Shareholders of Osisko Mining ...
4/29/2011Osisko Announces Revised Mine Production Plan at Canadian Ma...
3/29/2011Osisko Exercises Buy Out Option in Canadian Malartic Net Sme...
2/9/2011Goldcorp Sells Osisko Investment
12/22/2009Donates Shares to McGill University
12/11/2009and Clifton Star Complete Joint Venture Agreement on Duparqu...
11/13/2009Options Goldboro Gold Property From Orex Exploration
9/28/2009 Signs Option Agreement With Claim Post Resources for the Mo...
9/24/2009 Enters Into Financing Agreement With CPPIB Credit Investmen...
8/11/2009Signs Option Agreement With Midland Exploration for the Dunn...
7/10/2009Report on Osisko's Canadian Malartic Bape Hearings is Made P...
7/3/2009Osisko Mining Corporation Completes Strategic Investment
6/18/2009Comments on Trading of Common Shares
5/21/2009Discovers New Mineralized Zone Adjacent to South Barnat
5/19/2009Makes Strategic Investment
1/13/2009 Extends South Barnat to 1200 Metres Length
12/4/2008 Recognized for Strong Sustainability Performance
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (OSK.TO)FRANKFURT (EWX.F)
3.10+1.97%2.43-1.62%
TORONTO
CA$ 3.10
04/25 16:59 0.060
1.97%
Prev close Open
3.04 3.04
Low High
3.02 3.14
Year l/h YTD var.
2.42 -  3.21 12.32%
52 week l/h 52 week var.
2.36 -  3.87 -19.48%
Volume 1 month var.
653,155 17.87%
Produces Gold
Develops
Explores for Gold - Lead - Silver - Tin - Tungsten - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202413.55%
2023-22.00%4.532.64
2022-6.17%5.022.36
20210.81%3.972.33
2020-4.88%4.851.67
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :