Osisko Mining Corp.

Published : February 27th, 2018

Osisko Intersects 71.9 g/t Au Over 2.9 Metres at Lynx

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Osisko Intersects 71.9 g/t Au Over 2.9 Metres at Lynx

TORONTO, ONTARIO--(Marketwired - Feb 27, 2018) - Osisko Mining Inc. (OSK:TSX) ("Osisko" or the "Corporation") is pleased to provide new results from the ongoing drill program at its 100% owned Windfall Lake gold project located in the Abitibi greenstone belt, Urban ownship, Eeyou Istchee James Bay, Québec. The 800,000 metre drill program combines definition, expansion and exploration drilling in and around the main Windfall gold deposit and the adjacent Lynx deposit (located immediately NE of Windfall).

Significant new analytical results from 31 intercepts in 22 drill holes and 3 wedges focused on infill and expansion drilling in the Lynx deposit are presented below. Osisko continues to extend the known Lynx zones of mineralization through the application of the Windfall geological model and as the density of drilling increases.

Highlights from the new results include: 71.9 g/t Au over 2.9 metres OSK-W-17-941; 76.4 g/t Au over 2.4 metres and 52.5 g/t Au over 2.1 metres in OSK-W-17-1367-W1, 52.3 g/t Au over 2.1 metres in OSK-W-17-967, 40.6 g/t Au over 2.3 metres in OSK-W-17-1413; 48.0 g/t Au over 2.0 metres in OSK-W-18-1422 and 10.1 g/t Au over 6.5 metres in OSK-W-18-1415. Maps showing hole locations and full analytical results are available at www.osiskomining.com.

Hole Number From
(m)
To
(m)
Interval
(m)
Au (g/t)
uncut
Au (g/t)
cut to
100 g/t
Zone Corridor
OSK-W-17-898 375.5 380.7 5.2 3.75 Lynx 3 Lynx
including 375.5 376.2 0.7 10.8
including 380.2 380.7 0.5 16.4
OSK-W-17-907 893.0 895.0 2.0 5.71 Lynx 4 Lynx
including 894.0 895.0 1.0 10.3
OSK-W-17-941 231.0 233.9 2.9 71.9 25.9 Lynx 2 Lynx
including 231.85 232.15 0.3 545 100
OSK-W-17-967 240.9 243.0 2.1 52.3 47.7 VNCR Lynx
including 242.0 243.0 1.0 109 100
OSK-W-17-1099 108.0 110.1 2.1 3.04 Lynx 2 Lynx
including 109.8 110.1 0.3 14.5
OSK-W-17-1104 560.0 562.0 2.0 4.30 Lynx HW Lynx
including 560.5 561.3 0.8 10.4
591.8 594.0 2.2 4.06 Lynx HW Lynx
including 591.8 592.3 0.5 17.8
OSK-W-17-1113 363.4 366.0 2.6 3.33 Vein Lynx
including 365.6 366.0 0.4 19.5
OSK-W-17-1115 693.0 695.0 2.0 11.7 Vein Lynx
OSK-W-17-1147 712.8 716.5 3.7 3.29 Lynx 4 Lynx
including 712.8 713.1 0.3 24.4
OSK-W-17-1177 575.0 577.0 2.0 3.21 Lynx 1 Lynx
OSK-W-17-1181-W3 1113.7 1116.4 2.7 6.11 Lynx 4 Lynx
OSK-W-17-1187 264.0 266.7 2.7 3.43 Lynx 3 Lynx
OSK-W-17-1190 430.0 432.0 2.0 5.91 Lynx 1 Lynx
including 430.6 431.6 1.0 11.6
OSK-W-17-1193 979.0 981.8 2.8 4.48 Lynx 4 Lynx
OSK-W-17-1290 423.0 427.0 4.0 34.5 Vein Lynx
including 425.0 427.0 2.0 67.5
OSK-W-17-1293 41.5 44.0 2.5 14.4 Lynx 1 Lynx
including 43.0 44.0 1.0 35.4
OSK-W-17-1356 229.6 232.0 2.4 4.14 Lynx 1 Lynx
OSK-W-17-1367-W1 1009.5 1011.6 2.1 52.5 29,2 Lynx 4 Lynx
including 1010.3 1010.9 0.6 182 100
1016.6 1019.0 2.4 76.4 28.3 Lynx 4 Lynx
including 1016.6 1017.1 0.5 331 100
OSK-W-17-1396 897.0 899.8 2.8 6.13 Lynx 4 Lynx
OSK-W-17-1413 296.0 298.3 2.3 40.6 39.4 Lynx 2 Lynx
including 297.4 298.3 0.9 103 100
967.8 970.2 2.4 8.35 Lynx 6 Lynx
including 967.8 968.7 0.9 15.9
OSK-W-18-1414-W1 842.4 846.0 3.6 8.20 Lynx 1 Lynx
including 842.4 843.0 0.6 20.6
including 844.8 845.3 0.5 17.1
855.2 857.9 2.7 26.5 Lynx 1 Lynx
OSK-W-18-1415 457.0 463.5 6.5 10.1 Lynx HW Lynx
including 457.0 457.7 0.7 68.8
OSK-W-18-1418 544.0 546.3 2.3 8.09 Lynx 4 Lynx
including 545.2 545.5 0.3 61.0
551.0 553.2 2.2 4.02 Lynx 4 Lynx
OSK-W-18-1422 386.0 388.0 2.0 48.0 21.8 Lynx HW Lynx
including 386.7 387.1 0.4 231 100
OSK-W-18-1423 107.5 109.6 2.1 7.77 Lynx 1 Lynx
including 108.5 108.9 0.4 38.7
221.2 223.7 2.5 4.65 VNCR Lynx
Notes:
1. True widths are estimated at 65 - 80% of the reported core length interval. See "Quality Control" below.
2. Definitions: HW = Hanging Wall, VNCR = Crustiform Vein
Hole Number Azimuth
(°)
Dip
(°)
Length
(m)
UTM E UTM N Section
OSK-W-17-898 148 -51 555 453330 5435403 3675
OSK-W-17-907 134 -51 1317 453219 5435340 3575
OSK-W-17-941 330 -49 444 453434 5434969 3575
OSK-W-17-967 337 -62 720 453176 5434908 3300
OSK-W-17-1099 335 -56 264 453143 5434935 3300
OSK-W-17-1104 142 -50 1059 453383 5435455 3775
OSK-W-17-1113 138 -50 480 453280 5435347 3625
OSK-W-17-1115 153 -48 816 452796 5435118 3075
OSK-W-17-1147 335 -52 817 453241 5434380 3125
OSK-W-17-1177 340 -67 1422 454113 5435090 4225
OSK-W-17-1181-W3 133 -58 1247 453789 5435793 4275
OSK-W-17-1187 333 -55 477 453441 5435025 3600
OSK-W-17-1190 151 -49 1179 452905 5435152 3200
OSK-W-17-1193 141 -59 1803 453806 5435726 4275
OSK-W-17-1290 130 -52 462 453131 5435356 3500
OSK-W-17-1293 329 -70 828 452904 5434849 3050
OSK-W-17-1356 334 -67 429 453442 5435026 3600
OSK-W-17-1367-W1 131 -52 1161 453753 5435875 4300
OSK-W-17-1396 134 -52 956 453439 5435484 3825
OSK-W-17-1413 137 -53 996 453153 5435214 3450
OSK-W-18-1414-W1 133 -57 1198 453654 5435648 4100
OSK-W-18-1415 139 -49 561 453491 5435453 3850
OSK-W-18-1418 334 -45 1077 453288 5434531 3225
OSK-W-18-1422 140 -45 476 453492 5435452 3850
OSK-W-18-1423 327 -61 792 453025 5434853 3150

OSK-W-17-898 intersected Lynx 3 with 3.75 g/t Au over 5.2 metres. Mineralization is composed of 4% disseminated pyrite and 3% pyrite stringers hosted in quartz-tourmaline and quartz-carbonates veins in a fragmental felsic dike.

OSK-W-17-907 intersected Lynx 4 with 5.71 g/t Au over 2.0 metres. Mineralization is composed of 1% quartz-tourmaline veins with pyrite and 1% pyrite-silica flooding within a strongly sericitized and silicified rhyolite.

OSK-W-17-941 intersected 71.9 g/t Au over 2.9 metres in Lynx 2. Mineralization is composed of local visible gold within a silicified and weakly sericitized fragmental felsic dike.

OSK-W-17-967 intersected crustiform veins returning 52.3 g/t Au over 2.1 metres in the Lynx 2 Mineralization is composed of 1% disseminated pyrite in quartz-carbonate-chlorite veins within a sericitized gabbro.

OSK-W-17-1099 intersected 3.04 g/t Au over 2.1 metres in Lynx 2. Mineralization is composed of up to 2% pyrite clusters, 10% pyrite in pervasive silica flooding and 3% pyrite-tourmaline stringers hosted in a silica altered fragmental felsic dike.

OSK-W-17-1104 intersected 4.30 g/t Au over 2.0 metres and 4.06 g/t Au over 2.2 metres in Lynx HW. Mineralization is composed of up to 3% disseminated and stringer pyrite within a gabbro with sericite and fuchsite alteration.

OSK-W-17-1113 intersected 3.33 g/t Au over 2.6 metres. Mineralization is composed of quartz veins with trace pyrite stringers and 1% pyrite clusters and quartz-carbonate veins in a weakly sericitized rhyolite.

OSK-W-17-1115 intersected 11.7 g/t Au over 2.0 metres related to vein type mineralization. The interval is composed of 5% pyrite-tourmaline stringers and quartz veins within a chloritized andesite.

OSK-W-17-1147 intersected 3.29 g/t Au over 3.7 metres in Lynx 4. Mineralization is composed of 1% pyrite clusters with ptygmatic tourmaline veins within a sericitized rhyolite.

OSK-W-17-1177 intersected Lynx 1 with 3.21 g/t Au over 2.0 metres. Mineralization is composed of 1% pyrite stringers and tourmaline veins at a fuchsite altered contact between a gabbro and a porphyritic felsic dike.

OSK-W-17-1181-W3 intersected Lynx 4 with 6.11 g/t Au over 2.7 metres. Mineralization is composed of disseminated pyrite and tourmaline ptygmatic veins in a porphyritic felsic dike crosscutting a gabbro.

OSK-W-17-1187 intersected Lynx 3 with 3.43 g/t Au over 2.7 metres. Mineralization is composed of 4% pyrite clusters and 2% pyrite stringers with pervasive silica alteration in a sericitized porphyritic felsic dike.

OSK-W-17-1190 intersected 5.91 g/t Au over 2.0 metres in Lynx 1. Mineralization is composed of 5% pyrite stringers and 3% pyrite-silica flooding within a moderate sericite altered porphyritic felsic dike.

OSK-W-17-1193 intersected Lynx 4 with 4.48 g/t Au over 2.8 metres. Mineralization is composed of up to 2% pyrite stringers within a strongly sericitized felsic porphyritic dike.

OSK-W-17-1290 intersected 34.5 g/t Au over 4.0 metres in a vein within the Lynx Corridor. Mineralization is composed of traces of disseminated pyrite within a gabbro with strong chlorite and carbonate alteration.

OSK-W-17-1293 intersected Lynx 1 with 14.4 g/t Au over 2.5 metres. Mineralization is composed of disseminated pyrite, pyrite stringers and quartz-carbonates veins in a chloritized mafic intrusion bordered by the Bank fault deformation zone.

OSK-W-17-1356 intersected Lynx 1 with 4.14 g/t Au over 2.4 metres. Mineralization is composed of traces of pyrite clusters and/or fragments and pyrite stringers at the contact between a sericitized fragmental intrusive unit and an andesite.

OSK-W-17-1367-W1 intersected Lynx 4 with 52.5 g/t Au over 2.1 metres and 76.4 g/t Au over 2.4 metres. The first interval is composed of 4% pyrite clusters in 10 centimetres quartz-tourmaline veins and disseminated pyrite in a strongly fuchsite altered gabbro. The second interval is composed of trace pyrite-tourmaline stringer, 1% disseminated pyrite and 4% pyrite in ptygmatic tourmaline veinlets with trace chalcopyrite. Local visible gold is present in brittle fractures crosscutting tourmaline ptygmatic veins at contact between a small porphyritic dike and a fuchsite altered gabbro.

OSK-W-17-1396 intersected 6.13 g/t Au over 2.8 metres in Lynx 4. The mineralization is composed of up to 15% pyrite in quartz-tourmaline veins and 1% chalcopyrite within a sericitized and bleached mafic intrusion.

OSK-W-17-1413 intersected Lynx 2 with 40.6 g/t Au over 2.3 metres and Lynx 6 with 8.35 g/t Au over 2.4 metres. The first interval is composed of local visible gold and 1% pyrite clusters within a rhyolite with intense pervasive silica flooding. The second interval is composed of local visible gold and 3% disseminated pyrite in carbonate fracture filling, 2% pyrite stringers in smoky quartz veins hosted in a sheared andesite with chlorite alteration.

OSK-W-18-1414-W1 intersected Lynx 1 with 8.20 g/t Au over 3.6 metres and 26.5 g/t Au over 2.7 metres. The first interval is composed of up to 7% pyrite clusters, up to 3% pyrite stringers and ptygmatic quartz-tourmaline veins within a sericitized gabbro and rhyolite contact. The second interval is composed of up to 5% pyrite-silica flooding and 3% pyrite stringers within a strong silica altered rhyolite.

OSK-W-18-1415 intersected Lynx HW with 10.1 g/t Au over 6.5 metres. Mineralization is composed of local visible gold, up to 15% pyrite with pervasive silica flooding within a weakly bleached, sericitized and fuchsite altered gabbro.

OSK-W-18-1418 intersected Lynx 4 with 8.09 g/t Au over 2.3 metres and 4.02 g/t Au over 2.2 metres. Mineralization is composed of up to 5% pyrite stringers and 3% pyrite clusters in smoky quartz with, local carbonate in fracture filling and disseminated tourmaline hosted in a sericitized and silicified rhyolite.

OSK-W-18-1422 intersected Lynx hanging wall with 48.0 g/t Au over 2.0 metres. Mineralization is composed of up to 5% pyrite stringers, up to 3% pyrite clusters and 2% disseminated pyrite within a sericite, fuchsite and silica altered gabbro.

OSK-W-18-1423 intersected two interval 7.77 g/t Au over 2.1 metres in Lynx 1 and 4.65 g/t Au over 2.5 metres in a crustiform vein. The first interval is composed of 3% pyrite stringers, 1% pyrite clusters and crustiform quartz-carbonates veins within a strongly sericitized felsic porphyritic dike. The second interval is composed of up to 4% pyrite-tourmaline stringer and quartz-carbonate vein within a sericite, fuchsite, chlorite and carbonate altered andesite.

Qualified Person

The scientific and technical content of this news release has been reviewed, prepared and approved by Mr. Louis Grenier, M.Sc.A., P.Geo. (OGQ 800), Project Manager of the Windfall Lake gold project, who is a "qualified person" as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").

Quality Control and Reporting Protocols

True widths determinations are estimated at 65-80% of the reported core length intervals for most of the zones. Assays are uncut except where indicated. Intercepts occur within geological confines of major zones but have not been correlated to individual vein domains at this time. Reported intervals include minimum weighted averages of 3.0 g/t Au diluted over core lengths of at least 2.0 metres. All NQ core assays reported were obtained by either 1-kilogram screen fire assay or standard 50-gram fire-assaying-AA finish or gravimetric finish at ALS Laboratories in Val d'Or, Québec, Thunder Bay and Sudbury, Ontario or Vancouver, British Colombia or Bureau Veritas in Timmins, Ontario. The 1-kilogram screen assay method is selected by the geologist when samples contain coarse gold or present a higher percentage of pyrite than surrounding intervals. Selected samples are also analyzed for multi-elements, including silver, using an Aqua Regia-ICP-AES method at ALS Laboratories. Drill program design, Quality Assurance/Quality Control ("QA/QC") and interpretation of results is performed by qualified persons employing a QA/QC program consistent with NI 43-101 and industry best practices. Standards and blanks are included with every 20 samples for QA/QC purposes by the Corporation as well as the lab. Approximately 5% of sample pulps are sent to secondary laboratories for check assay.

About the Windfall Lake Gold Deposit

The Windfall Lake gold deposit is located between Val-d'Or and Chibougamau in the Abitibi region of Québec, Canada. The mineral resource defined by the previous operator comprises 2,762,000 tonnes at 8.42 g/t Au (748.000 ounces) in the indicated category and 3,512,000 tonnes at 7.62 g/t Au (860,000 ounces) in the inferred category (sourced from a technical report dated June 10, 2015 entitled "Preliminary Economic Assessment of the Windfall Lake Gold Property, Québec, Canada" with an effective date of April 28, 2015, prepared in accordance with NI 43-101). The Windfall Lake gold deposit is currently one of the highest grade resource-stage gold projects in Canada. The bulk of the mineralization occurs in the Main Zone, a southwest/northeast trending zone of stacked mineralized lenses, measuring approximately 600 metres wide and at least 1,400 metres long. The deposit is well defined from surface to a depth of 500 metres, and remains open along strike and at depth. Mineralization has been identified only 30 metres from surface in some areas and as deep as 870 metres in others, with significant potential to extend mineralization up and down-plunge and at depth.

About Osisko Mining Inc.

Osisko is a mineral exploration company focused on the acquisition, exploration, and development of precious metal resource properties in Canada. Osisko holds a 100% in the high-grade Windfall Lake gold deposit located between Val-d'Or and Chibougamau in Québec and holds a 100% undivided interest in a large area of claims in the surrounding Urban Barry area and nearby Quevillon area (over 3,300 square kilometres), a 100% interest in the Marban project located in the heart of Québec's prolific Abitibi gold mining district, and properties in the Larder Lake Mining Division in northeast Ontario, including the Jonpol and Garrcon deposits on the Garrison property, the Buffonta past producing mine and the Gold Pike mine property. The Corporation also holds interests and options in a number of additional properties in northern Quebec and Ontario. Osisko continues to be well financed with approximately $190 million in cash and investments (based on figures available as of December 31, 2017).

Cautionary Note Regarding Forward-Looking Information

This news release contains "forward-looking information" within the meaning of the applicable Canadian securities legislation that is based on expectations, estimates, projections and interpretations as at the date of this news release. The information in this news release about the Windfall Lake gold deposit being one of the highest grade resource-stage gold projects in Canada; the current 800,000 metre drill program; the significance of new results from the ongoing drill program at the Windfall Lake gold project; the significance of assay results presented in this press release describing the analytical results from 31 intercepts in 22 holes and 3 wedges focused on infill and expansion drilling in the Lynx deposit; the high-grade core developing at Lynx 4; the type of drilling included in the drill program (definition, expansion and exploration drilling in and around the main Windfall Lake gold deposit and the adjacent Lynx deposit, and exploration drilling on the greater deposit and Urban-Barry project area); potential mineralization; the potential to extend mineralization up and down-plunge and at depth at the Windfall Lake gold deposit; the ability to realize upon any mineralization in a manner that is economic; the ability to complete any proposed exploration activities and the results of such activities, including the continuity or extension of any mineralization; and any other information herein that is not a historical fact may be "forward-looking information". Any statement that involves discussions with respect to predictions, expectations, interpretations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "interpreted", "management's view", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking information and are intended to identify forward-looking information. This forward-looking information is based on reasonable assumptions and estimates of management of the Corporation. at the time it was made, involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Osisko to be materially different from any future results, performance or achievements expressed or implied by such forward-looking information.
Such factors include, among others, risks relating to the ability of exploration activities (including drill results) to accurately predict mineralization; errors in management's geological modelling; the ability of Osisko to complete further exploration activities, including drilling; property interests in the Windfall Lake gold project; the ability of the Corporation to obtain required approvals and complete transactions on terms announced; the results of exploration activities; risks relating to mining activities; the global economic climate; metal prices; dilution; environmental risks; and community and non-governmental actions. Although the forward-looking information contained in this news release is based upon what management believes, or believed at the time, to be reasonable assumptions. Osisko cannot assure shareholders and prospective purchasers of securities of the Corporation that actual results will be consistent with such forward-looking information, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither Osisko nor any other person assumes responsibility for the accuracy and completeness of any such forward-looking information, Osisko does not undertake, and assumes no obligation, to update or revise any such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except as may be required by law.

Read the rest of the article at https:
Data and Statistics for these countries : Canada | Colombia | Georgia | All
Gold and Silver Prices for these countries : Canada | Colombia | Georgia | All

Osisko Mining Corp.

PRODUCER
CODE : OSK.TO
ISIN : CA6882781009
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Osisko Mining is a gold producing company based in Canada.

Osisko Mining holds various exploration projects in Argentina, in Brazil and in Canada.

Its main asset in production is MALARTIC in Canada and its main exploration properties are GOLDBORO, SLEITAT, JC - SMART SKARNS, HAMMOND REEF, MALARTIC CHL GOLD PROPERTY, DUPARQUET and CLEMENT LAKE in Canada, EL POTOSI and SANTA CLARA / CERRO BONITO in El Salvador, CERRO CONDORINI and COAL CREEK in Peru, CASTELO DOS SONHOS in Brazil and FAMATINA in Argentina.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Osisko Mining Corp.
12/20/2018Osisko Mining reports 39% higher grade than resource model a...
Annual reports of Osisko Mining Corp.
2008 Annual report
Financings of Osisko Mining Corp.
8/31/2011Osisko Announces an Increase in Caterpillar Lease Financing ...
8/31/2011Announces an Increase in Caterpillar Lease Financing Facilit...
11/18/2009Strengthens Balance Sheet With $241 M Proceeds From Exercise...
6/30/2009Closes $10.64 Million Flow-Through Financing
4/17/2006Announces C10$ million "bought deal" financing
Nominations of Osisko Mining Corp.
5/10/2013Anounces Election of Directors
4/17/2012Nominates Michele Darling to Board of Directors
3/14/2012Appoints Gary Sugar to Board of Directors
2/2/2012Board Member Resigns
9/16/2011Osisko Appoints Richard Ross to Board of Directors
9/15/2011Appoints Richard Ross to Board of Directors
8/22/2011Director Resigns
Financials of Osisko Mining Corp.
2/14/2014Provides Notice of Fourth Quarter and Year End 2013 Results ...
8/1/2013Reports Second Quarter 2013 Results
7/15/2013Provides Notice of Second Quarter 2013 Operating and Financi...
5/9/2013Reports First Quarter 2013 Results
4/29/2013Provides Notice of First Quarter 2013 Financial Results Rele...
2/21/2013Reports Fourth Quarter and Year-End 2012 Results
11/13/2012Reports Third Quarter 2012 Results
7/5/2012Produces 92,003 Ounces Au in Second Quarter
5/9/2012Provides Notice of First Quarter 2012 Financial Results Rele...
2/27/2012Q4 2011 Net Profit of $37.8 Million
1/16/2012Provides Notice of Fourth Quarter and Year-End 2011 Financia...
8/11/2011Releases Second Quarter 2011 Results
5/16/2011Osisko Releases First Quarter 2011 Results
5/14/2011Osisko Releases First Quarter 2011 Results
2/28/2011Releases Year-End Financial Results and Review of 2010
11/6/2009Releases Third Quarter 2009 Results
8/11/2009Releases Second Quarter 2009 Results
Project news of Osisko Mining Corp.
7/26/2017OSK Osisko Mining drills 2.7 m of 57 g/t Au at Windfall
2/21/2014Intersects 2.26 g/t Gold Over 128 Metres at Kirkland Lake
2/7/2014(Malartic)Commences 2014 Canadian Malartic Exploration Program
2/6/2014(Malartic)Reports Record January Production at Canadian Malartic
12/4/2013Intersects 61.6 Metres Averaging 1.44 g/t Au at Bidgood
11/21/2013(Malartic)Canadian Malartic Mine Produces Millionth Ounce
10/23/2013GLOBAL'S NEVADA PROJECTS ATTRACT STRONG THIRD PARTY INTEREST...
7/10/2013(Malartic)Deposits Study Reporting Local and Regional Economic Impact ...
1/30/2013Intersects 5.5 g/t Au Over 54.0 Metres at Upper Beaver
12/10/2012(Malartic)Reports November Production From Canadian Malartic
11/12/2012Announces Friendly Acquisition of Queenston
10/11/2012(Malartic)Canadian Malartic Mine Produces Half Millionth Ounce
10/10/2012(Malartic)Reports Record Quarterly Production from Canadian Malartic
9/6/2012(Malartic)Reports Record Monthly Production from Canadian Malartic
7/26/2012Acquires Common Shares of Bowmore Exploration Ltd=2E
5/17/2012(Malartic)Canadian Malartic Mill Returns to Operation
5/10/2012(Malartic)Reports Fire Damage at Canadian Malartic Mill Limited to Cyc...
1/30/2012(Famatina)s Status of Famatina Exploration Project
12/22/2011and DIOS Discover New Gold Showings on the AU33 WEST Project
11/28/2011TSX.V Company Adjacent to Osisko Property - 3 Minute Video
9/29/2011(Goldboro)Orex to Pursue Exploration Work on Goldboro Gold Project
9/8/2011(Malartic)Intersects 1.23 g/t Au Over 172 Metres at Barnat Extension
8/31/2011Osisko and EMSE Sign Agreement for Development of Famatina P...
8/31/2011(Famatina)and EMSE Sign Agreement for Development of Famatina Project ...
8/11/2011(Goldboro)Goldboro Gold Project Drill Assay Results Identify Extension...
8/5/2011Osisko Buys Back a 1% Royalty Interest on Canadian Malartic ...
8/5/2011(Malartic)Buys Back a 1% Royalty Interest on Canadian Malartic Propert...
6/21/2011Osisko Declares Commercial Production at Canadian Malartic
6/21/2011(Malartic)Declares Commercial Production at Canadian Malartic
6/17/2011Osisko Submits Notice of Termination in Duparquet Project
6/17/2011(Duparquet)Submits Notice of Termination in Duparquet Project
6/14/2011(Malartic)Intersects 1.50 g/t Au Over 63.6 Metres at Jeffrey Zone
6/13/2011(Duparquet)et Clifton Star annoncent une estimation de ressources pour ...
6/13/2011(Duparquet)and Clifton Star Release Resource Estimate for the Beattie D...
6/1/2011(Malartic)Officially Inaugurates the Canadian Malartic Mine
6/1/2011Osisko Officially Inaugurates the Canadian Malartic Mine
5/2/2011(Malartic)Announces Revised Mine Production Plan at Canadian Malartic
4/21/2011(Goldboro)Orex Exploration Inc.: Drilling Campaign Has Begun at Goldbo...
4/20/2011Osisko Mining Corporation - Drilling campaign has begun at G...
4/20/2011Osisko Mining Corporation - Drilling campaign has begun at G...
4/13/2011(Malartic)Pours First Gold at Canadian Malartic Mine
3/31/2011(Malartic)Increases Gold Reserve at Canadian Malartic to 10=2E7 Millio...
3/29/2011(Malartic)Exercises Buy Out Option in Canadian Malartic Net Smelter Ro...
2/28/2011(Malartic) Découverte de minéralisation de type Canadian Malartic
2/24/2011(Hammond Reef)Reports 124 Metres Averaging 0.73 g/t Au in Southeast Extens...
1/29/2011(Malartic)Osisko Reports Significant New Intersections at Barnat Exten...
1/25/2011(Malartic)Reports Significant New Intersections at Barnat Extension, I...
12/21/2009(Malartic)Provides Update on Construction and Development Progress at ...
12/14/2009(Malartic)Releases New Resource Estimate for Canadian Malartic Project
10/20/2009(Malartic) Intersects New Gold Mineralization on the Malartic CHL Prop...
9/14/2009(Malartic)Intersects 1.20 g/t Au Over 86.9 Metres at Jeffrey Zone
9/1/2009(Malartic)Osisko Mining Corporation: Construction Activities at Canadi...
8/20/2009(Malartic)Quebec Government Authorizes Construction of Osisko's Canadi...
2/26/2009(Malartic) Preliminary Metallurgical Results on Barnat
1/26/2009(Malartic)Announces Inferred Resource Estimate for South Barnat Deposi...
12/3/2008(Malartic) Intersects 102 Metres Averaging 3.21 g/t Au at South Barnat
Corporate news of Osisko Mining Corp.
2/13/2014Mails Letter to Shareholders Regarding Inadequate Goldcorp O...
2/5/2014Provides Corporate Update
1/29/2014Commences Legal Proceeding to Restrain Misuse of Confidentia...
1/29/2014Announces Filing and Mailing of Directors' Circular and Reco...
1/20/2014Reports Preliminary Fourth Quarter 2013 Production
1/15/2014Responds to Unsolicited Proposal From Goldcorp Inc=2E
1/13/2014Responds to Announcement by Goldcorp
12/16/2013Completes Long-Term Debt Renegotiation
10/24/2013Provides Notice of Third Quarter 2013 Operating and Financia...
7/30/2013Enhances Financial Flexibility by Improving Long-Term Debt T...
7/5/2013Intercepts 68 Metres Averaging 1=2E26 =?ISO-8859-1?Q?=20g/t=...
7/2/2013Receives Final $30 Million Payment from Kirkland Lake Gold
4/29/2013Corporate Update
4/17/2013Comments on Trading Activities
4/9/2013(Malartic)Previews Q1 2013 Canadian Malartic Operating Results
3/21/2013Discovers Two New Gold-Copper Zones at Upper Beaver
2/19/2013(Malartic)Receives Modified Operating Parameters at Canadian Malartic
2/19/2013(Malartic)s Reserves at Canadian Malartic
2/11/2013Denis Cimon Receives the 2013 Mineral Processor of the Year
1/29/2013(Hammond Reef)Provides Resource Update for Hammond Reef Project
1/24/2013(Malartic)Previews Q4 2012 Canadian Malartic Operating Results and 201...
11/12/2012(Malartic)Reports Record Monthly Throughput at Canadian Malartic
10/15/2012Founder Retires
10/9/2012Acquires Ground in Emerging Gold Belt in Mexico and Identifi...
10/3/2012Deposits the Second Tranche of itsFinancial Guarantee Coveri...
8/3/2012Secondary Crusher Installation Completed
7/24/2012Acquisition of Subscription Receipts of Druk Capital Partner...
5/16/2012Enhances Credit Agreement With CPPIB
5/14/2012(Malartic)Provides Update on Canadian Malartic
5/10/2012(Malartic)Reports Fire at Canadian Malartic Milling Plant
4/3/2012and Metis Nation of Ontario Sign Memorandum of Understanding
3/12/2012Brings First Half of Secondary Crusher Online
3/1/2012Announces Record Date for Annual Meeting
2/16/2012Canadian gold producer Osisko Mining Corporation joins Globa...
1/12/2012(Malartic)Previews Q4 2011 Canadian Malartic Operating Results
1/3/2012Responds to Below Market Price Offer for 5 Million Shares On...
12/14/2011Osisko Comments on Trading of Common Shares
12/14/2011Comments on Trading of Common Shares
10/8/2011President Sean Roosen Named Ernst & Young 2011 Quebec Entrep...
6/17/2011(Duparquet)met fin =E0 sa participation au projet Duparquet
6/13/2011Osisko and Clifton Star Release Resource Estimate for the Be...
5/14/2011Osisko publie ses r=E9sultats du premier trismestre de 2011
5/12/2011Annual and Special Meeting of Shareholders of Osisko Mining ...
4/29/2011Osisko Announces Revised Mine Production Plan at Canadian Ma...
3/29/2011Osisko Exercises Buy Out Option in Canadian Malartic Net Sme...
2/9/2011Goldcorp Sells Osisko Investment
12/22/2009Donates Shares to McGill University
12/11/2009and Clifton Star Complete Joint Venture Agreement on Duparqu...
11/13/2009Options Goldboro Gold Property From Orex Exploration
9/28/2009 Signs Option Agreement With Claim Post Resources for the Mo...
9/24/2009 Enters Into Financing Agreement With CPPIB Credit Investmen...
8/11/2009Signs Option Agreement With Midland Exploration for the Dunn...
7/10/2009Report on Osisko's Canadian Malartic Bape Hearings is Made P...
7/3/2009Osisko Mining Corporation Completes Strategic Investment
6/18/2009Comments on Trading of Common Shares
5/21/2009Discovers New Mineralized Zone Adjacent to South Barnat
5/19/2009Makes Strategic Investment
1/13/2009 Extends South Barnat to 1200 Metres Length
12/4/2008 Recognized for Strong Sustainability Performance
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (OSK.TO)FRANKFURT (EWX.F)
3.12-1.74%2.43-1.62%
TORONTO
CA$ 3.12
04/24 14:22 -0.050
-1.74%
Prev close Open
3.17 3.15
Low High
3.09 3.16
Year l/h YTD var.
2.42 -  3.21 13.04%
52 week l/h 52 week var.
2.36 -  3.88 -20.41%
Volume 1 month var.
439,114 14.71%
Produces Gold
Develops
Explores for Gold - Lead - Silver - Tin - Tungsten - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202414.10%
2023-22.00%4.532.64
2022-6.17%5.022.36
20210.81%3.972.33
2020-4.88%4.851.67
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.97-1.30%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+0.00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.39-3.24%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.34+0.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.76-1.68%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.86-1.34%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :