Platinum Group Metals Announces a Positive Preliminary Economic Assessment for a 655,000 Ounce Per Year Platinum, palladium and Gold Mine at the Waterberg Joint Venture

 

VANCOUVER, BRITISH COLUMBIA and JOHANNESBURG, SOUTH AFRICA--(Marketwired - Feb 14, 2014) -Platinum Group Metals Ltd. (PTM.TO)(NYSE MKT:PLG)(NYSE Amex:PLG) ("Platinum Group" or the "Company") announces positive results from an Independent Preliminary Economic Assessment ("PEA") on the Waterberg Joint Venture project (the "Project") completed by international and South African engineering firm WorleyParsons. Platinum Group Metals Ltd. holds a 49% effective interest in the Waterberg Joint Venture while the Japan Oil, Gas and Metals National Corporation ("JOGMEC") holds a 37% interest. Empowerment partner Mnombo Wethu Consultants Pty Ltd. holds the balance of the joint venture.

The Project will immediately advance to the pre-feasibility stage. Details of the PEA include:

         Steady state production of 655,000 ounces of platinum, palladium and gold, "3E"; 

         A two year construction period planned in 2016 to 2018; 

         A Project post-tax NPV (7.5% discount rate) of 5.1 billion Rand or US$ 509 million (10R/US$); 

         Peak Funding of 8.85 billion Rand or US$ 885 million (10R/US$); 

         Major Risks to be assessed at pre-feasibility including smelting plans, water and power delivery and geotechnical work for mine design along with normal increased resource, metallurgical and cost confidence levels; and 

         Opportunities include significant resource expansion, optimization of mine plans, mine ramp up profiles, increased metallurgical recoveries and smelter terms and consideration of adjacent deposit exploration. 

R. Michael Jones, President of Platinum Group Metals Ltd. said "The Waterberg Joint Venture project stands out as an exceptional opportunity for the shallow production of safe, low cost platinum, palladium and gold by fully mechanized mining methods utilizing multiple decline access ramps. The planned 655,000 3E ounces of steady state production is significant in the global market for platinum group elements. The peak funding estimate is modest compared to the opportunity for large scale participation in the platinum and palladium markets. In addition we see significant opportunity to expand the Project's resources and to optimize the Project in the pre-feasibility study. We will continue our positive consultation with the rural communities in the mine area as our Project confidence advances. The potential for good margins, improved safety, better productivity and well paid workers along with improved working conditions compared to conventional mines is exciting."

Details

Assumptions and Results

Pricing

 

Approximate Recent/Spot

Applied in model
Approx. 3 yr.
Trailing Prices

Platinum (US$/oz)

1,380.00

1,586.06

palladium (US$/oz)

708.00

701.04

Gold (US$/oz)

1,259.00

1,548.84

Copper (US$/lb)

3.41

3.58

Nickel (US$/lb)

6.29

8.35

R/US$

11.13

10.00

Basket Price per T Layer and F Layer Metal Splits in US$ and Rand

   

Recent Spot
11.13 R/US$

3 Year trailing Average 10R/US$

T Zone

$/oz

1,014.40

1,129.60

 

R/oz

11,290.25

11,296.00

F Zone

$/oz

934.83

1,005.23

 

R/oz

10,404.62

10,052.33

Super F Zone

$/oz

934.68

1,005.03

 

R/oz

10,402.99

10,050.34

Total

$/oz

961.57

1,047.04

 

R/oz

10,702.24

10,470.41

Recoveries and Treatment Terms

2E&Au recovery T

88.3%

2E&Au recovery F

82.9%

Cu recovery T

86.6%

Cu recovery F

74.1%

Ni recovery T

82.9%

Ni recovery F

59.2%

Tolling terms 2E&Au

85.0%

Tolling terms Cu

67.5%

Tolling terms Ni

72.5%

Mined Tonnes and Recovered Ounces

Total Resource Tonnes mined

126,555,041

Total Pt_ozs

3,381,234

Total Pd_ozs

6,901,055

Total Au_ozs

1,127,123

Financial Metrics

Peak Funding (Rand billion)

8.853

Operating Cost (Rand/tonne)

501

Operating Cost (US $/3E ounce, Not including Cu, Ni Credits,/ including Cu, Ni Credits)

555/368

Production Cost, including royalty, and overhead (US $/3E ounce, Not including, Cu, Ni Credits/including Cu, Ni credits)

626/438

Undiscounted NPV (US$millions/@10)

2,085

NPV @ 7.5%(US$m) pre-tax

804.7

NPV @ 7.5% (US$m) post-tax

508.8

IRR pre-tax

16.4%

IRR post-tax

14.0%

Start of Construction

2016

Commencement of production

2018

Payback

2024

Note: at fixed metal prices at 10R/US$, no escalation costs or prices

The PEA conforms to the requirements of Canada's National Instrument 43-101. The economic analysis is based on Inferred Resources and is preliminary in nature. Inferred Resources are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as Mineral Reserves. There is no certainty that the PEA will be realized. The estimates in this preliminary assessment are estimated at +/-30% accuracy on an engineering basis. The complete PEA technical report on the Waterberg Joint Venture property will be filed on SEDAR (www.sedar.com) within 45 days of this release.

Mining

The mine plan in the PEA utilizes 3 decline clusters for access as a result of the shallow depth of the deposit. The shallow edge of the T layer is at 130 meters vertical and the shallow edge of the F layer is at 220 meters. The planned mining method is all mechanized including a combination of room and pillar mining on mineralized layers 3 to 10 meters thick and long hole open stoping on layers from 10 to 60 meters thick. The decline ramps for underground access are planned to be developed to the shallow edge of the T and F deposit layers. From there development ramps are to be all within the deposit along an apparent dip angle. This development approach is possible because of the thickness of the deposit and lowers waste development tonnes and costs.

Processing

Utilizing a standard flotation mill, at steady state the Project is estimated to produce 655,000 ounces per year 3E (platinum, palladium and gold) in concentrate, with copper and nickel as credits. The PEA relies on the previously reported preliminary metallurgical recovery estimates from test work at SGS labs of 83% 3E on the F layer mineralization and 88% 3E on the T layers. Other independent test work has been completed confirming these recovery rates or higher as well as indicating the ability to produce an attractive concentrate from both the T and F mineralized material of more than 100 g/t 3E containing almost no chrome. Further work to confirm the concentrate recoveries and characteristics will be completed during the pre-feasibility study stage. Co-mingling of the F and T materials does not appear to negatively affect recoveries in the initial test work.

Financial Results

The life of mine capital cost estimate over a 22 year period is un-escalated 17.8 billion Rand. Peak funding for the mine is estimated at 8.85 billion Rand. Undiscounted total positive cash flow for the project over a 22 year period is 21 billion Rand or US$ 2.1 billion on a 100% basis.

Operating cost including mining, milling, concentrate shipment and onsite overheads are estimated to be US$ 555 per 3E ounce over the life of the mine excluding Cu, Ni credits and US$ 368 per 3E ounce including Cu and Ni as credits. Including the state royalty and an allocation for head office overheads the operating costs are estimated to be US$ 626 per 3E ounce excluding Cu, Ni credits and US$ 438 per 3E ounce including Cu and Ni as credits, all at 10 Rand/US$.

The PEA considers the costs to concentrate and assumes a payability of 85% on the 3Eounces from a third party purchaser. Considerable further work will be required to confirm potential terms and a smelter sales plan. No offtake concentrate agreement is in place and the cost of a smelter is not included in the PEA. The concentrate from Waterberg is a sulphide concentrate with negligible chrome or other penalty elements and should be desirable based on its initial test characteristics.

The PEA assumes fixed metal prices for the life of mine based on February 2014 three year trailing average prices per ounce of US$ 1,586 for platinum, US$ 701 for palladium and US$ 1,549 for gold. The PEA is un-escalated and assumes and a fixed exchange rate for the life of mine at 10 Rand to the US dollar. The project IRR on a 100% basis is 16% pre-tax. The project pre-tax NPV is US$ 804.7 million (7.5 % discount rate). The post-tax the IRR is 14% and the post-tax NPV is US$ 508.8 million (7.5% discount rate). Peak funding for 100% of the Project is 8.85 billion Rand (US$ 885 million at 10 Rand/US$). Capital costs to first production are estimated to be 7.92 billion Rand un-escalated (US$ 792 million at 10 Rand/US$).

Interestingly, recent spot metal prices converted at 11.13 Rand to the US$ (approximately the spot currency rate) provided a Rand basket price within 3% of the three year trailing average prices supporting the model assumptions. The model being un-escalated, the conservative fixed exchange rate at 10 Rand to the US$ over the Project life, and the fixed life of mine metal prices for revenue provide a potential offset to anticipated South African inflation on costs.

The large scale, near surface mechanized nature of the deposit contributes to the highly competitive cost structure for the Project, estimated to be in the lowest quartile of costs in the platinum industry. The PEA indicates that the Waterberg deposit has potential to be a large platinum, palladium and gold mine comparable to some of the largest mining blocks in South Africa.

Resource Estimate Details

For the PEA mine plan WorleyParsons utilized the inferred resource estimate as reported on September 3, 2013 by Independent Qualified Person Ken Lomberg of Coffey. The Inferred resources are estimated at 167 million tonnes grading 3.26 g/t 3 E (0.98 g/t Pt, 1.97 g/t Pd, 0.32 g/t Au) in the T and F layers.

There is resource expansion potential on the T layers within the Waterberg Joint Venture and the deposit has been truncated for initial economic reasons prior to the PEA at 1,000 meters deep on both the T and F layers. As a Project opportunity the arbitrary cut off may be reconsidered during the pre-feasibility stage of Project study with potential for increased resource areas to be considered.

Inferred 2PGE+Au Resource Estimate for Waterberg JV Project, September 2, 2013

   

Thickness
M

 

Tonnes
Mt

 

Pt
(g/t)

 

Pd
(g/t)

 

Au
(g/t)

 

2PGE+Au
(g/t)

 

Pt:Pd:Au

 

2PGE+Au
(koz)

 

Cu
(%)

 

Ni
(%)

 

Cu
(t)

 

Ni
(t)

T1

 

2.30

 

8.50

 

1.04

 

1.55

 

0.47

 

3.06

 

34:51:15

 

842

 

0.17

 

0.10

 

14,500

 

8,400

T2

 

3.77

 

39.16

 

1.16

 

2.04

 

0.84

 

4.04

 

29:50:21

 

5,107

 

0.18

 

0.10

 

69,400

 

37,600

T Total

 

3.38

 

47.66

 

1.14

 

1.95

 

0.77

 

3.86

 

30:50:20

 

5,948

 

0.18

 

0.10

 

83,900

 

46,000

F Total

 

3.0 to 30.0

 

119.05

 

0.91

 

1.98

 

0.13

 

3.02

 

30:65:5

 

11,575

 

0.07

 

0.17

 

78,800

 

202,200

Total

     

166.71

 

0.98

 

1.97

 

0.32

 

3.26

 

30:60:10

 

17,523

 

0.10

 

0.15

 

162,700

 

248,200

 

   

Note:

The T1 and F layers are reported with a 2g/t 2PGE+Au cut-off
The T2 layer is reported based on the selection of a mining cut of a minimum of 2m consistently across all deflections

         Mineral resources that are not mineral reserves do not have demonstrated economic viability

         CIM definitions are followed for classification of Mineral Resources

The resource was calculated by Coffey by using 111 bore holes with a total of 301 pierce points including deflections. The resource estimate was undertaken by Coffey and a number of iterations were done to confirm the validity of the estimate. The resource estimation was completed using an Inverse Distance Weighted to the Power 2 methodology and examined at various cut-off grades. The previous split of the FH and FP layers were merged into one F zone. The average thickness was calculated for the T zones that have distinct rock layer characteristics. The F zone is located consistently near the floor of the Bushveld Complex and is associated with olivine rich rocks with a thickness of 3 meters to 30 meters on average. An area of F layer related to an interpreted depression in the floor rocks where thickness of the mineralization is greater than 10 meters has been given the name "Super F".

The estimate for the T Layer was based on cuts identified from examination of the borehole core. The cut selection was based on a combination of the stratigraphic position, minimum thickness of 2 meters and consistency between the intersections from the motherhole and the deflections. The estimation was restricted based on the tenement, geological interpretation of the extent of the T layer and a maximum depth of 1,000 meters below surface. A geological loss of 12.5% was applied based on the geological understanding of the deposit which is informed by the regular drilling grid of 250 meters x250 meters.

The F layer estimation was undertaken on a flattened model utilizing the base of the F layer as a stratigraphic marker. The block size was selected as 125 meters x 125 meters x 3 meters (Northing, Easting, RL). A grade tonnage profile was utilised with a grade cut off of 2g/t 2PGE+Au for resource declaration. Prior to the estimation domains within the F layer were determined based on the geology and grade characteristics. These domains were independently estimated. The estimation was restricted based on the tenement, geological interpretation of the extent of the F layer and a maximum depth of 1,000 metres below surface. A geological loss of 12.5% was also applied to the F layer estimate.

The independent Qualified Person, under the definitions in NI 43-101, for the Sept 2, 2013 resource estimate is Ken Lomberg of Coffey. He has a Master's degree in engineering and has 27 years of relevant experience in precious metals and PGM evaluations. He has verified the data by reviewing the detailed assay and geological information on the Waterberg deposit and visiting the site and core yard many times in 2013. He is satisfied that the data is appropriate for the resource estimate by reviewing the core, assay certificates and quality control information as well as reviewing the procedures on sampling, chain of custody and data base records of the Platinum Group exploration team. WorleyParsons has relied on Coffey as an expert for the resource estimate. The resource estimate has been completed under the SAMREC code and this code has no substantive differences from the CIM guidelines.

Inferred mineral resource estimates, under the CIM guidelines, do not have demonstrated economic viability and may never achieve the confidence to be mineral reserve estimates or to be mined. An inferred resource has reasonably assumed continuity based on limited sampling but the geological and grade continuity has not been verified. The property is held under a prospecting right with the exclusive right to convert that right to a mining right. There can be no assurance that a mining right will be granted without extensive further work and an Application to the Department of Mineral Resources of South Africa. WorleyParsons has not completed a review of the validity of the Company mineral tenure.

Jobs and Social, Labour Environment and Permitting

The Waterberg Project is estimated to create about 2,200 new jobs at full production and will have a positive effect on the local economy. The mechanized nature of the proposed mining at Waterberg will rely on skilled, well paid workers. Should the Project proceed there will be a significant opportunity for training and transformation of the local economy. Consultation with the local rural population that has occurred before and during the prospecting work will continue during the feasibility stage.

A number of large unpopulated areas are being studied for mine infrastructure. Considerable work in training local people will be required for the Project. Preliminary contact has been made with utilities for power and water and these aspects have not demonstrated fatal flaws at this stage. Considerable work will be required to secure these bulk services. Early cost estimates for these services and road improvements have been included in the PEA.

The Company has briefed the Department of Mineral Resources on the Waterberg Project and the Project was given a specific, positive comment in a speech by Minister of Mineral Resources at the recent mining Indaba in Cape Town.

The Waterberg Joint Venture property is held under a prospecting right and considerable work will be required to apply for a mining right.

Risks and Opportunities

Significant risks that will be studied at pre-feasibility include but are not limited to:

         Geological risks associated with inferred resources that cannot be assumed to be economically viable, may never be upgraded or declared reserves and will require further confirmation drilling for consideration in a pre-feasibility study; 

         Geotechnical risks of the rock stability underground for the assumed mining method and extraction ratios; 

         Metallurgical and marketing risks for the proposed concentrate; 

         Social and permitting risk as the Project is held under a prospecting right and a mining right will need to be applied for; 

         The Project will require water, power and infrastructure. These are regionally available but will need to be secured; 

         Financing risk for a large Project and metals price risk combined with South African inflation and Rand exchange rate volatility, particularly as escalation was not used on costs and a fixed exchange rate was used; and 

         South African labour relations, training and availability. 

Significant Opportunities include but are not limited to:

         Optimization of the mine plan and the timing and sequencing of the capital investment into modules; 

         Optimization of the mine plan by grade as outlined by more drilling; 

         Expansion of the deposit down dip (T and F layers) and along strike (T layer); and 

         Consideration of the potential on the Waterberg Extension Permits for larger resources and scale to reduce fixed infrastructure costs. 

Authors and Qualified Persons Statement

The PEA was prepared in conformance with NI 43-101 by WorleyParsons. WorleyParsons has extensive experience in engineering and construction of platinum projects including mining and processing in Southern Africa. Dr. Michael Roberts, a Fellow of the SAIMM, is an independent "Qualified Person" under NI 43-101 and has supervised the preparation of the information that forms the basis of the written disclosure in this news release and he is the person responsible for the PEA. Dr. Roberts has a PhD in mining engineering and has more than 35 years of experience in mining engineering and has published numerous technical papers.

He has visited the property and verified the information to his satisfaction. Input for the PEA was provided by Ken Lomberg, the independent Qualified Person for the mineral resource estimate and experienced professionals at WorleyParsons Charles Brittain, for engineering and project management, Paul Bates for mining and ventilation, and Paul Lombard for financial modelling. Ken Lomberg has also reviewed the references to mineral resource estimates in this news release.

R. Michael Jones, P.Eng is a non-independent Qualified Person for the Company and has verified information for the Company.

Next Steps

WorleyParsons has now successfully concluded the PEA, which has met its objectives. Technically WorleyParsons recommends that the Waterberg Joint Venture to proceed to the pre-feasibility stage and the Waterberg Joint Venture will consider the plan and budget ahead. A program of infill drilling, rock mechanics and metallurgical studies and other engineering and costing estimates will be planned by Platinum Group Metals Ltd., the operator of the Waterberg Joint Venture, for 2014. Detailed work on the pre-feasibility work will commence in the near term and budgets and plans of the Waterberg Joint Venture will be provided shortly.

Adjacent to the Waterberg Joint Venture, Platinum Group Metals is drilling with 10 machines with the objective of expanding the Waterberg Deposit onto the Waterberg Extension prospecting rights held with an effective interest of 87% by Platinum Group Metals. Further drill results will be provided in the weeks ahead.

About Platinum Group Metals Ltd.

Platinum Group is based in Johannesburg, South Africa and Vancouver, Canada. The Company's business is currently focused on the construction of the WBJV Project 1 platinum mine and the newly discovered Waterberg platinum deposit, where the Company is the operator of the Waterberg Joint Venture Project with JOGMEC and Mnombo. The Company has also expanded its exploration northward on to the Waterberg Extension project. As a result of the resource scale and thickness of the Waterberg deposit, the Waterberg Joint Venture project and the Waterberg Extension project have increased in importance in the Company's business.

Disclosure

The Toronto Stock Exchange and the NYSE MKT LLC have not reviewed and do not accept responsibility for the accuracy or adequacy of this news release, which has been prepared by management.

This press release contains forward-looking information within the meaning of Canadian securities laws and forward-looking statements within the meaning of U.S. securities laws ("forward-looking statements"). Forward-looking statements are typically identified by words such as: believe, expect, anticipate, intend, estimate, plans, postulate and similar expressions, or are those, which, by their nature, refer to future events. All statements that are not statements of historical fact are forward-looking statements. Forward-looking statements in this press release include, without limitation, the extent and timing of exploration programs and exploration results, the results of the PEA, including the planned construction period, the post-tax NPV and peak funding estimates, the risks and opportunities outlined in the PEA, the potential tonnage, grades and content of deposits, timing, establishment and extent of resources estimates, po tential production from and viability of the Company's properties, production and operating costs and permitting submission and timing. These forward-looking statements are made as of the date of this press release. Although the Company believes the forward-looking statements in this press release are reasonable, it can give no assurance that the expectations and assumptions in such statements will prove to be correct. The Company cautions investors that any forward-looking statements by the Company are not guarantees of future results or performance, and are subject to risks, uncertainties, assumptions and other factors which could cause events or outcomes to differ materially from those expressed or implied by such forward-looking statements. Such factors and assumptions include, among others, variations in market conditions; the nature, quality and quantity of any mineral deposits that may be located; metal prices; other prices and costs; currency exchange rates; the Company's abi lity to obtain any necessary permits, consents or authorizations required for its activities; the Company's ability to access further funding and produce minerals from its properties successfully or profitably, to continue its projected growth, or to be fully able to implement its business strategies. 
In addition, there are known and unknown risk factors which could cause our actual results, performance or achievements to differ materially from any future results, performance or achievements expressed or implied by the forward-looking statements. Known risk factors include risks associated with exploration and project development; the need for additional financing; the calculation of mineral resources; operational risks associated with mining and mineral processing; fluctuations in metal prices; title matters; government regulation; obtaining and renewing necessary licences and permits; environmental liability and insurance; reliance on key personnel; currency fluctuations; labour disputes; competition; dilution; the volatility of our common share price and volume; future sales of shares by existing shareholders; and other risk factors described in the Company's Form 40-F annual report, annual information form and other filings with the SEC and Canadian securities regulators, which may be viewed at 
www.sec.gov and www.sedar.com, respectively. Although we have attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. We are under no obligation to update or alter any forward-looking statements except as required under applicable securities laws.

Cautionary Note to U.S. Investors Regarding Estimates of Inferred Mineral Resources

This press release uses the terms "inferred mineral resources." We advise U.S. investors that while these terms are recognized and required by Canadian regulations, the SEC does not recognize them. "Inferred mineral resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an "inferred mineral resource" will ever be upgraded to a higher category. Under Canadian rules, estimates of "inferred mineral resources" may not form the basis of a feasibility study or prefeasibility studies, except in rare cases. The SEC normally only permits issuers to report mineralization that does not constitute "reserves" as in-place tonnage and grade without reference to unit measures. U.S. investors are cautioned not to assume that any part or all of an inferred resource exists or is economic ally or legally mineable.

Contact:

Platinum Group Metals Ltd.
R. Michael Jones
President
(604) 899-5450 / Toll Free: (866) 899-5450
www.platinumgroupmetals.net

OR

 

MI3 Communications Financieres Inc.

Mario Drolet

514 904-1333

mario@mi3.ca

 

P.S. Mail Management Instructions: This is an advertisement and a promotional mail strictly on the guidelines of CAN-SPAM act of 2003. We have clearly mentioned the source mail-id of this mail, also clearly mentioned the subject lines and they are in no way misleading in any form. We have found your mail address through our own efforts on the web search and not through any illegal way. This message is sent in compliance of the new e-mail bill: SECTION 301. paragraph (A)(2)(C) of S. 1618. This message is NOT Spam as long as you are provided with a way to stop at any time. If you find this mail unsolicited, please insert your email in the form below, click on submit and we will take care that you do not receive any further promotional mail.

To Unsubscribe Write your Email address Here and click on submit

>>>>>>>>>>> <<<<<<<<<

  If the submit doesn't work reply to this email with "remove me from this list" in the subject.

 

---
Data and Statistics for these countries : Canada | Japan | South Africa | All
Gold and Silver Prices for these countries : Canada | Japan | South Africa | All

New World Resource Corp.

CODE : NW.V
ISIN : CA6492971081
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

New World Res. is a gold and copper exploration company based in Canada.

New World Res. holds various exploration projects in Bolivia and in USA.

Its main exploration properties are LONG VALLEY PROJECT in USA and PASTOS GRANDES and LIPENA in Bolivia.

New World Res. is listed in Canada and in United States of America. Its market capitalisation is CA$ 2.7 millions as of today (US$ 2.0 millions, € 1.8 millions).

Its stock quote reached its highest recent level on February 11, 2011 at CA$ 3.30, and its lowest recent point on November 06, 2015 at CA$ 0.01.

New World Res. has 13 299 045 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of New World Resource Corp.
3/28/2012Galaxy Capital Corp. Arranges 12 Million Unit Private Placem...
3/15/2011Closes First Tranches of Non-Brokered Private Placement
2/22/2011New World Announces Non-Brokered Private Placement
7/2/2009 Closes $500,000 Private Placement
Nominations of New World Resource Corp.
10/23/2013PERISSON PETROLEUM INC. APPOINTS MI3 COMMUNICATIONS FOR FINA...
9/7/2012Announces Appointment of New Audit Committee Chairman
5/3/2012Appoints Chief Operating Officer
9/11/2009United accelerates plans for growth with new appointment
Financials of New World Resource Corp.
10/1/2013Eagle Hill Third Quarter Financial Results
5/10/2013s in 2012 and first quarter of 2013
Project news of New World Resource Corp.
2/14/2014Platinum Group Metals Announces a Positive Preliminary Econo...
2/11/2014Integra Gold Intersects 95.86 g/t Gold Over 2.0 Meters and ...
1/29/2014Barisan Gold Commences Drilling Hole UTD-005 at Upper Tengk...
1/28/2014Integra Gold Increases Lamaque Indicated Resource to 756,280...
1/27/2014PERISSON PETROLEUM INC. FILES ENVIRONMENTAL IMPACT STUDY ON...
1/21/2014Initiates Diamond Drill Program at the Agua Grande Gold - Co...
1/20/2014Doubleview Capital Corp. Announces Drill Results
1/15/2014Geomega Resources Inc.: Breakthrough in Physical Separation ...
11/27/2013Announces the Completion of the Lipe=F1a OptionAgreement wit...
11/20/2013Signs Agreement to Earn Interest in the Agua Grande Gold - C...
11/18/2013Integra Gold Discovers Extension of High-Grade Triangle Zone...
11/15/2013Platinum Group Metals Ltd.: Extension of the Super F Zone of...
11/13/2013on Project Video
11/12/2013TomaGold and IAMGOLD Sign a $17.575 Million Agreement on the...
11/7/2013Knick's Trecesson Property - "Scheelite Area" Kicks Tungsten
11/5/2013Cornerstone Intersects 126m @ 0.38% Copper, 0.43 g/t Gold at...
11/5/2013Barisan Gold Intersects 262 Metres of 1.0% Copper Equivalent...
10/30/2013Joint Venture Partner=2C MARTE=2C Advances Underground Explo...
10/23/2013DISCOVERY OF HIGH GRADE NICKEL SULPHIDE MINERALIZATION AT IM...
10/16/2013Cornerstone Capital Resources Inc.: Final Assay Results Lift...
9/26/2013Western Athabasca Syndicate Discovers Strong Radon Anomalies...
9/12/2013Sunset Cove Mining: Strong Underground Assay Results From th...
9/10/2013Legend Gold property agreements with Corado, Etruscan
9/6/2013Klondike Gold Corp. - Lone Star Property Update
7/10/2013Skyharbour et al. firm up exploration JV at Athabasca Ticker...
6/7/2013Bayfield Commences Geological, Geotechnical and Geochemical ...
6/3/2013Klondike Gold Concludes Lone Star Data Compilation and Deli...
5/23/2013Bayfield Drills 16.0m of 10.47 g/t Gold and 34.68 g/t Silver...
5/14/201380 g/t Au over 0.8 meters)
5/14/2013Skyharbour Grants Lucky Strike a 25% Earn-In Option on 400,0...
4/25/2013NEAR SURFACE DRILL RESULTS INCLUDE 6.18 G/T GOLD OVER 40.0 ...
4/23/2013Bayfield Drills 11.0m of 12.19 g/t Gold and 30.05 g/t Silver...
4/23/2013TomaGold confirms the continuity of the 325 zone at depth, ...
4/9/2013Graniz: Graphite Hole #128 Intersects 7.7% Gp Over 93 Feet, ...
2/25/2013Announces Intention to Acquire El Tesoro Copper-Gold Project...
2/20/2013TomaGold Hits Three High-Grade Gold Intersections at Monster...
1/17/2013Otis Drills 121.9 Metres @ 1.04 g/t Au and 83.8 Metres @ 1.1...
1/16/2013EAGLE HILL INTERSECTS 14.74 G/T GOLD OVER 17.9 METERS IN NEA...
1/10/2013Bayfield Ventures Corp. : Bayfield Drills 15.0m of 11.06 g/t...
12/11/2012Partner=2C MARTE=2C Commences Underground Exploration Work a...
10/31/2012Sunset Cove Completes the Channel Sampling in the Lindsay S...
10/25/2012TomaGold Hits 26.9 g/t Gold Over 1.5 Metres at Monster Lake
10/23/2012Yorbeau Intercepts 35.0 g/t Au Over 3.0 Metres and 4.3 g/t A...
10/17/2012Metanor Continues to Pour Gold at Bachelor-97.4% Recovery at...
10/11/2012Bayfield drills 19.60m of 5.45 g/t Au and 20.63 g/t Ag at Ea...
10/11/2012Closes the Agreement to Option 37.4% of its Lipe=F1a Project...
10/8/2012Bayfield Announces Additional Burns Block Drill Results in t...
9/27/2012Eagle Hill Intersects 10.59 g/t Gold Over 24.0 Meters and Ex...
9/18/2012Receives US$750=2C000 in Cash / Lipe=F1a Partner MARTE Incre...
9/18/2012Receives US$750,000 in Cash / Lipeña Partner MARTE Increases...
7/26/2012Cornerstone and SolGold Plc Sign Definitive Option Agreement...
7/25/2012BAYFIELD CONTINUES TO EXPAND EASTERN BURNS BLOCK DISCOVERY Z...
7/23/2012Eagle Hill Intersects 15.24 g/t Gold Over 2.9 Meters and Ex...
7/11/2012Entree Gold Confirms High Grade Gold on Argo Zone at Shivee ...
5/16/2012Metals Creek Drills 5.83 g/t Gold over 16.27m at Thomas Ogde...
5/10/2012Eagle Hill Continues to Intersect Near Surface-High Grade Go...
5/9/2012Bayfield Drills 13.5m of 5.13 g/t Au and 25.21 g/t Ag in De...
5/1/2012TomaGold Lines up a Second High-Grade Intersection of 101.2 ...
4/30/2012Cornerstone Announces Further Exploration Programs on the Sh...
4/26/2012Heruga Deposit in Mongolia
4/20/2012agle Hill's New Drill Results Show Continuity of Near Surfac...
4/16/2012Metals Creek Drills 5.73 g/t Gold Over 23.3 m at Thomas Ogde...
4/10/2012Cornerstone and Solomon Gold Sign Letter of Intent for the ...
4/5/2012Eagle Hill Expands Caribou Gold Zone With 9.0 m of 5.3 g/t o...
4/4/2012Alberta Star Announces Production Rate for Newly Drilled Wel...
3/29/2012Bayfield Reports 7.5m of 7.31 g/t Au, 107.95 g/t Ag and 7.9m...
3/28/2012Entree Gold Upgrades and Expands Resources at Ann Mason
3/21/2012Entree Gold Announces Best Drill Results to Date for Ann Mas...
3/15/2012Galaxy Capital Corp. Acquires Buckingham Graphite Property i...
3/14/2012Bayfield Ventures Corp. : Bayfield Drills 13.94 g/t Au over ...
3/1/2012Eagle Hill's Deepest Drill Hole Extends the Known Vertical ...
2/23/2012Cadillac Updates Thierry Underground Resource
2/21/2012Bayfield Ventures Corp. : Bayfield Drills 10.5m of 3.44 g/t ...
2/16/2012Metals Creek Intersects 1.92 g/t Gold Over 94.0 Meters, Inc...
2/14/2012Cadillac Announces Updated K1-1 Inferred Resource Estimate
2/8/2012Metals Creek Intersects 1.46 g/t Gold Over 27.8 Meters Near ...
1/27/2012YORBEAU INITIATES 2012 EXPLORATION PROGRAM
12/12/2011BAYFIELD REPORTS 7.2M OF 656.88 G/T AG IN RAINY RIVER, NORT...
11/29/2011Bayfield Drills 61.02 g/t Gold Over 7m & 64.66 g/t Gold Over...
10/14/2011WINDFALL LAKE PROPERTY UPDATE: SUMMARY AND PLANS FOR 2012
10/5/2011Metanor Resources Inc.: 89 New IP Anomalies at Barry-13 Km o...
9/20/2011Bayfield Reports 1,414.55 g/t Silver over 1.10m in Rainy Riv...
9/1/2011Saturn Minerals Reports Positive Washability Results from th...
8/25/2011Eagle Hill Confirms New Gold Bearing Zone With 7.47 g/t Gold...
8/24/2011Drils 30 Metres of 1,395 ppm Lithium at Pastos Grandes Lithi...
8/17/2011GOLD HIGHLIGHTS TRECESSON DRILLING
8/16/2011Saturn Minerals Inc. Acquires 100% Interest in the Saskatoba...
4/28/20116.1G/T GOLD OVER 6.7M (0.18oz/ton gold over 22.0 ft) ON EAS...
2/20/2011(Pastos Grandes)Retains Consultant for 43-101 Resource Estimate at Pastos Gr...
3/3/2010Nemaska Commissions NI 43-101 Mineral Resource Estimate on ...
2/12/2010Nemaska Intersects 97.9 m of Spodumene Bearing Pegmatite on ...
Corporate news of New World Resource Corp.
4/2/2014RPG bonds gain massively on IPO news
2/27/2014MI3 for Investor Relations
2/24/2014TomaGold (TSX-V: LOT) - Alerte d'Analyse Technique - Technic...
2/14/2014Share Consolidation Effective February 18, 2014
2/11/2014PERISSON ANNOUNCES NEW OIL RESOURCES EVALUATION ON ITS VMM...
2/5/2014Encounters Sulphide Mineralization in First Two Drill Holes ...
1/30/2014Metanor (TSX-V: MTO) - Tech Alert Follow-up - Suivi d'Analys...
1/27/2014Sirona Biochem Completes Exclusive Licensing Agreement With ...
1/9/2014Metanor Produces 4,514 Ounces Au in December at Bachelor
1/6/2014Eurasian Minerals TSX-v: EMX) - Techinical Analysis Alert - ...
1/2/2014Eurasian Minerals (TSX-V: EMX) stock is moving above its 50 ...
12/23/2013es et Meilleurs Voeux
11/26/2013Integra Gold Intersects 32.32 g/t Gold over 3.0 meters in Fi...
11/21/2013Golden Share Reports Historical Drilling Up To 11.69 G/T Au ...
11/15/2013? Alerte d?Analyse Technique
11/6/2013Duluth Metals (TSX: DM) - Alerte d'Analyse Technique - Tech...
10/31/2013Golden Share Confirms strength of Berens Mineralized Systems...
10/29/2013ential moving average
10/22/2013Argex signs LOI for distribution of up to 25,000 tonnes of T...
9/27/2013GOLDEN SHARE INTERSECTS MULTIPLE MINERALIZED ZONES IN BEREN...
9/25/2013Weststar Resources Acquires East Miller Claims Adjacent to ...
6/28/2013Eagle Hill Consolidates 100% of the Windfall Lake Gold Depos...
5/8/2013Extenway Signs First Contract in Ontario
5/2/2013Doubleview Capital Corp. (TSX-V: DBV) Announces commencement...
4/22/2013Eagle Hill Announces Three Year Extension of Windfall Lake ...
4/3/2013Three More Quebec Hospitals Choose Extenway Bedside Terminal...
3/27/2013Skyharbour Increases Land Package Near Patterson Lake South ...
3/26/2013Extenway Terminals: Hospitals in Gatineau and Hull Enter the...
3/20/2013Skyharbour Acquires Significant U3O8 Land-Package in Patters...
2/7/2013Canada Gold Engages Mi3 Communications Financieres Inc. for ...
1/7/2013Receives Second Cash Installment from Lipe=F1a Partner=2C MA...
10/24/2012Preliminary Economic Assessment of Entree Gold's Ann Mason ...
10/19/2012Entree Gold Provides Corporate Update
10/9/2012TomaGold Starts Metallurgical Testing on the Monster Lake M...
9/28/2012Yorbeau Announces Mining Analyst Report
9/12/2012Rockland Drills Strong Platinum-Palladium Values At Blue Lak...
7/12/2012Eagle Hill Exploration Corporation: Additional Near Surface ...
5/30/2012Metanor Pours 1st Gold Bar at Bachelor
5/23/2012Nevado's Farrell at 101.72 mt of 0.33% V2O5 inferred
5/11/2012BonTerra Resources Inc. : BONTERRA ASSAYS 73.82 G/T GOLD OVE...
4/27/2012Eagle Hill Intersects 5.7 g/t of Gold Over 55.0 Meters at W...
4/23/2012Announces Expiry of Letter of Intent for Proposed Sale of Li...
4/23/2012Entree Gold's Mongolia Operations Continue to Advance
4/19/2012Yorbeau Identifies Two New Exciting Exploration Targets at t...
4/11/2012TomaGold Hits High Grade Intersection of 237.6 g/t Au Over 5...
4/3/2012Drill Program at the Thomas Ogden Zone in Timmins, Ontario
3/5/2012Announces Extension of Period of Exclusive Negotiations in C...
2/28/2012Eagle Hill Exploration Corporation: New Drill Results Expand...
2/2/2012Cadillac Announces Balance of Drilling Results at K1-1 Proje...
1/23/2012Bayfield Expands Rainy River Exploration Program with Drilli...
1/20/2012Booth #1914 - Vancouver Cambridge Conference, Vancouver, BC
1/19/2012Cadillac Announces Drilling Results at K1-1 Project at Thier...
12/20/2011review
12/8/2011TRECESSON AUTUMN PROSPECTING GOLD RESULTS
10/7/2011Murgor Resources Discovers Deep Gold Zone Below the Golden ...
9/2/2011Cadillac Ventures Inc.: Thierry Mine Updated Mineral Resourc...
8/23/2011Yorbeau Announces NI 43-101 Compliant Gold Resources on Aug...
8/23/2011igence program with Entrée Gold, ETG.TO
8/19/2011Saturn Minerals Completes 4,540 line-km Airborne Gravity Su...
7/28/2011Cadillac Obtains 0.36% Copper Over 430 Feet
7/27/2011EAGLE HILL REPORTS UP TO 97 PERCENT GOLD RECOVERY AT WINDFAL...
6/20/2011(Lipena)Announces the Commencement of Lipena-Bonete Drill Program
3/20/2011Closes Final Tranche of Non-Brokered Private Placement
4/1/2010Nemaska Reports 52.3 m at 1.85% Li2O, 165 ppm Beryllium (Be)...
2/23/2010Nemaska looks to earn Street cred
9/8/2009to provide market-making activities
7/30/2009Begins Sampling Program At Pastos Grandes Lithium Brine Pro...
7/22/2009Japan and China fight it out for right to mine lithium under...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (NW.V)OTHER OTC (NWFFF)
0.205+0.00%2.77+0.00%
TSX-V
CA$ 0.205
06/28 17:00 -
0%
Prev close Open
0.205 0.215
Low High
0.205 0.215
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.205 -%
Volume 1 month var.
20,000 -%
24hGold TrendPower© : 34
Produces
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.22+1.63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48-1.59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.84-1.31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.85-2.63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.83+0.78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :