Kimber Resources Inc

Published : October 12th, 2011

Positive 2011 Exploration Results Underpin Kimber Plans to Update Mineral Resource Estimate for Carm

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Hi, just a reminder that you're receiving this email because you have expressed an interest in Kimber Resources.
 
You may if you no longer wish to receive our emails.
October 12, 2011

Positive 2011 Exploration Results Underpin Kimber Plans to Update Mineral Resource Estimate for Carmen Deposit

Management focused on strengthening team that can advance Carmen towards a production decision

Vancouver, British Columbia - Kimber Resources Inc. (NYSE Amex:KBX, TSX:KBR) is pleased to announce plans to update the mineral resource estimate for the Carmen gold-silver deposit at its Monterde Project, Mexico, based on positive 2011 drilling that has included many new high-grade intercepts below the current mineral resource.  On the advice of its independent consultants, Kimber's management and Board have determined that these drilling results are essential components of any economic study that will be used for development and production planning and need to be incorporated into mineral resource estimates and economic studies.

"Kimber has already completed two independent preliminary economic assessments that show Kimber�s potential to become a profitable gold-silver producer at the Monterde project in Mexico," said Gordon Cummings, President & CEO.  "We are making important strides in 2011, not only to increase the overall quantity and grade of Kimber�s mineral resource base but to strengthen our management team and our Board from a development and production perspective, and to advance our project towards a production decision.  We have decided to take the right steps, in the right order, to ensure that we can bring Monterde into production as efficiently and quickly as possible, while ensuring we design a robust and profitable operation."

The objectives for the next several months include:

  • Hire an executive level engineer with significant production experience.  Kimber has embarked on a search to hire a production experienced executive to lead the effort to bring Monterde into production.
  • Complete an updated mineral resource estimate for the Carmen deposit by April 30, 2012 based on drill results up to October 2011.  Since the last mineral resource estimate, Kimber has drilled over 32,000 metres at Carmen.  As a result of the deeper, higher-grade discoveries below the currently estimated mineral resources, it appears that incorporation of the high-grade discoveries may lead to changes in open pit configuration and require more underground mine planning to optimize the economic results for the project.
  • Continue drilling to expand and upgrade mineral resources at Monterde.
  • Continue with work on geotechnical matters, water and waste management, processing, assessment of permit requirements and environmental matters and other priorities that must be addressed before a production decision can be made.

�Kimber is currently reviewing proposals for various other feasibility level work programs which could be completed in the second and third quarters of 2012," said Mr. Cummings. �With the planned completion of the mineral resource estimate for Carmen and the hiring of a senior engineering executive in the first quarter of 2012, Kimber can move quickly towards completion of a feasibility study.�

Highlights of the previously released 2011 drill program targeted at the Carmen Deep areas:

Drill Hole Section From (m) To (m) Intercept* (m) Gold (g/t) Silver (g/t) Gold equivalent** (g/t)
MTC-117 29 584.0 594.0 10.0 11.0 3.6 11.1
MTC-122D 32 643.2 645.5 2.3 22.7 32.6 23.2
MTC-123A 32 395.0 405.1 10.1 2.0 27.3 2.5
MTRD-472 27 268.0 276.5 8.5 1.2 96.2 2.8
MTRD-473 38 188.0 192.0 4.0 25.1 13.6 25.3
MTRD-476 30 565.5 570.4 4.9 78.4 127.9 80.5
MTRD-477 34 166.0 174.0 8.0 1.7 181.5 4.7
MTRD-477 34 255.5 260.7 5.2 51.9 1,076.7 69.9
MTRD-477 34 338.4 340.4 2.0 25.2 725.0 37.3
MTRD-477 34 418.5 419.4 0.9 44.5 38.2 45.1
MTRD-477 34 432.0 433.2 1.2 28.2 26.0 28.6
MTRD-478 44 60.0 64.0 4.0 2.3 232.0 6.1
MTRD-478 44 156.0 162.0 6.0 4.2 40.6 4.9
MTRD-478 44 348.4 352.6 4.2 13.0 11.8 13.2
MTRD-492 43 473.5 475.5 2.0 12.8 5.7 12.9
MTRD-502 30 584.0 587.0 3.0 8.8 7.7 8.9
MTRD-511 35 190.0 202.0 12.0 1.8 130.8 4.0
MTRD-511 35 210.0 224.0 14.0 4.5 112.4 6.4
MTRD-511 35 366.7 371.2 4.5 12.7 9.7 12.9
MTRD-511 35 377.2 383.0 5.8 6.4 18.1 6.7
MTRD-516 37 118.0 144.0 26.0 0.5 68.2 1.6

* True widths are expected to range between 65% and 85% of the intervals reported on the table above.
**Gold equivalent grade assumes equivalence of 60 grams of silver to one gram of gold.
*** Results for drill holes MTRD-472 , MTRD-473 and MTRD-478 were made public in a press release dated May 19, 2011; results for drill hole MTRD-477 were made public in a press release dated May 26, 2011; results for drill hole MTRD-476 were made public in a press release dated May 31, 2011; results for drill hole MTRD-492 were made public in a press release dated June 2, 2011; results for drill hole MTC-117 were made public in a press release dated July 27, 2011; results for drill holes MTC-122D and  MTRD-502 were made public in a press release dated August 31, 2011; and results for drill holes MTRD-123A, MTRD-511 and MTRD-516 were made public in a press release dated September 28, 2011.

 

Illustrations

A plan view of the location of the previously released drill holes shown in this release, completed in 2011, can be viewed via the following link:
Plan View of select ion of Carmen 2011 drill holes

Highlights of the previously released 2011 drill program targeted at the Carmen Open Pit area:

Drill Hole Section From (m) To (m) Intercept* (m) Gold> (g/t) Silver (g/t) Gold equivalent** (g/t)
MTR-446 29 14.0 50.0 36.0 0.60 61.8 1.6
MTR-447 31 22.0 50.0 28.0 0.27 72.0 1.5
MTR-448 33 20.0 32.0 12.0 0.95 200.0 4.3
MTR-449 37 28.0 46.0 18.0 0.42 74.6 1.7
MTR-454 47 2.0 36.0 34.0 0.54 118.4 2.5
MTR-455 49 46.0 56.0 10.0 0.68 266.8 5.1
MTR-458 45 8.0 24.0 16.0 0.23 79.7 1.6
MTR-458 45 36.0 76.0 40.0 0.78 99.4 2.4
MTR-460 46 38.0 94.0 56.0 0.44 89.7 1.9
MTR-470 27 38.0 48.0 10.0 2.18 98.0 3.8
MTR-480 28.5 20.0 52.0 32.0 1.40 71.4 2.6
MTR-490 39.5 10.0 18.0 8.0 1.10 115.4 3.0

* True widths are expected to range between 65% and 85% of the intervals reported on the table above.
**Gold equivalent grade assumes equivalence of 60 grams of silver to one gram of gold.
***Results for drill holes MTR-446, MTR-447, MTR-448 and MTR-449 were made public in a press release dated February 7 2011; results for drill holes MTR-454, MTR-455, MTR-458 and MTR-460 were made public in a press release dated March 3, 2011; results for drill hole MTR-470 were made public in a press release dated April 19 2011; and results for drill holes MTR-480 and MTR-490 were made public in a press release dated May 19, 2011.

About Kimber

Kimber owns mineral concessions covering in excess of 39,000 hectares in the prospective Sierra Madre gold-silver belt, including the Monterde property, where three gold-silver mineral resources have already been defined. The most advanced of these, the Carmen deposit, has been extensively drilled and has undergone detailed geologic modeling. The completion of the Preliminary Assessment for Monterde in 2010 represented a significant step forward for Kimber and is expected to lead to further development and more advanced economic studies at the Monterde deposits including the completion of a pre-feasibility study during 2011.

FOR FURTHER INFORMATION PLEASE CONTACT:

Matthew Hamilton
Manager of Investor Relations
or
Gordon Cummings CA
President and CEO

North America Toll Free: 1-866-824-1100
Tel: (604) 669-2251
Fax: (604) 669-8577

Website: http://www.kimberresources.com
Email: news@kimberresources.com

Forward Looking Statements
Statements in this release may be viewed as forward-looking statements, including statements regarding estimates of mineral resources at Monterde, the preliminary assessment of the Monterde project, the conversion of inferred resources to measured and indicated resources, the conversion of mineral resources to mineral reserves, life of mine estimates, the potential for gold and silver mineral resources in the Carmen deposit and other targets within the Monterde project, the further development of the Monterde project, expected results and future economic assessments of the Monterde project, decisions to proceed to production, and the availability of financial and human resources to undertake the development and operation of a mine. When used in this press release, the words �expect�, �intend�, �hopes�, �believe�, �may�, �will�, �could�, �if�, �anticipates�, �potential�, �planned� and similar expressions are intended to identify forward-looking statements. Such statements involve risks and uncertainties that could cause actual results to differ materially from those projected. Such risks and uncertainties include, among others, uncertainty of mineral reserve and mineral resource estimates, risks relating to fluctuations in the price of gold and silver, the inherently hazardous nature of mining-related activities, potential effects on Kimber�s operations of environmental regulations in the countries in which it operates, risks due to legal proceedings, risks relating to political and economic instability in certain countries in which it operates, risks related to the use of inferred resources in the preliminary assessment, and uncertainty of being able to raise capital on favourable terms or at all, as well as those risk factors discussed under the headings �Cautionary Note Regarding Forward-Looking Statements� and �Risk Factors� in Kimber�s latest Annual Report on Form 20-F as filed on September 27, 2011. There are no assurances the Company can fulfil such forward-looking statements and the Company undertakes no obligation to update such statements, except as required by law. Such forward-looking statements are only predictions; actual events or results may differ materially as a result of risks facing the Company, some of which are beyond the Company�s control.

The technical information in this news release has been prepared in accordance with Canadian regulatory requirements set out in National Instrument 43-101 and reviewed by Mr. Petrus (Marius) Mar� P.Geo., Vice-President Exploration of the Company. The exploration activities at the Monterde and Pericones project sites are carried out under the supervision of Mr. Mar�, who is the designated Qualified Person under National Instrument 43-101 for the Monterde and Pericones projects.

Cautionary Note to U.S. Investors � The United States Securities and Exchange Commission permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. Kimber Resources uses certain terms on its website (and certain press releases), such as �measured,� �indicated,� and �inferred,� �resources,� which the SEC guidelines strictly prohibit U.S. companies from including in their filings with the SEC. U.S. Investors are urged to consider closely the disclosure under the heading �Cautionary Note to U.S. Investors Regarding Mineral Reserve and Resource Estimates� in our latest annual report on Form 20-F which may be secured from us, or from the SEC�s website at http://www.sec.gov/edgar.shtml.


This email was sent to .com by news@kimberresources.com |  
Update Profile/Email Address | Instant removal with � | Privacy Policy.

Kimber Resources | 215 - 800 West Pender Street | Vancouver | BC | V6C 2V6 | Canada

Data and Statistics for these countries : Canada | Mexico | All
Gold and Silver Prices for these countries : Canada | Mexico | All

Kimber Resources Inc

EXPLORATION STAGE
CODE : KBR.TO
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Kimber Res. is a gold and silver exploration company based in Canada.

Kimber Res. holds various exploration projects in Mexico.

Its main exploration properties are MONTERDE CARMEN, PERICONES, SETAGO, MONTERDE CAROTARE and MONTERDE VETAS MINITAS in Mexico.

Kimber Res. is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 15.7 millions as of today (US$ 14.2 millions, € 10.4 millions).

Its stock quote reached its highest recent level on December 29, 2006 at CA$ 3.95, and its lowest recent point on August 16, 2013 at CA$ 0.07.

Kimber Res. has 104 700 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Kimber Resources Inc
2007 Annual Report
Annual Report 2006
Nominations of Kimber Resources Inc
10/10/2013and Invecture Announce Take-Over Bid Circular and Directors'...
9/20/2011appoints TIm Haldane to the board of directors
Financials of Kimber Resources Inc
10/1/2013Announces Year End Financial Results
2/15/2013Announces Second Quarter Financial Results
10/2/2012Announces 2012 Year End Results
10/2/2012Announces 2012 Year End Results
5/15/2012Announces Third Quarter Financial Results
2/14/2012Announces Second Quarter Financial Results
5/17/2011ANNOUNCES THIRD QUARTER FINANCIAL RESULTS
2/16/2011ANNOUNCES SECOND QUARTER FINANCIAL RESULTS
Project news of Kimber Resources Inc
4/16/2012Continues to Drill High-Grade Silver at Monterde Including 4...
1/26/2012Intercepts 7 Metres of 18.3 G/T Gold And 374.3 G/T Silver in...
1/20/2012Exhibits at Vancouver Resource Investment Conference
8/31/2011Intercepts 2.3 Metres of 22.7g/T Gold Below Carmen Gold-Silv...
7/27/2011Intercepts 10 Metres Of 11g/T Gold Below Carmen Gold-Silver ...
6/1/2011(Monterde Carmen)Intercepts 4.9 Metres Of 78.4 G/T Gold And 127.9 G/T Silver ...
5/27/2011(Monterde Carmen)Intercepts 5.2 Metres Of 51.9 G/T Gold And 1,076 G/T Silver ...
3/3/2011(Monterde Carmen)Intercepts 8 Metres Of 1.6 G/T Gold And 224 G/T Silver At Ca...
2/7/2011(Monterde Carmen)First Drill Results From Carmen Gold-Silver Deposit, Monterd...
7/27/2010Filing Of NI 43-101 Preliminary Assessment Technical Report ...
6/2/2010(Monterde Carmen)Positive Preliminary Assessment For Monterde
5/26/2010(Pericones)Updates exploration activities at Monterde gold-silver and P...
11/20/2009(Monterde Carmen)High Grade Gold-Silver Mineral Resource Estimate
Corporate news of Kimber Resources Inc
9/25/2013Invecture Group to Make C$0.15 Per Share Cash Offer for Kimb...
7/22/2013Files Form 25
6/25/2013Receives Notification of Non-Compliance from NYSE MKT and De...
6/18/2013Extends Repayment of Debt to Sprott Resource Lending to Dece...
5/7/2013Receives Notification Letter from the NYSE MKT Regarding Its...
5/1/2013Reports Additional High Grade Gold and Silver Results From U...
4/18/2013Makes Changes to the Board
1/31/2013Announces Drawdown of $2 Million From Bridge Loan Credit Fac...
1/22/2013Files Preliminary Short Form Base Shelf Prospectus and F-3 R...
10/24/2012Announces Updated Mineral Resource for the Carmen Deposit
9/27/2012Initiates Underground Sampling at its Monterde Gold-Silver P...
9/20/2012Attends Chicago Hard Assets
7/31/2012Appoints David Hembree as VP, Exploration and James Mckay as...
7/18/2012Announces $5 Million Bridge Loan Credit Facility
5/29/2012Intercepts 2.1 Metres Grading 4.3 g/t Gold and 167 g/t Silve...
4/16/2012Continues to Drill High-Grade Gold-Silver at Monterde Includ...
11/28/2011Intercepts 16.7 Metres of 9.9 g/t Gold Equivalent at the Car...
10/12/2011Positive 2011 Exploration Results Underpin Kimber Plans to U...
8/31/2011intercepts 2.3 metres of 22.7g/t gold below Carmen gold-silv...
7/27/2011intercepts 10 metres of 11g/t gold below Carmen gold-silver ...
6/8/2011Announces Updated Preliminary Assessment and Mineral Resourc...
6/2/2011Intercepts 2 Metres Of 12.8 G/T Gold Below Carmen Gold-Silve...
2/11/2010Closing of Public Offering of Common Shares in the U.S.
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (KBR.TO)AMEX (KBX)
0.150+0.00%0.140+0.00%
Last quotes and information before delisting
Prev close Open
0.150 0.145
Low High
0.145 0.155
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.150 -%
Volume 1 month var.
290,500 -%
Produces
Develops
Explores for Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 10/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.90+2.73%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+6.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :