Kimber Resources Inc

Published : June 02nd, 2010

Positive Preliminary Assessment For Monterde

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
You're receiving this email because of your relationship with Kimber Resources
 
You may if you no longer wish to receive our emails.
June 2, 2010

KIMBER ANNOUNCES POSITIVE PRELIMINARY ASSESSMENT FOR MONTERDE GOLD-SILVER PROJECT, MEXICO

Over 60,000 oz of Gold per Year with Net Cash Costs of US$254/oz over 13.4 Year Life

VANCOUVER, BRITISH COLUMBIA - Kimber Resources Inc. (NYSE AMEX:KBX, TSX:KBR) is pleased to announce that it has received the results of an independent Preliminary Assessment (�PA�) prepared by Micon International Ltd., with assistance by Kirkham Geosystems Ltd., Knight Pi�sold Consulting Ltd. and various consultants employed directly by Kimber, on its 100% owned Monterde project, located in Mexico�s Sierra Madre mining district. This National Instrument 43-101 compliant PA is based on the revised mineral resource estimate for the Carmen and Veta Minitas deposits at Monterde detailed in the NI 43-101 technical report by Micon International and released on December 8, 2009. The PA was prepared based on a combination of open pit and underground mining for mill feed and a focus on the high grade gold-silver mineralization at the Monterde deposits.

�The Preliminary Assessment for Kimber�s Monterde project presents a very attractive scenario for the development of a high grade, low cost gold-silver mine,� said Gordon Cummings, President & CEO of Kimber. �The mine plan laid out in the Preliminary Assessment involves a combination of open pit and underground mining, with material processed in a mill in order to maximize recoveries. Production is estimated to total 813,000 ounces of gold and 21.4 million ounces of silver over a mine life of 13.4 years,� he said. �Completion of this PA for Monterde is a crucial step in defining the potential economics at Monterde and outlines a path forward for the completion of a pre-feasibility study and potential project development. Opportunities have also been identified to expand the mineral resources at the three existing deposits, while additional potential has been identified in new areas of mineralization located to the north of the Carmen deposit.�

Highlights of the Preliminary Assessment

The following are the highlights of the Monterde PA:
  • Before tax (at prices of US$875 per ounce of gold and US$14 per ounce of silver):
    • IRR of 24.9% with undiscounted net cash flows of US$372 million;
    • Project NPV (at an 8% discount rate) of US$141.8 million.
  • After tax (at prices of US$875 per ounce of gold and US$14 per ounce of silver):
    • IRR of 21.4% with undiscounted net cash flows of US$277 million;
    • Project NPV (at an 8% discount rate) of US$99.0 million;
    • Payback of pre-production capital and operating costs within 4.1 years.
  • After tax (at near spot prices of US$1,200 per ounce of gold and US$18.00 per ounce of silver):
    • IRR of 36.5% with undiscounted net cash flows of US$531 million;
    • Project NPV (at an 8% discount rate) of US$231 million;
    • Payback of pre-production capital and operating costs within 2.5 years.
  • Pre-production capital of US$111.4 million, with total life-of-mine capital cost of US$130.6 million, including a total contingency amount of US$28.3 million.
  • Total mine life of 13.4 years, with combination of open pit and underground production for 10 years at an average mill throughput of approximately 2,500 tonnes per day, followed by underground only for 3.4 years, with average mill throughput of approximately 1,500 tonnes per day.
  • Average annual production of 62,600 ounces of gold and 1.85 million ounces of silver for the first 10 years of production and average life-of-mine annual production of 60,600 ounces of gold and 1.60 million ounces of silver.
  • Life-of-mine cash costs of US$254 per ounce of gold, with silver as a by-product credit, and total costs of production, including capital costs, of US$415 per ounce of gold, with silver as a by-product credit.
  • Average annual production of 92,100 gold equivalent ounces for the first 10 years of production with average annual production of 86,200 gold equivalent ounces over the life of mine for 13.4 years (total production of 812,700 gold ounces and 21.4 million ounces of silver).
  • Life-of-mine cash costs of US$433 per gold equivalent ounce and total costs of production for life-of-mine, including capital costs, of US$546 per gold equivalent ounce.

The PA includes inferred mineral resources as part of the mine plan.. It is noted that CIM Mineral Resource Definition Standards dated November 22, 2005 states that �due to the uncertainty that may be attached to Inferred Mineral Resources, it cannot be assumed that all or any part of an Inferred Mineral Resource will be upgraded to an Indicated or Measured Mineral Resource as a result of continued exploration.�

Economic Analysis

The economic assessment in the PA is preliminary in nature and uses inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that this preliminary economic assessment will be realized. The inferred mineral resource used in the mine plan represents 37% of the total life-of-mine (�LOM�) mineral resource.

Analysis of various price scenarios and varying discount rates before tax

  Pre-Tax Results
Case Case 1 Case 2 Case 3
Gold price per ounce (US$) $875.00 $1,200.00 $898.37
Silver price per ounce (US$) $14.00 $18.00 $14.78
IRR 24.9% 42.3% 26.9%
Undiscounted net cash flows (US$ millions) $371.7 $721.5 $407.4
NPV 5% discount rate (US$ millions) $204.6 $432.6 $228.0
NPV 8% discount rate (US$ millions) $141.8 $322.5 $160.5
Case 1 is base case
Case 2 is near spot May 28, 2010
Case 3 is 3 year trailing average to 30 April, 2010

Analysis of various price scenarios and varying discount rates after tax

  After Tax Results
Case Case 1 Case 2 Case 3
Gold price per ounce (US$) $875.00 $1,200.00 $898.37
Silver price per ounce (US$) $14.00 $18.00 $14.78
IRR 21.4% 36.5% 23.2%
Undiscounted net cash flows (US$ millions) $277.0 $530.7 $303.4
NPV 5% discount rate (US$ millions) $147.6 $313.9 $165.2
NPV 8% discount rate (US$ millions) $99.0 $231.4 $113.2
Case 1 is base case
Case 2 is near spot May 28, 2010
Case 3 is 3 year trailing average to 30 April, 2010

The following table details some of the key mine plan parameters and assumptions used in this Preliminary Assessment:

Project parameters Amounts
Total tonnes of ore produced 10,609,000
Life-of-mine ore production rate 2,200 tpd
Open Pit
  • Tonnes of mill feed produced
5,195,000
  • Average gold grade
1.71 g/t
  • Average silver grade
122.2 g/t
  • Stripping ratio
13.8
Underground
  • Tonnes of mill feed produced
5,414,000
  • Average gold grade
3.34 g/t
  • Average silver grade
89.4 g/t
Gold recovery average* 95.6%
Silver recovery average* 61.8%
Recoverability after losses in solution and dor� refining losses 98.5%
Total recoverable gold production (ounces) 812,700
Total recoverable silver production (ounces) 21,423,800
Payability factor - gold 99.5%
Payability factor - silver 98.0%
Exchange rate US$:Mexican Peso 13.0
Mine Life 13.4 years
Initial capital US$111.4  million
Life-of-mine capital US$130.6 million
Average annual gold production
  • First 10 years
62,600 ounces
  • LOM
60,600 ounces
Average annual silver production
  • First 10 years
1,845,500 ounces
  • LOM
1,598,800 ounces
Total mining operating cost open pit LOM US$24.94/t milled
Total mining operating costs underground LOM  US$39.34/t milled
Processing Cost US$13.88/t milled
G&A  US$0.94/t milled
Corporate Tax Rate 28%
* Gold and silver recoveries are calculated as an average excluding losses in solution and refining dor� losses which are detailed separately above (losses in solution and refining dor� losses total 1.5% for both gold and silver).

Gold equivalent ounces referred to in this news release are based on prices of US$875/oz gold and US$14/oz silver for recovered ounces, giving a ratio of 62.5 to convert recoverable silver ounces to gold equivalent ounces. After refining charges, net revenue per payable ounce has a ratio of 63.7 to 1.

Compliance with National Instrument 43-101

Mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral resource estimates do not account for mineability, selectivity, mining loss and dilution. These mineral resource estimates include inferred mineral resources that are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. There is also no certainty that these inferred mineral resources will be converted to the measured and indicated categories through further drilling, or into mineral reserves, once economic considerations are applied

Qualified Persons

The following qualified persons, as defined in National Instrument 43-101, were involved in the preparation of the PA and have read and approved the relevant technical portions of this news release:

  • Mr. Richard Gowans, P. Eng., President and Metallurgical Engineer of Micon International, Ontario, Canada
  • Mr. Jim Leader, P. Eng., Senior Mining Engineer of Micon International, British Columbia, Canada
  • Mr. Christopher Jacobs, CEng, MIMMM of Micon International, Ontario, Canada
  • Mr Mike Godard, P. Eng., Senior Metallurgist for Micon International, British Columbia, Canada
  • Mr. Garth Kirkham, P.Geo., Principal Consultant of Kirkham Geosystems Ltd., British Columbia, Canada
  • Mr Jeremy Haile, P. Eng., President and Civil Engineer of Knight Pi�sold Ltd, British Columbia, Canada
  • Mr Gary Giroux P.Eng., Senior Consultant of Giroux Consultants, British Columbia, Canada
  • Mr. J. Byron Richards, P.Eng., Senior Consultant of JB Engineering, British Columbia, Canada

The technical information in this news release has been prepared in accordance with Canadian regulatory requirements set out in National Instrument 43-101 and reviewed by Mr. Petrus (Marius) Mare P.Geo., Vice-President Exploration of the Company.

About Kimber

Kimber owns mineral concessions covering in excess of 39,000 hectares in the prospective Sierra Madre gold-silver belt, including the Company's Monterde property, where three deposits with gold-silver mineral resources have already been defined. The most advanced of these, the Carmen deposit, has been extensively drilled and has undergone detailed geologic modeling in order to evaluate the potential for a combined open pit and underground mining operation based on current mineral resources. The Company is now seeking to complete a preliminary economic assessment of the Monterde deposits. In addition, the Company has a 100% interest in the mineral concessions of its Pericones property, an 11,890 hectare property targeted for silver, located approximately 160 kilometres southwest of Mexico City.

FOR FURTHER INFORMATION PLEASE CONTACT:

Matthew Hamilton
Manager of Investor Relations
or
Gordon Cummings CA
President and CEO

North America Toll Free: 1-866-824-1100
Tel: (604) 669-2251
Fax: (604) 669-8577

Website: http://www.kimberresources.com
Email: news@kimberresources.com

Statements in this release may be viewed as forward-looking statements. Such statements involve risks and uncertainties that could cause actual results to differ materially from those projected. There are no assurances the Company can fulfil such forward-looking statements and the Company undertakes no obligation to update such statements. Such forward-looking statements are only predictions; actual events or results may differ materially as a result of risks facing the Company, some of which are beyond the Company�s control.

The mineral resource estimates for the Carmen and Veta Minitas Deposits at Monterde were prepared by Mr. Gary Giroux P.Eng., a senior associate of Micon International, and the results for Carmen are effective at November 17, 2009 and for Veta Minitas at November 30, 2009. The estimation of grades was constrained by models of the geological and mineralized zones created by Kimber geological staff under the supervision of Mr. Petrus (Marius) Mare, P.Geo. Mr. Petrus (Marius) Mare, P.Geo. is the Vice-President Exploration, and the designated Qualified Person (�QP�) for the Monterde project under National Instrument 43-101. Models of the geology and mineralization of gold and silver at Carmen were reviewed and approved by Mr. Terrence Hennessey P.Geo. of Micon International. The wireframes of the high grade and low grade gold and silver mineralization were interpreted into various sub-domains to optimize the sample search orientation by Pierre Desautels P.Geo. of PEG Mining Consultants Inc. The gold and silver metallurgical recovery models used to calculate gold and silver recoveries by block and gold equivalent grade by block were prepared by Kimber staff and consultants, and reviewed and approved by Richard Gowans P.Eng., President of Micon International.

The technical information in this news release has been prepared in accordance with Canadian regulatory requirements set out in National Instrument 43-101 and reviewed by Mr. Petrus (Marius) Mare P.Geo., Vice-President Exploration of the Company. The exploration activities at the Monterde and Pericones project sites are carried out under the supervision of Mr. Mare, who is the designated Qualified Person under National Instrument 43-101 for the Monterde and Pericones projects. Mr. Petrus (Marius) Mare, Vice-President Exploration, is the designated Qualified Person (Q.P.) for the Monterde project, being responsible for quality assurance and quality control (�QA/QC�), and has verified the data being disclosed. He has determined that the laboratory reports matched the surface and adit sample logs and that the quality control assays fall within reasonable limits. QA/QC procedures incorporate blanks inserted at the core shack and standards inserted after sample preparation in respect of the Monterde Project samples. Pulps are analyzed by ALS Chemex at its laboratory in North Vancouver, British Columbia, using 50 gram sub-samples, using fire assay with an AA finish for gold and four-acid digestion and ICP finish for silver from a 0.4 gram subsample. High grade gold or silver intervals are re-assayed by fire assay with gravimetric finish.

Cautionary Note to U.S. Investors - The United States Securities and Exchange Commission permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. Kimber Resources uses certain terms on its website (and certain press releases), such as �measured,� �indicated,� and �inferred,� �resources,� which the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC. U.S.Investors are urged to consider closely the disclosure in our Form 20 F which may be secured from us, or from the SEC�s website at http://www.sec.gov/edgar.shtml.


This email was sent to .com by news@kimberresources.com.
Update Profile/Email Address | Instant removal with � | Privacy Policy.

Kimber Resources Inc. | 215 - 800 West Pender Street | Vancouver | BC | V6C 2V6 | Canada

Data and Statistics for these countries : Canada | Mexico | All
Gold and Silver Prices for these countries : Canada | Mexico | All

Kimber Resources Inc

EXPLORATION STAGE
CODE : KBR.TO
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Kimber Res. is a gold and silver exploration company based in Canada.

Kimber Res. holds various exploration projects in Mexico.

Its main exploration properties are MONTERDE CARMEN, PERICONES, SETAGO, MONTERDE CAROTARE and MONTERDE VETAS MINITAS in Mexico.

Kimber Res. is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 15.7 millions as of today (US$ 14.2 millions, € 10.4 millions).

Its stock quote reached its highest recent level on December 29, 2006 at CA$ 3.95, and its lowest recent point on August 16, 2013 at CA$ 0.07.

Kimber Res. has 104 700 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Kimber Resources Inc
2007 Annual Report
Annual Report 2006
Nominations of Kimber Resources Inc
10/10/2013and Invecture Announce Take-Over Bid Circular and Directors'...
9/20/2011appoints TIm Haldane to the board of directors
Financials of Kimber Resources Inc
10/1/2013Announces Year End Financial Results
2/15/2013Announces Second Quarter Financial Results
10/2/2012Announces 2012 Year End Results
10/2/2012Announces 2012 Year End Results
5/15/2012Announces Third Quarter Financial Results
2/14/2012Announces Second Quarter Financial Results
5/17/2011ANNOUNCES THIRD QUARTER FINANCIAL RESULTS
2/16/2011ANNOUNCES SECOND QUARTER FINANCIAL RESULTS
Project news of Kimber Resources Inc
4/16/2012Continues to Drill High-Grade Silver at Monterde Including 4...
1/26/2012Intercepts 7 Metres of 18.3 G/T Gold And 374.3 G/T Silver in...
1/20/2012Exhibits at Vancouver Resource Investment Conference
8/31/2011Intercepts 2.3 Metres of 22.7g/T Gold Below Carmen Gold-Silv...
7/27/2011Intercepts 10 Metres Of 11g/T Gold Below Carmen Gold-Silver ...
6/1/2011(Monterde Carmen)Intercepts 4.9 Metres Of 78.4 G/T Gold And 127.9 G/T Silver ...
5/27/2011(Monterde Carmen)Intercepts 5.2 Metres Of 51.9 G/T Gold And 1,076 G/T Silver ...
3/3/2011(Monterde Carmen)Intercepts 8 Metres Of 1.6 G/T Gold And 224 G/T Silver At Ca...
2/7/2011(Monterde Carmen)First Drill Results From Carmen Gold-Silver Deposit, Monterd...
7/27/2010Filing Of NI 43-101 Preliminary Assessment Technical Report ...
6/2/2010(Monterde Carmen)Positive Preliminary Assessment For Monterde
5/26/2010(Pericones)Updates exploration activities at Monterde gold-silver and P...
11/20/2009(Monterde Carmen)High Grade Gold-Silver Mineral Resource Estimate
Corporate news of Kimber Resources Inc
9/25/2013Invecture Group to Make C$0.15 Per Share Cash Offer for Kimb...
7/22/2013Files Form 25
6/25/2013Receives Notification of Non-Compliance from NYSE MKT and De...
6/18/2013Extends Repayment of Debt to Sprott Resource Lending to Dece...
5/7/2013Receives Notification Letter from the NYSE MKT Regarding Its...
5/1/2013Reports Additional High Grade Gold and Silver Results From U...
4/18/2013Makes Changes to the Board
1/31/2013Announces Drawdown of $2 Million From Bridge Loan Credit Fac...
1/22/2013Files Preliminary Short Form Base Shelf Prospectus and F-3 R...
10/24/2012Announces Updated Mineral Resource for the Carmen Deposit
9/27/2012Initiates Underground Sampling at its Monterde Gold-Silver P...
9/20/2012Attends Chicago Hard Assets
7/31/2012Appoints David Hembree as VP, Exploration and James Mckay as...
7/18/2012Announces $5 Million Bridge Loan Credit Facility
5/29/2012Intercepts 2.1 Metres Grading 4.3 g/t Gold and 167 g/t Silve...
4/16/2012Continues to Drill High-Grade Gold-Silver at Monterde Includ...
11/28/2011Intercepts 16.7 Metres of 9.9 g/t Gold Equivalent at the Car...
10/12/2011Positive 2011 Exploration Results Underpin Kimber Plans to U...
8/31/2011intercepts 2.3 metres of 22.7g/t gold below Carmen gold-silv...
7/27/2011intercepts 10 metres of 11g/t gold below Carmen gold-silver ...
6/8/2011Announces Updated Preliminary Assessment and Mineral Resourc...
6/2/2011Intercepts 2 Metres Of 12.8 G/T Gold Below Carmen Gold-Silve...
2/11/2010Closing of Public Offering of Common Shares in the U.S.
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (KBR.TO)AMEX (KBX)
0.150+0.00%0.140+0.00%
Last quotes and information before delisting
Prev close Open
0.150 0.145
Low High
0.145 0.155
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.150 -%
Volume 1 month var.
290,500 -%
Produces
Develops
Explores for Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 10/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.92-1.71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+0.00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.38-3.64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.32+0.46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.77-1.12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.10-0.89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :