News Release - Monday, January 30, 2012
Tournigan's Prefeasibility Study Indicates Kuriskova Could be Among World's Lowest Cost Uranium Producers

Vancouver, January 30, 2012-Tournigan Energy Ltd. (TVC: TSX-V; TGP: Frankfurt) has received a Preliminary Feasibility Study ("PFS") on its flagship Kuriskova high-grade uranium deposit located in Slovakia from its independent consultant, Tetra Tech, Inc. (Tt), in Golden, Colorado.

Highlights of the PFS for Kuriskova:
  • Internal Rate of Return 30.8%; 1.9 year payback; $277 million Net Present Value (NPV) at an 8% discount rate (Pre-Tax, base case US$68/lb U3O8 , US$15/lb Mo);
  • 94% increase of Indicated Resource to 28.5 million pounds of U3O8 since Tournigan�s June 2009 Preliminary Economic Assessment (�PEA�);
  • 92% uranium recovery in PFS, increased from 90% in the PEA;
  • 62% increase in the uranium grade to the process plant to 0.408% U3O8 in the PFS from 0.252% U3O8 in PEA;
  • 26% lower life of mine operating costs in the PFS compared to the PEA. The PFS estimates US$22.98/lb U3O8 life of mine operating costs and US$16.68/lb U3O8 during the first 4 years of production. These are net of a molybdenum credit of about US$1.27 per pound of U3O8 ;
  • 1.5 year decrease of preproduction construction period in PFS to 3 years compared to 4.5 years in the PEA;
  • The project can be developed as an underground mine/processing facility with a very small surface footprint;
  • Kuriskova would utilize Best Available Technologies in the mining and processing operations. The uranium can be extracted using conventional alkaline (non-acid) processing; and
  • There are multiple exploration targets within the Kuriskova License area, with the potential to expand the resource base and extend project life.
"We are very pleased with these results. They demonstrate that the Kuriskova project has the potential to be among the lowest cost uranium producers in the world. The PFS not only illustrates the robust economics of the Kuriskova project but also the competitive advantages it has over other uranium projects as a result of its high-grade resource and relatively low operating cost estimates." said Dorian L. (Dusty) Nicol, Tournigan's president and chief executive officer.
"Our next step is, working with our strategic partner Areva, to begin a Feasibility Study and Environmental Assessment Study that will continue to define project parameters to a higher degree of confidence and allow the permitting of the project to begin. The development of the Kuriskova uranium project could provide Slovakia with a secure source of uranium for approximately 30 years at its current consumption rate," said Nicol.

Mineral Reserves and Resource Estimate

The PFS resource estimate is based on the report, "Mineral Resource Update Kuriskova Uranium Project East-Central Slovakia" prepared by Tetra Tech, Inc. dated June 9, 2011 (the Independent Qualified Person for this report was Dr. Rex Bryan of Tetra Tech) as summarized in the following table:

Kuriskova Resource Estimate April 2011 - Cutoff 0.05%U *
  U% Tonnes
(000)
%U3O8 U3O8 lbs
(000)
Mo% Tonnes
(000)
Mo lbs
(000)
Total Indicated (Main Zone, Hanging wall zone
and Zone 45 )
0.471 2,328 0.555 28,487 .065 2,301 3,312
Total Inferred (Main Zone, Hanging wall zone
and Zone 45 )
0.157 3,099 0.185 12,664 .033 2,996 2,185
* Molybdenum resource numbers represent molybdenum associated with uranium resource blocks above a 0.05%U cutoff.

Based on estimated Indicated Resources, mineral reserves (including dilution tonnage of 5% at a grade of 0.03% U) were estimated at 2.5 million tonnes at an average grade of 0.346%U which was determined to provide an underground mining rate of about 210,000 ore tonnes per year at an economic cutoff of 0.13% U3O8 for approximately 13 years. No Inferred resources were used in reserve calculation or mine plan.

Resource Expansion Potential

Tournigan is planning an exploration program to continue testing multiple uranium exploration targets within the Kuriskova license area. Exploration success would likely add resources that could be accessed from the planned Kuriskova infrastructure. Tournigan will conduct further step-out exploration drilling where the high-grade mineralization is open along strike and at depth.

Mining and production

The PFS states that the project would be best developed as an underground mine using conventional mining and processing methods. The mine plan is based on underhand drift and fill mining utilizing a roadheader as the primary production method and assuming an external dilution (over break) of 5% at a grade of 0.03% U.

The project would be designed with an underground processing facility. As a result of the mining and processing facilities being underground, the project can be developed with a very small surface footprint. The uranium can be extracted using conventional alkaline (non-acid) processing. Kuriskova would utilize Best Available Technologies in the mining and processing operations.

Metallurgical test results completed at Hazen Research in Golden, Colorado indicate that uranium and molybdenum recoveries can be achieved using conventional alkaline leaching and precipitation circuits producing separate uranium (yellowcake) and molybdenum concentrates.

The average annual production of uranium as a U3O8 concentrate would be approximately 786 tonnes and 84 tonnes of molybdenum in molybdenite with a life-of-mine U3O8 production of 20.9 million pounds (9,500 tonnes). Project economics in the base case analysis are based on these figures.

Metallurgy and Processing

Metallurgical test results completed at Hazen Research in Golden, Colorado indicate that uranium and molybdenum recoveries of 92.0% and 86.8%, respectively, can be achieved using conventional alkaline leaching and precipitation circuits producing separate uranium (yellowcake) and molybdenum concentrates.

Financial Analysis

The base case uses forward prices of US$68/lb U3O8 and US$15/lb Mo respectively.

Initial capital costs are US$225 million (including owner's costs and a contingency of US$31 million). During the life of mine there will be sustaining capital requirements of about US$71 million.

Total operating costs are estimated to be US$22.98 per pound of U3O8 over the mine life. During the first 4 years of production, total operating costs are estimated at US$16.68 per pound of U3O8 . These costs are net of a byproduct credit for molybdenum of about US$1.27 per pound of U3O8 .

In addition to adding value to the Kuriskova project, molybdenum has been defined as a Class 2 strategic metal by the European Union. Royalties payable to the government in this base case will add about US$2.89 per pound of U3O8 .

The base case internal rate of return is estimated at 30.8% on a pre-tax basis with a 1.9 year payback after the start of production on an estimated initial capital cost of US$225 million including owner's costs and a contingency of US$31 million.
At an 8% discount rate, the pre-tax NPV is estimated at US$277 million. The project is financially sensitive to U3O8 price and amount of uranium produced per year. This is directly related to the tonnage and grade mined and processed annually as well as to plant recovery.

The following tables illustrate the sensitivity of the project to changes in U3O8 price and discount rate used in the NPV calculation:

Uranium (U3O8) Price Sensitivity

Economic Parameter

-10%

Base Case

+10%

($61.2)

($68.0)

($74.80)

NPV

$201.2 $276.8 $352.4
IRR

25.7%

30.8%

35.4%

Discount Rate Sensitivity

NPV 0%

NPV 5%

NPV 8% Base Case

NPV 10%

$618.3 $374.2 $276.8 $225.7

All dollar values are in US$ millions.

All dollar values are in US$ millions.

PFS Technical Report

A PFS Technical Report will be filed on SEDAR within 45 days.

Qualified Person

This release has been reviewed and approved by Dr. Rex Bryan and Dr. Richard W. Jolk, P.E. of Tetra Tech of Golden, Colorado both independent Qualified Persons as defined in NI 43-101. This release has also been reviewed and approved for Tournigan by Dorian L. Nicol, President and CEO of Tournigan, and a Qualified Person as defined in NI 43-101.

About Tournigan

Tournigan is a uranium exploration and development company. The company's flagship asset is the Kuriskova uranium deposit in Slovakia, among the highest grade uranium deposits in the world. Slovakia currently has four nuclear reactors generating half of its electricity, with two more reactors planned or under construction.

With the anticipated acquisition of uranium properties from Mawson Resources Ltd., Tournigan is diversifying geographically by acquiring projects in Sweden and Finland, also members of the European Union and countries which rely on nuclear generated electricity. In Sweden, ten nuclear reactors generate over 40% of the country's electricity. Finland currently has four operating reactors generating about 28% of the country's electricity. A fifth large nuclear plant is under construction in Finland with plans firming for a sixth. Tournigan is committed to safe and sustainable exploration and mine development.

TOURNIGAN ENERGY LTD.

"Dusty Nicol"

Dorian L. (Dusty) Nicol, President and CEO

For further information please contact: Doris Meyer, at (604) 536-2711, or visit www.tournigan.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statement:

This news release contains forward-looking statements that are based on the Corporation's current expectations and estimates. Forward-looking statements are frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans to continue to be refined; possible variations in ore grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Corporation disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

Notice to US investors:

This press release uses the terms "indicated resources" and "inferred resources", which are calculated in accordance with the Canadian National Instrument 43-101 and the Canadian Institute of Mining and Metallurgy Classification system. We advise investors that while those terms are recognized and required by Canadian regulations, the U.S. Securities and Exchange Commission do not recognize them. U.S. investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into reserves. In addition, "Inferred resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to a higher category. Under Canadian rules, estimates of Inferred Mineral Resources may not form the basis of feasibility or pre-feasibility studies, except in certain exceptional cases. U.S. investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally minable.


Copyright � 2012 TOURNIGAN ENERGY LTD. (TSXV-TVC) All rights reserved. For more information visit our website at http://www.tournigan.com/ or send email to info@tournigan.com ..

Data and Statistics for these countries : Finland | Slovakia | Sweden | All
Gold and Silver Prices for these countries : Finland | Slovakia | Sweden | All

Tournigan Energy Limited

EXPLORATION STAGE
CODE : TVC.V
ISIN : CA8915651035
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Tournigan Energy Ltd. is a gold and silver exploration company based in Canada.

Tournigan Energy Ltd. holds various exploration projects in Slovakia.

Its main exploration properties are NOVOVESKA HUTA and KURISKOVA in Slovakia and CURRAGHINALT in Ireland.

Tournigan Energy Ltd. is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 5.2 millions as of today (US$ 4.2 millions, € 3.9 millions).

Its stock quote reached its highest recent level on December 31, 2007 at CA$ 4.50, and its lowest recent point on February 17, 2023 at CA$ 0.02.

Tournigan Energy Ltd. has 208 018 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Tournigan Energy Limited
2008 Annual Report
2007 Annual Report
Financings of Tournigan Energy Limited
1/5/2012Closes Private Placement With Areva, And Welcomes Andreas M...
7/14/2010Closes Private Placement
6/29/2010Plans Private Placement
Nominations of Tournigan Energy Limited
1/30/2009Cuts Costs, Opens Denver Office, Appoints CFO, Corporate Sec...
11/3/2008Appoints VP Engineering / Environmental and VP Exploration
8/8/2007Appoints New Chairman
Project news of Tournigan Energy Limited
3/1/2012To Open March 1, 2012 As European Uranium Resources Ltd.
2/22/2012Takes Final Steps To Become European Uranium Resources Ltd.
11/30/2011(Novoveska Huta)Files Technical Report For Novoveska Huta Resource
4/26/2011(Kuriskova)Increases Indicated Resource at Kuriskova by 39% to 28.5 Mil...
3/7/2011(Kuriskova)Continues to Improve Grade in Kuriskova's Main Zone South
8/3/2010(Kuriskova)Metallurgical Testing For Prefeasibility Study Indicates Ura...
3/24/2010(Kuriskova)Increases Indicated Resource, Adds High Grade, at Kuriskova ...
11/23/2009(Kuriskova)Discovers New Zone of High Grade Mineralization at Kuriskova
11/9/2009(Kuriskova)Drills More High Grade Uranium at Kuriskova
11/3/2009(Kuriskova)Initial Metallurgical Testing at Tournigan's Kuriskova Proje...
10/19/2009(Kuriskova)Awards Prefeasibility Study of Kuriskova Uranium Deposit
10/1/2009(Kuriskova)Resumes Drilling at Kuriskova Uranium Deposit
9/30/2009(Curraghinalt)Sells Curraghinalt Gold Project
7/27/2009Files Technical Report
6/26/2009(Kuriskova)Positive Preliminary Assessment for Tournigan's Kuriskova Ur...
6/8/2009(Kremnica Mine)Signs Option Agreement on Kremnica Gold Property
2/24/2009(Kuriskova)Doubles Contained Uranium and Increases Grade of Indicated R...
1/19/2009(Kuriskova)Provides Update on Kuriskova Uranium Deposit in Slovakia
9/10/2008(Kuriskova)Adds Uranium Mineralization at Kuriskova and Novoveska Huta
8/29/2008(Kuriskova)Files Kuriskova Technical Report
7/16/2008(Kuriskova)Upgrades Portion of Kuriskova Resource to Indicated Category...
4/23/2008(Kuriskova) Continues Reporting High Grade Uranium Assays at Kuriskova,...
4/8/2008(Kuriskova)Reports High Grade Chemical Assay Results at Kuriskova
2/28/2008(Curraghinalt)Confirms High-Grade Gold Veins at Curraghinalt with Addition...
2/21/2008(Kuriskova)Kuriskova Infill Drilling Returns More High Grade Uranium
12/5/2007(Curraghinalt) Announces Significant Increase in Curraghinalt Gold Resourc...
Corporate news of Tournigan Energy Limited
3/13/2012(Kuriskova)European Uranium Files Technical Report For Kuriskova Prelim...
3/1/20122012 Outlook
2/2/2012in Northern Miner
1/30/2012(Kuriskova)Prefeasibility Study Indicates Kuriskova Could be Among Worl...
12/28/2011News Release
12/7/2011Forges Alliance With Areva, Acquires Scandinavian Uranium As...
8/23/2011(Kuriskova)Geotechnical Drilling Hits Uranium Mineralization at Much Hi...
8/9/2011(Kuriskova)s Progress on Prefeasibility Study for Kuriskova
4/8/2011Elects New Board Member
7/20/2010Mobilizes Zone 45 Drill Program
4/30/2010files Voluntary U.S. Deregistration
4/15/2010completes sale of Kremnica to Ortac
1/14/2010Cuts 4.5 Metres of 0.977 Percent eU3O8 at Kuriskova
1/5/2010Sale of Irish Property Brings Year-End Cash Up to $5.6 Milli...
12/10/2009Members of Parliament Did Not Agree with Uranium Mining Ban
11/2/2009Closes $5.5 Million Dalradian Sale
3/2/2009Completes Sale of U.S. Uranium Properties
12/23/2008Finalizes Dalradian Gold Agreement in Northern Ireland
10/2/2008Arranges Sale of Non-Core Assets in Northern Ireland and the...
9/4/2008A Letter to Shareholders from Dorian L. (Dusty) Nicol, Presi...
7/9/2008Information Now Available Through S&P Market Access Program
5/15/2008Provides Clarification
5/5/2008Name Change to Tournigan Energy Ltd. Focus on Kuriskova Uran...
3/19/2008's Uranium Targets Continue to Expand
3/4/2008 Completes Acquisition of US Uranium Interests
2/8/2008Extends Uranium Roll-front in Wyoming
1/31/2008Adopts Shareholder Rights Plan
1/15/2008Hits Uranium in Wyoming
10/24/2007 Announces Exploration Property Resource Changes, Restatemen...
10/12/2007Tournigan U.S. Uranium Acquisition Agreement and Reorganizat...
7/19/2007 Project Updates
5/29/2007Receives Positive Pre-feasibility on Kremnica Gold
5/28/2007Seeks to Unlock Shareholder Value by Separating
5/7/2007Tournigan's Resource at Kuriskova (Jahodna) Almost Triples t...
4/19/20072007 Operational Update - Uranium Properties
3/29/2007Adds Claims in Wyoming
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (TVC.V)FRANKFURT (TGP.F)
0.025-16.67%0.012+71.43%
TSX-V
CA$ 0.025
05/18 11:38 -0.010
-16.67%
Prev close Open
0.030 0.025
Low High
0.025 0.025
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
0.025 -  0.035 -16.67%
Volume 1 month var.
69,300 -%
24hGold TrendPower© : 44
Produces
Develops
Explores for Gold - Molybdenum - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/10/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
20240.00%
20230.00%0.040.02
2022-86.11%0.230.02
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.92-1.71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+0.00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.38-3.64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.32+0.46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.77-1.12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.10-0.89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :