Bear Creek Mining Corporation

Published : October 13th, 2011

Provides Corporate Update; Corani Feasibility Study on Schedule, Tassa Drilling to Commence; Peru

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Re:       News Release - Tuesday, October 11, 2011
Title:     Bear Creek Provides Corporate Update; Corani Feasibility Study on Schedule, Tassa Drilling to Commence; Peru

Vancouver, B.C. - Bear Creek Mining (TSX Venture: BCM / BVL: BCM) ("Bear Creek" or the "Company") is pleased to provide updates on its development and exploration programs in Peru. The Company maintains an aggressive generative exploration program while advancing the development of the Corani silver-lead-zinc mine with a nearly completed feasibility study for a mine capable of producing up to 15 million ounces of silver per year. The three exploration prospects described in this update range from advanced Phase II drilling programs at the Tassa silver/gold prospect and at the La Yegua copper prospect to new acquisitions and discoveries. (To view location map of new projects please refer to: http://www.bearcreekmining.com/i/pdf/BearCreekMiningProjectLocationMapOct11-2011.pdf)

Corani Silver-Lead-Zinc Deposit - The feasibility study is scheduled for completion in early November and is expected to describe a robust project in line with previous guidance at an expanded throughput rate (22,500 tpd, or approximately 15M ounces Ag/year).

Drilling continues with three rigs principally focusing on condemnation and geotechnical drilling at the tailings and waste rock sites. Interestingly, drilling has encountered mineralization in the vicinities of the planned waste rock and tailings dam facilities. The first condemnation drill hole (CS-01) located in the upper part of the tailings storage facility 2.8 kilometers south of the current pit limit intersected 16 meters averaging 0.55 g/t Au, 23.95 g/t Ag, 1.26% Pb, and 0.45% ̥Zn. The mineralization intersected to date is not expected to significantly alter the project design pending further drilling results; however, the tailings storage facility may require minor modification if offset drilling demonstrates that the mineralization warrants inclusion in the reserve/resource models. Furthermore, two engineering holes (MS02 and MS03) drilled in waste rock sites intersected altered and fractured sedimentary basement rock containing highly anomalous Zn and weakly to moderately anomalous Pb, Cu, Ag and Au. Four of the initially planned fourteen condemnation drill holes have been completed. Results of additional drilling and potential impacts on the project infrastructure will be reported as information is received and evaluated. Importantly, the intersection of potentially economic mineralization during the condemnation and engineering drilling demonstrates that further exploration potential is significant in this under-explored district. (To view Corani drill hole location map please refer to: http://www.bearcreekmining.com/i/pdf/CoraniDrillHoleOctober11-2011.pdf)

Santa Ana Silver Deposit - The status of Santa Ana remains under the conditions of the Supreme Decree issued on June 25, 2011 by the previous Peruvian administration (see news release dated June 25, 2011). The Company maintains its firm position that any modification or annulment to the Supreme Decree, granted in 2007 in full accordance with Peruvian law and confirming Bear Creek's titles to its mineral concessions located within 50 kilometers of the territorial border, is illegal and without basis. The Company is hopeful that a negotiated settlement which remains the preferred outcome for the Santa Ana silver project despite the legal actions taken by the Company to counter the Supreme Decree issued by the Garcia government can be reached in order to achieve a mutually acceptable resolution. Management is confident that a resolution can be reached with the new government which will place this important investment for Peru back on the development track as Santa Ana is supported by local communities and will provide significant revenues, growth and local employment that will assist in reducing poverty in over eighteen communities located in the department of Puno, Peru.

Related to the issuance of the Supreme Decree in June 2011, the Company was recently notified of a civil lawsuit lodged by the Ministry of Energy and Mines' former administration against the Company claiming that the Santa Ana titles were not acquired by the Company in accordance with the law. Similar to the action taken under the Supreme Decree, the Company and its Peruvian legal counsel strongly maintain that the grounds of this action are without merit.

Tassa silver-gold (100% BCM) - Phase II drilling is scheduled to commence by October 25th with an estimated 4,000 meters in approximately 9 drill holes. As reported, Phase I drilling encountered numerous mineralized intercepts including 60 meters averaging 224.2 g/t Ag from 24 to 84 meters depth and 40 meters averaging 110.7 g/t Ag from 2 to 42 meters depth as well as scattered anomalous gold intercepts with up to 1.24 g/t Au over 2 meters (see news release dated 6 December, 2010). Phase I drilling tested a 1.5 km by 800 meter anomaly where 852 rock chip samples averaged 30.71 g/t silver. Silver (and gold) mineralization was intersected within multiple phases of breccias which are part of a diatreme breccia complex, strongly fractured rhyolitic volcanics, and brecciated sediments.

Phase II drilling will focus on new target areas defined within a 4 kilometer by 1 kilometer area where two-meter wide surface sampling has identified anomalous outcrops containing up to 2.51&#805;g/t Au in silicified outcrops and 5.36 g/t Au in structures (assay values range from <5ppb to 5.36 g/t Au) and up to 203 g/t Ag in strongly fractured rhyolite and 8,160 g/t Ag in selected structures (assay values range from <0.2 g/t to 8,160 g/t Ag ). The anomalies occur within the hydrothermal breccia complex and the Mesozoic sedimentary contact zone and overlie strong IP anomalies indicating sulfide mineralization at depths between 100 and 400 meters.

Drilling will test for gold mineralization hosted within underlying favorable sediments in contact with the mineralized breccias. The target model at Tassa bears strong similarities to the nearby Canahuire/ Chucapaca discovery (Goldfields/Buenaventura) 16 kms to the southeast which contains reported resources of 132.7 MT averaging 1.4 g/t Au and 10.8 g/t Ag (6M oz Au and 46M oz Ag) with mineralization remaining open. Surface mapping at Tassa continues to identify additional breccias to the north suggesting the continuation of the hydrothermal breccia complex below the Mesozoic sediments further expanding the target area. Stratigraphic studies suggest that the favorable sediments were not reached in the Phase I drilling; therefore, Phase II drilling will test deeper in the system (up to 500 meters depth) where favorable Mesozoic sedimentary formations which host the Canahuire/Chucapaca mineralization are believed to exist in contact with the breccia complexes. (To view Tassa map with expanded target please refer to: http://www.bearcreekmining.com/i/pdf/TassaOct11-2011.pdf)

Sumi gold project - The Company holds a 100% interest comprised of 1,200 hectares in a Bear Creek discovery located in the Au-Ag Tertiary-age epithermal belt in central Peru. The prospect exhibits alteration and mineralization typical of a volcanic-hosted, high- and low-sulfidation precious metals system. To date, seventy (70) surface rock chip samples have been collected and field work continues. Assay results for the first 48 samples have returned precious metal values including 15.65 g/t gold and 156 g/t silver in a vein- breccia structure over widths of 0.3 to 2.0 meters and 12.1 g/t gold and 102 g/t silver over 2 meter widths in a silicified volcano- sedimentary rock. Twenty-seven (27) of the first forty-eight (48) assay samples received contained highly anomalous gold > 100 ppb. The remaining assay results will be reported in future news releases. As previously reported, the prospect was partially tested in 2003 and 2006 by a third party with limited drilling reportedly intersecting multi-gram gold values over intervals ranging from 2 to over 47 meters and beginning at the surface. The limited drill program totaled approximately 4,600 meters; however, drilling did not test altered targets where ongoing sampling continues to identify anomalous gold in outcrop. Currently, field work indicates that an 800 by 400 meters prospective area remains untested. Furthermore, favorable sedimentary formations have been identified indicating potential for underlying gold mineralization at shallow depth. Plans are to complete detailed surface mapping, sampling and geophysics in preparation for Phase I drilling estimated to commence the first quarter of 2012.

La Yegua copper-gold-molybdenum project (100% BCM) - La Yegua is located 20 kms northeast of the Los Chancas copper/gold/molybdenum deposit in a prolific porphyry copper belt also containing the Las Bambas, Huaquira, Constancia, Tintaya and Antapaccay deposits.

As previously reported, Bear Creek entered into a joint venture agreement with Japan Oil, Gas and Metals National Corporation ("JOGMEC") to advance the La Yegua Project into Phase II drilling (see news release dated April 6, 2011). The agreement provides for JOGMEC to earn a 51% interest through investing US$3M over a three year period. Previous limited drilling intersected up to 114 meters with 0.24% copper and 0.03 g/t gold was restricted to a small portion of the altered intrusive complex. Recently, the joint venture completed additional geophysics identifying two high-chargeability anomalies defined by Induced Polarization/ Resistivity ("IP") surveys. These two targets, measuring 700 x 300 meters and 500 x 300 meters, are located at shallow depths 600 meters east and 1.5 kms south-west of previous drilling and strongly suggest the presence of untested porphyry targets.

Currently, the first coincident IP and surface geochemical copper anomalies is being tested by Diamond drilling with the first hole testing an anomaly within an altered quartz-feldspar porphyry intrusive containing anomalous copper (500 ppm) in outcrop. The total drill plan for this phase is approximately 750 meters in 3- 4 drill holes. Geologic mapping outside the main drilling area is underway to identify possible future drilling targets.

Consistent with the Company's aggressive generative exploration philosophy, several additional prospects in the portfolio are being evaluated for future drilling or acquisition.

The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release.

- End -


Andrew Swarthout - CEO, or Patrick De Witt - Investor Relations
Phone: 604-685-6269 Direct: 604-628-1111
E-mail: info@bearcreekmining.com
For further information, please visit the Company's website (www.bearcreekmining.com)

Regulatory footnotes:

All of Bear Creek's exploration programs and pertinent disclosure of a technical or scientific nature are prepared by or prepared under the direct supervision of Marc Leduc, P. Eng., President and COO, Christian Rios, P.Geo. Exploration Manager and the CEO, Andrew Swarthout, P.Geo., who serve as the Qualified Persons under the definitions of NI 43-101. All Diamond drilling has been performed using HQ diameter core with recoveries averaging greater than 95%. Core is logged and split on site under the supervision of Bear Creek geologists. Sampling is done on two-meter intervals and samples are transported by Company staff to Arequipa, Peru for direct shipping to ALS Chemex, Laboratories in Lima, Peru. ALS Chemex is an ISO 9001:2000-registered laboratory and is preparing for ISO 17025 certification. Silver, lead, and zinc assays utilize a multi-acid digestion with atomic absorption ("ore-grade assay method"). The QC/QA program includes the insertion every 20th sample of known standards prepared by SGS Laboratories, Lima. A section in Bear Creek's website is dedicated to sampling, assay and quality control procedures.

Certain disclosure in this release, including management's assessment of Bear Creek's plans and projects, constitutes forward-looking statements that are subject to numerous risks, uncertainties and other factors relating to Bear Creek's operation as a mineral exploration company that may cause future results to differ materially from those expressed or implied in such forward-looking statements. These risks, uncertainties and other factors are disclosed in Bear Creek's continuous disclosure filings with Canadian securities regulators including its most recent annual information form, available on www.sedar.com. Bear Creek expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise.


Copyright � 2011 BEAR CREEK MINING CORPORATION (BCM) All rights reserved. For more information visit our website at http://www.bearcreekmining.com/ or send email to info@bearcreekmining.com.

Data and Statistics for these countries : Japan | Peru | All
Gold and Silver Prices for these countries : Japan | Peru | All

Bear Creek Mining Corporation

DEVELOPMENT STAGE
CODE : BCM.V
ISIN : CA07380N1042
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Bear Creek Mining is a silver development stage company based in Canada.

Bear Creek Mining develops silver, lead and zinc in Peru, and holds various exploration projects in Peru.

Its main assets in development are SANTA ANA PERU and CORANI in Peru and its main exploration properties are LA YEGUA, DON MARCELO PERU, ATASPACA and TASSA in Peru.

Bear Creek Mining is listed in Canada and in United States of America. Its market capitalisation is CA$ 38.7 millions as of today (US$ 28.3 millions, € 26.4 millions).

Its stock quote reached its lowest recent point on September 17, 2004 at CA$ 0.29, and its highest recent level on October 06, 2006 at CA$ 9.99.

Bear Creek Mining has 103 090 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Bear Creek Mining Corporation
Annual Report 2006
Annual Report 2005
2004 Annual Report
Option Grants of Bear Creek Mining Corporation
3/24/2011 Grants 893,000 Stock Options at $10,77
Nominations of Bear Creek Mining Corporation
8/6/2013Announces Promotion of Peruvian GM Elsiario Antunez De Mayol...
3/16/2012Announces Appointment of New CFO
Financials of Bear Creek Mining Corporation
4/22/2016Board Approves Adoption of Shareholder Rights Plan
Project news of Bear Creek Mining Corporation
8/15/2014Peru hopes to revive Bear Creek mine, avoid legal battle
1/13/2014Announces Start Of Phase I Drilling At Its Carito Gold Proje...
4/15/2013(Corani)Announces Positive Corani Public Hearing and Life of Mine Co...
12/11/2012(Corani)submits Corani ESIA; silver project on track for approval
8/16/2012(Corani)Provides Corani Project and Exploration Update, Peru
10/13/2011(Tassa)Provides Corporate Update; Corani Feasibility Study on Sched...
10/13/2011(Corani)Provides Corporate Update; Corani Feasibility Study on Sched...
7/13/2011(Santa Ana Peru)Announces the Filing of Legal Actions to Protect its Santa A...
6/1/2011(Santa Ana Peru)Reports Peruvian Government Resolution Which Potentially Fur...
2/28/2011(Santa Ana Peru)AWARDS EPCM CONTRACT AND COMPLETES MILESTONE PUBLIC HEARING ...
1/24/2008 Announces First Santa Ana Leachable Silver Deposit Resource...
1/17/2008(Corani)Announces Positive Scoping Study And Updated Resource Estima...
1/15/2008(Corani) Completes Earn-In On Corani Silver Deposit; Final Payment T...
Corporate news of Bear Creek Mining Corporation
7/26/2016Bear Creek Mining Announces Closing of $30 Million Bought De...
7/6/2016Bear Creek Mining Corporation Annolunces Bought Deal Financi...
7/5/2016Bear Creek Mining Addresses Share Price Movement
6/20/2016Bear Creek Mining Grants Incentive Stock Options
4/22/2016Bear Creek Mining Board Approves Adoption of Shareholder Rig...
4/18/2016Bear Creek Mining Addresses Share Price Movement
1/27/2016Bear Creek Mining Provides An Update On Corporate Activities
7/20/2015Bear Creek Mining Files NI 43-101 Technical Report for Coran...
2/23/2015Bear Creek Grants Incentive Stock Options
2/23/2015Bear Creek grants incentive stock options
2/19/2015Bear Creek Provides Update on Feasibility Study, Corani, Per...
2/19/2015Bear Creek provides update on Feasibility Study, Corani, Per...
10/15/2014Bear Creek Provides Corporate Update
10/15/2014Bear Creek Provides Corporate Update
9/8/2014Bear Creek provides update on Corani, Peru optimization and ...
8/12/2014Bear Creek announces its intent to commence an arbitration a...
6/23/2014Bear Creek provides corporate update
5/14/2014Bear Creek says Peru court renews right to revive silver pro...
5/14/2014IIROC Trading Resumption - BCM
5/14/2014Bear Creek Mining Announces Conference Call Details
5/14/2014Bear Creek Announces Favorable Judicial Decision in the Sant...
5/12/2014IIROC Trading Halt - BCM
2/7/2014Files Notice Of Intent To Arbitrate With Peruvian Government...
9/25/2013(Corani)Announces Approval of Corani ESIA, Peru
8/28/2013(Corani)Announces Official Submission Of Responses To Comments; Cora...
6/17/2013Announces Appointments of Three New Officers
5/7/2013Announces Senior Management Change
4/2/2013Announces Adoption of Advance Notice Policy for Future Share...
3/18/2013Announces The Acquisition Of Two New Precious Metals Explora...
3/13/2013Announces Positive Drill Results on Its Sumi Gold Project, P...
2/6/2013Grants Incentive Stock Options
2/5/2013Announces Favorable Ruling In Santa Ana Civil Case, Peru
6/12/2012Grants Incentive Stock Options
4/20/2012Retains Renmark Financial Communications Inc.
1/24/2012Grants Incentive Stock Options
9/2/2011Grants Incentive Stock Options
6/30/2011Expresses Condolences Over the Loss of Karen Swarthout
6/26/2011Peruvian Unrest at Juliaca Airport Occurring 160KM from Proj...
5/24/2011Reports on Peruvian Government Study on Mining Permit Proces...
4/8/2011Provides Update On Its Exploration Programs Including Two Ne...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (BCM.V)Other OTC (BCEKF)
0.375+1.35%0.275+1.48%
TSX-V
CA$ 0.375
04/26 16:59 0.010
1.35%
Prev close Open
0.370 0.370
Low High
0.365 0.380
Year l/h YTD var.
0.170 -  0.420 108.33%
52 week l/h 52 week var.
0.160 -  0.720 -40.48%
Volume 1 month var.
233,877 70.45%
24hGold TrendPower© : -6
Produces
Develops Lead - Silver - Zinc
Explores for Copper - Gold - Molybdenum
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/26/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-17.58%
2023-40.13%0.920.41
2022-40.16%1.370.37
2021-59.42%3.370.92
20209.82%4.170.75
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :