Erdene Provides Project Updates and First Quarter Financial Results
Published : June 15, 2011
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   B-wave | Coal | Commodities | Copper | Gold | Gold Discovery | Growth | Kaolin |

HALIFAX, NOVA SCOTIA--(Marketwire - June 15, 2011) - Erdene Resource Development Corp. ("Erdene" or "Company") (News - Market indicators), today provided an update on the Company's principal projects in conjunction with the release of its first quarter 2011 financial results.

Highlights

  • Marston finalizing Donkin NI 43-101 report expected in the second quarter

  • Zuun Mod 30 year Mining Licence Issued

  • Zuun Mod NI 43-101 Resource Estimate Issued

  • Initial Drilling Program completed on the Khuvyn Khar copper discovery

  • Ends quarter with $7.5 million in cash and cash equivalents

Project Summaries and Updates

Donkin Coal Project

On April 7, 2011, subsequent to the end of the quarter, the Donkin Coal Project manager, Xstrata Coal Donkin Management Limited ("Xstrata"), delivered its internal pre-feasibility study to both Erdene and Marston & Marston Inc. ("Marston"). An independent National Instrument 43-101 ("NI 43-101") compliant technical report is being prepared by Marston based on the Donkin coking coal project internal Pre-Feasibility Study and is expected to be finalized by the end of the second quarter 2011. 

Erdene has a 25% interest in the Donkin Coal Project, located on Cape Breton Island, Nova Scotia with joint-venture partner and project manager, Xstrata. The deposit is accessed by 3.5-kilometre twin access tunnels and is strategically located proximal to deep water with ready access to most of the world's major shipping routes. The NI 43-101 compliant resource includes 227 million metric tonnes ("Mt") of Indicated and 254Mt of Inferred high volatile-A bituminous (12,000-14,000 BTU/lb) coal. The processed Donkin coal also has many excellent coking coal properties including low ash, low phosphorus, high CSN (crucible swell number) and high fluidity. At full production, the Donkin Coal Project is expected to utilize five continuous miners added incrementally over the first 18 months of commercial production. In addition, a coal wash plant will be built on site and it is proposed that coal will be transported from the mine site using a barge to ship system or by rail to Sydney Harbour. Under the revised development plan, the Donkin Coal Project is projected to produce approximately 2.75 million tonnes per annum of washed, export-grade metallurgical and thermal coal at full production, pending receipt of all government approvals.

Zuun Mod Molybdenum Project - Mongolia

In February, the Corporation announced the results of recent drilling at Zuun Mod which indicated higher molybdenum and copper grades in the South Racetrack deposit. A new NI 43-101 compliant report by independent technical consultants, Minarco MineConsult (part of the Runge Group), was commissioned to provide an updated resource estimate. Subsequent to the end of the first quarter, the new resource estimate was issued which included an increase in the Measured and Indicated resources by 38 million tonnes as well as an increase in the average grade. 

Subsequent to the end of the first quarter, a 30-year renewable Mining License was granted by the Mongolian Government. The Zuun Mod Mining License covers an area of 6,041 hectares and contains the South Racetrack and North Racetrack deposits, which hosts all of the Measured and Indicated resources at Zuun Mod. The Mining License also contains the Khuvyn Khar copper prospect. Approval of an application for a second contiguous Mining License, south of the approved Mining License, is pending. This license application covers 358 hectares and contains the Stockwork deposit which hosts 17.8 percent of the Inferred resource at Zuun Mod.

Khuvyn Khar Copper Project

In February, the Corporation also announced results from exploration drilling on the Khuvyn Khar copper prospect, located on the Zuun Mod Mining License. A drill hole (ZMD 121) located 2.2 km to the northwest of the main Zuun Mod Mo/Cu deposit returned an average grade of 1.3% copper and 9.24 g/t silver over 34 metres, from 308 to 342 metres. Subsequent to the end of the first quarter a follow-up drilling program was carried out over the Khuvyn Khar copper prospect with results pending.

Nomin Copper-Gold Prospect

The Nomin prospect is a new copper-gold discovery located in southwestern Mongolia. Samples from ancient shallow pits returned an average of 2.2% copper and 1.7g/t gold over a strike length of 250 metres. A sample from a second similar occurrence, 1.2 kilometres south-southwest of the main occurrence, returned assays of 1.6% copper and 1.15g/t gold. Geophysical surveys (magnetic and IP dipole-dipole) have been completed over the area of the mineral occurrences. During the first quarter, Wave Geophysics LLC of Colorado, USA was contracted to re-process and create a 3D model of the geophysical data from the Nomin property to assist in the identification of drill targets. An exploratory drilling program is planned for later this month to test a number of geochemical and geophysical targets on this property.

In 2011, the Corporation will continue to expand its program of regional exploration to identify areas, principally in southern Mongolia, with the potential to host porphyry related copper-gold-molybdenum mineralization.

Coal Projects in Mongolia

Erdene is involved in a comprehensive coal generative and acquisition program in Mongolia that evaluates numerous prospective metallurgical and high-quality thermal coal deposits. The program is being fully funded by the Company's partner, Xstrata Coal, under an Alliance Agreement with whom it is coordinating operations. During the first quarter of 2011, Erdene continued to complete numerous property evaluations and seek to identify and secure high-quality, large-tonnage coal deposits on behalf of the Alliance.

On March 8th, 2011 Xanadu Mines Ltd. commenced an extensive drilling programme at its Galshar coal project in South East Mongolia, 250 kilometres South East of Ulaanbaatar. The aim of the current drilling programme is to further define the known deposit into a JORC code compliant resource. Erdene holds a royalty interest from any coal mined from the property.

Granite Hill Aggregate Project

Erdene's Granite Hill Project (also known as the "Sparta Quarry") is a former producing granite aggregate quarry in central Georgia. Erdene owns the 342-acre property, which holds in excess of a 120 million-ton resource and is situated on an existing rail line allowing for market penetration throughout the south eastern United States. The quarry is currently being developed by Aggregates USA (Sparta), LLC, ("AUSA"), a major construction materials producer, which is responsible for fully funding all capital and operating costs for the project. Under the mining lease, the corporation has granted an exclusive right to AUSA to mine, process, and sell aggregate from the Granite Hill property. The sale of all aggregate from the property is subject to an industry competitive royalty payable to the Corporation.

During the first quarter 2011, installation of plant equipment continued and construction started on the railway underpass on Highway 16 to link the property to the existing rail-line. This work is expected to be completed in the third quarter of 2011. Commercial production is forecast to commence in late 2011 at an estimated start-up production rate of one million tons of granite aggregate per year, with a design capacity of up to 2.5 million tons. Based on current production projections, the Granite Hill project will have an estimated lifespan in excess of 30 years.

Advanced Primary Minerals Corp.

Erdene controls 60% of TSX-V listed Advanced Primary Minerals Corporation ("APM"). In the first quarter on 2011, APM recognized clay sales of $195,268 (2010 - $109,575). APM continues to build on its customer base through sales and customer trials in the manufacture of value-added products for the ceramics, paint and paper industries. APM's goal is to be North America's leading specialized primary kaolin producer with its unique, high quality primary clay deposits and modern processing facility.

Quarter ended March 31, 2011 Financial Summary

Erdene successfully made the transition to International Financial Reporting Standards ("IFRS"). The transition required extensive research and analysis and was carried out with the advisory support of the Company's auditor, KPMG.

Erdene's first quarter financial statements and Management's Discussion and Analysis were filed with regulatory authorities on June 14, 2011 and are available on the Company's website at www.erdene.com and on SEDAR at www.sedar.com.

For the three months ended March 31, 2011, revenues amounted to $240,388, compared to $129,082 in 2010. Cost of sales amounted to $314,263 compared to $424,320 in the prior year.

Exploration and operating expenses amounted to $881,976 in the first quarter of 2011, compared to $239,394 in 2010. Deferred expenditures for the quarter totalled $609,021 compared to $226,454 in 2010.

Expenditures were primarily directed toward the continued advancement of the Company's core projects: the Donkin Coal Project and the Zuun Mod molybdenum-copper project. Specifically, expenditures by project were as follows:

  • Zuun Mod: $206,080 for the three months ended March 31, 2011 (2010 - $81,920)

  • Donkin: $483,941 for the three months ended March 31, 2011 (2010 - $141,867)

  • Coal exploration in Mongolia funded by Xstrata Coal: $71,908 for the three months ended March 31, 2011 (2010 – $118,899).

Corporate & administrative expenses totalled $3,753,849 for the three months ended March 31, 2011 (including non-cash stock based compensation of $3,115,643), compared to $633,262 in the first quarter of 2010 (including non-cash stock based compensation of $103,095).

The Company recorded a loss of $4,719,540, or $0.05 per share, in the first quarter of 2011 compared with a loss of $1,016,177, or $0.01 per share, for the same period in 2010. At March 31, 2011, Erdene had approximately $7.5 million in cash and cash equivalents and $7.1 million in working capital, including that of its controlled subsidiary APM, compared to $8.3 million at December 31, 2010.

About Erdene

Erdene Resource Development Corp. is a diversified resource company with multiple projects at various stages of development from exploration to production; all projects are focused on high-growth commodities. Erdene has a current working capital position of approximately $5.6 million, including that of its controlled subsidiary Advanced Primary Minerals Corp., with 90,323,377 common shares issued and outstanding and a fully diluted position of 97,841,377 common shares.

Qualified Person

J.C. (Chris) Cowan, P. Eng. (Ontario) is a Qualified Person as that term is defined in National Instrument 43-101 and has reviewed and approved the technical information contained in this news release. Sample analyses have been carried out at SGS Laboratory in Ulaanbaatar, Mongolia. In addition to internal checks by SGS Laboratory, the company incorporates a QA/QC sample protocol utilizing prepared standards, blanks and duplicates.

Forward-Looking Statements

Certain information regarding Erdene contained herein may constitute forward-looking statements within the meaning of applicable securities laws. Forward-looking statements may include estimates, plans, expectations, opinions, forecasts, projections, guidance or other statements that are not statements of fact. Although Erdene believes that the expectations reflected in such forward-looking statements are reasonable, it can give no assurance that such expectations will prove to have been correct. Erdene cautions that actual performance will be affected by a number of factors, most of which are beyond its control, and that future events and results may vary substantially from what Erdene currently foresees. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration results, continued availability of capital and financing and general economic, market or business conditions. The forward-looking statements are expressly qualified in their entirety by this cautionary statement. The information contained herein is stated as of the current date and subject to change after that date. Erdene does not assume the obligation to revise or update these forward-looking statements, except as may be required under applicable securities laws.

NO REGULATORY AUTHORITY HAS APPROVED OR DISAPPROVED THE CONTENTS OF THIS RELEASE

Erdene Resource Development Corp.
Peter C. Akerley, President and CEO or
Ken W. MacDonald, Vice President Business Strategy and CFO
(902) 423-6419
info@erdene.com
www.erdene.com
or
Renmark Financial Communications Inc.
Barbara Komorowski: bkomorowski@renmarkfinancial.com
Dustin Buenaventura: dbuenaventura@renmarkfinancial.com
(514) 939-3989 or (416) 644-2020
www.renmarkfinancial.com
Data and Statistics for these countries : Mongolia | All
Gold and Silver Prices for these countries : Mongolia | All

Erdene Resource Development Corporation

EXPLORATION STAGE
CODE : ERD.TO
ISIN : CA29480N2068
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Erdene is a gold and copper exploration company based in Canada.

Erdene holds various exploration projects in Canada and in Mongolia.

Its main exploration properties are DONKIN in Canada and DURVULJIN UUL, ERDENET and GALSHAR UUL in Mongolia.

Erdene is listed in Canada and in United States of America. Its market capitalisation is CA$ 60.3 millions as of today (US$ 44.1 millions, € 41.0 millions).

Its stock quote reached its highest recent level on July 06, 2007 at CA$ 2.05, and its lowest recent point on November 01, 2013 at CA$ 0.07.

Erdene has 145 390 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Erdene Resource Development Corporation
6/14/2018Erdene becomes first cross-listed firm on the Mongolian Stoc...
5/31/2018Mongolia listing boosts investors confidence in Erdene Resou...
5/10/2018Erdene soars as Altan Nar project in Mongolia proves larger ...
5/3/2018Mongolian Copper Corp considers international fight for Erde...
12/8/2017Mongolian Gov't can't nationalize Erdenet Copper Mine — cour...
Financings of Erdene Resource Development Corporation
4/23/2013Closes Private Placement
12/12/2012Announces Private Placement
12/6/2011Completes Private Placement Financing
11/28/2011Closes $1,715,000 Financing Pursuant to Private Placement Th...
6/20/2008Closes $18.6 Million Private Placement
6/2/2008Announces $15 Million Private Placement
Financials of Erdene Resource Development Corporation
8/17/2009Reports 2009 Second Quarter Financial Results and Provides P...
5/19/2009Reports 2009 First Quarter Financial Results and Provides Pr...
5/15/2008Reports First Quarter Operating and Financial Results
Project news of Erdene Resource Development Corporation
11/18/2013Completes Trenching Program on the Altan Nar Gold-Silver Pro...
8/8/2012(Donkin)Finalizes Agreement to Separate Donkin Coal and Mongolian Mi...
7/26/2012(Donkin)Provides Donkin Export Coking Coal Project Update
7/3/2012Completes US$3.35 Million Sale of the Granite Hill Quarry Pr...
6/28/2012(Donkin)to Separate into Two Public Companies focused on Donkin Coal...
1/17/2012Granite Hill Quarry Commences Production: Erdene Receives Mi...
7/27/2011(Nomin)Drill Results Confirm Continuity of Copper-Gold-Silver Sulfi...
6/30/2011(Donkin)Receives Independent Technical Report on Donkin Export Cokin...
6/1/2011(Zuun Mod Molybdenum)Receives Mining License for the Zuun Mod Molybdenum-Copper P...
3/4/2011(Zuun Mod Molybdenum)Reports Additional Results from Mongolian Copper Discovery: ...
11/28/2008(Donkin Coal Project)Provides Update on Donkin Coal Project
Corporate news of Erdene Resource Development Corporation
7/5/2016Morien Announces Appointment of CFO
11/3/2015Erdene Announces a Three Month Extension to Warrants
10/20/2015Erdene Announces Private Placement; Drilling to Commence on ...
10/15/2015RETRANSMISSION - Erdene Reports Multiple High-Grade Gold-Pol...
10/15/2015Erdene Reports Multiple High-Grade Gold-Polymetallic Interse...
10/5/2015IIROC Trade Resumption - ERD
10/5/2015Erdene Discovers Bonanza Grade Gold in Southwest Mongolia
10/5/2015IIROC Trading Halt - ERD
9/29/2015Erdene Drills 12 m of 5.3 g/t Gold Equivalent at Union North...
9/16/2015Metallurgical Testing at Erdene's Altan Nar Project Returns ...
7/15/2015Erdene and Tian Poh Amend Option Agreement; Drilling to Comm...
7/6/2015Erdene Appoints Layton Croft to the Board of Directors
4/17/2015Erdene Announces Private Placement
4/1/2015Erdene Provides Year-End Financial Results and Project Revie...
4/1/2015Provides Year-End Financial Results and Project Review
4/1/2015IIROC Trade Resumption - ERD
3/31/2015Reports Initial Resource Estimate for Altan Nar Gold-Polymet...
3/31/2015Erdene Reports Initial Resource Estimate for Altan Nar Gold-...
3/31/2015IIROC Trading Halt - ERD
2/12/2015IIROC Trade Resumption - ERD
2/12/2015Erdene Enters Agreement with Tian Poh Resources Ltd to Excha...
2/12/2015IIROC Trading Halt - ERD
2/9/2015IIROC Trade Resumption - ERD
2/9/2015Erdene Intersects Multiple High Grade Gold-Polymetallic Zone...
2/9/2015IIROC Trading Halt - ERD
1/12/2015Intersects 51 m of 2.5 g/t Gold Equivalent at Altan Nar Incl...
1/12/2015Erdene Intersects 51 m of 2.5 g/t Gold Equivalent at Altan N...
12/18/2014CWN Mining Acquisition Corporation Announces Private Placeme...
11/14/2014November 14, 2014 Erdene Secures Financing and Commences Res...
11/14/2014Erdene Secures Financing and Commences Resource Drilling on ...
10/7/2014IIROC Trade Resumption - ERD
10/6/2014Erdene Announces Private Placement; Altan Nar Gold-Polymetal...
10/6/2014IIROC Trading Halt - ERD
10/2/2014Erdene Provides Altan Nar Exploration Update
8/25/2014Erdene Provides Exploration and Corporate Update : Commences...
6/19/2014Erdene Provides Highlights of AGM and Project Updates
6/3/2014IIROC Trade Resumption - ERD
6/2/2014Erdene Intersects High Grade Gold and Base Metal Zone at Alt...
6/2/2014IIROC Trading Halt - ERD
1/23/2014Altan Nar Trenching Intersects Multiple High Grade Gold and ...
10/18/2013Announces Private Placement Altan Nar Gold Project - Explora...
10/18/2013Announces Private Placement : Altan Nar Gold Project-Explora...
10/7/2013Commences Exploration Program at Altan Nar Gold Project
7/2/2013Provides Highlights of AGM and Project Update
6/27/2013Reports Encouraging Metallurgical Results for Altan Nar Gold...
4/11/2013Establishes Strategic Alliance in Mongolia
4/3/2013Provides Year-End Financial Results and Project Review
11/9/2012and Morien Announce Completion of Plan of Arrangement and Co...
11/2/2012and APM Receive Final Court Approval for Plan of Arrangement...
10/26/2012and APM Shareholders Vote in Favor of Plan of Arrangement
10/9/2012Commences Drill Program on the Altan Nar Gold Project
10/2/2012Proposing Division into Two Public Companies
8/22/2012Provides Update on Mongolian Metals Projects
8/13/2012Morien Resources Corp. Selected as Proposed New Name and Joh...
5/30/2012Drilling Continues to Expand Altan Nar Gold Discovery
5/22/2012Announces Sale of its Land and Royalty Interest at the Grani...
5/17/2012Provides Project Updates and First Quarter Financial Results
4/26/2012(Donkin)Schedules Conference Call to Provide Update on Donkin Coal P...
3/29/2012Provides Project Updates and Reports Year End Financial Resu...
3/5/2012Announces Drilling Program for Altan Nar Gold-Silver Project
1/26/2012Confirms Continued Widespread Gold Mineralization at Altan N...
10/12/2011Drilling Confirms Significant Epithermal Gold Mineralization...
9/7/2011Announces Significant New Gold Discovery in Southwest Mongol...
8/15/2011Provides Project Updates and Second Quarter Financial Result...
7/6/2011(Nomin)Initial Drill Results Confirm Copper-Gold Sulfide Zone at Er...
6/21/20112010 Annual General Meeting-June 23, 2011
6/15/2011Provides Project Updates and First Quarter Financial Results
4/12/2011Provides Project Updates and Reports Year End Financial Resu...
2/17/2011Zuun Mod Results Continue to Enhance Potential of Copper and...
2/28/2009Concludes Reverse Takeover of Beta Minerals Inc.
9/15/2008Xstrata Coal Canada Increases Ownership in Erdene
5/29/2008Erdene Name Change Approved at Annual and Special Meeting
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (ERD.TO)Other OTC (ERDGF)
0.415+1.22%210,713.380
TORONTO
CA$ 0.415
05/06 16:53 0.010
1.22%
Prev close Open
0.410 0.410
Low High
0.410 0.415
Year l/h YTD var.
0.300 -  0.415 22.06%
52 week l/h 52 week var.
0.280 -  0.415 15.28%
Volume 1 month var.
58,230 6.41%
24hGold TrendPower© : 21
Produces
Develops
Explores for Coal
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202415.28%0.420.29
202326.32%0.450.27
2022-34.48%0.500.25
20217.41%0.500.33
2020138.24%0.710.13
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.52+0.47%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.05+2.47%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-0.92%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64+1.93%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.84+4.55%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20-4.76%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+4.47%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 50.86+0.63%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :