July 28, 2008

SULPHIDE PROJECT UPDATE:

TVI PACIFIC PROVIDES UPDATE ON CONSTRUCTION ACTIVITIES FOR CANATUAN SULPHIDE PROJECT

TVI Pacific Inc (TSX: "TVI" or the "Company") today provided an update for the Canatuan Mine, which is located in Southern Philippines and operated by the Company's affiliate, TVI Resource Development (Phils.) Inc ("TVIRD"). 

Certain statements in this News Release constitute forward-looking statements, including statements respecting the anticipated timing of commencement of mining and processing activities at the Canatuan Sulphide Project.  Readers should refer to the cautionary statement that appears at the end of this News Release.

Sulphide Project On Plan

The Company reported that activities are onging and "on plan" in relation to the engineering, development and construction of a copper-zinc flotation plant to process ore from the lower, sulphide portion of the volcanogenic massive sulphide deposit located at Canatuan.  TVI is currently seeking further financing for the project, which is scheduled to commence operations in the fourth quarter of 2008.  There can be no assurance that financing will be available to the Company or TVIRD on terms acceptable to them.  The sulphide portion of the ore body underlies the oxidized, gossan zone, which has now successfully been mined at the TVIRD Canatuan site.

The hiring of senior technical personnel to oversee the engineering, development and construction of the sulphide plant has been completed.  As well, TVIRD has recruited personnel to fill various key senior administrative positions in the operation. The search process for additional operating personel has been initiated with a view to filling key positions at the time operations commence.  

Sulphide Project Construction Progress Update

Crushing Plant:

  • Completed the mounting of the primary crushing assembly including the vibrating grizzly feeder.
  • Completed installation and alignment of the apron feeder.
  • Completed installation of rebars, forms, supports, and concrete pouring for floor slab (top portion) of feed conveyor tunnel.
  • Fabrication of the truck dump and the installation of the secondary crusher and screen are ongoing.

 

 

Grinding Circuit:

  • Completed fabrication of wedge plates for primary ball mill sole plates alignment.
  • Primary ball mill
    • Concrete pouring of floor slab completed.
    • Over sizing of primary ball mill end flange bolt holes 50% completed. This is part of the critical work of converting the ball mill to a SAG mill.
    • Preparation and cleaning of pinion and motor sole plates 65% completed.
    • Fabrication of cyclone headers and cyclone launders 50% complete.

Flotation Area:

  • Completed the fabrication of conditioning tanks - ready for painting.
  • Fabrication of rebars and form for concrete pad 60% completed.
  • Excavation for reagent tanks area concrete pad 80% completed.
  • Continued with the clearing of the filter press and concentrate house area.
  • Fabrication of concentrate thickener shell using old thickener tank #1 45% completed.

Assay Laboratory Extension:

  • Completed preparation of ground for flooring and piling of hollow blocks for walling.
  • Installation of roofing structure 45% completed.
  • Finishing of inside walling 65% completed.

Dam Construction:

  • Except for the sand haul (for dam filter requirement), the project continued to be ahead of schedule.  Management of the Company believes that there is a sufficient stockpile of sand to continue the pace of work.
    • Total dam material placement totaled 45,700 cubic metres versus plan of 25,900 cubic metres.
    • Sand haul during the week of July 21, 2008 was affected by rains and was 784 cubic metres compared to plan of 2,450 cubic metres.

Environmental Rehabilitation:

  • Developing remedial plans to rehab creeks silted by exceptional rains during the previous months (additional information available on TVIRD's website at http://www.tviphilippines.com/article.php?id=176).
  • Completed construction of lower dam concrete spillway.
  • Planted 500 tree seedlings within the mine area and surrounding disturbed areas. TVIRD has planted over 100,000 trees in Canatuan since 2004.
  • Rehabilitation of previous mine areas and overburden waste areas within the Lumot  Creek watershed are underway.  Reconstruction of the backroad access was completed.

Social Development and Management Program:

  • Five month intensive community consultation and education communication sessions completed.
  • Comprehensive Social Development and Management Program ("SDMP") completed for the communities within the Sulphide Project area.
  • The SDMP represents TVIRD's continuing commitment to the sustainable development of the Subanon ancestral domain and its neighboring communities.
  • Additional information available on TVIRD's website at:  http://www.tviphilippines.com/article.php?id=179.

About TVI Pacific Inc.  (TSX: TVI)

TVI Pacific Inc. is a publicly traded Canadian mining company focused on exploring for and producing precious and base metals within district scale systems in the Philippines. The Company's interest in the Canatuan Mine and its other Philippine assets are held through its affiliate, TVI Resource Development (Phils.) Ltd. 

Further Information:    Investor Relations - 403-265-4356 or tvi-info@tvipacific.com

Certain information set out in this News Release constitutes forward-looking information.  Forward-looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "continue", "estimate", "expect", "may", "will", "intend", "could", "might", "should", "believe" and similar expressions.  Forward-looking statements are based upon the opinions and expectations of management of the Company as at the effective date of such statements.  Although the Company believes that the expectations reflected in such forward-looking statements are based upon reasonable assumptions, it can give no assurance that those expectations will prove to have been correct.  Forward-looking statements are subject to certain risks and uncertainties (known and unknown) that could cause actual outcomes to differ materially from those anticipated or implied by such forward-looking statements.  These factors include, but are not limited to, such things as the volatility of prices for precious metals and base metals, commodity supply and demand, fluctuations in currency and interest rates, inherent risks associated with the exploration and development of mining properties, ultimate recoverability of mineral reserves, timing, results and costs of exploration and development activities, availability of financial resources or third-party financing, new laws (domestic or foreign), changes in administrative practices, changes in exploration plans or budgets,  availability of equipment and availability of personnel.  Accordingly, readers should not place undue reliance upon the forward-looking statements contained in this News Release and such forward-looking statements should not be interpreted or regarded as guarantees of future outcomes.  Forward-looking information respecting the timing of commencement of mining and processing activities at the Canatuan Sulphide Project, is based upon progress made to date on the construction of the Infrastructure required to support mining and processing activities at Canatuan, advice received from third-party contractors with respect to the timing of various components of the construction project, prior experiences of management with construction activities at Canatuan, the current development plan for Canatuan and the Company's current budget and overall strategy for Canatuan, which plans, budget and strategy are all subject to change.  The forward-looking statements of the Company contained in this News Release are expressly qualified, in their entirety, by this cautionary statement.  Various risks to which the Company is exposed in the conduct of its business (including exploration activities) are described in detail in the Company's Annual Information Form for the year ended December 31, 2007, which was filed on SEDAR on March 27, 2008 and is available under the Company's profile at www.SEDAR.com.  Subject to applicable securities laws, the Company does not undertake any obligation to publicly revise the forward-looking statements included in this News Release to reflect subsequent events or circumstances.

The Toronto Stock Exchange has neither approved nor disapproved of the information contained herein.


2000, 736 - 6  Avenue S.W.  Calgary, Alberta T2P 3T7     

Tel: (403) 265-4356 Fax: (403) 264-7028

Website: http://www.tvipacific.com   E-mail: tvi-info@tvipacific.com




.
Data and Statistics for these countries : Philippines | All
Gold and Silver Prices for these countries : Philippines | All

TVI Pacific Inc

PRODUCER
CODE : TVI.TO
ISIN : CA8729171097
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

TVI Pacific is a gold and silver producing company based in Canada.

TVI Pacific produces gold, silver, copper and zinc in Philippines, and holds various exploration projects in China and in Philippines.

Its main asset in production is CANATUAN in Philippines and its main exploration properties are SIENNALYNN, BALABAG, RAPU RAPU and BALABAG RIDGE in Philippines and SHUIKOUSHAN in China.

TVI Pacific is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 13.1 millions as of today (US$ 10.1 millions, € 9.0 millions).

Its stock quote reached its highest recent level on May 17, 1996 at CA$ 2.74, and its lowest recent point on May 06, 2016 at CA$ 0.01.

TVI Pacific has 655 470 372 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of TVI Pacific Inc
7/8/2014TVI Pacific Inc. Announces Final Closing of Philippines Inve...
1/10/2014TVI Pacific Inc. Announces Second Closing of Philippines Inv...
12/13/2013TVI Pacific Inc. Announces Closing of U.S. $2 Million Privat...
12/11/2013TVI Pacific Inc. enters into definitive agreements for third...
10/21/2013TVI Pacific Inc. Announces Financing Opportunity and Propose...
3/1/2011TVI Pacific Enters Loan Arrangement with TG World Energy Cor...
Option Grants of TVI Pacific Inc
4/3/2012. Announces New VP of Investor Relations
Nominations of TVI Pacific Inc
4/25/2013TVI Pacific Inc. Appoints New Vice President, Investor & Cor...
8/11/2008Announces Appointment of Chief Financial Officer
7/23/2007Announces Appointment of Chief Financial Officer
Financials of TVI Pacific Inc
11/12/2013TVI Pacific Provides Third Quarter 2013 Financial and Operat...
8/13/2013TVI Pacific Provides Second Quarter 2013 Financial and Opera...
5/14/2013TVI Pacific Provides First Quarter 2013 Financial and Operat...
8/10/2012TVI Pacific Provides Second Quarter 2012 Financial and Opera...
5/11/2012TVI Pacific Provides First Quarter 2012 Financial and Operat...
8/16/2011TVI Pacific Provides Second Quarter 2011 Financial And Opera...
5/16/2011TVI Pacific Provides First Quarter 2011 Financial and Operat...
3/20/2011TVI Pacific Year End Results Reinforce Solid Financial and O...
11/13/2008Files Third Quarter Financial Documents
8/8/2008Files Second Quarter Financial Documents
5/12/2008 Files First Quarter Financial Documents
11/27/2007(Canatuan) Releases Third Quarter Operating Results for Canatuan Mine
8/16/2007Releases Second Quarter Operating Results for Canatuan Mine
5/15/2007Announces Solid Financial Results For Three Month Period End...
Project news of TVI Pacific Inc
5/4/2016(Balabag)30.66% Owned TVIRD Receives Approval to Develop the Balabag ...
12/22/2015Nickel miner TVI defers Philippine listing until Feb. 29
10/15/2015Philippine nickel miner pursues $22-mln IPO despite metal sl...
1/20/2014(Canatuan)TVI Pacific Inc. Announces Closure of Milling Operations at ...
10/18/2013TVI Pacific Inc. Provides an Update of its Agata High-Iron D...
10/17/2013TVI Pacific Inc. Reports BGRIMM Pilot Plant Test Work Result...
10/16/2013(Balabag). Receives Environmental Compliance Certificate for Balabag ...
6/26/2013(Balabag)TVI Pacific Reports Pilot Plant Metallurgical Test Work Resu...
6/24/2013TVI Pacific Arranges Loan to Joint Venture Partner and Amend...
6/20/2013(Balabag)Announces Completion And Submittal Of The Declaration Of Min...
4/15/2013TVI Pacific Inc. Issues Correction for Agata North Resource ...
4/10/2013TVI Pacific Inc. Reports New Resource Estimate for Agata Nor...
2/14/2013TVI Pacific Inc. to Proceed with Amended Tranche 2 Subscript...
2/13/2013TVI Pacific Inc. Introduces the Mindoro Joint Venture Projec...
2/11/2013TVI Pacific Inc. Provides an Update on its Mindoro Joint Ven...
10/10/2012TVI Pacific announces purchase of additional securities of M...
1/26/2012TVI Pacific Inc. Advances Permit Approval for Near-Mine Prop...
1/10/2012TVI Pacific Inc. Withdraws From Niger Exploration Program
11/24/2011(Canatuan)Canadian Ambassador Thornley Tours Canatuan Mine
6/2/2011(Canatuan)(angl) Completes 22nd Shipment With Increased Copper Concent...
5/11/2011(Siennalynn)Provides Siennalynn and Near-Mine Tenement Update and Welcom...
4/20/2011(Alaska North Slope)TVI Pacific Inc. Provides Operational Update on Alaskan Well
4/8/2011(Balabag)Releases Additional Balabag Gold Project Drill Results and C...
3/5/2010(Canatuan)Completion ofTwelfth Shipment of Copper Concentrates Produc
12/3/2009(Tamarok)Permit to Advance Tamarok Copper-Gold Project Approved
11/5/2009(Canatuan)Construction of Canatuan Zinc Circuit Begins Ahead of Schedu...
10/2/2009(Canatuan)Completion of Seventh Shipment of Copper Concentrates Produc...
9/2/2009(Canatuan)Announces Completion Of Sixth Shipment Of Copper Concentrate...
8/10/2009(Canatuan)Completes Fifth Shipment of Copper Concentrates From Canatua...
7/7/2009(Canatuan)Completes Fourth Shipment of Copper Concentrates From Canatu...
5/28/2009(Canatuan)Completes Third Shipment of Copper Concentrates From Canatua...
2/26/2009(Canatuan)d Canatuan Sulphide Project Slideshow Available
2/4/2009(Canatuan)Provides Update On Commissioning Activities For Canatuan Sul...
11/21/2008(Canatuan)Updated Canatuan Sulphide Project Slideshow Available
8/21/2008(Balabag)Files Balabag Scoping Study
7/17/2008(Balabag)Receives Balabag Scoping Study
5/14/2008(Canatuan)Sulphide Project Process Engineering Progressing; Gossan Ope...
4/8/2008(Canatuan) Files Updated NI 43-101 Technical Report Regarding Sulphide...
4/1/2008(Canatuan)TVI Provides 2007 Year End Operating Review for Canatuan Min...
3/13/2008(Canatuan)Signs Definitive US$15 Million Bridge Financing Agreement
1/10/2008(Canatuan)Representative Visits Canatuan Subanons
10/10/2007(Golden Triangle) Announces Award of Exploration Licence in Chinese Golden Tr...
8/10/2007(Balabag Ridge)Technical Report on the Balabag Resource Estimate
7/30/2007(Balabag Ridge)Exploration Activities and Infill Drilling At Balabag Produc...
6/6/2006(Balabag)provides Balabag exploration update
5/26/2006(Canatuan)receives completed feasibility study on Canatuan sulphide pr...
Corporate news of TVI Pacific Inc
7/13/2016TVI to Voluntarily Delist from the Toronto Stock Exchange an...
6/10/2016TVI Announces the Results of its Annual Meeting of Sharehold...
5/4/2016TVI's 30.66% Owned TVIRD Receives Approval to Develop the Ba...
12/21/2015TVI's 30.66% Owned TVIRD Files Updated Preliminary Prospectu...
10/8/2015TVI's 30.66% Owned TVIRD Files Preliminary Prospectus in Con...
8/12/2015TVI Pacific Files Second Quarter 2015 Financial Results and ...
8/4/2015TVI's Philippine Affiliate JV Completes Four Shipments of Ni...
7/13/2015TVI's Philippine Affiliate JV Completes One Shipment of Nick...
4/27/2015TVI Extends Due Diligence Program at the Cirianiu Gold Proje...
4/10/2015TVI's Philippine Affiliate JV Completes Three Additional Shi...
4/10/2015Philippine Affiliate JV Completes Three Additional Shipments...
4/10/2015Philippine Affiliate JV Completes Three Additional Shipments...
3/25/2015TVI Ends 2014 Year with $5.3 million in Cash and Short Term ...
3/25/2015Ends 2014 Year with $5.3 million in Cash and Short Term Inve...
3/24/2015TVI's Philippine Affiliate JV Completes Seventh Shipment of ...
3/11/2015TVI's Philippine Affiliate JV Completes Seventh Shipment of ...
3/11/2015Philippine Affiliate JV Completes Seventh Shipment of Nickel...
1/8/2015Philippine Affiliate JV Completes Two Shipments of Nickel Or...
11/26/2014TVI's Philippine Affiliate JV To Ship Higher Grade Ore at Ni...
11/24/2014TVI's Philippine Affiliate Joint Venture Nears Completion of...
11/20/2014TVI's Philippine Affiliate JV Receives Letter of Advice from...
11/14/2014TVI's Philippine Affiliate JV Completes Second Shipment of N...
11/13/2014TVI Pacific Provides Third Quarter 2014 Financial and Operat...
11/3/2014TVI Signs Heads of Terms Agreement on the Cirianiu Gold Proj...
10/31/2014TVI Announces Members of Project Advisory Group
10/23/2014TVI Joint Venture Completes First Shipment of Nickel Ore at ...
10/16/2014TVI Launches Operations at the Agata Nickel DSO Project
10/16/2014Launches Operations at the Agata Nickel DSO Project
4/28/2014The Agata Mining Joint Venture Receives Declaration of Minin...
2/5/2014TVI Pacific Inc. Completes 39th Shipment of Copper Concentra...
1/21/2014TVI Pacific Inc. Completes Seventh Shipment of Zinc Concentr...
12/17/2013TVI Pacific Inc. Completes 38th Shipment of Copper Concentra...
9/23/2013TVI Pacific Inc. Completes 37th Shipment of Copper Concentra...
9/10/2013TVI Pacific Inc. and Mindoro Resources Ltd. Announce Robust ...
8/6/2013TVI Pacific Inc. Completes Sixth Shipment of Zinc Concentrat...
8/2/2013. Extends Tranche 2 Subscription Agreement with Foyson Resou...
7/9/2013TVI Pacific Announces Twelve month Extension of Service Cont...
6/27/2013TVI Pacific Inc. Completes 36th Shipment of Copper Concentra...
6/14/2013TVI Pacific Announces the Results of its Annual Meeting of S...
6/5/2013Agata Nickel Project Pilot Plant Commissioned, Operation Com...
5/1/2013Interview of interest: The new gold stock paradigm
5/1/2013TVI Pacific Inc. Completes 35th Shipment of Copper Concentra...
3/19/2013TVI Pacific 2012 Year End Results and Operational Performanc...
3/12/2013(Balabag)TVI Affiliate Secures US$23 Million Low Interest Financing f...
2/21/2013TVI Pacific Inc. Completes 34th Shipment of Copper Concentra...
2/8/2013(Rapu Rapu)TVI Pacific Inc.'s Philippine Affiliate Provides Update on N...
2/7/2013(Canatuan)TVI-Kennemer Partnership Shores up Livelihood in Canatuan, Z...
11/8/2012TVI Pacific Inc. Completes 32ND Shipment of Copper Concentra...
10/2/2012TVI Pacific Inc. Completes 31st Shipment of Copper Concentra...
10/1/2012TVI Pacific Inc. announces the signing of definitive joint v...
8/29/2012TVI Pacific Inc. Announces the Signing of Subscription Agree...
8/20/2012TVI Pacific Inc. Announces Joint Venture Opportunities and P...
8/15/2012(Balabag)TVI Pacific Inc. Files an Updated NI 43-101 for Its Balabag ...
8/10/2012TVI Pacific Inc. Completes 30th Shipment of Copper Concentra...
7/6/2012. Announces Joint Venture Opportunities and Equity Investmen...
6/25/2012TVI Pacific Inc. Completes Latest Concentrate Shipments
6/25/2012TVI Pacific Inc.: Service Contract 54 Sub-Phase 6 Extension
6/1/2012TVI Pacific Inc. Signs a Memorandum of Agreement to Develop ...
5/25/2012TVI Pacific Announces the Results of Its Annual Meeting of S...
5/22/2012TVI Pacific Announces Webcast Details For Annual Meeting
5/11/2012TVI Pacific Inc. Completes 28th Shipment of Copper Concentra...
4/17/2012(Rapu Rapu)TVI Pacific Inc. Provides An Update on Rapu Rapu
4/17/2012(Rapu Rapu). Provides An Update on Rapu Rapu
4/3/2012TVI Pacific Inc. Announces New VP of Investor Relations
3/23/2012Website Update
3/20/2012TVI Pacific 2011 Year End Results and Operational Performanc...
3/16/2012TVI Pacific Inc. Completes Latest Concentrate Shipments
2/9/2012(Canatuan)Paper from TVI on Canatuan Operations for Canadian Mineral P...
1/5/2012Receives Preliminary Injunction
1/5/2012TVI Pacific Inc. Wins Injunction Against Ordinance That Woul...
12/30/2011TVI Pacific Inc. Completes 26th Shipment of Copper Concentra...
12/21/2011TVI Pacific Inc. Completes Second Shipment of Zinc Concentra...
12/16/2011Television Segments
12/14/2011New Responsible Mining Video
12/7/2011Recent Developments
8/30/2011Provides Update on Niger Exploration Program
8/12/2011. Completes 23rd Shipment of Copper Concentrate and 1st Ship...
7/21/2011(Balabag)TVI Pacific Provides Additional Drill Results From the Balab...
7/15/2011TVI Pacific JV Partner Nido Petroleum Provides Update Regard...
6/27/2011s Shipping Schedule
6/13/2011TVI Pacific Inc=2E Announces Commencem =?ISO-8859-1?Q?ent=20...
5/29/2011Announces the Results of Its Annual & Special Meeting of Sha...
3/15/2011TVI Pacific Inc. Announces Spud of Alaskan Well
3/10/2011. and TG World Energy Corp. Announce Completion of Arrangeme...
4/22/2010Provides Zinc Circuit Update and Details Regarding Annual Ge...
10/2/2009Initiates Fund Drive for Philippine Flood Victims
9/24/2009's Philippine Affiliate Seeks Debt Refinancing
9/1/2009Announces Addition To Senior Management Leadership Team
7/6/2009Court Approvals Relating to Class-Action Proceedings
6/16/2009Completes Voluntary Stock Option Cancellations
5/30/2009Results of 2009 Annual General Meeting
5/28/2009Annual General Meeting
2/20/2009Clifford M. James Acquires Beneficial Ownership of Additiona...
2/20/2009Announces Issuance of Common Shares to Discharge Certain Pre...
2/9/2009Closing Of US$29.9 Million Term Loan Facility
1/20/2009Signs US$29.9 Million Term Loan Facility
1/14/2009Granted Extended Maturity Date On Bridge Financing
12/12/2008Signs Amendment Agreement To Increase Bridge Financing By US...
11/14/2008Signs Amendment Agreement To Extend Maturity Date on Bridge ...
11/11/2008Signs Five Year Off-Take Agreement with MRI Trading AG
11/10/2008Secures Additional Bridge Financing To Continue Construction...
11/3/2008Announces Management Change
9/24/2008Fostering a Safety Culture
9/19/2008Ensuring the Safety of Kith And Kin
9/9/2008Announces Commissioning Activities At Canatuan Sulphide Proj...
9/4/2008d Canatuan Sulphide Project Slideshow Available
9/2/2008Provides Update On Construction Activities For Canatuan Sulp...
8/29/2008RD Gets MGB Approval for 2nd Social Dev’t Plan
8/15/2008When Work Feels Like Home
8/8/2008Meet the Sulphide Project Team
7/30/2008d Sulphide Project Slideshow Available
7/29/2008Announces Agreement to Sell Drilling Assets in Kyrgyzstan
7/28/2008Provides Update on Construction Activities for Canatuan Sulp...
7/22/2008Affiliate Engages BNP To Arrange Best Efforts Debt Financing...
6/24/2008Canatuan Sulphide Project Progress Report - Updated Links
6/24/2008Canatuan Sulphide Project Progress Report
6/2/2008Announces Results of 2008 Annual General Meeting
5/30/2008Annual General Meeting - Today at 3:00 PM MT
5/20/2008Announces Webcast Details For Annual Meeting
4/24/20082007 Letter to Shareholders
4/4/2008 Provides Update on US$15 Million Bridge Financing Agreement
3/28/2008 Files Financial Statements and Related Materials
3/14/2008 Article from Philippine Star
3/4/2008 Announces Disposition of Chinese Operations
2/5/2008 Atlas Joint Venture Negotiations Discontinued; Alternative ...
1/31/2008 ANNOUNCES FURTHER EXTENSION TO JOINT VENTURE NEGOTIATIONS
1/21/2008 Signs US$15 Million Bridge Financing Term Sheet
1/16/2008 Announces Extension to Joint Venture Negotiations
1/11/2008Confirms Revocation of Cease Trade Orders and Resumption of ...
12/27/2007Announces Joint Venture Negotiations and Associated Funding ...
12/19/2007 Announces Management Changes
12/19/2007 Files Restated Financial Statements and Related Materials
10/17/2007Confirms Cease Trading Order by the Alberta Securities Commi...
10/11/2007Provides Update on Accounting Restatement
8/16/2007Confirms Approval of Management Cease Trade Order by Alberta...
8/9/2007Plans Revisions To Financial Statements
7/31/2007New Mining Chief Wants to Make Philippines Top Mineral Produ...
5/31/2007Annual & Special Meeting - Today at 3:00 PM MT
5/25/2007Industry News
5/11/2007Reschedules Q1 2007 Release Date and Webcast Presentation
2/20/2007Canatuan Operations Update
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (TVI.TO)FRANKFURT (TVP.F)
0.020+33.33%0.002+0.00%
TORONTO
CA$ 0.020
07/29 11:10 0.010
33.33%
Prev close Open
0.015 0.010
Low High
0.010 0.020
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.020 -%
Volume 1 month var.
80,000 -%
24hGold TrendPower© : -31
Produces Copper - Gold - Silver - Zinc
Develops
Explores for Copper - Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/30/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :