Pure Gold Mining.

Published : November 16th, 2017

Pure Gold Intersects 19.4 g/t Gold Over 9.8 Metres at McVeigh, Madsen Gold Project

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Pure Gold Intersects 19.4 g/t Gold Over 9.8 Metres at McVeigh, Madsen Gold Project

VANCOUVER, British Columbia, Nov. 16, 2017 (GLOBE NEWSWIRE) -- Pure Gold Mining Inc. (PGM.V) (“Pure Gold” or the “Company”) is pleased to announce additional drilling results from its 100% owned Madsen Gold Project (“Madsen”). Drilling from underground continues to confirm mineralization in the McVeigh and South Austin Deposits and highlights the expansion potential within the Madsen mineral resource. 

Drilling highlights:

  • Multiple new drill holes collared from the underground mine workings have expanded the known mineralization outside of the current mineral resource, including 13.7 g/t gold over 6.8 metres from hole PGU-0033 and 9.1 g/t gold over 6.6 metres from drill hole PGU-0024 within the McVeigh and 11.3 g/t gold over 2.2 metres from PGU-0035 within the South Austin;
  • Infill drilling has confirmed near surface resources in close proximity to the Madsen ramp, with 19.4 g/t gold over 9.8 metres returned from drill hole PGU-0028 and 15.4 g/t gold over 4.0 metres from drill hole PGU-0042 in the McVeigh Deposit.

             
“Today’s results have returned exceptional widths and grades from underground drilling collared from the Madsen ramp” said Darin Labrenz, President and CEO of Pure Gold.  “Drilling within the Madsen deposit has intersected gold mineralization both external to, and within, near surface and early mine life stopes from our recently released preliminary economic assessment (“PEA”)2, both de-risking the project and highlighting the potential for mineral resource expansion.   With existing infrastructure including a shaft, ramp, mill and tailings facility, Madsen represents a unique low capital development opportunity in one of Canada’s premier high grade gold camps.” 

Infill Underground Drilling Confirms Gold Mineralization
Drill hole PGU-0028 targeted the McVeigh Deposit within one of the first scheduled mining stopes from the Company’s recently released PEA, returning 19.4 g/t gold over 9.8 metres, including 39.9 g/t gold over 4.5 metres at a vertical depth of 150 metres.  Drill hole PGU-0042, designed to target the limits of the same stope, returned multiple intercepts including 57.0 g/t gold over 1.0 metre, and 15.4 g/t gold over 4.0 metres. Drill hole PGU-0027 targeted the McVeigh approximately 150 metres below surface and intersected 35.5 g/t gold over 1.5 metres in the footwall of the known mineralization. 

Underground Drilling Expands Mineralized Zones
In addition to targeting initial stope shapes from the recent PEA, ongoing underground drilling is also designed to test for extensions to the current resource in the upper portion of the Madsen deposit.   Drill hole PGU-0025 targeted the South Austin and returned 23.4 g/t gold over 1.0 metre, outside of the mineral resource. Drill hole PGU-0035 also targeted the South Austin intersecting 11.3 g/t gold over 2.2 metres in a new area.  Additionally, drill hole PGU-0033 targeted the McVeigh outside of the resource, returning 13.7 g/t gold over 6.8 metres, including 28.7 g/t gold over 3.2 metres

Drill Results Summary
New assay results from select drill holes are outlined below:

Hole ID From (m) To (m) Length (m) Gold (g/t) Zone
PGU-0024 145.0 160.5 15.5 5.5 McVeigh
incl. 145.0 151.6 6.6 9.1  
PGU-0025 263.0 264.0 1.0 23.4 South Austin
PGU-0027 133.3 134.9 1.5 35.5 McVeigh
PGU-0028 132.6 142.4 9.8 19.4 McVeigh
incl. 135.8 140.3 4.5 39.9  
PGU-0033 107.9 114.6 6.8 13.7 McVeigh
incl. 107.9 111.0 3.2 28.7  
  140.0 144.3 4.3 6.6  
incl. 140.0 142.0 2.0 12.5  
PGU-0035 59.8 62.0 2.2 11.3 McVeigh
PGU-0036 70.8 71.8 1.0 13.5 McVeigh
PGU-0040 52.1 54.5 2.4 7.3 South Austin
incl 52.1 53.1 1.0 12.7  
PGU-0041 79.1 82.0 2.9 6.0 South Austin
incl 79.1 80.0 0.9 17.1  
PGU-0042 103.3 104.3 1.0 57.0 McVeigh
112.0 116.0 4.0 15.4 McVeigh
Incl. 112.0 113.0 1.0 49.6  


*Assay composites were calculated using uncut assays and true widths are interpreted to vary from 70-90% (80%, on average) of reported core lengths above.


For a set of figures showing the setting of drill results, click link below:
http://www.globenewswire.com/NewsRoom/AttachmentNg/6492ca4d-a382-4068-b9fa-93effb963258

For a complete list of 2017 drill results to date, click link below:
http://www.globenewswire.com/NewsRoom/AttachmentNg/aad083b1-e3eb-4ba1-a3e4-1a69308e68b9

Next Steps
Over the coming months, the Company will be focused on:

  • completing a detailed Project Development schedule which will provide a critical path to a production decision, including detailed engineering and permitting;

  • resource definition drilling from the Madsen ramp, designed to test for extensions to the current mineral resource;

  • exploration drilling from surface with the goal of identifying and extending new zones of gold mineralization close to existing mine infrastructure, including up-dip of the 8 zone and down dip of the Russet South Deposit;

  • Resource modelling of satellite deposits with a goal of releasing an updated mineral resource estimate for Madsen in the fourth quarter of 2017;

  • continuing environmental baseline work to support the update of existing permits and the application of new permits and the filing of a Project Definition in the first quarter of 2018; and

  • undertaking a feasibility level study in 2018.

ABOUT MADSEN
The Madsen Gold Project has historic production of 2.5 million ounces of gold and remains one of the highest-grade, undeveloped gold projects in the world.1  With an indicated resource of 1,648,000 ounces gold at 8.9 g/t gold (in 5.79 million tonnes) and an inferred resource of 178,000 ounces gold at 9.4 g/t gold (in 0.59 million tonnes), the Project benefits from existing infrastructure including a mill and tailings facility, paved highway access, and access to power, water and experienced labour.2 

  1. Sourced from the Natural Resource Holdings Global Gold Mines & Deposit Ranking of 2013
  2. See the National Instrument 43-101 technical report entitled “Preliminary Economic Assessment of the Madsen Gold Project for Pure Gold Mining Inc., Red Lake, Ontario, Canada” with an effective date of September 14, 2017 for complete details, available on the Company’s website at www.puregoldmining.ca or Sedar profile at www.sedar.com.

QA/QC and Core Sampling Protocols
Drill core samples are bagged and sealed and submitted to SGS in Red Lake, Ontario for sample preparation by crushing to 75% less than 2mm, a riffle split of 1kg, and pulverization of the split to better than 85% passing 75 microns. Gold analysis is completed in the SGS Red Lake lab with a 30g fire assay and AAS finish (code GE-FAA313). Samples returning >5 g/t Au are re-assayed with a gravimetric finish (code GO-FAG303). Mineralized zones with visible gold are also analyzed by a 1kg screen fire assay with screening to 106 microns (code GO-FAS51K). Two 30g fire assays are conducted on the screen undersize and combined with an assay of the entire oversize fraction. Control samples (accredited standards and non-accredited blanks) were inserted on a regular basis. Results are assessed for accuracy, precision and contamination on an ongoing basis.

Qualified Persons and 43-101 Disclosure

Phil Smerchanski, P. Geo., Vice President, Exploration for the Company, is the designated Qualified Person for this news release within the meaning of National Instrument 43-101 (“NI 43-101”) and has reviewed and verified that the technical information contained herein is accurate and approves of the written disclosure of same.

ABOUT PURE GOLD
Our mandate is pure and simple. To dream big. To colour outside the lines. To use smart science and creativity to unlock the next major discovery at the Madsen Gold Project in Red Lake, Ontario. And become Canada’s next iconic gold company.

Additional information about the Company and its activities may be found on the Company’s website at www.puregoldmining.ca and under the Company’s profile at www.sedar.com.

ON BEHALF OF THE BOARD
"Darin Labrenz"                                  
Darin Labrenz, President & CEO

Investor inquiries:
Adam Buchanan, Manager, Investor Relations
Tel: 604-646-8000
info@puregoldmining.ca

All statements in this press release, other than statements of historical fact, are "forward-looking information" with respect to Pure Gold within the meaning of applicable securities laws, including, but not limited to statements with respect to those that address potential quantity and/or grade of minerals, potential size and expansion of a mineralized zone, proposed timing of exploration and development plans. Forward-looking information is often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "continue", "planned", "expect", "project", "predict", "potential", "targeting", "intends", "believe", "potential", and similar expressions, or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "should", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management at the date the statements are made including, among others, assumptions about future prices of gold and other metal prices, currency exchange rates and interest rates, favourable operating conditions, political stability, obtaining governmental approvals and financing on time, obtaining renewals for existing licences and permits and obtaining required licences and permits, labour stability, stability in market conditions, availability of equipment, accuracy of any mineral resources, successful resolution of disputes and anticipated costs and expenditures. Many assumptions are based on factors and events that are not within the control of Pure Gold and there is no assurance they will prove to be correct.

Such forward-looking information, involves known and unknown risks, which may cause the actual results to be materially different from any future results expressed or implied by such forward-looking information, including, risks related to the interpretation of results at the Madsen Gold Project; changes in project parameters as plans continue to be refined; current economic conditions; future prices of commodities; possible variations in grade or recovery rates; the costs and timing of the development of new deposits; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; the timing and success of exploration activities generally; delays in permitting; possible claims against the Company; labour disputes and other risks of the mining industry; delays in obtaining governmental approvals, financing or in the completion of exploration as well as those factors discussed in the Annual Information Form of the Company dated June 16, 2017 in the section entitled "Risk Factors", under Pure Gold’s SEDAR profile at www.sedar.com.

Although Pure Gold has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Pure Gold disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise unless required by law.

Read the rest of the article at https:

Pure Gold Mining.

EXPLORATION STAGE
CODE : PGM.V
ISIN : CA74624E1007
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Pure Gold. is a gold exploration company based in Canada.

Its main exploration properties are MADSEN, VAN HORNE, NEW KLONDIKE, GOLDPINES, GRENVILLE and MAZE LAKE in Canada.

Pure Gold. is listed in Canada. Its market capitalisation is CA$ 3.8 millions as of today (US$ 3.0 millions, € 2.6 millions).

Its stock quote reached its highest recent level on December 18, 2020 at CA$ 3.08, and its lowest recent point on November 01, 2022 at CA$ 0.01.

Pure Gold. has 187 780 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Pure Gold Mining.
4/1/2019Pure Gold eyes London listing this quarter
Financings of Pure Gold Mining.
3/20/2013Closes $100,000 Non-Brokered Private Placement
6/14/2011AngloGold Ashanti Ltd. Exercises Laurentian Goldfields Ltd. ...
3/7/2011Closes $2.65 Million Non-Brokered Private Placement
2/18/2011Increases Non-Brokered Private Placement
Financials of Pure Gold Mining.
9/23/2016Pure Gold Announces AGM Results
6/18/2016Reports Fiscal 2016 Financial Results
Project news of Pure Gold Mining.
7/14/2016(Madsen)Extends High Grade Gold to a Depth of 275 Metres - 170 Metre...
5/17/2016(Madsen)Intersects 10.9 g/t gold over 9.8 metres, Including 27.0 g/t...
6/9/2011(Van Horne)Commences Drill Program at Van Horne Property
4/12/2011(Goldpines)Completes Drill Program at Goldpines North Joint Venture
Corporate news of Pure Gold Mining.
9/24/2016Announces AGM Results
7/14/2016Pure Gold Extends High Grade Gold to a Depth of 275 Metres -...
6/18/2016Pure Gold Reports Fiscal 2016 Financial Results
6/14/2016Pure Gold Intersects 31.3 g/t Gold Over 3.7 Metres Including...
6/9/2016Pure Gold Announces Significant Expansion of 2016 Exploratio...
6/8/2016Pure Gold Closes Previously Announced Bought-Deal Private Pl...
6/3/2016Pure Gold Files PEA Technical Report on SEDAR
6/2/2016Pure Gold Announces Appointment of Corporate Secretary and G...
5/25/2016Pure Gold Announces C$5 million Bought Deal Private Placemen...
5/20/2016Pure Gold Announces Final Closing of Sale of Non-Core Assets...
5/17/2016Pure Gold Intersects 10.9 g/t Gold Over 9.8 Metres, Includin...
5/4/2016Pure Gold Reports Additional Near Surface, High Grade Gold a...
10/24/2012Announces Share Consolidation Proposal
3/30/2012Defines Bulk-Tonnage Gold Exploration Target
7/18/2011Completes Phase I Drilling at Thundercloud Property, Ontario
5/26/2011Intersects 1.55 g/t Gold Over 68.8 Metres at Thundercloud Pr...
5/10/2011Stakes Rossing-Type Uranium Target in Saskatchewan
4/7/2011Commences Drill Program at Thundercloud Project
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (PGM.V)
0.020+33.33%
TSX-V
CA$ 0.020
12/06 09:30 0.010
33.33%
Prev close Open
0.015 0.020
Low High
0.015 0.020
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.020 -%
Volume 1 month var.
485,844 -%
24hGold TrendPower© : -7
Produces
Develops
Explores for Copper - Gold - Iron
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/24/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2022-97.33%0.880.01
2021-70.93%2.680.65
2020258.33%3.080.38
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.28+2.17%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.46-2.38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.82-1.43%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.83-3.68%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.97+1.05%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :