Lonmin PLC.

Published : January 28th, 2010

Q1 2010 Production Report

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Nickel | Palladium | Platinum | Rhodium |

RNS Number : 2300G

Lonmin PLC

28 January 2010

  

Lonmin Plc

 

Q1 2010 Production Report 

& Interim Management Statement

 

Lonmin Plc ("Lonmin" or the "Company") today announces its production report and Interim Management Statement for the quarter to 31 December 2009 (unaudited).

 

Overview

 

Our performance in the first quarter of 2010 exemplified management's focus on operational stability and delivering on its commitments,
with metals in concentrate production from our underground operations at Marikana being equivalent to the prior year period. Tonnes mined from Marikana underground operations fell slightly, partly as a result of the planned closure of uneconomic production units in 2009.  However, this volume reduction was compensated for by improvements in grade and concentrator recoveries during the period and was achieved with a significantly reduced workforce. Following its successful re-build during October, the Number One furnace performed well.  

 

Mining

 

Our underground mining operations at Marikana produced 2.6 million tonnes during the first quarter of 2010, a like for like decline of 3.9%, equivalent to around 100,000 mined tonnes, from the same period in 2009. 

 

There were two reasons for this shortfall. Firstly, as expected, production was impacted by the previously announced closure of an
uneconomic decline shaft and a number of half levels at Marikana during the third quarter of 2009. These unprofitable operations contributed around 35,000 mined tonnes during the first quarter of 2009. 

 

Secondly, whilst the frequency of Section 54 safety stoppages at Marikana during the first quarter of 2010 declined from the prior year period, the volume impact was worse with tonnes lost during the quarter being around 60,000 tonnes higher than the prior year period. This was predominantly due to production at our largest shaft, K3, being impacted by a 7 day Section 54 safety shutdown following a fatal incident at the shaft on 10 December 2009. 

 

Production at Saffy and Hossy shafts continued to perform well, delivering a combined tonnage increase of 46% from the prior year period. 

 

Pandora underground production increased slightly during the first quarter of 2010 from the prior year period. 

 

Total tonnes mined declined by 15.3% from the same period in 2009 to 2.6 million, following the planned closure of non-value adding production at our Limpopo operations and the opencast operations at Marikana and the Pandora joint venture during the 2009 financial year.  

 

Concentrators

 

As a result of the above factors, total tonnes milled for the quarter declined by 15.6% from the first quarter of 2009 to 2.6 million tonnes. However, total metals in concentrate production declined by just 6.6% to 161,845 saleable ounces of Platinum, with metals in concentrate production from our Marikana operations remaining flat at 156,025 saleable ounces of Platinum. This was due to improvements in grade and concentrator recoveries during the first quarter of 2010. Underground milled head grade during the period increased by 6.3% to 4.74 grammes per tonnes, as a result of a number of factors including cleaner mining across the property, a better ratio of stoping ore to development ore at Hossy and Saffy as well as an improved ore mix. This also helped underground concentrator recoveries, which improved significantly during the quarter to 84.5%, from 80.2% during the prior year period. The improvement in concentrator recoveries was also the result of continued benefits from our concentrator optimisation programme, excellent plant availability and a rigorous focus on batch milling the right ore through the right concentrators. It should also be noted that the performance in quarter one last year was impacted by an intensive maintenance programme which reduced recoveries. 

 

These improvements in grade and recoveries are pleasing. However, we need to see these sustained before being confident that we have made a step change in our performance.  

 

 

Smelter and Refineries

 

The planned 30 day re-build of the Number One furnace was completed successfully and the furnace has been operating consistently since matte was tapped on 9 November 2009.  A furnace re-build was also conducted during the prior year period and total refined PGM production was flat at 243,114 ounces. However, refined Platinum production for the first quarter of 2010 declined 16.7% 110,786
ounces mainly as a result of metal-in-process inventory timing differences. 

 

Sales & Pricing

 

Consequently, Platinum sales for the first quarter of 2010 declined 13.6% from the prior year period to 109,044 ounces, whilst sales of total PGM's increased 4.8% to 239,685 ounces.     

 

The US dollar PGM pricing environment improved considerably during the first quarter of the 2010 financial year from the prior year period, with the basket price improving 35%, but our South African Rand PGM basket price was flat due to a much stronger South African Rand against the US dollar during the quarter.

 

Incwala Resources

 

Discussions regarding the future of Incwala Resources (Pty) Ltd, our Black Economic Empowerment partner, are ongoing. We will update the market on these discussions, once they have been concluded. 

 

As anticipated, on 18 December 2009, R147 million ($20 million) was paid to Impala Platinum Holdings Limited (Impala), as part of the vendor financing indemnity given by Lonmin to Impala at the time of the creation of Incwala.. Following an earlier payment in October 2009, a total of R441 million ($59 million) has been paid to Impala in relation to this vendor financing indemnity. Further details of these and other indemnity agreements can be found in Note 25 on page 121 of the 2009 Annual Report. 

 

Wage Settlements 

 

As announced on 4 December 2009, we completed a two year wage agreement with the National Union of Mine Workers in respect of our Marikana operations. Employees will receive a 10% wage increase during the first year of the agreement, which has been backdated to 1 October 2009. In the second year of the wage agreement, employees will be eligible to receive a CPI (Consumer Price Index) plus 2% wage increase. In addition, certain minimum rates of pay will be increased over the life of the wage agreement. In November 2009, we also concluded a one year wage agreement with Solidarity, under the terms of which employees will receive a 9.5% wage increase for the 2010 financial year.

 

Outlook 

 

Our production performance during the first quarter of 2010 represents a solid start to the year and supports our 2010 sales guidance of 700,000 ounces of Platinum, as published on 16 November 2009. Our cost guidance for the increase in South African Rand gross operating costs to be below local inflation, still stands despite the above inflation wage increases agreed. We therefore reiterate our sales and cost guidance for the year. 

 

ENQUIRIES: 

 

Investors / Analysts: 

 

Rob Gurner                                                                                                                  +44 (0) 207 201 6050

Head of Investor Relations

 

Media:

 

Cardew Group                                                                                                              +44 (0) 207 930 0777

Anthony Cardew / Rupert Pittman    

 

Financial Dynamics                                                                                                       +27 (0) 21 487 9000    

Dani Cohen / Ravin Maharaj

 

  

 

 

 

 

 

 

3 months

3 months 

 

 

 

 

 

 

 

to 31st December

to 31st December

 

 

 

 

 

 

 

2009

2008

 

Tonnes mined

Marikana

Underground - total

000

 

2,571 

2,674 

 

 

Underground - conventional

000

 

2,148 

2,385 

 

 

Underground - Hossy & Saffy1

000

 

422 

289 

 

 

 

 

 

 

 

 

 

Opencast

000

 

216 

 

 

Total

000

 

2,571 

2,890 

 

Limpopo

Underground

000

 

87 

 

 

Opencast

000

 

 

 

Total

000

 

87 

 

Pandora attributable2

Underground

000

 

38 

34 

 

 

Opencast

000

 

68 

 

 

Total

000

 

38 

103 

 

Lonmin Platinum

Underground

000

 

2,609 

2,796 

 

 

Opencast

000

 

285 

 

 

Total

000

 

2,609 

3,080 

 

Tonnes milled3

Marikana

Underground

000

 

2,447 

2,662 

 

 

Opencast

000

 

61 

116 

 

 

Total

000

 

2,508 

2,778 

 

Limpopo

Underground

000

 

92 

 

Pandora4

Underground

000

 

89 

80 

 

 

Opencast

000

 

124 

 

 

Total

000

 

89 

205 

 

Lonmin Platinum

Underground

000

 

2,535 

2,835 

 

Head grade5

g/t

 

4.74 

4.46 

 

Recovery rate6

%

 

84.5%

80.2%

 

Opencast

000

 

61 

240 

 

 

Head grade5

g/t

 

1.96 

4.74 

 

 

Recovery rate6

%

 

42.3%

69.9%

 

 

Total

000

 

2,596 

3,075 

 

 

 

 

Head grade5

g/t

 

4.68 

4.48 

 

 

 

 

Recovery rate6

%

 

84.0%

79.4%

 

 

  

 

 

 

 

 

 

3 months

3 months 

 

 

 

 

 

 

 

to 31st December

to 31st December

 

 

 

 

 

 

 

2009

2008

 

Metals in concentrate7

Marikana

Platinum

oz

 

156,025 

157,450 

 

 

palladium

oz

 

72,596 

72,825 

 

 

Gold

oz

 

3,361 

3,613 

 

 

Rhodium

oz

 

21,678 

21,809 

 

 

Ruthenium

oz

 

33,350 

33,836 

 

 

Iridium

oz

 

7,281 

7,410 

 

 

Total PGMs

oz

 

294,291 

296,944 

 

 

Nickel8

MT

 

661 

679 

 

 

Copper8

MT

 

417 

421 

 

Limpopo

Platinum

oz

 

3,770 

 

 

palladium

oz

 

3,331 

 

 

Gold

oz

 

243 

 

 

Rhodium

oz

 

487 

 

 

Ruthenium

oz

 

688 

 

 

Iridium

oz

 

159 

 

 

Total PGMs

oz

 

8,679 

 

 

Nickel8

MT

 

76 

 

 

Copper8

MT

 

54 

 

Pandora3

Platinum

oz

 

5,820 

12,013 

 

 

palladium

oz

 

2,745 

5,406 

 

 

Gold

oz

 

40 

93 

 

 

Rhodium

oz

 

911 

1,657 

 

 

Ruthenium

oz

 

1,403 

2,427 

 

 

Iridium

oz

 

231 

456 

 

 

Total PGMs

oz

 

11,151 

22,051 

 

 

Nickel8

MT

 

12 

 

 

Copper8

MT

 

 

Lonmin Platinum

Platinum

oz

 

161,845 

173,232 

 

palladium

oz

 

75,341 

81,563 

 

 

Gold

oz

 

3,401 

3,949 

 

 

Rhodium

oz

 

22,589 

23,953 

 

 

Ruthenium

oz

 

34,754 

36,952 

 

 

Iridium

oz

 

7,512 

8,025 

 

 

Total PGMs

oz

 

305,442 

327,674 

 

 

Nickel8

MT

 

669 

767 

 

 

Copper8

MT

 

422 

481 

 

 

  

 

 

 

 

 

 

3 months

3 months 

 

 

 

 

 

 

 

to 31st December

to 31st December

 

 

 

 

 

 

 

2009

2008

 

Metallurgy12

Lonmin refined metal
Production

Platinum

oz

 

110,786 

132,935 

 

 

 

palladium

oz

 

70,967 

60,756 

 

 

 

Gold

oz

 

3,408 

3,496 

 

 

 

Rhodium

oz

 

21,564 

18,749 

 

 

 

Ruthenium

oz

 

25,632 

25,338 

 

 

 

Iridium

oz

 

9,921 

2,544 

 

 

 

Total PGMs

oz

 

242,278 

243,818 

 

 

 

Toll refined metal
production

Platinum

oz

 

 

 

 

palladium

oz

 

 

 

 

Gold

oz

 

 

 

 

Rhodium

oz

 

324 

 

 

 

Ruthenium

oz

 

512 

 

 

 

Iridium

oz

 

 

 

 

Total PGMs

oz

 

835 

 

 

 

Total refined PGMs

Platinum

oz

 

110,786 

132,935 

 

 

 

palladium

oz

 

70,967 

60,756 

 

 

 

Gold

oz

 

3,408 

3,496 

 

 

 

Rhodium

oz

 

21,888 

18,749 

 

 

 

Ruthenium

oz

 

26,144 

25,338 

 

 

 

Iridium

oz

 

9,921 

2,544 

 

 

 

Total PGMs

oz

 

243,114 

243,818 

 

 

 

Base metals

Nickel9

MT

 

668 

764

 

 

 

Copper9

MT

 

378 

499

 

Sales

Refined Metal Sales

Platinum

oz

 

109,044 

126,202 

 

palladium

oz

 

68,572 

53,345

 

Gold

oz

 

2,020 

3,379 

 

Rhodium

oz

 

25,262 

17,102 

 

Ruthenium

oz

 

25,511 

25,668 

 

Iridium

oz

 

9,277 

3,108 

 

Total PGMs

oz

 

239,685 

228,805

 

Concentrate and other10

Platinum

oz

 

 

palladium

oz

 

 

Gold

oz

 

 

Rhodium

oz

 

 

Ruthenium

oz

 

 

Iridium

oz

 

 

Total PGMs

oz

 

 

Lonmin Platinum

Platinum

oz

 

109,044 

126,202 

 

palladium

oz

 

68,572 

53,345 

 

 

Gold

oz

 

2,020 

3,379 

 

 

Rhodium

oz

 

25,262 

17,102 

 

 

Ruthenium

oz

 

25,511 

25,668 

 

 

Iridium

oz

 

9,277 

3,108 

 

 

Total PGMs

oz

 

239,685 

228,805 

 

 

Nickel9

MT

 

572 

676

 

 

Copper9

MT

 

483 

403

 

  

 

 

 

 

 

 

3 months

3 months 

 

 

 

 

 

 

 

to 31st December

to 31st December

 

 

 

 

 

 

 

2009

2008

 

Prices

Average

Platinum

$/oz

 

1,411 

882 

 

 

palladium

$/oz

 

363 

187 

 

 

Gold

$/oz

 

1,163 

819 

 

 

Rhodium

$/oz

 

2,214 

2,347 

 

 

Ruthenium

$/oz

 

118 

248 

 

 

Iridium

$/oz

 

386 

421 

 

 

Basket price of PGMs11

$/oz

 

1,017 

751 

 

 

Nickel9

$/MT

 

16,606

15,143 

 

 

Copper9

$/MT

 

6,431

4,950 

 

Exchange
Rates

Average rate for period

 

R/$

 

7.46 

9.92 

 

Closing rate

 

R/$

 

7.37 

9.45 

 

 

 

Notes:

 

Hossy and Saffy are replacement/growth shafts in ramp up. Hossy is fully mechanised whilst Saffy has conventional stoping but mechanised development. In previous production reports this section showed all M&A/Hybrid mining. All comparatives have been restated.

 

 

Pandora attributable tonnes mined includes Lonmin's share (42.5%) of the total tonnes mined on the Pandora joint venture.

 

 

Tonnes milled excludes slag milling.

 

 

Lonmin purchases 100% of the ore produced by the Pandora joint venture for onward processing which is included in downstream operating statistics.

 

 

Head Grade is the grammes per tonne (5PGE + Au) value contained in the tonnes milled and fed into the concentrator from the mines (excludes slag milled).

 

 

Recovery rate in the concentrators is the total content produced divided by the total content milled (excluding slag).

 

 

Metals in concentrate include slag and have been calculated at industry standard downstream processing losses. 

 

Corresponds to contained base metals in concentrate.

 

 

Nickel is produced and sold as nickel sulphate crystals or solution and the volumes shown correspond to contained metal. Copper is produced as refined product but typically at LME grade C.

 

 

10 

Concentrate and others sales essentially relates to BMR concentrate and BMR/PMR residues.

 

 

11 

Basket price of PGMs is based on the revenue generated from the actual PGMs (5PGE + Au) sold in the period.

 

 

12 

Lonmin refined metal production and sales include an estimated 3koz saleable ounces of Platinum produced from toll refining third party concentrate (Q1 2009 - nil). 

 

 

 


This information is provided by RNS

The company news service from the London Stock Exchange

 

END

Lonmin PLC.

PRODUCER
CODE : LMI.L
ISIN : GB0031192486
CUSIP : 54336Q203
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Lonmin is a gold and platinum producing company based in United kingdom.

Lonmin produces gold, platinum, palladium and rhodium in South Africa, and holds various exploration projects in Canada, in Gabon, in South Africa and in Tanzania.

Its main assets in production are PANDORA JV, LIMPOPO, MARIKANA, EASTERN PLATINUM (EPL) and KAREE MINE (WPL) in South Africa and its main exploration properties are LUWUMBU in Tanzania, PANTON in Australia, MESSINA PLATINIUM and WESTERN PLATINUM in South Africa and WINDY LAKE in Canada.

Lonmin is listed in Germany, in United Kingdom and in United States of America. Its market capitalisation is GBX 21.4 billions as of today (US$ 25.0 billions, € 22.0 billions).

Its stock quote reached its highest recent level on August 28, 2009 at GBX 9 964.65, and its lowest recent point on June 28, 2019 at GBX 75.60.

Lonmin has 282 784 288 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Lonmin PLC.
5/28/2019Sibanye, Lonmin create world's largest platinum miner as mer...
5/21/2019Sibanye keeps option to increase Lonmin offer against rival ...
5/17/2019South African court clears way for Sibanye's acquisition of ...
5/15/2019Lonmin likely to cut fewer jobs due to revenue boost – CEO
5/11/2019Lonmin says delays in Sibanye-Stillwater deal to hurt sales
4/27/2019Sibanye agrees to raise offer for Lonmin on metal price gain
4/26/2019Africa's Sibanye-Stillwater lowers valuation for miner Lonmi...
12/20/2018Lonmin's biggest mining union tries to block Sibanye deal
11/22/2018S. Africa competition tribunal OKs Sibanye acquisition of Lo...
11/22/2018S.African watchdog orders six-month hold on job cuts in Siba...
11/13/2018Lonmin workers ask South African tribunal to stop merger wit...
10/22/2018Lonmin in $200m loan deal with state-backed Chinese company
9/19/2018Sibanye -Stillwater, Lonmin still committed to merger after ...
9/18/2018South Africa imposes tough conditions on Sibanye-Lonmin deal
5/19/2018PLATINUM WEEK-Sibanye CEO confident of Lonmin takeover despi...
5/15/2018Lonmin tanks as UK competition watchdog looks into Sibanye t...
2/25/2009Lonmin and Evraz axe 8,500 jobs
2/24/2009Lonmin axes 5,500 jobs
Annual reports of Lonmin PLC.
2008 Annual report
Financings of Lonmin PLC.
6/6/2007Makes Private Placement in Wallbridge Mining
Nominations of Lonmin PLC.
4/19/2016APPOINTMENT OF EXECUTIVE DIRECTOR AND CHIEF FINANCIAL OFFICE...
8/3/2010Notification of Transactions of Directors and Persons Discha...
6/17/2010Notification of Transactions of Directors and Persons Discha...
Financials of Lonmin PLC.
7/22/2010Third Quarter 2010 Production Report
7/23/2009Third Quarter 2009 Production Report
Project news of Lonmin PLC.
8/1/2016Third Quarter 2016 Production Report and Business Update
2/24/2009(Marikana)reaches agreement with unions regarding restructuring at Mar...
Corporate news of Lonmin PLC.
8/19/2016Lonmin Secures $50m Funding for Tailings Project
8/2/2016Q3 2016 Production Report
7/22/2016NOTIFICATION OF MAJOR INTEREST IN SHARESi
6/2/2016Director/PDMR Shareholding
5/26/2016Holding(s) in Company
5/17/2016Half-year Report
5/17/2016Q2 Production Report 2016
5/17/2016Appointment of CFO
11/19/2015Lonmin: stay of execution
11/12/2015Victims of Marikana bloodshed sue ANC's Cyril Ramaphosa
11/6/2015Lonmin shares plunge ahead of crucial fundraising
11/2/2015Lonmin warns of $2bn impairment charges
10/21/2015Lonmin: last chance
10/21/2015Lonmin shares rise as debt restructuring plan is revealed
7/30/2015Lonmin: victim of price falls and management wobbles
7/29/2015Low Prices And Mounting Costs Slam Platinum Producers
7/24/2015Anglo American and Lonmin to cut up to 12,000 jobs
7/24/2015Lonmin Plunges on Funding Concern; Plans to Cut 6,000 Jobs
7/24/2015Lonmin to cut jobs and operations as platinum price falls
7/23/2015PRESS DIGEST- British Business - July 24
5/14/2015Platinum: tarnished
5/11/2015Lonmin to cut capital spending as platinum price fall bites
4/10/2015Moolman confirmed as Chief Operating Officer
3/5/2015Lonmin shares at two-decade low on pay worries
2/11/2015Glencore to divest Lonmin stake, cut expenditure to counter ...
2/11/2015Glencore’s 23.9% stake in Lonmin plc
12/15/2014Issuance of Shares and Total Voting Rights
12/15/2014Operational Update
12/15/2014Director/PDMR Shareholding
12/3/2014Total Voting Rights
11/28/2014Lonmin Completes BEE Transaction
11/27/2014Director/PDMR Shareholding
11/14/2014Director/PDMR Shareholding
11/12/2014Fourth Quarter 2014 Production Report
11/11/2014PRESS DIGEST- Financial Times - Nov 11
11/5/2014Total Voting Rights
8/25/2014Exclusive: Lonmin CEO denies job cuts plan, says focus is on...
8/11/2014Protesters disrupt "massacre" evidence by South Africa's Ram...
8/11/2014South Africa's Ramaphosa defends actions before Marikana mas...
4/2/2013Hemscott News Alert - Lonmin PLC
1/31/2013Hemscott News Alert - Lonmin PLC
1/16/2013Hemscott News Alert - Lonmin PLC
12/11/2012Hemscott News Alert - Lonmin PLC
11/9/2012Hemscott News Alert - Lonmin PLC
10/29/2012Hemscott News Alert - Lonmin PLC
10/11/2012Hemscott News Alert - Lonmin PLC
10/1/2012Hemscott News Alert - Lonmin PLC
9/17/2012Hemscott News Alert - Lonmin PLC
9/4/2012Hemscott News Alert - Lonmin PLC
6/25/2012Hemscott News Alert - Lonmin PLC
6/6/2012Hemscott News Alert - Lonmin PLC
5/14/2012Hemscott News Alert - Lonmin PLC
5/2/2012Hemscott News Alert - Lonmin PLC
4/2/2012Hemscott News Alert - Lonmin PLC
3/1/2012Hemscott News Alert - Lonmin PLC
1/24/2012Hemscott News Alert - Lonmin PLC
1/9/2012Hemscott News Alert - Lonmin PLC
12/29/2011Hemscott News Alert - Lonmin PLC
12/12/2011Hemscott News Alert - Lonmin PLC
12/2/2011Hemscott News Alert - Lonmin PLC
8/31/2011Hemscott News Alert - Lonmin PLC
8/16/2011Hemscott News Alert - Lonmin PLC
5/24/2011Hemscott News Alert - Lonmin PLC
5/3/2011Hemscott News Alert - Lonmin PLC
3/29/2011Hemscott News Alert - Lonmin PLC
1/27/2011production report for the quarter to 31 December 2010
8/5/2010Department of Mineral Resources orders Lonmin to suspend sal...
8/3/2010Total Voting Rights and Capital as at 31 July 2010
7/13/2010Transaction Completion and Directorate Change
5/24/2010Number One Furnace Shut Down Update
5/4/2010Total Voting Rights and Capital as at 30 April 2010
3/11/2010Directorate Change
3/1/2010Total Voting Rights and Capital as at 28 February 2010
1/28/2010Q1 2010 Production Report
1/4/2010Total Voting Rights and Capital as at 31 December 2009
11/25/2009Hemscott News Alert
9/30/2009Update on Incwala Resources
8/19/2009Notification of Directors' and PDMRs' shareholdings
7/8/2009Notification of major interest in shares
7/2/2009Total Voting Rights and Capital as at 30 June 2009
6/24/2009Update on Number One Furnace
6/17/2009Notification of Major interest in shares
6/4/2009Directorate Change
5/29/2009Notifications of Major Interests in Shares
5/18/2009Disclosure of Disclosable Short Position relating to Securit...
3/10/2009Notifications of Major Interests in Shares
1/29/2009Q1 2009 Production Report and Interim Management Statement
1/5/2009Hemscott News Alert - Lonmin PLC
12/17/2008Notification of PDMRs' shareholdings pursuant to Disclosure ...
12/11/2008has included 32,597 shares in the Company
12/3/2008Hemscott News Alert
11/27/2008IFC Invests US$15 million in new Lonmin shares
11/26/2008notification of major interests in shares
11/19/2008Notification of Directors' and PDMRs' shareholdings
11/18/2008Final Results Part 2o
10/11/2007Wallbridge Mining and Lonmin Approve $2.5 million for 2008 S...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
LSE (LMI.L)Other OTC (LNMIF)
75.60+0.00%0.976+10.91%
LSE
GBX 75.60
06/28 17:35 -
0%
Prev close Open
75.60 73.20
Low High
72.60 78.80
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  75.60 -%
Volume 1 month var.
12,125,630 -%
24hGold TrendPower© : -44
Produces Platinum
Develops
Explores for Gold - Nickel - Palladium - Platinum
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.92-1.71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+0.00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.38-3.64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.32+0.46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.77-1.12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.10-0.89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :