Otto Energy Limited

Published : January 27th, 2016

Quarterly Activities and Cashflow Report December 2015

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Quarterly Activities and Cashflow Report December 2015

6b3ef07a-fae2-47a1-871c-f1c7c159e175.pdf


Quarterly Report for the Period Ended 31 December 2015


Name:

Byron Energy Limited

ASX code:

BYE

Shares on issue as at 31 December 2015:


192.920 million

Quoted shares:

192.920 million

Options on issue (unquoted):


38.945 million

Cash at 31 Dec 2015:

US$2.76 million

Market Capitalisation at 31 December 2015

A$29 million (@$0.15 per share)

Highlights

Byron secured a multi-well farm out deal with Otto Energy Limited ("Otto") on Gulf of Mexico ("GOM") properties; Otto has committed to drill the SM 6

#2 well with an option to drill SM 71 #1 well, with drilling of SM 6 #2 well expected to commence in February 2016;


Byron announced a $A4.5 million equity placement to provide sufficient funding for Byron's share of SM 6 #2 and SM 71 #1 wells and a Share Purchase Plan enabling shareholders to participate on the same terms as placees;


Byron also announced a proposal for a debt to equity conversion, eliminating the cash call on the Company to repay the existing loans ($A700,000 and

$US612,500) due on 1 July 2016;


On December 31 2015, the Bureau of Safety and

Environmental Enforcement ("BSEE") granted Byron an extension of the SM 6 lease from December 28, 2015 through December 31, 2016 subject to a commitment to continue to progress development of SM 6;


Byron acquired an onshore/marshland lease from private landowners over approximately 2,400 contiguous acres (9.7 square kilometres) along the southern Louisiana Gulf Coast inboard of Byron's existing shallow water leases. This lease acquisition represents a significant addition to Byron's expanding position in the highly productive transitional zone comprising the northernmost shallow waters of the Federal Gulf Of Mexico Shelf, Louisiana State Waters, and onshore coastal Louisiana.


Byron progressed the necessary approvals for drilling of SM 6 #2 and SM 71 #1 wells.


Directors

Doug Battersby (Non-Executive Chairman) Maynard Smith (Chief Executive Officer) Prent Kallenberger (Chief Operating Officer) Charles Sands (Non-Executive Director) Paul Young (Non-Executive Director) William Sack (Executive Director)

Company Secretary and Chief Financial Officer

Nick Filipovic


Contact Details


Level 4, 480 Collins Street

Melbourne Vic 3000

Telephone: +61 3 8610 6583

Email: [email protected] Web:www.byronenergy.com.au


Level 4 480 Collins Street Melbourne VIC 3000 T: 03 8610 6583 F: 03 8610 6334 E: [email protected] W: byronenergy.com.au


ABN 88 113 436 141


1

Corporate

Funding


Placement

On 30 December 2015, Byron Energy Limited ("Byron"or the"Company") (ASX:BYE) announced that commitments have been received to raise $A4.5 million through a placement ("Placement") of 29.9 million new shares.


The Placement consists of 29,928,333 fully paid new ordinary shares to be issued at A$0.15 per share to raise

$A4.5 million (before issue costs). The Placement shares comprise:-


an unconditional placement of 23,866,666 shares to raise approximately $A3.6 million (to be completed in January 2016) utilising the Company's existing Listing Rule 7.1 placement capacity, and


a conditional placement of 6,061,667 shares ("Conditional Placement") to raise approximately $A0.9 million comprising subscriptions from Byron directors (and their associates).


The Conditional Placement is subject to shareholder approval at an Extraordinary General Meeting ("EGM") of Byron's shareholders, expected to be held on 15 February 2016 and will therefore not use up any of the Company's existing Listing Rule 7.1 placement capacity.


Share Purchase Plan

The Company also announced a Share Purchase Plan ("SPP") to raise up to $A2.5 million. The SPP will allow shareholders who, at the record date of 7pm (Sydney time) on 29 December 2015, have a registered address in Australia or New Zealand, the opportunity to subscribe for a maximum of $A15,000 worth of ordinary shares in the Company at a subscription price of A$0.15 per share (being the issue price of the Placement). The SPP opened on 12 January 2016 and is scheduled to close on 29 January 2016, unless extended.


Conversion of Loans to Equity

Byron currently has outstanding loans of $A700,000 ("AUD Loans") and $US612,500 ("USD Loans") repayable on 1 July 2016. The loans are unsecured bearing interest at 10% per annum.


The AUD Loans are from entities associated with Doug Battersby ($A500,000) and Maynard Smith ($A200,000), both directors of the Company. Of the USD Loans, $US250,000 is from Charles Sands and $US37,500 from an entity associated with Prent Kallenberger, also both directors of the Company. The balance of the USD Loans of

$US325,000 is from several US based shareholders ("US Shareholder Lenders").


The Company requested and Messrs Battersby, Smith, Sands and Kallenberger agreed, that their existing loans to the Company be converted to shares in the Company, subject to shareholder approval. The conversion, subject to shareholder approval, will be at A$0.15 per share, the same price as the issue price under the Placement. The Company has convened a general meeting of shareholders on 15 February 2016 to seek shareholder approval for the conversion of the loans to equity, under ASX Listing Rule 10.11. Assuming shareholders approve the proposal, which would reduce the cash call on the Company on 1 July 2016 by approximately $US0.8 million, the debt to equity conversion will result in the issue of approximately 7.3 million new shares to interests associated with Messrs Battersby, Smith, Sands and Kallenberger, based on an issue price of A$0.15 per share and AUD/USD exchange rate of $A1=$US0.72.


The proposed conversion of debt to equity by these directors is in addition to the cash subscriptions proposed to be made by those directors under the Placement.


Level 4 480 Collins Street Melbourne VIC 3000 T: 03 8610 6583 F: 03 8610 6334 E: [email protected] W: byronenergy.com.au


ABN 88 113 436 141


2

Corporate (Cont.)

The US Shareholder Lenders have also agreed to convert their loans to the Company of $US325,000 into shares in the Company, also at A$0.15 per share, to be completed at the same time as the conversion by Directors. This will result in an the issue of approximately 3.0 million new shares to the US Shareholder Lenders, based on an issue price of A$0.15 per share and AUD/USD exchange rate of $A1=$US0.72.


Issue of new Options

On 4 December 2015 Byron announced the proposed issue of 1.7 million unlisted options to Mr William ("Bill") Sack, Executive Director of the Company, exercisable at an exercise price of $A0.25 per Share on or after issue at any time on or before 30 September 2018, subject to shareholder approval, which will be sought at a general meeting of shareholders on 15 February 2016.


On 4 December 2015 Byron also announced the proposed issue of 250,000 unlisted options in the Company, to Mr Peter Love, an adviser to the Company, exercisable at an exercise price of $A0.25 per Share on or after issue at any time on or before 30 September 2018. The issue to Mr Love was completed on 11 December 2015.


Issued capital

As at 31 December 2015, Byron's issued capital comprised:-


Total issued

Quoted

Unquoted

Escrowed

Shares (ASX:BYE)

192,919,735

192,919,735

Nil

Nil

Options

38,695,984

Nil

38,695,984

Nil


Projects Update

Multi-well Farm Out Deal with Otto on GOM Properties

On 11 December 2015, Byron announced a multi-well farm out deal with Otto Energy Ltd. ("Otto") on certain Gulf Of Mexico properties, summarised as follows:-

Byron has entered into a multi-well staged farm-out agreement with Otto Energy Ltd. (ASX: OEL) that potentially injects $US 17.3 million in capital into three of Byron's existing projects.

This transaction accelerates Byron's drilling program in the GOM by partnering with a well-capitalised company and reduces Byron's capital requirements while Byron retains operatorship and leverages its GOM expertise.

Otto will earn a 50% working interest in Byron's SM 6 lease by paying a disproportionate 66.67% share of drilling costs of the SM 6 #2 well, plus reimbursing a portion of Byron's past costs. Otto will then have an option to earn a 50% working interest in Byron's SM 70/71 leases by paying a disproportionate 66.67% share of drilling costs of the SM 71 #1 well and reimbursing a portion of Byron's SM 70/71 past costs.

Ottowillalsohaveanoptiontoearna 45% workinginterestin Byron's Bivouac Peakleasesbypayingadisproportionate share of drilling costs of the first well on the leases and reimbursing a portion of Byron's past costs.

Byron will utilise a Hercules jack up rig , as previously announced, to drill one well at SM 6, followed by an optional well at SM 71 beginning in the March 2016 quarter.

Byron has also taken steps to place the SM 6 lease on a path to production by executing a Production Handling Agreement with the offset operator, Fieldwood Energy LLC, and has applied for the necessary approvals with BOEM to modify the existing SM 6 caisson with the goal of establishing initial production by end 2016/early 2017.

For further details refer to the ASX release of 11 December 2015.


Level 4 480 Collins Street Melbourne VIC 3000 T: 03 8610 6583 F: 03 8610 6334 E: [email protected] W: byronenergy.com.au


ABN 88 113 436 141


3

Salt Dome Projects

At 31 December 2015, Byron holds acreage over four salt domes in the shallow waters of the GOM, comprising South Marsh Island 6, Eugene Island 63/76, South Marsh Island 70/71 and Grand Isle 63/72/73.


South Marsh Island Block 6

South Marsh Island Block 6 ("SM 6") is located offshore Louisiana, in the shallow waters of the GOM, 216km southwest of New Orleans in approximately 65 feet (20 metres) of water. Byron owns a 100% working interest and an 81.25% net revenue interest in the block.


SM 6 covers a portion of a salt dome that has previously produced 18.6 million barrels of oil and 37.1 bcf of gas from this block commencing in 1962. There is currently no production from SM 6.


As previously reported the SM 6 #1 BP 02 well:-


encountered two hydrocarbon bearing sands with combined net pay of 82 feet (25 metres) in the F40 Sand and several thin hydrocarbon bearing sands with combined net pay of 17 feet (5 metres) in the F30 Sand,


was cased and suspended inside a caisson in July 2014, and


was completed for future production in July 2015; the Hercules 205 drilling rig was used to re-enter the well and perforated the lower of the two hydrocarbon bearing sand lobes in the F40 Sand.


During the December quarter Byron filed a Development Operations Coordination Document ("DOCD") with the Bureau of Ocean Energy Management ("BOEM"). The DOCD is structured, to allow Byron to modify the existing SM 6 caisson and lay a flow line to the SM 10 "A" platform where hydrocarbons will be separated and transported to market for sale. Along with that DOCD application, Byron requested a Suspension of Production ("SOP") from the Bureau of Safety and Environmental Enforcement ("BSEE") for the SM 6 lease that will extend the lease term in order to give Byron time to design, install and hook up these new facilities. A key component of this process is a Production Handling Agreement between Byron and the offset operator at SM 10, Fieldwood Energy LLC ("Fieldwood").


On December 31 2015 BSEE granted Byron an SOP for SM 6 from December 28, 2015 through December 31, 2016, based on an activity schedule submitted by Byron. In accordance with the activity schedule, Byron will first conduct a Right of Way pipeline pre-lay survey in January 2016. The pipeline, when completed, would link SM 6 wells with the nearby Fieldwood operated host platform at SM 10, on the offset lease.


During the December quarter, Byron filed the Application for Permit to Drill ("APD") in relation to the SM 6 # 2 well. The APD is in the final stages of review by BSEE with final approval expected in late January 2016 in time to utilize the Hercules jack-up rig when it is released from its current obligation.


South Marsh Island 70/71 Salt Dome Project

South Marsh Island Blocks 70/71 ("SM 70/71") covers a portion of a large piercement salt dome which has previously produced 75 million barrels of oil from sands above 7,500 feet true vertical depth with production commencing in 1963. There is no current production from SM 70/71.

As previously reported the analysis of full wave inversion of 3D seismic data was completed and confirmed the hydrocarbon prospectivity in both J sand and D5 target sands. Mapping has detailed D5 analog production and stratigraphic components on the dome. Interpretation work is ongoing to optimise future drilling locations.



Level 4 480 Collins Street Melbourne VIC 3000 T: 03 8610 6583 F: 03 8610 6334 E: [email protected] W: byronenergy.com.au


ABN 88 113 436 141


4

Read the rest of the article at www.publicnow.com
Data and Statistics for these countries : Australia | Georgia | Mexico | New Zealand | All
Gold and Silver Prices for these countries : Australia | Georgia | Mexico | New Zealand | All

Otto Energy Limited

CODE : OEL.AX
ISIN : AU000000OEL3
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Otto Energy is a and oil exploration company based in Australia.

Otto Energy is listed in Australia, in Germany and in United States of America. Its market capitalisation is AU$ 15.4 millions as of today (US$ 10.1 millions, € 9.4 millions).

Its stock quote reached its highest recent level on March 30, 2012 at AU$ 0.15, and its lowest recent point on April 03, 2020 at AU$ 0.00.

Otto Energy has 1 186 300 032 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Otto Energy Limited
Annual Report 30 June 2011
Annual Report to shareholders
Nominations of Otto Energy Limited
4/6/2011Resignation of Managing Director
7/16/2008Appoints Commercial Manager
Project news of Otto Energy Limited
2/23/2014Otto Enters Next Phase in Tanzania Production Licences
7/30/2013Otto Updates Duhat-2 Drilling in SC51
5/2/2013welcomes KUFPEC to Galoc Joint Venture
5/1/2013Otto Achieves Financial Close on Project Finance Facility
9/11/2012Otto Acquires Increased Working Interest in SC51 JV
8/12/2011Galoc Oil Field Acquisition Presentation
7/1/2011Final Director's Interest Notice
6/8/20113D seismic acquisition commences in SC69
3/9/2011Philippine Exploration Update
Corporate news of Otto Energy Limited
7/29/2016Dispute Notices Issued to Swala Oil & Gas (Tanzania) Plc
7/7/2016Independent Reserves Report - SM-71
7/7/2016Bivouac Peak Option Entry and SM-6 Update
6/20/2016Farm Down of Upcoming Tanzania Drilling
4/29/2016Corporate Governance Statement
4/27/2016Otto Energy's Alaskan Potential Upgraded
4/26/2016SM-71 No. 1 DISCOVERY UPDATE - GULF OF MEXICO
4/4/2016BYE: Byron Energy Spuds SM 71 No 1 Well
3/30/2016SM 6 No 2 and SM 71 No 1 Well Updates
3/29/2016Otto Exercises Option to Drill SM71 No.1 Well
3/29/2016Drilling Update SM6 No. 2
3/29/2016Trading Halt
3/29/2016BYE: SM 6 No 2 and SM 71 No 1 Well Updates
1/27/2016Quarterly Activities and Cashflow Report December 2015
12/23/2015RMP: SC 55 - Update
12/10/2015Staged Farm In Gulf of Mexico with Byron Energy
11/26/2015Final Director's Interest Notices
10/27/2015Quarterly Activities Report
10/1/2015US$21.3 million Hawkeye-1 Drilling Contribution Received
10/1/2015Otto Invests US$7m in Alaskan North Slope Acquisition
9/24/2015Appendix 4G Corporate Governance Statement
9/24/2015Annual Report to shareholders
9/10/2015Appendix 3B
9/3/2015Investor Presentation
8/16/2015Hawkeye-1 Exploration Well Results
8/14/2015Appendix 3B
8/12/2015Appendix 3B and sec 708 Statement
8/7/2015Change of Director's Interest Notice
8/5/2015Otto Acquires Borealis Petroleum Pty Ltd
8/3/2015Hawkeye Drilling Update Number 1
7/30/2015Pryce Gases 10% Farm-in to SC55 Hawkeye Rig Mobilised
7/21/2015Otto Acquires Onshore Alaskan Interest
7/17/2015Trading Halt
7/14/2015Investor Presentation
7/14/2015Quarterly Activities & Cashflow Report
7/3/2015Change of Director's Interest Notice
7/2/2015RMP: Commencement Notice and Appendix 3B
7/2/2015Hawkeye-1 Exploration Well Update
6/25/2015Appointment of Managing Director
6/9/2015GM Results Capital Return Special Dividend
4/20/2015Quarterly Activities & Cashflow Report
4/20/2015Investor Presentation
4/2/2015Appendix 3B
3/10/2015Half Year Accounts
3/2/2015RMP: Letter of Intent Signed for Philippines Drill Rig
3/2/2015OEL: SC55 Farm-Down and Rig Letter of Intent Signed
3/2/2015RMP: Farmin Agreement Signed With Otto Energy
2/17/2015Completion of Sale of Galoc Oil Field
1/11/2015Quarterly Activities & Cashflow Report
1/8/2015SC55 PNOC-EC Farm-in and Hawkeye Progress Update
1/6/2015Successful Completion 2014 Seismic Programme over Kilombero
10/29/2014OEL: Kilombero Seismic Update
1/20/2014SC55 - Otto Executes Binding Agreements
1/20/2014SC55 - Otto Executes Binding Agreements
12/18/2013Positive Results from Tanzanian Exploration Programme
12/10/2013Confirms Kito Prospect in Tanzania
12/10/2013Otto Energy Confirms Kito Prospect in Tanzania
12/5/2013Commencement of Production from Galoc Phase II
12/5/2013Galoc Phase II First Oil - Boardroom Radio Interview
12/5/2013Investor Presentation
11/27/2013SC55 - Otto Secures LOI to Assume BHP Billiton's Interest
11/15/2013Results of Meeting
11/14/2013AGM Chairman Speech and CEO Presentation
11/8/2013Further Positive Results from Seismic Programme
10/29/2013Service Contract 55 Update
10/8/2013to Relinquish Stake in SC69
9/3/2013Executes Service Contract 73 in the Philippines
7/25/2013Drilling Commences on the Duhat Oil Prospect in SC51
6/20/2013GALOC EXPLORATION DRILLING UPDATE
6/20/2013Galoc Exploration Update
6/19/2013GALOC DRILLING UPDATE
6/19/2013Galoc Phase II Drilling Update Number 2
6/12/2013GALOC-5H AND GALOC-6H DRILLING UPDATE
6/12/2013Galoc Phase II Drilling Update Number 1
5/3/2013Boardroom Radio Update Mar 2013 Quarterly Report
4/16/2013Clarifies Media Speculation on SC55
3/14/2013Galoc Reserves Update
2/22/2013Preferred Bidder for Area 7 Release
2/22/2013Otto Energy Preferred Bidder for Area 7 Release
10/12/2012Investor Update - Boardroom Radio Interview
10/12/2012Otto obtains Philippines Government Approval
9/11/2012Investor Update - Boardroom Radio Interview
5/21/2012Upgrades Galoc Oil Field Reserves
12/28/2011Execution of Final Farm-in Documents for SC55
11/28/2011Galoc Field Shut-in for FPSO Upgrade
10/27/2011Quarterly Activities Report
9/30/2011Completes Acquisition of Galoc Production Company WLL
9/5/2011Phase II development progresses in Galoc Oil Field
8/19/2011Boardroom Radio Interview with Mr Matthew Allen
8/16/2011Investor Briefing Replay with Mr Matthew Allen
8/16/2011Investor Briefing Replay
8/12/2011buy Vitol's stake in Galoc Oil Field
7/8/2011Galoc Mooring Update
6/23/2011SC69 3D Seismic Completed
5/25/2011Operational Update - Duhat-1A Well
5/16/2011Operational Update - Duhat-1
5/11/2011Farm-in Option Exercised in Service Contract 55
5/11/2011Investor Briefing Update
5/4/2011Galoc Reserves Update
4/28/2011March 2011 Quarterly Report
4/28/2011Duhat-1 Well Operational Update
4/19/2011Duhat-1 well spuds in Service Contract 51
3/15/2011Half Year Accounts 31 December 2010
3/3/2011Comments on release concerning Philippine Service Contracts
3/24/2010Seismic Program - SC69 Philippines
2/9/2010Seismic Acquisition Commencing - SC55 Philippines
1/27/2010Turkey Drilling Update
1/14/2010Seismic Acquisition and Farm-in Option Agreement - SC55
12/15/2009Gas Sale Agreement Secured for Edirne Project
11/10/2009Galoc Oil Field Operations Update
10/27/2009Galoc Operations Update
9/23/2009Financial Report for the year ended 30 June 2009
7/15/2009Operations Update
7/2/2009Drilling Operations Update
6/25/2009Significant Milestone for Otto and the Galoc Oil Field
5/27/2009Operations Update
12/29/2008Po Valley Italy Exploration Update
12/22/2008(Audio) Boardroom Radio Interview Broadcast
9/26/2008StockAnalysis Otto Energy Special Issue
9/23/2008Resources Estimate- Edirne Gas Fields, Western Turkey
9/19/2008Galoc Oil Field Update
9/1/2008Open Briefing=AE with CEO of Otto Energy
8/13/2008Turkey Field Development Contracts Awarded
7/30/2008Quarterly Report
7/23/2008Galoc Update
7/10/2008Independent Evaluation Santa Rosa Permit Argentina
7/7/2008Galoc Update
7/4/2008100% Drilling Success as Arpaci 2A Encounters Gas
6/23/2008Galoc: Operations Update
6/10/2008Second zone flows gas in Kuzey Arpaci-1
6/4/2008Flows Gas from Kuzey Arpaci-1 in Turkey
5/15/2008encounters gas in Arpaci-2 in Turkey
5/15/2008Completes Placement to Raise $15 Million
5/13/2008Office Upgrade for Otto Energy
5/12/2008Rubicon Intrepid FPSO Arrives at Galoc
5/9/2008spuds Arpaci 2 well - Western Turkey
5/9/2008awarded Area 8 - Philippines
5/1/2008 makes 6th Gas Discovery in Turkey
4/28/2008 spuds third of 5 wells in gas campaign in Turkey
4/8/2008 spuds second of 5 wells - Turkey
4/4/2008Discovers substantial gas in first of 5 wells in Turkey
12/17/2007Completes Galoc Oil Field Transaction
12/3/2007Results of 2007 Annual General Meeting
11/28/2007ASX Notice Under Section 708A
11/8/2007Activity Report for October 2007
10/30/2007Notice of Annual General Meeting
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (OEL.AX)BERLIN (O1E.BE)
0.013+8.33%0.005+0.00%
AUSTRALIA
AU$ 0.013
04/29 17:10 -
8.33%
Prev close Open
0.012 0.013
Low High
0.012 0.013
Year l/h YTD var.
0.010 -  0.020 -35.00%
52 week l/h 52 week var.
0.010 -  0.021 -7.14%
Volume 1 month var.
211,233 -%
24hGold TrendPower© : -21
Produces
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-27.78%
202338.46%0.020.01
2022-7.14%0.020.01
202155.56%0.020.01
2020-75.68%0.040.00
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.66-0.78%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.22-0.33%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.52-0.76%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64+0.00%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.48+1.54%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.26+4.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.23+9.52%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.06%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 53.08+0.70%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :