QUARTERLY REPORT for the Quarter Ended 31 March 2015

Magnetic Resources NL

ABN 34 121 370 232

ASX Codes: MAU and MAUCA Ground Floor, 22 Delhi Street, West

Perth WA 6005

T +61 8 9226 1777

F +61 8 9485 2840

E [email protected]

PO Box 1388

West Perth WA 6872

Issued Capital:

Shares - Quoted:

97,936,814 ordinary shares.

20,418,862 partly paid shares ($0.20 unpaid).

Options - Unquoted

- 2,145,000 options exercisable at

$0.4607 by 21 December 2015

-12,757,143 options exercisable at

$0.1499 by 27 December 2016

- 4,000,000 options exercisable at$0.17 on or by 31 December 2017

- 150,000 options exercisable at

$0.18 on or by 31 December 2017

Cash: $0.97 m

Directors: Gavin Fletcher

Managing Director

Eric Lim

Non-Executive Director

John Blanning

Non-Executive Director

Company Secretary

Ben Donovan

HIGHLIGHTS

MT JOY TENEMENT AQUISITION:

Magnetic Resources applies for large tenement holding close to

Northam known as Mt Joy.

Builds on Company vision of securing prospective ground to feed future mine developments

Tenement application covers over 19,000 Ha of highly prospective magnetic anomalies

Tenement area includes approx. 70 strike km of magnetic anomalies

Key drilling targets already identified

Discussions with key landholder, results in a secured access agreement allowing for the immediate commencement of drilling

Immediate plans to drill a maiden JORC resource in a highly prospective area of the Mt Joy tenement in the next quarter

1

INTRODUCTION:

Magnetic Resources NL (Magnetic or the Company) is pleased to announce that as part of its broader strategy of securing highly prospective ground to feed into planned future mines, it has applied for over 19,000Ha of highly prospective tenements located less than 5km from the town of Northam and the Government owned, open access Trans Australian Railway.

The Mt Joy land holding is located 15 kms to the North of the Company's other projects at Ragged Rock, and further south, Kauring which potentially offers the Company significant benefits in terms of securing synergies on processing and construction for any future mine development.

Figure 1: Location Map Mt Joy Project

2

Tenement Application

The Company made an application for 66 sub blocks (19,306.22Ha) under Exploration Licence EL 70/4692. A competing application was made by another ASX listed Company on the same day for a sub lot of 19 blocks (approx. 5600Ha) under EL 70/4693. The areas of greatest interest to Magnetic are not contained within this competing application.
The objection period for both tenement applications expired on 9 March 2015 with no objections currently lodged against either application. This means that the Magnetic application E70/4692 has no competing interests for at least 47 of the blocks originally applied for. The priority over the remaining 19 blocks will be resolved by negotiation with the other partner or by a ballot conducted by the Mining Warden, at a date yet to be determined in the near future.

The diagram below outlines the location and relationship of the 2 tenement applications:

Figure 2: Mt Joy E70/4692 and competing application E70/4693

3

Prospectivity of the area

The Company is very excited about the potential of the area, given that the magnetic anomalies are generally more pronounced, wider and more continuous than many other areas within the same metamorphic belt of geology.
The magnetic anomalies are similar to those seen on the Company's Kauring project where drilling has intersected numerous very thick and high yielding BIF zones, giving the Company strong belief that the Mt Joy area will contain similar or better intersections.

Figure 3 below outlines a number of significant anomalies totalling some 70 km of strike.

Figure 3: Mt Joy E70/4692 anomalies and strike kilometres

4

Consultation with the Landholders

The Company has been very proactive in the area since making the tenement application and has met with many of the farmers to negotiate land access agreements.
At least one agreement has been concluded over a very strategic area, and the Company is in the advanced stages of negotiation with the surrounding farmers.
The negotiated agreement covers a feasibility stage and operations phase but most important, Magnetic has the ability to take the project all the way through to a mine which gives the Company the confidence to commence drilling on the project
The agreement involves a number of staged payments on normal industry terms when certain milestones are reached, followed by a production royalty payment to the landholder if the project eventually reaches production.
The Company is sufficiently convinced of the mineral potential of this strategic landholding (based on historical drilling information from the 1960's) that a drill program will be undertaken early in the next quarter with a view of delineating a maiden JORC resource over the area.

GENERAL:

Commenting on the Mt Joy tenement, Managing Director Gavin Fletcher said "the Company is very pleased to have secured the Mt Joy tenement. The tenement is highly prospective, very close to infrastructure and an agreement has already been reached over a strategic target with surrounding landholders also showing a great deal of interest in working with the Company"

RAGGED ROCK PROJECT: (Magnetic 100%)

Further to previous quarter outlining several ground magnetic surveys as future exploration targets, drilling will be subject to agreements with land holders.

JUBUK PROJECT: (Magnetic 100%)

Application for retention and extension status has been made for the Jubuk coarse grained magnetite deposit near Corrigin. This will allow Magnetic to focus on evaluating its Ragged Rock and Kauring projects. The Company has been advised of a 5 year extension of exploration licence was granted in early 2015. Application for Retention Status is pending.

KAURING PROJECT: (Magnetic 100%)

During the quarter the Company advised that results of additional reverse circulation drilling in its December
2014 Quarterly Report and will further advise on any significant changes to the Exploration Target as a result of additional drilling.

OTHER TENEMENTS:

Magnetic has rationalised its tenement holdings in order to focus on the newly acquired Mt Joy tenement and Kauring projects. As a result of this focus, no exploration was carried out on Magnetic's other tenements during the quarter.

CORPORATE:

On 2 March 2015, the Company announced John Blanning purchased 265,000 shares on market.
On 4 March 2015, the Company announced Gavin Fletcher purchased 160,000 shares and 686,418 contributing shares via an off market purchase.
On 4 March 2015, the Company announced John Blanning purchased 1,170,000 shares and 635,524 contributing shares via an off market purchase, and became a substantial shareholder of the Company.
On 16 March 2015, the Company announced John Blanning purchased 60,000 shares on market.

5

TENEMENT SCHEDULE:

Tenement Schedule in accordance with ASX Listing Rule 5.3.3
Tenements held at the end of the Quarter

Location

Tenement

Nature of

Interest

Project

Equity (%)

held at start of

Quarter

Equity (%) held at end of Quarter

WA

E70/3536

Granted

JUBUK

100%

100%

WA

E70/3716

Granted

LOMOS

100%

100%

WA

E70/4243

Granted

RAGGED ROCK

100%

100%

WA

E70/4384

Granted

MT MARY

100%

100%

WA

E70/4478

Granted

COLLINS HILL

100%

100%

WA

E70/4508

Granted

KAURING

100%

100%

WA

E70/4528

Granted

KAURING

100%

100%

WA

E70/4598

Granted

LATHAM ROCK

0%

100%

WA

E77/2035

Granted

LAKE SEABROOK

Gold Rights

Only

Gold Rights Only

Mining Tenements acquired during the Quarter

WA

E70/4692

Application

Mount Joy

100%

100%

Mining Tenements disposed during the Quarter

WA

nil

For more information on the Company visit www.magres.com.au

Gavin Fletcher Managing Director Phone (08) 9226 1777

Mobile 0400 747 179
Email [email protected]

Competent Person's Statement

The information in this report that relates to exploration results is based on information compiled or reviewed by Mr Cyril Geach BSc (Hons-Geology) who is a member of the Australian Institute of Geoscientists. Cyril Geach is an independent consultant with his own business, Cyril Geach - Geologist and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Cyril Geach consents to the inclusion of this information in the form and context in which it appears in this report.

About Magnetite

Magnetite is a major source of iron and accounts for about 30% of global iron furnace feed for steel production. The largest producer of iron ore and iron is China and its main iron ore source is magnetite. North America is the sixth largest producer and is also mostly a magnetite producer.
Magnetite (Fe3O4) is a magnetic mineral, an important property in aiding discovery using magnetic surveys and in ore processing. Ore can be crushed, passed over a magnet and the magnetite extracted to produce a clean, high grade iron product.
Magnetite ore grades are usually lower than commercially exploited hematite ores but after processing, a product with much higher iron grades and much lower costly impurities is derived.

6

Code, 2012 Edition - Table 1 report template

Section 1 Sampling Techniques and Data (Criteria in this section apply

to all succeeding sections

Magnetic Resources Kauring Report Release 19 December 2013 update with Magnetic Resources Kauring Report Release 19 February 2014 update with Magnetic Resources Kauring Report Release 04 & 20 March 2014 update with Magnetic Resources Kauring Report Release 07 April 2014 update with Magnetic Resources Quarterly Report to 30 September 2014 update with

Magnetic Resources Kauring Report 24 November 2014 and this release January 2015

Sampling techniques Reverse Circulation Drilling collected at 1m , 2m and 4m interval and sub sample split through a cyclone rotary splitter

Duplicates taken using a 75:25 riffle splitter at every 20-30m and standards introduced at every 30-40m

Susceptibility readings taken at each 1m from larger sample collected using a Georadus

K10 magnetic susceptibility meter x10-3SI

Hand held Delta Dynamic XRF Model DP-4000-C Serial No 510246 used to test every 5-7 metres of collected sample for early recognition of Fe content. Error 5-10%Fe to assay expected.

Drilling techniques Reverse Circulation Drill Rig owned by Orbit Drilling Pty Ltd, Breakthru Drilling PL using a

140mm RC hammer drill bit, pre-collar to 6m and Mt Magnet Drilling HQ and NQ DDH

Drill sample recovery Visual observation and noted where water occurs - water was minimal and 90% of sample recovery water free

Drilling companies engaged ensure the efficiency is acceptable and audit of machine efficiency through Duplicates carried out.

It is assumed minimal bias to sample recovery and grade and if so expect at the 1m interface between geological horizons bias to occur backed up where susceptibility and duplicates are a measure of down-hole consistency. Duplicate results indicate in a number of samples that future improved recovery at the rig is required, but as this is an exploratory drill program results are deemed acceptable at this initial level, but would need to improve QA/QC consistency for JORC purposes at MR level when testing the weathered horizon in particular.

Logging Logging at 1m intervals to assess the geological interpretation. DDH 14DD1 was accurate in duplicating 13KRC4 DH log detail to within 1m of the fresh interface.

RC sampling at 1m interval is quantitative using Hand Held XRF and will become qualitative after assaying is carried out. Assay results previously reported in ASX release February

2014 and March 2014 are firm data.

Total length of intersections logged 1266.2 metres as 100% of the drilling at Kauring

Sub-sampling techniques and sample preparation

Quality of assay data and laboratory tests

Verification of sampling and assaying

RC sampling at 1m, 2m and 4m interval is quantitative using Hand Held XRF and became qualitative after assaying data is to be released.

Composite sub sampling was on a volumetric method taking a scoop

the sub samples in the field to be compared v lab assay to detect any major errors.

Duplicate samples are 1m samples only.

Rotary Split at rig at 1m intervals into Calico for 0.5-2.0kg sub samples and riffle split at

75:25 for duplicates >3Kg

Dry samples into calico bags for assay vary with size of collected sample between 0.5-2.0kg weight - expect the sample to be homogenous over the 1m collected

Cyclone cleaned regularly at every 5-10m to prevent cross contamination or cleansed more if clayey or damp conditions prevailed however minimal

Duplicate at every 20-30m to measure continuity of the drill rig and sample recovery, particularly the BIF. Duplicate results indicate in a number of samples that future improved recovery at the rig is required, but as this is an exploratory drill program results are deemed acceptable at this initial level, but may need to improve QA/QC consistency for JORC purposes at MR level when testing the weathered horizon in particular.

Grain size mostly fine powdery in weathered zone and fresh zone

Total digest and XRF methods employed for Fe suite elements when assaying to be employed. Hand Held XRF used as quantitative tool not qualitative.

Hand held XRF self-calibrating specific for Fe and limited to testing a portion of the calico sub sample. Susceptibility readings an average reading across a 1m sample not all the sample able to be read. Hand held XRF tested against known standards to determine any start, middle and end bias. So far accuracy extremely good for Fe% and within tolerable ranges of 2S for Al, P, S.

Quality control methods using 3 x Geostats CRM standards and duplicates. Duplicates to be tested at 2 laboratories for umpire testing in later rounds of drilling. No blanks used. Internal checks and standards satisfy control of lab methods Fire Assay Fe suite XRF / ICP /MS methods by certified laboratory Bureau Veritas.

At this juncture no independent verification of geology apart from personnel involved in recovery of samples and log chip tray observation by third parties and management. One twinned holes to date proved accurate for validating previous fresh BIF drill hole

13KRC4

Documentation of primary data, data entry procedures, data verification, data storage

(physical and electronic) protocols carried out

Discuss any adjustment to assay data not carried out. Weighted assays for composite samples not viable in the field taken as a volumetric scoop size. Weighted in the lab.

Location of data points No surveys or verification of drill holes apart from GPS located. Magnetic variation occurs which has potential to throw out magnetic bearing by up to 10 degrees and noted.

GPS grid system to date

GPS topographic control and located data from GSWA airborne survey

7

Data spacing and distribution

Data spacing for reporting of Exploration Results and Exploration Target are conceptual and

not relevant at this juncture leading to a MR which may or may not be determined.

Data spacing adequate along cross section enables appropriate geological control for

Mineral Resource use at present requires further drilling to ascertain a MR.

Sample compositing so far has been applied to parts of the drill column (February and

March 2014 data to ASX) and at 1m and 2m spacing for zones of BIF of interest such as fresh BIF at Kauring.

Orientation of data in relation to geological structure

DDH 14KDD1 has confirmed a steep 85 degree dip for the eastern BIF. Orientation of sampling depends on the down hole travel of the drill string not yet determined apart from

the DDH. Further drilling will assist in determining any bias.

Mineralised structures and sample bias - too early to understand this affect

Sample security

Samples personally delivered to the laboratory and also stored on site for repeat sampling if

necessary

Audits or reviews

Sample audits at this stage are duplicate and standards taken.

Section 2 Reporting of

Exploration Results

(Criteria listed in the

preceding section also apply to this section.)

Criteria

JORC Code explanation

Mineral tenement and land

tenure status

E70/4508 granted 100% to Magnetic Resources no third party arrangement apart from

standard Department of Mines and Energy requirement access agreements with farm owners, no Native Title or extricated land apart from the Avon Valley water catchment. Land ownership is private used as farm land. Future end agreements will have to be entered into with farmers and discussions begun with a select few. One 5 year option agreement in November 2014 has been signed with the farm owner over the Central Target at Kauring. Land owner agreements over Mount Joy land holdings are a pre-requisite to access and future mining opportunity before any serious exploration carried out. An inferred JORC resource aims to be achieved in April-June 2015 quarter over one prospect of the Mount Joy Tenement

The security of the tenure held at the time of reporting along with any known impediments to

obtaining a licence to operate in the area is subject to a Program of Work approval by DMP and granted for reconnaissance drill holes over Minerals to Crown land. Remnant bush may require a DEC survey in the future for flora and fauna. Minerals to Owner title may exist requiring agreements separate to DMP requirement.

Exploration done by other

parties

No search for Fe by other parties known at Ragged Rock and Kauring.

Geology

Outcropping Banded Iron Formation (BIF) comprising weathered BIF and fresher BIF at

depth within a gneissic strati-form layered succession steeply dipping NE including orthopyroxenite - hornblendite in western BIF that differs from the eastern BIF which is a quartzite BIF at Kauring. Weathered BIF is partial weathered to goethite, hematite, and martite after magnetite at Kauring. Minor sulphide noticed in volcanics and testing to see if sulphide in fresh BIF in the eastern BIF can be separated by DTR analysis at Kauring. Work is ongoing with regard to understanding the relationship of weathered (hematite and martite) alteration over magnetite BIF at Kauring. Layered peridotite / pyroxenite / gabbro footwall to western BIF supports an EIS grant of $141,323 for 20 x RC and 1xDDH in June 2014 quarter.

Drill hole Information

Data summary forms part of an ASX release dated 19 December 2013 and 19 February

2014 and ASX quarterly reports for December 2013, March 2014 and November 2014.

o easting and northing of the drill hole collar provided

o elevation or RL (Reduced Level - elevation above sea level in metres) of the drill hole collar estimated not outlined

o dip and azimuth of the hole provided

o down hole length and interception depth provided

o hole length provided

azimuths are submitted with an error to 10% over the magnetic BIF until further accurate data can be submitted but not critical at such an early stage of reporting of ER or ET

Data aggregation methods

The use of Hand Held XRF data taken at 5-7m intervals is purely quantitative with expected

errors of

Susceptibility readings taken at each 1m RC drill sample from larger sample collected using

a Georadus K10 magnetic susceptibility meter x10-3SI vary across a wide and reported only an average until assay results are posted which will project a better understanding of the Fe% and susceptibility measured at 1m intervals or as composited samples that are yet to

be determined.

The assumptions used for any reporting of metal equivalent values should be clearly stated

not undertaken or represented. Not used for this purpose.

Relationship between

mineralisation widths and intercept lengths

These relationships are particularly important in the reporting of Exploration Results as

outlined in the ASX release dated about 19 December 2013 by MAU.

Fresh BIF sampled at 1m, 2m intervals whilst weathered BIF sampled at 2m and 4m composite levels on composites unreleased in current drill program. Incompatible elements

8

in head grade by XRF on fresh BIF further determined using Satmagan and then if positive -

Davis Tube Recovery to see if they are removed. Results awaited in January 2015. Sulphur was an element that showed normal and above normal levels down-hole in 13KRC drill samples but considered to be workable in context of the very low Al, P incompatible elements and high Fe% at a coarse grind at 100 micron at Kauring in overall sample collection.

If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported and is outlined in Figure 3 this report January 2014 at Kauring.

If it is not known and only the down-hole lengths are reported, there should be a clear

statement to this effect (e.g. 'down hole length, true width not known'). True widths and

down hole widths reported together in Figure 3 this report January 2015.

Diagrams

Appropriate maps and sections (with scales) and tabulations of intercepts should be

included are reported in Figures 1-3 and Tables 1-2.

Balanced reporting

Where comprehensive reporting of all Exploration Results is not practicable - results released and prior reported and as detailed in Notes to the Exploration Target in December

2013, February 2014 and March 2014 ASX releases about Ragged Rock and Kauring.

Other substantive exploration

data

Improved exploration data know about the physical - chemical nature of the reported logged

drill intercepts occurs at this point. Metallurgy is an increasing determination and reported identifying coarse magnetite recoverable at a coarse grind.

We know that a BIF sequence of rocks with 3 zones of BIF a western, central and eastern zone, occurs at Kauring as reported up to January 2015. Overburden of 50m of weathered

BIF reported at Kauring with evidence parts are commercially interesting to date but not affirmative along strike.

Historical drill logs and core used to determine validity of Mount Joy tenement at one of the

defined prospects. Further information to be released in due course. Ground geophysics at

100m carried out and to be reported in due course.

Further work

Further work will require further drilling to improve the geological model being reported broader ground magnetic survey, infill ground magnetics and drilling.

.

9

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : China | All
Gold and Silver Prices for these countries : China | All

Magnetic Resources NL

CODE : MAU.AX
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Magnetic Resources is a gold and nickel exploration company based in Australia.

Magnetic Resources holds various exploration projects in Australia.

Its main exploration properties are SEABROOK and JUBUK in Australia.

Magnetic Resources is listed in Australia and in Germany. Its market capitalisation is AU$ 174.9 millions as of today (US$ 113.0 millions, € 106.0 millions).

Its stock quote reached its lowest recent point on February 05, 2016 at AU$ 0.04, and its highest recent level on August 28, 2020 at AU$ 1.71.

Magnetic Resources has 161 960 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Magnetic Resources NL
1/5/2010article from The Australian
Nominations of Magnetic Resources NL
7/17/201317 July 2013 - Director Resignation
3/13/2013Receives First Draw Down & Appoints Industry Excutives
Financials of Magnetic Resources NL
3/18/2013Half Year Financial Report - 31 Dec 2012
4/29/2011Quarterly Report and Cash Flow Statement for the Quarter End...
Project news of Magnetic Resources NL
3/12/2010(Seabrook)Uranium drilling commences. New uranium anomalies at lake ha...
7/23/2009(Seabrook)Six uranium targets at Seabrook
5/29/2009(Seabrook)Seabrook Uranium Update
3/9/2009(Jubuk)Encouraging Iron results from Jubuk, WA
Corporate news of Magnetic Resources NL
12/21/2015Notice of General Meeting
11/24/2015Notice received under Section 249D
9/10/2015Appendix 4G
9/10/20152015 Annual Report
7/29/2015Quarterly Activities Report - Ended 30 June 2015
3/17/2015Becoming a substantial holder - J Blanning
3/2/2015Half-Year Financial Report for the period ending 31 Dec 2014
1/22/2015Quarterly Activities Report - Ended 31 December 2014
1/22/2015Quarterly Cash Flow Report - Ended 31 December 2014
1/15/2015Appendix 3B - Advisor options
11/24/2014Magnetic Secures Kauring Project
10/31/2014Ceasing to be a substantial holder - G Sakalidis
8/13/2013Pilot Scale Testwork Confirms Outstanding Metallurgical Prop...
5/24/2013General Meeting Outcomes - 22 May 2013
5/7/2013Collins Hill Sampling 7 May 2013
3/12/201312 Mar 2013 - Potential to significantly increase strike len...
2/1/2012Quarterly Report
9/29/2011MAU ASX Release
2/28/201128 Feb 2011
8/24/2010MAU ASX Release
7/30/2010MAU Quarterly Report
7/30/2010MAU ASX Release
6/11/2010MAU ASX Release
4/27/2010MAU ASX Release
4/7/2010Share placement to raise $1.58 Million
3/17/2010Boardroomradio Release
3/10/2010188 km of Iron Ore targets identified
3/3/2010New Iron target identified
2/26/2010Iron Ore targets significantly increased to 150 km strike le...
2/17/2010article in GMG
2/2/2010Quarterly Report
10/30/2009Quarterly Report September 2009
10/23/2009Share placement to raise $972k
10/16/2009Change of Address
10/8/2009MAU ASX Report 8 October 2009
10/8/2009MAU ASX Release 8 October 2009
8/25/2009New Uranium prospects increase holdings to 752Q KM
7/30/2009Quarterly Report
5/19/2009a placement of 5,894,511 fully paid ordinary shares
3/11/2009JUBUK IRON UPDATE
1/15/2009EXPLORATION UPDATE
11/21/2008RESULTS OF GENERAL MEETING
9/11/2008IRON ORE ACREAGE SIGNIFICANTLY INCREASED TO 1565 SQUARE KM
7/30/2008 Quarterly Report
7/14/200814.07.2008
6/25/200825 June 2008
1/31/2008For the Quarter Ended 31 December 2007
11/1/2007Quarterly Report for the period ended 30 September 2007.
9/25/200733KM long shear zone with anomalous Gold up to 1,3G/T on sur...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (MAU.AX)BERLIN (MGT.BE)
1.08+3.85%0.600+2.56%
AUSTRALIA
AU$ 1.08
04/23 15:24 0.040
3.85%
Prev close Open
1.04 1.04
Low High
1.04 1.09
Year l/h YTD var.
0.840 -  1.11 8.00%
52 week l/h 52 week var.
0.460 -  1.11 111.76%
Volume 1 month var.
193,025 4.85%
24hGold TrendPower© : -44
Produces
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202435.00%
2023-6.98%0.950.46
2022-40.48%1.510.68
202123.50%1.701.17
2020134.00%1.710.35
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.72-0.19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.10+2.12%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55-0.90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.41+1.26%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.25-3.42%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.84-1.08%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.56+0.83%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.88%Trend Power :