Eastern Iron Limited

Published : April 27th, 2015

Quarterly Activities Report - March 2015

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Australia | Copper | Gold | Iron | K Street | Market | New Zealand | Oil | Recovery | Report | Ubs | Water |

Quarterly Activities Report - March 2015

QUARTERLY REPORT - MARCH 2015

ASX Code: EFE

Issued Capital: 152,008,130 (as at 31 March 2015)

Directors

Steve Gemell (Chairman) Greg Jones
Michael Giles
Greg De Ross (CEO)

Address

Level 1, 80 Chandos Street
St Leonards, NSW 2065

Postal

PO Box 956, Crows Nest
NSW 1585

T: +61 2 9906 7751

F: +61 2 9906 5233

Twitter: @EasternIronEFE

www.easterniron.com.au

HIGHLIGHTS

NOWA NOWA IRON PROJECT

Further enhancement of product transport system shows potential for Nowa Nowa Iron Project to be amongst the lowest cost iron ore producers in Australia.

Based on a recent research conducted by UBS, Eastern Iron could be the lowest cost iron ore producer behind only BHP Billiton and Rio Tinto.

Total CNF cash costs projected at FOB cash cost of approximately A$32/t (US$24/t) and US$36/t CFR for an upgraded 62% Fe product.

CORPORATE

Various cost saving measures implemented to preserve cash balance.

Board representation halved with resignation of three non- executive directors.


Eastern Iron Limited (ASX: EFE) is pleased to report on activities undertaken during the quarter ended 31st March 2015.

NOWA NOWA IRON PROJECT

The Nowa Nowa Iron Project is located some 250 kilometres east of Melbourne close to the Princes Highway, which provides ready access to several nearby towns and possible export sites (Figure 1).

Figure 1 - Nowa Nowa Locality Plan

Over the past 12 months, Eastern Iron has advanced a Definitive Feasibility Study (DFS) into the potential development of the magnetite-rich iron ore at the Five Mile deposit.

Definitive Feasibility Study

During 2014 Eastern Iron released the results of the Definitive Feasibility Study (DFS) prepared for the Nowa Nowa iron project.
The study was based on the development of the Five Mile magnetite iron deposit by open pit mining and upgrading the ore to a beneficiated product at site then transporting this product to market by the most efficient and cost effective means. Key milestones in progressing this project have been achieved with the completion of a Native Title Agreement with the Gunaikurnai Land and Waters Aboriginal Corporation in December 2013 and the grant of the mining licence in April
2014.
Since the completion of the Feasibility study and in view of the decline of the iron ore price, Eastern Iron has sought avenues to further reduce the cost of production of the delivered

Page | 2


product. In November 2014 the Company announced the results of a study completed by independent shipping consultants, Innovative Shipping Group Pty Ltd (ISG), into loading iron concentrate by slurry pipeline onto suitably configured bulk carrying vessels directly off the Victorian coast. Since the completion of the study the Company has considered further options to reduce costs and improve the value of the final product (see ASX announcement 4th March

2015). The principal improvements are the projected upgrade of the iron product to 62% Fe and replacing off-site trucking and multiple handling of the product with a concentrate pipeline to the slurry pipeline loading point adjacent to the coast some 18km from the minesite.

Operating and capital cost estimates (shown in the table below) are based on the results of the Feasibility study, modified to include slurry pipeline estimates from the ISG November 2014 study and estimates for the increased cost of comminution, further magnetic separation and tailings disposal from wet processing at the minesite.

Nowa Nowa Iron project

Geological Resource

9.05Mt @ 50.8% Fe1

Crushing Plant Feed

1 Mtpa ore

Mine Life

9.5 years

Mass yield (average)

64%

Iron recovery

81%

Production (average)

600,000tpa

Product

62% Fe magnetite

FOB Cost2

A$31.4/t product

Capital Cost3

A$65.2 million

Notes 1. Resource calculated at 40% Fe lower cut-off grade

2. Site costs including mining, processing and indirect costs

3. Capital costs have been calculated at +/-15% and include contingency and EPCM costs

The information concerning resources is extracted from the report entitled "Resource Upgrade at Nowa Nowa Iron Project" announced to the ASX on 21 May 2014 and is available to view on www.easterniron.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original

market announcement.

Page | 3


Product Transport Plan

The proposed slurry to ship concentrate loading system is based on an existing operation at the Taharoa iron sands operation in New Zealand and overcomes the need for otherwise cost prohibitive trucking operations to the nearest port at Eden (220km) or Melbourne (320km). Selected shipping operators have been involved in the study and have advised that minimal modifications would be required to existing +100,000 tonne ore-bulk-oil vessels for the purpose. The single mooring and loading point also overcomes the need for expensive and invasive coastal infrastructure.

ISG has advised that the study "clearly demonstrates that the technologies required to deliver a
'slurry to ship' logistics solution are all readily available, proven mature technologies."
The major benefits of this proposal include:

No permanent wharf, jetty or other port related facility required.

Low capital cost compared with standard port related infrastructure.

Loading at around 3km offshore onto bulk carriers that are larger than those operating at existing bulk ports elsewhere in Victoria.

Greatly reduced trucking requirement compared to the former proposal of transporting ore to Eden with reduced cost and impact on roads and other road users.

Next Steps

Technical studies and more detailed evaluation are required to bring the various enhancements included in the project plan to the feasibility level. These include:

Expanded metallurgical testwork for producing a +62% Fe product using low intensity wet magnetic separation.

Crush and grindsize optimisation.

Page | 4


Concentrate pipeline engineering and design.

Detailed design of slurry pipeline, stockpile area and associated headworks.

Water supply studies.

Detailed capital and operating cost estimates.

Total cost of these works is estimated at around $800,000.

Project Benchmarking

Eastern Iron has estimated an FOB cash cost of A$31.4/t of beneficiated iron product or US$23.55/t at an exchange rate of US$0.75:A$. Assuming shipping costs of US$12/t gives a projected total CFR cash cost of US$36/t which based on the published cost curve below puts the
Nowa Nowa Iron Project potentially among the lowest cost producers in Australia.

Projected Nowa Nowa CFR cash cost

Source UBS Research, published Australian Financial Review, April 13, 2015

NOWA NOWA COPPER

Eastern Iron is continuing discussions with interested parties for a potential joint venture to explore the copper and gold potential of the Company's exploration tenements in the Nowa Nowa area.

Page | 5


CORPORATE

The Company continues to implement measures to reduce the ongoing cost of the business as well as streamline management. During the quarter the Company announced that three non- executive Directors had resigned reducing the Board to a minimum three directors.

FORWARD PROGRAM

Nowa Nowa Iron Project

The Company intends to complete assessment of the modified project as funds are available.

FINANCIAL POSITION

Total exploration expenditure for the quarter was $23,000. The cash balance at the end of the quarter was $173,000.

INVESTOR INFORMATION

Eastern Iron is investigating the potential for development of a high grade magnetite resource at Nowa Nowa in Eastern Victoria as well as exploring for high grade copper deposits in the Nowa Nowa region.
Further information, previous Eastern Iron announcements and exploration updates are
available at the News and Reports tab on the Company's website - www.easterniron.com.au

Mr Greg De Ross,

Chief Executive Officer

Mob: 0417 711 274

The information in this report that relates to Exploration Results, Mineral Resources and Ore Reserves is based on information compiled by Greg De Ross, BSc, who is a Fellow of the Australasian Institute of Mining and Metallurgy. Greg De Ross is Chief Executive Officer of Eastern Iron Limited and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr De Ross consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.

ASX: EFE

For enquiries on your shareholding or change of address please contact:

Boardroom Limited GPO Box 3993, Sydney NSW 2001 Phone: (02) 9290 9600

Page | 6

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Australia | New Zealand | All
Gold and Silver Prices for these countries : Australia | New Zealand | All

Eastern Iron Limited

CODE : EFE.AX
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Eastern Iron is a exploration company based in Australia.

Eastern Iron holds various exploration projects in Australia.

Its main exploration properties are MAINLINE PROJECT and COBAR PROJECT in Australia.

Eastern Iron is listed in Australia. Its market capitalisation is AU$ 2.3 millions as of today (US$ 1.5 millions, € 1.4 millions).

Its stock quote reached its highest recent level on January 21, 2011 at AU$ 0.24, and its lowest recent point on March 20, 2020 at AU$ 0.00.

Eastern Iron has 285 860 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Eastern Iron Limited
2008 Annual Report
Financials of Eastern Iron Limited
7/25/2016Quarterly Activites Report
Project news of Eastern Iron Limited
2/18/2010High Grade Magnetite - Vanadium Assays Hawkwood Joint Ventur...
2/18/2009(Cobar Project)Drilling Results
Corporate news of Eastern Iron Limited
7/25/2016Quarterly Activities Report - June 2016
1/22/2016Appointment of New Directors
1/22/2016Appendix 3X
1/18/2016Appendix 5B
1/15/2016Fortune Future Holdings invests $2 million in Eastern Iron L...
10/30/2015Appendix 5B - September 2015
10/30/2015Quarterly Activities Report - September 2015
9/24/2015Corporate Governance
9/24/2015Eastern Iron Limited 2015 Annual Report
9/22/2015$2 Million Investment in Eastern Iron Signals Changed Focus ...
7/29/2015Appendix 5B
7/28/2015Quarterly Activities Report June 2015
4/27/2015Appendix 5B - March 2015
4/27/2015Quarterly Activities Report - March 2015
3/13/2015Half Year Financial Report - December 2014
2/16/2015Resignation of Ms Corbett Mr Polovineo and Mr Critchlow as D...
2/1/2015Quarterly Activities Report - December 2014
10/27/2014Exciting New Copper-Gold Targets Identified from VTEM Survey...
1/21/2014EFE Announcement
10/2/2013EFE Announcement
7/3/2012letter
4/19/2010New ground acquisition at the Hawkwood Iron-Vanadium Project
3/15/2010Half Year financial report - 31 December 2009
12/23/2009Key terms of Employment Agreement – Mr Greg De Ross (CEO)
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (EFE.AX)
0.008+0.00%
AUSTRALIA
AU$ 0.008
04/24 11:00 -
0%
Prev close Open
0.008 0.008
Low High
0.008 0.008
Year l/h YTD var.
0.007 -  0.010 -20.00%
52 week l/h 52 week var.
0.007 -  0.013 -38.46%
Volume 1 month var.
0 -20.00%
24hGold TrendPower© : 8
Produces
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-20.00%
2023-65.52%0.030.01
2022-45.28%0.080.02
2021430.00%0.100.01
2020150.00%0.020.00
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.92-1.71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+0.00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.38-3.64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.32+0.46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.77-1.12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.10-0.89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :