Quarterly Activities Report

26 April 2013

ASX Market Announcements Office via electronic lodgement

Quarterly Report

Quarter ended 31 March 2013

Highlights

PhosEnergy - Uranium Extraction Technology

Independent, PFS-level engineering study completed on PhosEnergy Process.


Estimated cash operating cost of less than US$18 per pound of U3O8.
Estimated capital cost for base-case commercial production facility of US$156 million for production of 880,000 pounds of U3O8 per annum.

UEQ believes further opportunities exist for improvements in both capital and operating costs.

Cameco re-affirms support with commitment of US$4 million investment tranche for next phase of development - UEQ remains free carried.

Exploration - Australia

Cost effective exploration strategy developed for the Nabarlek Project for the 2013 field season.

Rudall River Project tenements granted - joint venture with Cameco Australia now unconditional.

Investment in Energia Minerals

Energia Minerals (ASX:EMX) announce an expanded JORC compliant inferred resource of 16.7 million pounds at their Carley Bore Uranium Deposit in WA.

Energia Minerals received a take-over offer from Cauldron Energy (ASX:CXU).

Corporate

Announcement of a 1-for-3 non-renounceable pro-rata rights issue at 2.5 cents, with a Top-Up Facility, to raise up to $2.2 million before issue costs.

Page 1

Our Strengths

• Breakthrough

PhosEnergy Process

• Nabarlek - rare near mine exploration portfolio

• Multiple near term

growth opportunities

ASX: UEQ

HEAD OFFICE

Level 5

29 King William Street

Adelaide, SA 5000

T: +61 8 8110 0700

F: +61 8 8110 0777

E: [email protected]

PERTH OFFICE

Level 2, 1292 Hay Street

West Perth, WA 6005

GPO Box 2890

Perth, WA 6001

T: +61 8 9322 3990

F: +61 8 9322 5800

w w w . u e l . c o m . a u

1. URANIUM EXTRACTION TECHNOLOGY

On 5 March 2013 the Company announced the completion of an independent Pre-Feasibility Study (PFS) level Engineering Study of the PhosEnergy Process. The results supported the viability and low-cost nature of the Process for extracting uranium as a by-product from phosphate fertiliser production.
The Study estimated a capital cost of US$156 million and a cash operating cost of less than US$18 per pound for a base case PhosEnergy plant capable of producing approximately 880,000 pounds of uranium per annum(1).
In UEQ's opinion the results of the PFS put the PhosEnergy Process in the bottom quartile for operating costs of all uranium production worldwide and at a considerable cost advantage over the bulk of new projects likely to come online over the next 5 to 10 years.
Following receipt of the PFS Cameco has committed to pursuing the next key phase of development of the jointly owned PhosEnergy Process by committing a further US$4 million to the project. This investment finalises Cameco's earn into 73 per cent of the technology with UEQ retaining a 27 per cent interest.

Figure 1 - PhosEnergy Processing Plant

Cash Operating Cost Estimate

Cash operating costs were derived using a methodology consistent with achieving an accuracy of +50%/-30% and an AACE Class IV estimate. The Study estimated operating costs to produce an intermediate product which can be toll-milled through any one of a number of facilities in the United States, for which quotes have been received.
The estimated cash operating cost including toll milling and product transport is estimated at less than US$18 per pound of U3O8 including contingency.
Intermediate product transport for toll-milling accounts for a substantial portion of the total cash operating costs. This represents a significant opportunity for cost-structure improvements both through improved contractual transport arrangements and contained uranium concentration of the intermediate product.

Page 2


Other opportunities exist in the refinement of reagent usage and power consumption as the development progresses. Estimated operating costs do not include corporate office, marketing and downstream phosphate processing costs which may be incurred.

Capital Cost Estimate

The capital cost estimate was derived from Process Flow Diagrams (PFDs), site plans, General Arrangements (GAs) and a detailed mechanical equipment list. A site layout of the PhosEnergy Processing plant as designed is shown in Figure 1.
Depending on the phosphate facility targeted for commercialisation, there may be additional capital required for infrastructure such as electrical sub-stations and reagent storage. It is estimated that these additional capital items may cost up to US$9 million for a facility in the south east USA. Several opportunities for further optimising equipment, structural and civil capital components are under review and will be incorporated into subsequent studies.

Next Steps in Commercialisation

Discussions are continuing with phosphate producers to allow on-site demonstration of the PhosEnergy Process using the existing containerised Demonstration Plant. This Demonstration Plant operation will allow for further refinement of capital and operating cost numbers and provide sufficient inputs to enable a Definitive Feasibility Study (DFS) to be completed.
Commercial discussions around the split in revenue on a commercial application of the PhosEnergy Process on an operating phosphate facility will be required to allow an investment decision to progress the project further. These commercial negotiations will consider the capital risk taken by both parties, the phosphate producer's appetite for exposure to the uranium market and the long mine life of phosphate projects - generally over 20 years.

(1) Uranium Equities and global uranium leader Cameco Corporation have jointly developed a potentially industry- changing process for the extraction of uranium from phosphoric acid streams produced in the production of phosphate-based fertilisers, "the PhosEnergy Process". Cameco is funding the development of this Process through an investment of US$16.5 million, with a further commitment to fund a minimum of 50 per cent of Uranium Equities' share of the capital cost for construction of the first commercial plant, should this occur.

An independent Pre-feasibility Level Engineering Study completed in March 2013 estimates the cash operating cost of uranium production employing the PhosEnergy Process to be below US$18 per pound of U3O8 based on a

1Mtpa P2O5 phosphate production facility operating in south east USA. The initial focus of the development team is on the phosphate fertiliser industry in the USA, where we estimate there is an opportunity to recover approximately

6Mlbs of uranium per annum. The worldwide opportunity is in the region of 20Mlbs per annum. Operating in the

USA also has several potential synergies with Cameco's existing US operations.

Page 3

2. EXPLORATION ACTIVITIES - AUSTRALIA

2.1 Project Summary

Name

State

Target

Area (km2)

Ownership

Name

State

Target

Granted

Applic.

Ownership

West Arnhem

JV

NT

Structurally controlled and unconformity style uranium

448

49

UEQ 40% - earning 100%:

Cameco Australia 60%

Nabarlek ML

NT

Structurally controlled and unconformity style uranium

12

-

UEQ 100%

Woodside,

Cadel North

& Aurari Bay

NT

Structurally controlled and unconformity style uranium

-

164

UEQ 100%

Headwaters

NT

Coronation Hill-style gold - platinum

- palladium - uranium

-

2,280

UEQ 100% (in moratorium)

Rudall River

WA

Kintyre style uranium

171

4

Cameco 85%:UEQ free carried 15% conditional JV

Narraweena

QLD

Ben Lomond style uranium

42

-

UEQ 100%

Marla

SA

IOCG+-U, Broken Hill style meta-

sedimentary hosted Cu-Au

2,886

-

UEQ 100%

Oodnadatta

SA

IOCG+-U

4,860

-

UEQ 100%

8,419

2,497

Uranium Equities has a focused portfolio of high quality exploration projects in a number of Australian states and territories and including a number of different deposit styles and targets.

The West Arnhem Joint Venture, with Cameco Australia (Uranium Equities right to earn 100%) and the 100%- owned Nabarlek Mineral Lease, located in the Alligator Rivers Uranium Field in the Northern Territory, represent a rare near-mine uranium exploration opportunity surrounding the historic Nabarlek Uranium Deposit (previous production: 24Mlbs @ 1.84% U3O8) - the Nabarlek Project.

2.2 The Nabarlek Project

Target generation and planning for the 2013 field season continues, primarily focussing on drill ready targets in and around the Nabarlek Mineral Lease and along the Quarry Fault Zone - host to the U40 target where grades of well over 6% U3O8 have been drilled (see ASX announcement dated 16 December 2010). To assist with drill targeting, detailed 3D geological modelling has been undertaken on these key prospect areas.
At the U40 Prospect, this work has identified the possible structural controls on the known mineralisation and provided some insight into the location of additional targets elsewhere within the Quarry Fault Zone. On the Nabarlek Mineral Lease the work has successfully modelled the geological setting of the area providing for the geometric analysis of potential targets.

Page 4


Figure 2 - Nabarlek Project Prospects

2.3 Oodnadatta & Marla Projects (SA)

The Oodnadatta and Marla Projects cover a total area of 7,746 km2. In the northern Gawler Craton in South Australia (Figure 3) and are considered prospective for IOCGU (iron-oxide-copper-gold-uranium) deposits, possible Broken Hill-style meta-sedimentary hosted copper - gold mineralisation and Kazakhstan-style sandstone-hosted uranium deposits.

Additional geophysical targeting was completed during the quarter focussing on the Marla Project.
A 3D inversion of the gravity dataset collected by UEQ in 2012 was completed during the quarter. A first inversion was carried out using the entire data set to get a general idea of the different trends (Figure 3) and smaller inversions were setup for the individual blocks to get more details in areas of interest. Six targets zones were examined in detail - Bacup, Clough-Lydgate, Cornholm, Rochdale, Todmorden and Walsden.

Page 5


Figure 3 - Inverted Marla Model Represented as Isocontour

The modelling revealed Bacup and Rochdale as high density targets which has upgraded their prospectivity.
The 3D inversion modelling of the Bacup Target shows a possible high density body consisting of three main units linked in a boudinaged arrangement on the margin of an interpreted granitic intrusion. The three main units of the dense body coincide with three interpreted en-echelon east - west trending structures which are located within structural corridor trending towards the northeast. The dense body is believed to be at a depth of approximately
300m. This target will be included in future drill planning.
The Rochdale Target has also been modelled to be a dense body which extends from approximately 100m - 700m below the surface. This target was included in the previous drill proposals.

2.4 Rudall River (WA) (Cameco 85% : UEQ free carried 15% conditional JV)

The Rudall River Project (Uranium Equities free carried 15% interest) consists of three Exploration Licences and three Prospecting Licence Applications covering a total area of 175km2. The western-most Exploration Licence adjoins the Cameco/Mitsubishi Kintyre Project (current published NI43-101 compliant measured and indicated resource estimate of 55Mlbs @ 0.58% U3O8).

The Western Desert Lands Aboriginal Corporation (WDLAC) Board has approved the final access agreement for the Rudall River Project and have withdrawn their objection to the granting of the exploration licences.
Subsequently, the WA Department of Mines and Petroleum have advised that E45/3118, E45/3119 and E45/3126 have been granted for a period of 5 years from the 26th February 2013. The granting of the Rudall River

Page 6


exploration licences has now formalised the joint venture agreement with Cameco Australia on the Rudall River
Project - UEQ retains a free carried 15% interest.
Cameco expects to begin preliminary exploration on the Rudall River Project in 2013 to investigate a number of radiometric, geochemical and geophysical targets.

2.5 Other Projects

Aurari Bay (NT)

A new exploration licence application covering approximately 109km2 has been made in Arnhem Land (ELA 29897) in an area identified as having similar structural and geological setting to the adjacent Angularli Uranium Project operated by Cameco Australia Pty Ltd. Uranium Equities believes a similar parallel structural position within Cahill Formation basement lithologies may provide an opportunity for a repetition of the significant uranium mineralisation in this region.
This new exploration licence application area lies 60km to the north of the Nabarlek Project area.

Page 7

3. STRATEGIC INVESTMENT IN ENERGIA MINERALS LIMITED (ASX: EMX)

The Company holds a 21.15% interest in ASX-listed uranium explorer Energia Minerals Limited (ASX: EMX). Energia's flagship project is their 100%-owned Nyang Uranium Project, host to the 16.7 million pound Carley Bore Uranium Deposit, in the emerging Carnarvon Basin uranium province which also includes Paladin's Manyingee and Cauldron Energy's Bennett Well projects. The Carley Bore resource is a sedimentary hosted roll-front deposit that may be amenable to the relatively low cost In-Situ Recovery (ISR) production method.

On 26 February 2013 Energia Minerals announced a 33% increase in the JORC compliant Inferred Resource estimate for the Carley Bore Uranium Deposit in Western Australia following successful in-fill and extensional drilling programs completed late 2012.

Using a 150ppm U3O8 cut-off, the updated Inferred Resource calculated independently by Coffey Mining Pty Ltd is

23 million tonnes grading 330ppm U3O8 for 16.7 million pounds of contained U3O8.

The Carley Bore resource is a sedimentary hosted roll-front deposit that may be amenable to the relatively low cost
In-Situ Recovery (ISR) production method.
On 18th March 2013 Cauldron Energy Limited (ASX: CXU) announced that it intends to make a conditional offer for all the shares in Energia Minerals under which Cauldron Energy offered 1 Cauldron Energy share for every 8
Energia Mineral shares held. Uranium Equities has written to Energia Minerals confirming that the offer will not be accepted in its current form.

4. CORPORATE

The Group's cash balance at the end of the quarter was $0.46 million (refer Appendix 5B for further information).
On 10 April 2013 the Company announced a 1-for-3 non-renounceable rights issue to eligible shareholders at 2.5 cents for each new share to raise up to $2.2 million before issue costs. Directors, accounting for approximately
16.4% of total Shares on issue have committed to fully take up their entitlements.
It is currently proposed to use the net proceeds from the Offer to further progress our key Nabarlek Project and for general working capital requirements.
Shareholders at the Record Date (other than Directors and related parties of the Company) may apply for additional shares, over and above their entitlement at 2.5 cents per share.
Please refer to the Offer Document dated 10 April 2013 on our website, www.uel.com.au, or the ASX website for further information.

Bryn Jones
Managing Director

Page 8


Competent Person Statement

The information in this report that relates to Exploration Results is based on information compiled by Mr. Grant Williamson, Geology Manager - Exploration of Uranium Equities Limited, who is a Member of the Australian Institute of Geoscientists. Mr. Williamson has sufficient experience in the field of activity being reported to qualify as a Competent Person as defined in the

2004 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, and consents to the release of information in the form and context in which it appears here.

About Uranium Equities

Uranium Equities Limited (UEQ) is positioned for growth in the uranium sector through the development of the PhosEnergy

Process and exploration activities directed at high quality exploration assets in Australia's premier uranium districts.

The PhosEnergy Process is an innovative patented process for the extraction of uranium as a by-product from phosphate in the production of phosphate-based fertilisers.

The global annual production potential of uranium from the phosphate industry is in the order of 20 Mlbs U3O8. This quantity of uranium is mined in phosphate ores but not recovered annually on a worldwide basis. The major phosphate based fertiliser producers are located in Northern Africa, North America and Asia.

The PhosEnergy Process has been proven to demonstration plant scale with results establishing a robust process capable of achieving high levels of uranium recovery at the lower end of the cost curve. An independent PFS level engineering study has estimated cash operating costs of less than US$18 per pound of uranium, putting it in the lowest quartile for operating costs of worldwide uranium production expected to come on line in the next 5 to 10 years.

The Nabarlek Project provides a rare near mine exploration opportunity surrounding the historic Nabarlek Uranium Deposit (previous production: 24 Mlbs @ 1.84% U3O8). The previously mined deposit lies within an extensive uranium mineral system which extends over more than 50 square kilometres within the Mineral Lease and the surrounding tenements. The mineral system which contains widespread anomalous uranium geochemistry and ore grade mineralisation at several locations remains largely untested.

Page 9

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Australia | Kazakhstan | All
Gold and Silver Prices for these countries : Australia | Kazakhstan | All

Cauldron Energy Ltd.

EXPLORATION STAGE
CODE : CXU.AX
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Cauldron Energy is a exploration company based in Australia.

Cauldron Energy holds various exploration projects in Australia.

Its main exploration properties are WEST LAKE FROME, GLENCOE, YANREY, ECLIPSE, MARREE, KALGOORLIE and AMADEUS in Australia and LAS MARIAS and RIO COLORADO in Argentina.

Cauldron Energy is listed in Australia. Its market capitalisation is AU$ 13.2 millions as of today (US$ 8.6 millions, € 8.0 millions).

Its stock quote reached its highest recent level on October 12, 2012 at AU$ 0.60, and its lowest recent point on September 08, 2023 at AU$ 0.01.

Cauldron Energy has 329 290 016 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Cauldron Energy Ltd.
7/6/2016CAULDRON RECOVERS JUDGMENT DEBT
3/17/2011announces 'Cauldron Energy receives $2M convertible note fun...
Financials of Cauldron Energy Ltd.
3/12/2013announces 'Half year financial report - 31 December 2012'.
3/15/2011announces 'Half year financial report - 31 December 2010'.
Project news of Cauldron Energy Ltd.
5/28/2013(Marree)announces 'Marree IP Data Yields Possible Mine Extension'.
3/21/2013(Marree)announces 'Base Metal mineralisation identified in initial d...
11/1/2012announces 'Company Presentation - The Mining 2012 Resources ...
11/1/2012announces 'Company Presentation-The Mining 2012 Resources Co...
10/31/2012announces 'Appendix 3Y - Change of Director’s Interest Notic...
10/30/2012(Yanrey)announces 'Peak grade intersection of nearly 1% Uranium iden...
10/25/2012(Yanrey)announces 'New High Grade Uranium Zone Discovered at Yanrey'...
10/23/2012announces 'Base Metals Discovery in South Australia'.
8/28/2012(Yanrey)announces 'Cauldron to commence Yanrey drilling program'.
2/21/2011(Rio Colorado)announces 'Cauldron to lead exploration within historic mini...
Corporate news of Cauldron Energy Ltd.
7/29/2016Quarterly Report & App5B
7/13/2016Becoming a substantial holder from Sky Shiner Investment Ltd
7/6/2016Voluntary Escrow Shares
5/4/2016Quarterly Report 31 March 2016
3/29/2016Cauldron Recovers Judgment Debt
2/1/2016Quarterly Activities Report and Appendix 5B
2/1/2016Cauldron Wins Legal Proceedings
1/12/2016Lapse of Options
1/12/2016Appendix 3B
12/7/2015Significant extension of Mineralisation to over 11km at Benn...
7/20/2015Re-Release of Company Announcement
4/1/2015Issue of Shares and Appendix 3B
1/8/2015Application for Exploration Licences Moves Forward
10/16/2014LEGAL PROCEEDINGS
2/18/2014Extension of Closing date for takeover offer for Energia Min...
2/17/2014Cauldron Energy to Urge Mines Minister to Grant Licences
2/3/2014Change of Company Secretary
2/3/2014announces 'Quaterly Report for the quarter ended 31 December...
11/22/2013announces 'Results of AGM'.
11/7/2013announces 'Extension of closing date for takeover offer for ...
10/7/2013Media Articles - The Pick Issue 11 - Cauldron set for the ne...
10/1/2013announces 'New Substantial Shareholder'.
7/27/2013Announcements - Extension of Closing Date for Takeover Offer...
7/25/2013First Supplementary Targets Statement
4/30/2013announces 'Quarterly Report for the quarter ended 31 March 2...
4/26/2013Quarterly Activities Report
4/16/2013announces 'Company Presentation - April 2013'.
3/19/2013announces 'Takeover offer for Energia Minerals '.
2/21/2013(Yanrey)announces 'Major In-Situ Leach Uranium Province Identified a...
2/7/2013(Yanrey)announces '300% growth in uranium resource at Yanrey Project...
11/13/2012announces 'Accelerated drilling program at silver-lead-zinc ...
11/6/2012announces 'Listed Options Expiry'.
11/1/2012announces 'Partial Underwriting of Listed Options'.
11/1/2012announces 'Quarterly Report for the quarter ended 30 Septemb...
10/29/2012(Yanrey)announces 'Further Drilling Results at Yanrey Project.'.
10/22/2012announces 'Expiration of Listed Options (CXUO) on 31 Oct 201...
10/22/2012Announcements: Company Presentation
10/22/2012announces 'Response to ASX Query'.
10/22/2012announces 'Appendix 3B - Exercise of Options'.
10/22/2012announces 'Notice of Annual General Meeting'.
10/22/2012announces 'Appendix 3B - exercise of listed options'.
9/13/2012announces 'Annual Report for the year ended 30 June 2012'.
8/2/2012announces 'Conversion of 100% Convertible Notes'.
7/31/2012announces 'Quarterly Activities Report and Appendix 5B'.
6/8/2012announces 'Experienced Executive Operations Consultant Appoi...
5/25/2012announces 'Results of General Meeting of Shareholders'.
5/1/2012announces 'Quarterly Report for the Quarter Ended 31 March 2...
4/5/2012announces 'Change of Registered Office'.
3/26/2012announces 'Securities Trading Policy'.
3/26/2012announces 'Convertible Note Redemption Date Extended'.
11/25/2011Announcements: Results of Annual General Meeting of Sharehol...
10/27/2011announces 'Company Presentation'.
10/25/2011announces 'Notice of Annual General Meeting'.
9/12/2011announces 'SHARE PLACEMENT TO SOPHISTICATED INVESTORS'.
9/12/2011Recent News: SHARE PLACEMENT TO SOPHISTICATED INVESTORS
9/2/2011announces 'Quarterly Report for the quarter ended 30 June 20...
9/2/2011announces 'Lapse of Options'.
3/31/2011announces 'Resignation of Director and Company Secretary'.
3/16/2010Half-year financial report 31 December 2009
11/24/2009Results of Annual General Meeting
11/24/2009Drilling Confirms Large Uranium Target in South Australia
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (CXU.AX)
0.040-4.76%
AUSTRALIA
AU$ 0.040
04/26 15:38 -
-4.76%
Prev close Open
0.042 0.039
Low High
0.037 0.040
Year l/h YTD var.
0.030 -  0.050 33.33%
52 week l/h 52 week var.
0.006 -  0.050 471.43%
Volume 1 month var.
5,611,536 -%
24hGold TrendPower© : 38
Produces
Develops
Explores for Copper - Nickel - Silver - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 10/22/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024263.64%
202357.14%0.010.01
2022-75.86%0.030.01
2021-29.27%0.050.02
2020127.78%0.070.01
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :