Cue Energy Resources Ltd.

Published : January 22nd, 2016

Quarterly Reports for Period Ended 31 December 2015

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Quarterly Reports for Period Ended 31 December 2015

Microsoft Word - CUE ASX Release CoverNEW


ABN 45 066 383 971

22 January 2016 PAGES (including this page): 16


ASX Market Announcements ASX Limited

Exchange Centre

Level 4, 20 Bridge Street

Sydney NSW 2000


Quarterly Report for Period Ended 31 December 2015


Attached please find Cue Energy Resources Limited's release with respect to the above mentioned.


Yours faithfully


Andrew M Knox

Chief Financial Officer

CUE ENERGY OVERVIEW

Cue is an Australian based oil & gas company with activities in Australia, New Zealand, Indonesia and the USA.


THE COMPANY HAS:

  • Long life production

  • A strong balance sheet

  • An active exploration programme


    CUE ENERGY DIRECTORS

  • Paul Foley (Chairman)

  • Stuart Brown

  • Peter Hazledine

  • Koh Ban Heng

  • Brian Smith


    CUE ENERGY MANAGEMENT

  • David Biggs (CEO)

  • Andrew Knox (CFO)

  • Jeffrey Schrull (Exp Man)


OFFICE

Level 19

357 Collins Street

Melbourne Vic 3000


CONTACT DETAILS

Tel: +613 8610 4000

Fax: +613 9614 2142


EMAIL

[email protected]


WEBSITE

www.cuenrg.com.au


LISTINGS

ASX: CUE

ADR/OTC: CUEYY


Quarterly Report

Q02 FY16 | December 2015

SUMMARY OF ACTIVITIES

Production

  • The Maari Field in New Zealand (Cue 5%) was producing ~13,500bopd at the end of 2015. Successful workovers have been completed on both MR3 and MR9 and several more are scheduled for Q1 calendar 2016 with the intention of increasing the production rates of underperforming wells. In Q1 calendar 2016 an upgrade to the Maari mooring system and repair to the water injection flow-line is planned. It is anticipated that once water injection is reinstated it should provide pressure support to several of the producers and enhance both short term and long term production.

  • Oyong and Wortel Fields in the Sampang PSC (Cue 15%) in Indonesia are producing at a total combined gross rate of ~1100 bopd and ~75 mmcfcd at the end of 2015. Oyong is now fully benefitting from the increased gas price which came into effect during the year. The onshore gas compression at the Grati gas plant is helping to sustain deliverability from Wortel at 45 mmcf of gas per day. Studies are now underway to extend field gas production from Oyong and Wortel.


    Exploration

  • Operations in Indonesia for drilling in the Mahakam Hilir PSC at Naga Selatan-2 (Cue 100% and operator) continued with the construction of the road and drilling location completed in Q4 calendar 2015. The rig contract was also completed in Q4 calendar 2015 and the Naga-Selatan-2 well spudded on 7 January 2016 with an estimated time to drill of 2-3 weeks depending on drilling results.

  • In the Mahato PSC (Cue12.5%) in Indonesia planning is underway by the operator to drill one well and acquire 2D seismic in 2016-2017.

  • The Te Kiri North-1 (Cue 20%) well in New Zealand spudded on 16 December 2015 and a decision to plug and abandon the well was made on 19 January 2016. The Miocene oil objective had uncommercial oil shows.

  • Cue has identified and matured the 15 TCF Mungaroo Formation Ironbark gas prospect which straddles both the WA-359-P and WA-409-P permits offshore Western Australia (Cue 100% and operator). A process is now underway to farm-out a material interest in both permits.

    Financial

  • Quarterly revenue receipts from hydrocarbon production for the quarter were $13.92 million on sales of 76,525 barrels of oil at an average price of US$44 per barrel and 1,001 million cubic feet (mmcf) of gas at an average price of $9.26 per Mcf.

  • Approximately 67% of revenue receipts are derived from non-oil linked gas sales which are not affected by current low oil prices.

  • Cue has no hedging in place.

  • Cue has no debt.

  • $29.61 million cash on hand at the end of the quarter.

Production & Financial Summary

KEY PERFORMANCE METRICS

Dec Quarter Q2 FY16

Sept Quarter Q1 FY16

Change

%

Oil Production (net to Cue)

bbl

80,802

86,829

(6.94)

Gas Production (net to Cue)

mmcf

873.02

764.19

14.24

Oil Liftings (net to Cue receipts)

bbl

76,525

66,120

15.74

Gas Liftings (net to Cue receipts)

mmcf

1001

669.20

49.59

Total Revenue Receipts

$m

13.92

10.57

31.69

Production Expenditure

$m

3.23

5.14

(37.16)

Closing Cash Position

$m

29.61

26.61

11.27



ACTIVITY REVIEW

AUSTRALIA EXPLORATION - Carnarvon Basin

WA-359-P

Cue Interest: 100%

Operator: Cue Exploration Pty Ltd

Cue has evaluated the regional prospectivity in all of its Western Australia offshore permits and has identified an exciting new play type associated with the prolific gas- bearing Mungaroo Formation. The "Ironbark" prospect, a Mungaroo Formation prospect with multiple objectives, has been identified as the primary candidate for drilling and Cue estimates that it holds a success case best technical estimate of 15TCF of gas reserves. A farm-out process to find suitable joint venture partner(s) to participate in the drilling of the well is ongoing with several international oil companies currently evaluating the opportunity.

The Company has been notified by the National Offshore Petroleum Titles Administrator of the approval of its application for a suspension of the Permit Year 3 work programme commitment for WA-359-P. The Year 3 work

programme comprises the drilling of one exploration well which is now due by October 2016.


WA-409-P

Cue Interest: 100%

Operator: Cue Exploration Pty Ltd

The Ironbark prospect has been mapped as straddling both WA-359-P and WA-409-P. Cue plans to farm-out a material interest in both the WA-359-P and WA-409-P permits which ensures the entire prospect is included in the commercial offer. Ironbark is planned to be tested by a well in WA-359-P and if successful, subsequent possible appraisal drilling would take place in WA-409-P.


WA-360-P

Cue Interest: 37.5%

Operator: MEO Australia Limited

All obligations have been met for this Block and Cue will be withdrawing in Q1 calendar 2016 with no further financial commitments.


WA-361-P

Cue Interest: 15% Operator: MEO Australia Limited

All obligations have been met for this Block and Cue will be withdrawing in Q1 calendar 2016 with no further financial commitments.


WA-389-P

Cue Interest: 40%

Operator: BHP Billiton Petroleum (Australia) Pty Ltd

Reprocessing of existing 2D and 3D seismic data has been approved by the Joint Venture and is expected to be completed in Q1 calendar 2016. A full evaluation of the prospectivity of the Block is planned for 2016 with the anticipation of farming out prior to committing to a well.



NEW ZEALAND EXPLORATION - Taranaki Basin

PEP 51149

Cue Interest: 20%

Operator: Todd Exploration Limited

The Te Kiri North-1 well spudded on 16 December 2015 and as of year-end 2015 was drilling the potentially oil-bearing objective in the Miocene-age Mount Messenger Formation. A decision to plug and abandon the well was made on 19 January 2016 as the well only encountered non-commercial oil shows. Drilling of the well fulfills Cue's permit obligations.


PEP 54865

Cue Interest: 20%

Operator: Todd Exploration Limited


The permit carries a minimum work

programme of 285 km² of 3D seismic to be acquired, processed and interpreted prior to June 2016. The Joint Venture was unable to secure a seismic vessel for Q1 calendar 2016 and, subject to government consent, will now have to defer the seismic acquisition work programme until a suitable vessel can be procured.


PEP 51313

Cue Interest: 14% interest

Operator: OMV New Zealand Limited

The Joint Venture is focused on assessing the remaining potential associated with the Matariki trend, up-dip of the Maari field. Studies are being completed by the operator to determine the feasibility of acquiring additional 3D seismic to reduce the geologic risk of the remaining prospects. Cue will need to make a decision by 30 July 2016 whether to proceed into the next stage of the permit which will include either the acquisition and processing of 100sqkm of 3D seismic or the reprocessing of 100sqkm of 3D seismic.

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Australia | Georgia | Indonesia | New Zealand | All
Gold and Silver Prices for these countries : Australia | Georgia | Indonesia | New Zealand | All

Cue Energy Resources Ltd.

CODE : CUE.AX
ISIN : AU000000CUE9
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Cue Energy Res. is a producing company based in Australia.

Cue Energy Res. holds various exploration projects in Australia.

Its main exploration property is CARNARVON BASIN in Australia.

Cue Energy Res. is listed in Australia and in Germany. Its market capitalisation is AU$ 76.8 millions as of today (US$ 50.2 millions, € 46.9 millions).

Its stock quote reached its highest recent level on October 15, 2010 at AU$ 0.45, and its lowest recent point on September 01, 2017 at AU$ 0.05.

Cue Energy Res. has 698 120 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Nominations of Cue Energy Resources Ltd.
8/18/2016Change of Board
Project news of Cue Energy Resources Ltd.
3/26/2015Notice of change of interests of substantial holde
3/25/2015Notice of change of interests of substantial holde
3/24/2015Notice of change of interests of substantial holde
3/22/2015Notice of change of interests of substantial holde
3/19/2015Notice of change of interests of substantial holde
3/16/2015Change of interests of substantial holder from NZO
3/15/2015Notice of change of interests of substantial holde
1/28/2009(Carnarvon Basin)Weekly Drilling Report Zeus -1
Corporate news of Cue Energy Resources Ltd.
9/22/2016Sampang Field Life Extension
8/8/2016Becoming a substantial holder from ZER
7/27/2016Quarterly Report for Period Ended 30 June 2016
6/14/2016Unmarketable Parcel Share Sale Facility
6/8/2016Cue Energy Strategy
5/4/2016Approval of 4 Yr Extension to Mahakam Hilir PSC Permit Term
4/22/2016Quarterly Report for Period Ended 31 March 2016
4/14/2016WA-359-P Approved Suspension of Work Program Commitment
3/28/2016Interim Executive Chairman Appointed
1/22/2016Quarterly Reports for Period Ended 31 December 2015
1/19/2016Te Kiri North-1 Drilling Update
1/7/2016Naga Selatan-2 Well Spuds
12/18/2015New Zealand Maari Field Facility Mooring Upgrade
12/16/2015Te Kiri North-1 Spuds
10/21/2015Quarterly Report for Period Ended 30 September 2015
10/16/2015Notice of Annual General Meeting and Explanatory Memorandum
10/7/2015Annual Report 2014/15
10/6/2015Annual Report 2015 Full Year Accounts
9/29/2015Annual Report
8/17/201530 June 2015 Full Year Preliminary Financial Report
7/31/2015Appendix 3X Initial Directors Interest Notice
7/31/2015Appendix 3Z Final Directors Interest Notice
7/29/2015Changes to the Board of Directors
7/29/2015Results of Extraordinary General Meeting 29 July 2015
7/24/2015Quarterly Report for Period Ended 30 June 2015
6/17/2015Notice of General Meeting
4/13/2015Appendix 3X - Initial Directors Interest Notices
4/13/2015Appendix 3Z - Final Directors Interest Notice
3/29/2015Change in substantial holding from NZO
3/27/2015Fifth Supplementary Target's Statement
3/25/2015Approval received for Farm-in to Mahato PSC
3/24/2015Fourth Supplementary Target's Statement
3/24/2015MR6A Production - Maari Growth Project
3/23/2015Change in substantial holding from NZO
3/23/2015NZO: Fourth Supplementary Bidder's Statement
3/19/2015Third Supplementary Bidder's Statement
3/18/2015Change in substantial holding from NZO
3/18/2015Chairmans Letter to Shareholders
3/18/2015Ceasing to be a substantial holder
3/17/2015Third Supplementary Target's Statement
3/16/2015NZO: Second Supplementary Bidder's Statement
3/12/2014Presentation Excellence in Oil and Gas, March 2014
1/3/2014Naga Utara-2 Progress Report No 12
12/5/2013Change of Address
8/17/2009Release - Manaia-1 Appraisal Well: 14 August 2009
5/19/2009Release - Manaia -1 Appraisal Well
2/13/2009Zeus -1 Update: 13th February 2009
1/19/2009Release - Zeus -1 Well
12/11/2008Spikey Beach -1 update, T/38P
11/26/2008Release - Outcome of Resolution
10/2/2008RELEASE - ROSE 3D SEISMIC SURVEY COMPLETED
8/22/2008Release - Weekly Drilling Report Cobra -1A ST3: 22nd August ...
7/18/2008Weekly Drilling Report Cobra -1A ST1: 18th July 2008
7/14/2008Release - Update on Cobra -1A Well
5/30/2008Release - Weekly Drilling Report Cobra -1A 30th May 2008
5/23/2008Weekly Drilling Report Cobra -1A: 23rd May 2008
5/9/2008Release - Weekly Drilling Report Cobra -1A: 9th May 2008
4/23/20082D Seismic Survey Completed - T37P and T38P Bass Basin
4/18/2008Weekly Drilling Report Cobra -1A 18th April 2008
4/11/20082D SEISMIC SURVEY UPDATE – T/37P and T/38P, Bass Basin
4/3/2008Release - 2D Seismic Survey Update - T/37P and T/38P, Bass...
3/27/2008 2D Seismic Survey Update - T37P and T38P Bass Basin
3/20/2008 Weekly Drilling Report for Cobra
2/8/2008 Weekly Drilling Report Cobra -1: 7 Feb 2008
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (CUE.AX)Berlin (CU5A.BE)
0.110+10.00%0.038+2.70%
AUSTRALIA
AU$ 0.110
04/26 17:10 0.010
10%
Prev close Open
0.100 0.100
Low High
0.100 0.110
Year l/h YTD var.
0.060 -  0.120 83.33%
52 week l/h 52 week var.
0.050 -  0.120 77.42%
Volume 1 month var.
180,674 30.95%
24hGold TrendPower© : -31
Produces
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202480.33%
2023-7.58%0.070.06
2022-4.35%0.090.06
2021-23.33%0.090.06
2020-28.00%0.240.06
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.72-0.39%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.21+10.53%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :