RENO, NV--(Marketwired - Mar 31, 2014) - Ram Power, Corp. (TSX: RPG) ("Ram Power" or the "Company"), a renewable energy company focused on the development, production and sale of electricity from geothermal energy, is pleased to announce its operating results for the fiscal year ended December 31, 2013. This earnings release should be read in conjunction with Ram Power's financial statements, and management's discussion and analysis ("MD&A"), which are available on the Company's website at www.ram-power.com and have been posted on SEDAR at www.sedar.com.

HIGHLIGHTS

San Jacinto-Tizate Project

  • The San Jacinto-Tizate Power Plant generated 423,998 (net) MWh resulting in revenue of $46.2 million for the year ended December 31, 2012 (an increase of 65% over 2012) and EBITDA (as defined below) of $30.5 million in 2013 compared to revenue of $28.1 million and EBITDA of $9.7 million in 2012;
  • Well SJ 12-3 was placed in commercial operation following an extensive thermal recovery period in late February, 2014. Well head temperature and pressures continue to oscillate since being placed into production, but will stabilize over time and the well is currently producing between 7-10 MW.
  • Well SJ 9-3 continues to be in thermal recovery. The Company has made four attempts to tie in the well into the plant after nine weeks of thermal recovery. SJ 9-3, when achieving well head pressure necessary for the operating pressure of the plant, has demonstrated a production output between 7-10 MW. The well continues to show improved thermal recovery of temperature and pressure, but will continue to be shut in for periods of time over coming weeks to allow for complete stabilization.

Corporate Update

  • The Company entered into a letter of intent on January 14, 2014 with an interested party for the purchase and sale of the Geysers Project. The Company is in the final stages of negotiating a purchase and sale agreement, and intends to execute an agreement in the immediate future. The Company anticipates an expected close and funding of the sale by April 30, 2014.
  • The Company continues to work with Dundee Securities on the strategic process, and expects letters of intent from interested parties by mid-April 2014.
  • The Company continues the process of selling and / or disposing of all non-core assets to focus its efforts on maximizing the cash flow and profitability of the Company's producing assets in Nicaragua. Accordingly, the Company has made the strategic decision to close the Reno, Nevada office effective May 31, 2014.

FINANCIAL OVERVIEW

The financial results of Ram Power for the year ended December 31, 2013 and 2012 are summarized below:

             
             
    Year ended  
(all figures in U.S dollars)   December 31, 2013     December 31, 2012  
          (As restated)  
Total revenue   $ 46,210,054     $ 28,061,520  
Other direct costs     (6,164,893 )     (4,359,874 )
Depreciation and amortization of plant assets     (24,500,650 )     (12,514,916 )
General and administrative expenses     (9,609,351 )     (12,152,374 )
Other operating income (costs)     96,295       (1,879,975 )
Operating income (loss)     6,031,455       (2,845,619 )
Recovery (loss) on impairment     (20,348,852 )     (42,518,283 )
(Loss) gain on warrant liability valuation     (4,431,225 )     (5,008,947 )
Loss on prepayment option valuation     4,624,518       -  
Other loss     460,489       8,477,149  
Deferred taxes     (8,224,431 )     (6,391,495 )
Total loss and comprehensive loss     (50,935,278 )     (60,181,461 )
Total loss and comprehensive loss per share   $ (0.17 )   $ (0.21 )
                 
    As at December 31, 2013     As at December 31, 2012  
              (As restated )
Total assets   $ 457,959,404     $ 506,823,848  
Long-term debt     239,841,360       210,591,894  
Total liabilities     295,537,930       300,933,868  
Cash     22,549,994       51,330,351  
Working capital     6,329,850       (11,325,167 )
                 
                 

For the year ended December 31, 2013, the Company reported revenue of $46.2 million and a total loss and comprehensive loss of $50.9 million, or $(0.17) per share, compared to revenue of $28.1 million and a total loss and comprehensive loss of $60.2 million, or $(0.21) per share, for 2012. The 65% increase in revenue resulted from commencing operations of the San Jacinto Phase II expansion in January 2013. Total loss and comprehensive loss for year ended December 31, 2013 was the result of non-cash depreciation and amortization expense of $24.5 million, a one-time loss on impairment of the Geysers and other North America projects of $20.3 million, deferred tax expense of $8.2 million and nonrecurring corporate restructuring costs of $1.3 million.

EBITDA increased to $30.5 million for the year ended December 31, 2013 compared to $9.7 million for the prior year. The $20.8 million increase in EBITDA for the year ended December 31, 2013 principally resulted from an $18.1 million increase in revenue and a $4.5 million decrease in general and administrative expenses and other operating costs, offset by increases in direct costs of plant operations of $1.8 million.

For the year ended December 31, 2013, the Company had net operating cash inflows of $8.4 million, net investing cash outflows of $20.4 million and net financing cash outflows of $16.8 million, which combined for a net decrease in cash of $28.8 million. The Company expended $24.8 million for additions to geothermal properties, including $8 million related to completion of Phase II of the San Jacinto expansion and $19.2 million related to San Jacinto drilling costs. At December 31, 2013, the Company had cash of $22.5 million, of which $19.9 million was held for current use in the San Jacinto project.

Antony Mitchell, Executive Chairman of Ram Power, said, "I am proud of what we have accomplished in 2013. Through a hard look at our overhead costs, we have emerged a leaner Company, with a sharp focus on the execution of our immediate goal of returning San Jacinto closer to its design capacity. And though the process of thermal recovery from our remediation program has taken longer than expected, I would like to thank our shareholders who continue to support the Company as we continue to work to maximize value for shareholders."

CORRECTION OF ERROR

In its financial statements for the year ended December 31, 2013, the Company determined the calculation of deferred income tax expense was in error for previously issued financial statements for the year ended December 31, 2012. The Company incorrectly recognized deferred tax assets related to net operating losses in PENSA. Nicaraguan law changed at the end of 2012, resulting in restrictions on the recognition of NOLs after a tax holiday. The law was substantially enacted by December 31, 2012. This change resulted in a $6.4 million understatement of 2012 deferred tax expense. As a result of this error, the previously reported balances of deferred tax liability and accumulated deficit as at December 31, 2012, were misstated and certain previously reported amounts in the consolidated statements of operations and comprehensive loss, consolidated statements of changes in shareholders' equity and consolidated statements of cash flows for the year ended December 31, 2012 were misstated. The amount of the error was significant, and the Company has restated the financial statements for the year ended December 31, 2012 to correct the error. Accordingly, the Company has restated its financial statements for the year ended December 31, 2012 to correct the error. The error and its correction had no effect on the Company's cash flows or cash balances. The restated financial statements and MD&A are available on the Company's website at www.ram-power.com and have been posted on SEDAR under the Company's profile at www.sedar.com.

Ram Power will hold its earnings call to discuss the year ending December 31, 2013 financial and operating results on Monday, April 7, 2014 at 10:00 am EDT (7:00 am PDT). To listen to the call, please dial 1-866-696-5910 by entering the participant pass code 1658549, or on the web at http://bell.media-server.com/m/p/xvc6oofu.

About Ram Power, Corp.

Ram Power is a renewable energy company engaged in the business of acquiring, exploring, developing, and operating geothermal properties, and has interests in geothermal projects in the United States, Canada, and Latin America.

USE OF NON-GAAP MEASURES

Certain non-GAAP measures referenced in this news release have no standardized meaning under International Financial Reporting Standards ("IFRS") and, therefore, are unlikely to be comparable to similar measures presented by other issuers. Where we reference non-GAAP measures, we provide definitions. For example, EBITDA is commonly defined as earnings before interest, taxes, depreciation and amortization. EBITDA is most directly comparable to the GAAP measure operating income or loss, except depreciation and amortization expenses of plant assets are excluded in the calculation of EBITDA. Accordingly, where EBITDA measures are disclosed by the Company, they equal operating income or loss plus depreciation and amortization of plant assets. Although a non-GAAP measure, management believes users of the Company's financial information find EBITDA useful in assessing the Company's financial performance. In the Company's earnings releases, consolidated financial statements and MD&As, unless otherwise noted, all financial data is prepared in accordance with IFRS.

Cautionary Statements

This news release contains certain "forward-looking information" which may include, but is not limited to, statements with respect to future events or future performance, management's expectations regarding the Company's growth, results of operations, estimated future revenue, requirements for additional capital, revenue and production costs, future demand for and prices of electricity, business prospects and opportunities. In addition, statements relating to estimates of recoverable geothermal energy "reserves" or "resources" or energy generation are forward-looking information, as they involve implied assessment, based on certain estimates and assumptions, that the geothermal resources and reserves described can be profitably produced in the future. Such forward-looking information reflects management's current beliefs and is based on information currently available to management. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "predicts", "intends", "targets", "aims", "anticipates" or "believes" or variations (including negative variations) of such words and phrases or may be identified by statements to the effect that certain actions "may", "could", "should", "would", "might" or "will" be taken, occur or be achieved. A number of known and unknown risks, uncertainties and other factors may cause the actual results or performance to materially differ from any future results or performance expressed or implied by the forward-looking information. Such factors include, among others, general business, economic, competitive, political and social uncertainties; the actual results of current geothermal energy production, development and/or exploration activities and the accuracy of probability simulations prepared to predict prospective geothermal resources; changes in project parameters as plans continue to be refined; possible variations of production rates; failure of plant, equipment or processes to operate as anticipated; accidents, labor disputes and other risks of the geothermal industry; political instability or insurrection or war; labor force availability and turnover; delays in obtaining governmental approvals or in the completion of development or construction activities, or in the commencement of operations; as well as those factors discussed in the section entitled "Risk Factors" in the Company's Annual Information Form. These factors should be considered carefully and readers of this news release should not place undue reliance on forward-looking information.

Although the forward-looking information contained in this news release is based upon what management believes to be reasonable assumptions, there can be no assurance that such forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. The information in this news release, including such forward-looking information, is made as of the date of this news release and, other than as required by applicable securities laws, Ram Power assumes no obligation to update or revise such information to reflect new events or circumstances.

Read the rest of the article at finance.yahoo.com
Data and Statistics for these countries : Canada | Nicaragua | All
Gold and Silver Prices for these countries : Canada | Nicaragua | All

Ram Power Corp.

CODE : RPG.TO
ISIN : CA7513081074
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Ram Power is a gold and copper development stage company based in Canada.

Ram Power develops gold, copper and in Nicaragua, and holds various exploration projects in Canada.

Its main asset in development is SAN JACINTO-TIZATE in Nicaragua and its main exploration property is ANA in Canada.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Ram Power Corp.
4/20/2015, Corp. Announces Private Placement and Recapitalization Tra...
3/20/2013, Corp. Announces Anticipated Closing Date for Senior Debent...
3/2/2011. Announces Closing of $50 Million Credit Facility
Nominations of Ram Power Corp.
9/30/2011, Corp. Announces Selby F. Little as Acting Chief Financial ...
9/28/2011, Corp. Announces Shuman Moore as President and Chief Execut...
Financials of Ram Power Corp.
10/31/2013Announces Release Date for Third Quarter Results
8/7/2013Announces 2013 Second Quarter Results
5/16/2013Announces 2013 First Quarter Results
4/25/2013Announces Release Date for First Quarter Results
3/27/2013Announces 2012 Year End Results
3/11/2013Announces Release Date for 2012 Year End Results
1/28/2013Announces a Corporate Reorganization and Strategic Initiativ...
11/1/2012Announces Release Date for Third Quarter Results
8/14/2012Announces Continued Positive Results With Record Revenue and...
8/2/2012Announces Release Date for Second Quarter Results
5/15/2012Announces Record First Quarter 2012 Results
5/3/2012Announces Release Date for First Quarter Results
3/31/2012Announces 2011 Year End Results
3/12/2012Announces Release Date for 2011 Year End Results
8/15/2011Announces Second Quarter 2011 Results
8/9/2011Announces Release Date for Second Quarter 2011 Results
6/6/2011Announces Release Date for First Quarter 2011 Results
4/1/2011Announces Fourth Quarter and 2010 Year End Results
Project news of Ram Power Corp.
8/15/2013(San Jacinto-tizate), Corp. Announces Updates for the San Jacinto-Tizate Project
7/18/2013(San Jacinto-tizate)Commences Drilling Operations at San Jacinto-Tizate
2/7/2013(San Jacinto-tizate), Corp. Announces Updates for the San Jacinto-Tizate Project
11/5/2012(San Jacinto-tizate)Announces Update for Its San Jacinto-Tizate Project
10/10/2012(San Jacinto-tizate)Announces Tariff Increase for San Jacinto-Tizate Project
7/26/2012(San Jacinto-tizate)Receives Initial Equity Distribution From Its San Jacinto-Ti...
6/7/2012(San Jacinto-tizate)Announces Update for San Jacinto-Tizate Project and Corporat...
2/21/2012(San Jacinto-tizate), Corp. Announces Updates for the San Jacinto-Tizate Project
2/6/2012(San Jacinto-tizate), Corp. Announces Updates for the San Jacinto-Tizate Project
3/25/2011(San Jacinto-tizate) Announces Successful Drilling Results at San Jacinto-Tizate
2/7/2011(San Jacinto-tizate) Announces General Corporate Update
Corporate news of Ram Power Corp.
9/28/2015POLARIS INFRASTRUCTURE ANNOUNCES SIGNING OF RIG SERVICES CON...
9/28/2015POLARIS INFRASTRUCTURE ANNOUNCES CHANGE OF AUDITOR
4/20/2015IIROC Trade Resumption - RPG
4/20/2015IIROC Trading Halt - RPG
4/20/2015Ram Power, Corp. Announces Private Placement and Recapitaliz...
3/30/2015RAM POWER ANNOUNCES 2014 YEAR END RESULTS
3/25/2015RAM POWER ANNOUNCES RELEASE DATE FOR YEAR END 2014 RESULTS
1/26/2015TSX Delisting Review - Ram Power, Corp. (Symbols: RPG and RP...
1/26/2015RAM POWER ANNOUNCES NOTIFICATION OF TSX CONTINUED LISTING RE...
1/26/2015Ram Power Announces Notification of TSX Continued Listing Re...
12/31/2014Ram Power Announces Strategic Process and Corporate Update
11/13/2014Ram Power Announces 2014 Third Quarter Results
11/13/2014RAM POWER ANNOUNCES 2014 THIRD QUARTER RESULTS
11/10/2014RAM POWER ANNOUNCES RELEASE DATE FOR THIRD QUARTER 2014 RESU...
11/10/2014Ram Power Announces Release Date for Third Quarter 2014 Resu...
8/12/2014Ram Power Announces 2014 Second Quarter Results
8/6/2014Ram Power Announces Release Date for Second Quarter Results
6/17/2014Ram Power Announces Results of Annual Meeting
5/27/2014Ram Power, Corp. Announces Completion of 30-Day Stabilizatio...
5/15/2014Ram Power Announces 2014 First Quarter Results
4/28/2014Ram Power, Corp. Announces Commencement of 30-Day Stabilizat...
4/22/2014Ram Power, Corp. Completes Sale of Geysers Project
4/7/2014Ram Power, Corp. Announces Stock Purchase Agreement With US ...
4/1/2014Ram Power Announces 2013 Year End Results
10/2/2013, Corp. Announces Operational Update Including:
8/20/2013(San Jacinto-tizate), Corp. Announces Update for San Jacinto-Tizate
8/1/2013(San Jacinto-tizate), Corp. Announces Conversion of San Jacinto-Tizate Phase II ...
7/2/2013, Corp. Announces Agreement With Project Lenders to Extend C...
6/18/2013Announces Results of Annual and Special Meeting
6/4/2013, Corp. Announces Signing of Drilling Contract and Agrees Wi...
3/27/2013, Corp. announces closing of C$50.9 million Senior Debenture...
12/12/2012Announces Termination of Power Purchase Agreement for Clayto...
3/27/2012, Corp. Announces the Signing of a Letter of Intent With SNC...
3/26/2012, Corp. Announces the Signing of a Mandate Letter With IFC f...
2/23/2012, Corp. Announces Updates for the Casita Project
1/9/2012(San Jacinto-tizate), Corp. Announces Commercial Operation of the Phase I Expans...
12/22/2011(San Jacinto-tizate), Corp. Announces Synchronization of the Phase I Expansion a...
12/6/2011, Corp. Announces Execution of Amendments to Credit Facility
10/26/2011, Corp. Announces San Jacinto Project, Casita Project and Ge...
9/15/2011, Corp. Announces San Jacinto Project and Corporate Finance ...
8/15/2011(San Jacinto-tizate)Confirms Resource and Closes $160 Million Credit Facility fo...
6/10/2011Northern California Power Agency Signs Power Purchase Agreem...
6/9/2011(San Jacinto-tizate), Corp. Announces Successful Production Test Results at San ...
6/8/2011, Corp. Announces Resolution of Credit Facility Non-Complian...
3/29/2011Northern California Power Agency Approves Power Purchase Agr...
3/24/2011(San Jacinto-tizate), Corp. Announces Successful Drilling Results at San Jacinto...
3/2/2011, Corp. Announces Closing of $50 Million Credit Facility
2/7/2011 Announces General Corporate Update
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (RPG.TO)
0.005+0.00%
TORONTO
CA$ 0.005
05/15 15:59 -
0%
Prev close Open
0.010 0.005
Low High
0.005 0.005
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.005 -50.00%
Volume 1 month var.
2,743,935 -50.00%
24hGold TrendPower© : 21
Produces
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.24%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :