Avanti Mining Receives Positive Prefeasibility Study Confirming Robust Economics for Restart of Kitsault Mine

Vancouver, British Columbia: Avanti Mining Inc. (TSX-V:AVT) ("Avanti") is pleased to release the results of the NI 43-101 Preliminary Feasibility Study ("PFS") prepared by Wardrop, a Tetra Tech Company ("Wardrop") on its 100% owned Kitsault Molybdenum property in British Columbia, Canada. The complete report will be filed on SEDAR and Avanti's web site, www.avantimining.com, within 45 days of the issue of this press release. All figures in US dollars and were derived assuming 100% equity funding excluding the benefits and cost of potential debt financing.

Highlights include:

  • The mine plan calls for a total of 215.3 million tonnes of proven and probable reserves grading 0.085% molybdenum to be mined over a 15 - year mine life, producing 368 million pounds of molybdenum. The first five years of production averages 0.10% Mo;
  • Initial capital costs are estimated at $641 million;
  • Cash operating costs are estimated to be $4.43/lb of accountable molybdenum (recovered molybdenum less 1% deductions);
  • The average life of mine (LOM) price of molybdenum for base case scenario is computed by using the CPM Group projections and it is $15.88/lb.
  • The base case after-tax NPV(8%) is $551 million, with an IRR of 20.6%
  • Projected undiscounted net cash flow (after-tax) is $1.56 billion;
  • Annual metal production for the mine life averages 24.5 million pounds of molybdenum with the first five years averaging 29.2 million pounds per year;
  • The mine has certain infrastructure in place with road and ocean freight access to the mine site and will be serviced by the BC Hydro transmission grid;
  • Develop a Run-of-River Hydro-electric project, by taking advantage of the site water diversion design in managing runoff from the average 2 meters of precipitation.
  • The Hydroelectric project may represent a long lived project asset with implications for project reclamation financing.
  • The reopening of the mine is projected to create over 330 jobs in addition to 250 construction jobs over that 3 year period.
  • The mines existing M-10 permit can be amended under the BC Mines Act process or a voluntary BC Environmental Assessment Act "opt-in" process.
"We are delighted that the PFS confirms the preliminary economic assessment done in 2008 by SRK" stated Craig J. Nelsen, Avanti's President and CEO. "We are happy with the robust economics disclosed in this report, with the most significant changes being the reduction in operating costs per lb to $4.43 per pound and the increase in the capex primarily due to on-site engineering of the tailing management facility and water diversion civil works. The discounted net present value of the project represents value of over $2.25 per issued share of Avanti. We plan to immediately embark on marketing and project financing efforts in parallel with initiating the Project's bankable feasibility study and continue mine permitting activities."

Project Description

The Kitsault property is located about 140 km north of Prince Rupert, British Columbia, and south of the head of Alice Arm, an inlet of the Pacific Ocean. The property includes three known molybdenum deposits, Kitsault, Bell Moly, and Roundy Creek. The Kitsault mine was a producer of molybdenum between 1967 and 1972 and from 1981 to 1982 with total production on the property during both periods being approximately 30 million pounds of molybdenum.

Kitsault has road access to the mine site, which is approximately 12 km from ocean transport routes and is serviced by the BC Hydro transmission grid. The PFS estimates that the Kitsault Mine would operate at an annual resource throughput rate of 14.6 million tonnes, or 40,000tpd, with a strip ratio of 0.75:1 during a mine life of 15 years. The ore mined will be crushed in a gyratory primary crusher, then ground using a SAG-ball mill configuration. The molybdenum concentrate will be dried and packaged into bags for shipment. The life-of mine molybdenum production is estimated at 368 million pounds of molybdenum contained in 320,301 tonnes of molybdenum concentrate produced from the processing of 215.3 million tonnes of reserves grading 0.085%Mo. Total molybdenum recovery is estimated at 90.6%.

Mineral Resource/Reserves Statement

The mineral resources are reported in accordance with National Instrument 43-101 ("NI 43-101"). The audit of this resource estimate was completed by Jeffrey Volk, P.Geo, an independent Qualified Person (QP), as this term is defined in NI 43-101. The effective date of this resource estimate is March 31, 2009 and the results were previously released on April 6, 2009. The mineral resource statement for the Kitsault molybdenum project is presented in Table 1 below:

Table 1 Mineral Resource Statement* for the Kitsault Molybdenum Deposit -- March 31, 2009

Resource Classification

Qty
(Mt)

Grade

Contained Metal

Mo
(%)

Ag
(g/t)

Pb
(%)

WO3
(%)

Mo
(Mlb)

Ag
(Moz)

Pb
(Mlb)

WO3
(Mlb)

Measured**

54

0.112

4.54

0.022

0.007

133

8

26

8

Indicated**

153

0.088

5.24

0.025

0.006

297

26

84

20

Measured & Indicated**

207

0.094

5.06

0.024

0.006

430

34

110

28

Inferred**

26

0.069

4.15

0.019

0.005

40

4

11

3


*Mineral resources are not mineral reserves and do not have demonstrated economic viability. All figures have been rounded to reflect the relative accuracy of the estimates. The cut-off grades are based on metal price assumptions of US$20.00/lb Mo, and a metallurgical recovery of 89% Mo. Silver, lead, and WO3 were not used in the pit optimization.
** Reported at a cut-off grade of 0.04 % Mo contained within a potentially economic open pit.

The mineral resources are reported at a cut-off grade to reflect the "reasonable prospects" for economic extraction. It is considered that portions of the Kitsault molybdenum deposit are amenable for open pit extraction, and has not considered underground mining methods for deeper portions of the deposit.

The following Table 2 reflects the material present at various cut-off grades.

Table 2 Mo Cut-off Grade Sensitivity Analyses within Resource Pit -- Measured and Indicated Resources

Cutoff Grade
(Mo%)

Quantity
(Mt)

Mo Grade
(%)

Contained Metal
Mo (Mlb)

0.02

315

0.072

501

0.025

292

0.076

490

0.03

257

0.083

468

0.035

234

0.088

452

0.04

207

0.094

430

0.045

197

0.097

420

0.05

189

0.099

412

0.055

183

0.100

405

0.06

178

0.102

398

0.065

170

0.103

388

0.07

163

0.105

377

0.075

151

0.108

357

0.08

134

0.111

329



Avanti has completed a significant volume of work during the 2008 field season, which included a 33-hole (10,131 m) infill drilling program. This program focused on both conversion of inferred to indicated resources as well as the confirmation of the historical drilling results. The results of this program have been reviewed; the assay results from the 2008 drilling compare closely with the assays from the historic drilling and are overall confirmatory. In addition, the 2008 program successfully converted inferred resources to indicated and measured resources, and the current
drillhole spacing within the Kitsault deposit appears sufficient to advance the project to feasibility level studies.

The Kitsault mine Mineral Reserves have been prepared in accordance with NI 43-101 standards and CIM standard definitions. This statement has been prepared by Mr. Miloje Vicentijevic (P.Eng.) of Wardrop, a QP as defined in NI 43-101. These reserves are sufficient for close to 15 years of operation at an annual production rate of 40,000 t/d. Mineral Reserves are summarized by class in Table 3. The notes accompanying Table 3 are an integral part of the Mineral Reserves and should be read in conjunction with the Mineral Reserve statement.

Table 3 Mineral Reserves by Class

By Class

Cut-off
Grade (Mo%)

Quantity
(Mt)

Mo Grade
(Mo%)

Contained
Metal (Mlb)

Proven

0.036

55.7

0.109

121.35

0.027

3.8

0.031

2.35

Total

59.5

0.104

123.70

Probable

0.036

134.5

0.086

231.08

0.027

21.2

0.031

13.13

Total

155.7

0.079

244.21

Total Proven & Probable

215.3

0.085

367.91



Notes:
  1. Reserves calculated in accordance with CIM guidelines.
  2. The metal price used for reserve calculation is US$12.51/lb Mo.
  3. Metallurgical recovery is 90.6% for Mo.
  4. Pit optimization parameters have changed from the time the resource estimate was completed. As a result, an additional 8.3 million tonnes grading 0.031% Mo of the economic reserves within optimized pit was available for the variable cut-off strategy (Note 5 below) making the reserve statement higher than the resource statement (see Tables 1 & 2)
  5. Cut-off grades used were variable, 0.036% Mo and 0.027% Mo.
  6. Mining recovery is estimated at 100% and dilution is nil.
  7. The waste-to-ore ratio for the deposit is 0.75.
Mining

Mining will be conducted using two 18 m3-shovels, one 18 m3 loader, and up to fifteen 177-t haul trucks with related support equipment. Benches will be drilled on an 8 m by 8 m drill pattern. All blast holes will be sampled and assayed for molybdenum. The holes will be loaded and shot with a combination of ANFO and emulsion. Benches are 10 m in height and the blast hole drilling will be to a depth of 11.6 m, including sub-drill.

Assay analyses will provide grade control for ore. Haul distances will be shortened both by the proposed borrow material for starter dam construction and the proposed low grade stock pile location on the top of existing Patsy Dump. Low grade ore will be stock piled and processed during the last two years of the operation and higher grade ore will be sent to the mill.

The mining production schedule is presented in Table 4.

Table 4 Summarized Production Schedule



Processing

The proposed concentrator in the PFS is based on an annual resource throughput rate of 14.6 Mt, or 40,000 tpd at 92% plant availability, for the production of a molybdenum concentrate. The processing plant is expected to operate 24 hours/day, 365 days/year. Over the life of mine, the processing plant will produce an estimated 314,700 t of molybdenite concentrate grading 52% Mo. The molybdenum recovery is estimated at 90.6%, consistent with previous production on the property.

The proposed process design is based on historical testwork results, the results from a recent (2009) test program and utilizing plant data from the previous Kitsault concentrator operations with the exception that the crushing-grinding circuit has been revised to reflect current technologies using a primary crusher-SAG-ball mill configuration, which is comprised of the following unit processes:
  • Primary crushing using a gyratory crusher;
  • Grinding using a SAG--ball mill configuration with cyclones for size classification;
  • Rougher and scavenger flotation;
  • Four stages of cleaner flotation with three stages of regrinding;
  • Final molybdenum concentrate thickening, leaching for the removal of contaminants, and the filtering, drying and packaging of the final concentrate; and
  • Tailing will be deposited by gravity into an on-site TMF.
Capital Costs

Initial capital is estimated at $641 million, which includes $48 million for mobile mining equipment. Preproduction stripping costs of $15 million are reflected in the initial operating costs. Life of Mine sustaining mine capital was estimated to be $435 million, which is comprised mainly of mobile equipment and TMF embankment ongoing construction. All capital costs are [+/-30%] in the PFS estimate.

The capital costs for the mine, plant and tailing management facility are given in Table 5 below.

Table 5 Capital Cost Summary

Description

US$000

Direct Works

Overall Site

37,300

Mining

51,000

Crushing

24,000

Crushed Ore Storage and Reclaim

12,900

Process

106,200

Tailing Management Facility

122,200

Water Management

33,200

Site Services and Site Utilities (Mine Site)

4,500

Ancillary Buildings (Mine Site)

16,700

Plant Mobile Fleet

2,400

Temporary Services (Port Site)

13,400

Port Site Facilities

8,700

Subtotal

432,500

Indirects

Project Indirects

104,000

Owner's Costs

26,000

Contingencies

78,100

Subtotal

208,100

Total Capital Cost

640,600



Operating Costs

LOM unit cash operating costs are US$7.47/t milled and operating costs for the processing plant are estimated at $3.57/t milled (�25% accuracy). General and administrative costs have been estimated at $0.55/t milled. Mine Closure costs have been estimated as $0.28/t ore milled. The Life of Mine unit cash operating costs are also summarized in Table 6 below:

Table 6 Unit Cash operation costs (LOM average)

Description

Dollars
$000s

US$/Tonnes
Mined

US$/Tonnes
Milled

US$/Recovered
Lbs

Mining

657,107

1.63

3.05

1.79

Processing

768,406

1.91

3.57

2.09

G & A

118,825

0.30

0.55

0.32

Power Generation

3,421

0.01

0.02

0.01

Tailings mgmt

61,085

0.15

0.28

0.17

Totals

1,608,844

4.00

7.47

4.38



Project Economics

The PFS economic results utilized assumptions summarized in the Table 7 below:

Table 7 Financial Analysis Parameters

Parameters

Inputs

General Assumptions

 

                Mine Life

15 years

                Available mill operating days per year

365 days/y

                Production Rate (average)

40,000tpd

                Process Recovery

90.6%

                Molybdenum Concentrate

320,301t

Market

 

                Discount Rate

8%

                Base Case LOM average molybdenum price

$15.88/lb

Royalty

 

                Amax Zinc (Newfoundland) Ltd Net profits Interest

9.22%

                Alcoa Royalty

1.0%



The PFS economic model for the base case assumes a LOM average molybdenum price of $15.88/lb for revenue purposes.

The after-tax NPV at an 8% discount rate over the estimated mine life is $551 million. The after-tax IRR is 20.6%. Payback of the initial capital investment is estimated to occur during the fourth production year.

Sensitivity

Sensitivity analysis for key economic parameters is shown in Table 8. This analysis suggests that the project is most sensitive to commodity prices followed by operating cost. The Project is least sensitive to capital costs.

Table 8 Base Case Sensitivity to Pre-Tax NPV (US$ Millions) at 8% Discount Rate

 

-30%

-20%

-10%

Base Case

10%

20%

30%

Moly Price

108

378

648

919

1,189

1,460

1,730

Exchange Rate

2,003

1,551

1,200

919

689

497

335

Moly Head Grade

163

415

667

919

1,171

1,423

1,675

Operating Cost

1,154

1,076

997

919

840

762

684

Capital Cost

1,101

1,040

979

919

858

798

737



Development Timetable

Avanti is currently working toward completion of a formal bankable feasibility study by Q4, 2010. This study will largely involve, pit optimization, additional field investigations and metallurgical testwork to support the feasibility study, and also include a roaster trade off study and bi-product (lead-silver) recovery metallurgical work.

It is expected that the bankable feasibility work will progress over the next twelve months in conjunction with permitting, marketing and financing activities so Avanti can have a rapid transition to construction and be in production by Q3 2013 to take advantage of the expected global economic recovery and the resulting demand for commodities.

The NI 43-101 Preliminary Feasibility Study, Avanti Mining Inc., Kitsault Molybdenum Property, British Columbia, Canada was prepared by industry consultants, all of whom are independent of Avanti Mining Inc. and are QP's under National Instrument 43-101. The QP's have reviewed and approved this news release. The consultants (QP's) with their responsibilities are as follows:

SRK Consulting (U.S.) Inc. (SRK US) under the direction of Mr. Jeffrey Volk (P.Geo.) for all matters relating to the mineral resource estimate.

SRK US under the direction of Mr. Michael Levy (P.E., P.G.) for matters relating to the pit slopes.

SRK Consulting (Canada) Inc. (SRK Canada) under the direction of Mr. Peter Healey (P.Eng) for matters and costs relating to mine closure and reclamation.

SRK Canada under the direction of Mr. Stephen Day (P.Geo.) for matters relating to metal leaching and acid rock drainage.

Wardrop under the direction of Mr. Miloje Vicentijevic (P.Eng.) for matters and costs relating to mineral reserve statements, mining, mining capital, mine operating costs, and financial analysis.

Wardrop under the direction of Mr. Andre de Ruijter (P.Eng.) for matters relating to the metallurgical testing review, mineral processing, and process operating costs.

Wardrop under the direction of Mr. Frank Grills (P.Eng.) for matters relating to the overall report coordination, process capital cost estimate and associated infrastructure.

Resource Development Inc. (RDi) under the direction of Mr. Deepak Malhotra (P.Eng.) for matters relating to metallurgical testing in 2009.

Knight Pi�sold Ltd. (KP) under the direction of Mr. Ken Brouwer (P.Eng.) for matters and costs relating to plant site geotechnical conditions, surface water diversions (including the diversion tunnel), tailing embankments, tailing access roads, tailing/reclaim pipeworks, and the run-of-river hydroelectric power plant.

Rescan Environmental Services Ltd. (Rescan) under the direction of Mr. Rolf Schmitt (P.Geo.) for matters and costs relating to environmental assessment, which involved qualified professionals conducting investigations on the property from October 2008 through November of 2009.

Avanti Mining Inc. is focused on the development of the past producing Kitsault molybdenum mine located north of Prince Rupert in British Columbia.

For further information, please visit www.avantimining.com, or phone 303-565-5491 to contact:

Craig J. Nelsen, Chief Executive Officer
A J Ali, Chief Financial Officer

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.


Forward-Looking Statements: This news release contains certain forward-looking information concerning the business of Avanti Mining Inc. (the "Corporation"). All statements, other than statements of historical fact, included herein including, without limitation; anticipated dates for receipt of permits and approvals, construction and production, and other milestones; anticipated results of drilling programs, feasibility studies and other analyses; estimated timing and amounts of future expenditures, and the Corporation's future production, operating and capital costs, operating or financial performance, are forward-looking statements. These forward-looking statements are based on the opinions of management at the date the statements are made and are based on assumptions and subject to a variety of risks and uncertainties and other factors that could cause actual events to differ materially from those projected in forward-looking statements. Important factors that could cause actual results to differ materially from the Corporation's expectations include fluctuations in commodity prices and currency exchange rates; uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs, recovery rates, production estimates and estimated economic return; the need for cooperation of government agencies and native groups in the exploration and development of properties and the issuance of required permits; the need to obtain additional financing to develop properties and uncertainty as to the availability and terms of future financing; the possibility of delay in exploration or development programs or in construction projects and uncertainty of meeting anticipated program milestones; uncertainty as to timely availability of permits and other governmental approvals; and other risks and uncertainties disclosed in the Corporation's Annual Information Form dated July 2, 2009, which is available at www. Sedar.com. The Corporation is under no obligation to update forward-looking statements if circumstances or management's opinions should change, except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking statements.

You can also view this News Release on our website at:
http://www.avantimining.com/s/NewsReleases.asp?ReportID=372253

Home  | Management  |  Projects |  Investors | News  |  Contact   |  � Avanti Mining Inc.   Disclaimer

Avanti Mining Plc.

DEVELOPMENT STAGE
CODE : AVT.V
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Avanti Mining is a lead and silver development stage company based in Canada.

Avanti Mining develops lead, silver and molybdenum in Canada, and holds various exploration projects in Canada.

Its main asset in development is KITSAULT in Canada and its main exploration property is ROUNDY CREEK in Canada.

Avanti Mining is listed in Canada. Its market capitalisation is CA$ 6.8 millions as of today (US$ 5.2 millions, € 4.5 millions).

Its stock quote reached its highest recent level on December 31, 2010 at CA$ 0.37, and its lowest recent point on April 29, 2016 at CA$ 0.01.

Avanti Mining has 151 826 295 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Avanti Mining Plc.
7/5/2013Arranges US$10 Million Bridge Loan And Restructures Existing...
6/11/2012Signs US$20 Million Bridge Financing
3/28/2011Reports Results for the Year Ended December 31, 2010
12/22/200912,221,019 Warrants Exercised by Resource Capital Fund for P...
7/15/2009Confirms Expiration Date for Warrants
Option Grants of Avanti Mining Plc.
2/12/2011Reports Issuance Of Stock Options
Nominations of Avanti Mining Plc.
10/29/2013Announces Resignation of Michael Winship as Director
10/1/2013Announces Appointment of New President & CEO and Management ...
2/7/2011Hires Nicola Street Capital Inc. as Investor Relations Consu...
5/28/2010Appointment of Bob Jacko To Its Management
3/8/2010Appoints New Director
2/22/2010Appoints Investor Relations Manager
12/1/2009Appointment of Kenneth Collison, Ex COO of Thompson Creek, t...
Project news of Avanti Mining Plc.
3/20/2013(Kitsault)Receives Environmental Approval From British Columbia for Ki...
4/30/2012(Kitsault)Updates Kitsault Resource Statement And By-Product Silver Me...
4/21/2012Issues Shares In Lieu Of Cash For Interest Payable Under Ter...
4/14/2012To Extend Bridge Loan Agreement With Resource Capital Fund ...
2/15/2012Issues Shares in Lieu of Cash for Interest Payable Under Ter...
1/13/2012Issues Shares in Lieu of Cash for Interest Payable Under Ter...
12/7/2011Announces Loan Agreement With Resource Capital Fund IV L.P.
10/12/2011Issues Shares in Lieu of Cash for Interest Payable Under Ter...
4/12/2011Issues Shares in Lieu of Cash for Interest Payable Under Ter...
2/3/2011(Kitsault)Releases NI 43-101 Compliant Technical Report on the Kitsaul...
2/4/2011(Kitsault)NI 43-101 Feasibility Study
3/8/2010(Kitsault)Appoints AMEC To Prepare Feasibility Study
3/2/2010(Kitsault)Satisfies final conditions for purchase of contiguous minera...
1/14/2010(Kitsault)Expands land holdings 300% by purchase of contiguous mineral...
12/17/2009(Kitsault)Files Final Preliminary Feasibility Study For Kitsault Molyb...
11/16/2009(Kitsault)Receives Positive Prefeasibility Study Confirming Robust Eco...
Corporate news of Avanti Mining Plc.
5/6/2016Alloycorp Files First Quarter Financials And Announces Share...
4/25/2016Alloycorp Announces Amendment To Loan Agreement, Share Conso...
3/24/2016Resource Capital Fund Elects To Extend Loan Maturity Dates
12/23/2015Alloycorp Announces Extension to Facility Maturity Dates and...
10/9/2015Alloycorp Issues Shares in Lieu of Cash for Interest Payable...
9/25/2015Alloycorp President and CEO Gordon Bogden to Step Down
8/14/2015Alloycorp Mining Provides Corporate Update
7/10/2015Alloycorp Issues Shares in Lieu of Cash for Interest Payable...
4/17/2015Alloycorp Mining to Present at the 121 Mining Investment Con...
4/10/2015Alloycorp Issues Shares in Lieu of Cash for Interest Payable...
4/6/2015Alloycorp Mining Grants Stock Options
3/30/2015Alloycorp Mining Announces Arrangements for US$435 Million i...
3/30/2015Alloycorp Mining Announces Arrangements for US$435 Million i...
3/25/2015Alloycorp Mining to Present at the John Tumazos Very Indepen...
3/25/2015Alloycorp Mining to Present at the John Tumazos Very Indepen...
3/16/2015Alloycorp Mining Grants Stock Options
1/13/2015Alloycorp Mining to Attend Vancouver Resource Investment Con...
8/2/2014Avanti Mining Issues Shares in Lieu of Cash for Interest Pay...
7/30/2014Avanti Mining Signs Mandate Letter for US$612 Million Debt F...
7/11/2014Avanti Mining Appoints Vice President, Corporate Development...
6/30/2014Avanti Mining Receives Environmental Approval From the Gover...
6/24/2014Avanti Mining Commences Construction at the Kitsault Project
6/19/2014Avanti Mining Grants Stock Options
6/16/2014Avanti Mining Receives an Amended Mines Act Permit for the K...
6/3/2014Avanti Mining and the Nisga'a Nation Conclude Kitsault Mine ...
6/3/2014Avanti Mining Reports Results from Annual Meeting
4/30/2014Avanti Mining Grants Stock Options
4/28/2014Avanti Executes Offtake Agreement with SeAH
4/24/2014Avanti Appoints New Director and Files 2013 Year End Audited...
1/20/2014Announces Memorandum of Understanding With the Wilp Luxxhon
1/8/2014Announces Initiation of Strategic Process
12/4/2013ISS And Glass Lewis Recommend Avanti Mining Shareholders Vot...
11/23/2013Increases Amount of Preconstruction Loan to US$50 Million an...
11/14/2013(Kitsault)Further Optimizes Kitsault Feasibility Study
10/31/2013Arranges US$40 Million Preconstruction Loan
10/22/2013Draws Down US$5 Million on Loan Facility
10/9/2013Issues Shares in Lieu of Cash for Interest Payable Under Ter...
8/26/2013Reports the Start of the Final 30-Day Public Comment on the ...
8/2/2013Responds and Will Oppose Judicial Review Application by Nisg...
7/15/2013Closes Restructuring Of US$20 Million Bridge Facility And Ad...
7/11/2013Grants Stock Options
7/8/2013Announces Letter Of Understanding With Gitanyow Hereditary C...
7/3/2013Extends Maturity Date of US$20 Million Bridge Loan
6/20/2013Announces Offtake Agreement With ThyssenKrupp
5/17/2013Receives and Will Oppose Judicial Review Application by Nisg...
4/19/2013Makes Payment to Nicholas Carter Pursuant to Purchase and Sa...
3/15/2013Responds to Nisga'a Dispute Resolution
2/5/2013(Kitsault)s Kitsault Feasibility Study
12/12/2012Grants Stock Options
7/3/2012Closes US$20 Million Bridge Loan
5/3/2012Iinc. Final Environmental Assessment Application Accepted by...
5/1/2012Final Environmental Assessment Application Accepted for Form...
4/24/2012Grants Stock Options
3/4/2011(Kitsault)Holds Open House and Invites Public Comments for Kitsault En...
7/24/2010Issues Shares In Lieu Of Cash For Interest Payable Under Ter...
6/28/2010Receives section (10) order under Environmental Assessment A...
6/1/2010Announces Alternative Site for Tailings Management Facility ...
5/5/2010Dissemination of its CEO TV Interview
4/22/2010Purchase of Contiguous Mineral Claims
4/9/2010Issues Shares in Lieu of Cash for Interest Payable Under Ter...
4/12/2010Receives Environmental Assessment Act Order Under Section 7(...
2/23/2010Closes C$17 Million Public Offering
2/16/2010Enters Into Underwriting Agreement
1/29/2010Closes purchase of contiguous mineral tenures at Kitsault
1/22/2010Files Preliminary Prospectus
11/9/2009Board & Management Changes
10/7/2009Issues Shares In Lieu Of Cash For Interest Payable Under Ter...
10/5/2009Announces Definitive Agreement for Conversion by RCF of 75% ...
9/9/2009Conversion by RCF of 75% of the Convertible Loan Into Units
8/19/2009Raises CDN $4.8 Million Through Warrant Exercises
7/7/2009Issues Shares In Lieu Of Cash For Interest Payable Under Ter...
6/11/2009Amends Advisory Services Agreement with Featherstone Capital...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (AVT.V)
0.045+0.00%
TSX-V
CA$ 0.045
09/27 10:30 -
0%
Prev close Open
0.045 0.045
Low High
0.045 0.045
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.045 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : -19
Produces
Develops Molybdenum - Silver
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/26/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :