Goldsource Mines Inc.

Published : December 01st, 2008

Receives Saskatchewan Work Permits; Confirms Winter Drill Program

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Coal | K Street | Market | Sulphur |
Goldsource Mines Inc.

Goldsource Receives Saskatchewan Work Permits;
Confirms Winter Drill Program

VANCOUVER, B.C. December 1, 2008 � Goldsource Mines Inc. (the �Company�) is pleased to announce that it has received the approval from the Saskatchewan Ministry of Environment for its planned work program at the Durango Coal Seam, Border Coal Project, Hudson Bay, Saskatchewan. The receipt of the approval and the attendant permits enables the Company to immediately proceed with potential resource definition drilling in the area of its recent coal discovery as well as exploration drilling on other areas with geophysical signatures indicative of potential coal basins within the 132,000 hectare project.

The Company is now permitted to drill up to 300 holes within the project area in a phased program based on success. The Phase I plan is to drill approximately 50 holes this winter commencing as soon as road preparations and access to drill sites are completed.

J. Scott Drever, President stated: �We are pleased that the approvals for our proposed work program have been received in a timely manner. Preparations for our extensive winter drill program are proceeding at full pace and depending on continued cold weather, will allow us to complete a full winter season of exploration drilling. In addition to the geological information derived from this summer�s program, recent additional interpretation of airborne and down-hole geophysics has helped define the paleo-topography of the Devonian sub surface, enabling us to identify those areas where the coal is likely to occur near to surface and in the greatest thicknesses.�

The Company announced on November 11, 2008, the basic analytical results for 213 coal samples from nine holes drilled this summer which confirmed that the Durango Coal Seam is a good quality thermal coal which ranges from sub-bituminous C to bituminous C in rank. The coal ranges in calorific value from 20,640 kj/kg (8,874 Btu/lb) to 23,358 kj/kg (10,042 Btu/lb) on a dry basis. By way of comparison, the average calorific value of the Durango Coal Seam is generally higher than those of the Alberta thermal coal fields and the major coal producers of the Powder River Basin in the United States. In addition, preliminary washing tests completed by Loring Labs on the two discovery hole samples earlier in the year indicated the potential to significantly upgrade the quality of all of the coal by reducing the ash and sulphur content. The Company is proceeding with additional comprehensive wash tests of the coal in order to further enhance its thermal and usage characteristics. The results of this test work will be reported when completed.

N. Eric Fier, CPG, P.Eng. and Qualified Person for this news release has reviewed and approved its contents.

On Behalf of the Board of Directors of
Goldsource Mines Inc.

�J. Scott Drever�
___________________________________
J. Scott Drever, President

For further information, please contact:
Fred Cooper
Telephone: (604) 691-1760
Fax: (604) 691-1761

Email: info@goldsourcemines.com
Website: www.goldsourcemines.com

405-1311 Howe Street
Vancouver, BC V6Z 2P3

This news release contains forward-looking statements, which address future events and conditions, which are subject to various risks and uncertainties. The Company�s actual results, programs and financial position could differ materially from those anticipated in such forward-looking statements as a result of numerous factors, some of which may be beyond the Company�s control. These factors include: the availability of funds; the timing and content of work programs; results of exploration activities and development of mineral properties, the interpretation of drilling results and other geological data, the uncertainties of resource and reserve estimations, receipt and security of coal permits and mineral property titles; project cost overruns or unanticipated costs and expenses, fluctuations in commodity product prices; currency fluctuations; and general market and industry conditions. Forward-looking statements are based on the expectations and opinions of the Company�s management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements.

Goldsource Mines Inc.

EXPLORATION STAGE
CODE : GXS.V
ISIN : CA38153U1084
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Goldsource Mines is a coal exploration company based in Canada.

Goldsource Mines holds various exploration projects in Canada.

Its main exploration properties are BORDER and BALLANTYNE in Canada.

Goldsource Mines is listed in Canada and in Germany. Its market capitalisation is CA$ 121.9 millions as of today (US$ 89.1 millions, € 83.3 millions).

Its stock quote reached its highest recent level on June 06, 2008 at CA$ 9.75, and its lowest recent point on December 28, 2018 at CA$ 0.04.

Goldsource Mines has 166 970 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Goldsource Mines Inc.
4/25/2011Announces Increase to Private Placement Financing
6/27/2008Completes $18 Million Private Placement
6/20/2008Prices $18 Million Private Placement
6/16/2008Announces Private Placement Financing
12/22/2005Closes Final Tranche of Private Placement
12/12/2005Closes Second Tranche of Private Placement
12/5/2005Closes $4.7 Million First Tranche of $5.9 Million Private Pl...
11/23/2005Announces $5.9 Million Private Placement
Option Grants of Goldsource Mines Inc.
4/24/2008 Announces Grant of Stock Options
Nominations of Goldsource Mines Inc.
12/16/2008Appoints Vice President Of Operations
6/3/2008Appoints New Director
Financials of Goldsource Mines Inc.
9/30/2008THIRD QUARTER ;SEPTEMBER 30, 2008
Project news of Goldsource Mines Inc.
3/17/2011(Border)Files Positive Preliminary Assessment Report for the Border ...
2/28/2011(Border)Receives Positive Preliminary Assessment for the Border Coal...
2/26/2009(Border) Announces Coal Continuity Developing in Pasquia Sub-Basin, ...
2/9/2009(Border)Updates Border Winter Drill Program; Intercepts New 50 Metr...
1/13/2009(Border)Commences Border Winter Drill Program; Receives Ballantyne C...
11/11/2008(Border)Confirms Thermal Coal Quality At Border Coal Property, Saska...
8/19/2008(Border)Completes Initial Drill Program Border Property, Saskatchewa...
8/5/2008(Border)Intercepts 36.8 Metres of Continuous Coal: Border Property, ...
3/10/2008(Border)Commences Drill Program on Saskatchewan Diamond Properties
6/6/2006(Border)Begins Drilling on Saskatchewan Big River Diamond Property
Corporate news of Goldsource Mines Inc.
7/11/2016Goldsource Reports Production Results for Q2 and H1 2016; Ea...
6/23/2016Goldsource Reports Results of AGM
6/21/2016Goldsource Achieves Commercial Production at Eagle Mountain ...
4/20/2016Eagle Mountain Gold Project Phase I Commissioning Update, Ye...
4/18/2016Goldsource Announces Early Warrant Exercise; Accelerates Pla...
1/28/2016Goldsource Begins Commissioning of Eagle Mountain Mine
12/17/2015Goldsource Announces Grant Of Stock Options
12/15/2015Goldsource Provides Eagle Mountain Construction Update
11/3/2015Goldsource Provides Eagle Mountain Gold Project Construction...
9/1/2015Goldsource Provides Construction Update at Eagle Mountain Go...
3/23/2015Goldsource COO to Take Partial Leave of Absence
3/23/2015Goldsource Commences Construction at Eagle Mountain Gold Pro...
3/5/2015Goldsource Commences Construction at Eagle Mountain Gold Pro...
2/26/2015Goldsource COO to Take Partial Leave of Absence
2/17/2015Goldsource Mines Announces Grant of Stock Options
12/31/2014Goldsource Mines Completes Final Tranche of Private Placemen...
12/31/2014Goldsource Mines Completes Final Tranche of Private Placemen...
12/15/2014Goldsource Mines Completes $6.7 Million First Tranche of Pri...
12/15/2014Goldsource Mines Completes $6.7 Million First Tranche of Pri...
12/9/2014Goldsource Mines Announces Private Placement of up to $7.5 M...
12/9/2014Goldsource Mines Announces Private Placement of up to $7.5 M...
9/16/2014Goldsource Files Eagle Mountain Preliminary Economic Assessm...
8/26/2014Goldsource Announces Mining Permit on Eagle Mountain Gold Pr...
8/1/2014Goldsource Mines (TSXV:GXS) (FSE:G5M) Announces Results of P...
7/31/2014Goldsource Announces Positive Preliminary Economic Assessmen...
4/23/2014Goldsource Mines Updates Eagle Mountain Amending Agreement
4/14/2014Goldsource Mines Announces Adoption of New Stock Option Plan...
3/20/2014Goldsource Mines Nominated for 2014 “Deal of the Year” Award
3/20/2014Goldsource Mines Nominated for 2014 "Deal of the Year" Award
5/14/2013Announces Proposed Reduction of Outstanding Stock Options, C...
7/11/2011Proposes Merger with Coal Gasification Technology Company -P...
5/19/2011Completes $3.7 Million Financings via Short Form Offering Do...
4/19/2011Announces $3 Million Financing Via Short Form Offering Docum...
3/31/2011Announces Joint Venture Agreement on 25% of Westcore Energy ...
12/1/2008Receives Saskatchewan Work Permits; Confirms Winter Drill Pr...
7/28/2008Drills 23.2 Metre Coal Intercept at Border Property
7/21/2008Border Coal Drill Program
7/14/2008Commences Border Coal Drill Program
6/26/2008Receives Additional Saskatchewan Coal Permits
6/20/2008Mining Industry TV will be airing their show this weekend fe...
6/18/2008Receives Saskatchewan Coal Permits; Confirms Summer Drill Pr...
5/30/2008Retains Norwest For Independent Review of Saskatchewan Coal ...
5/22/2008Receives Ministry Confirmation of Priority Status for Coal A...
5/9/2008Adopts Shareholder Rights Plan
5/5/2008 Confirms Saskatchewan Coal Discovery Analytical Results and...
4/23/2008 Updates Drill Program on Saskatchewan Diamond Properties
5/3/2006Receives Exchange Approval for Investor Relations and Minera...
4/13/2006Signs With Minera Pacific Inc. and Engages Investor Relation...
2/13/2006Big River Diamond Property Airborne Geophysical Survey Compl...
12/29/2005Announces Stock Option Grants
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (GXS.V)FRANKFURT (G5M.F)
0.730+0.00%0.068-5.56%
TSX-V
CA$ 0.730
04/26 12:54 -
0%
Prev close Open
0.730 0.720
Low High
0.720 0.730
Year l/h YTD var.
0.230 -  0.730 170.37%
52 week l/h 52 week var.
0.185 -  0.730 87.18%
Volume 1 month var.
27,998 55.32%
24hGold TrendPower© : -37
Produces
Develops
Explores for Coal
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 7/2/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024217.39%
2023-46.51%0.500.18
2022-49.41%0.900.30
2021608.33%1.350.09
202026.32%0.190.07
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.40+3.85%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.65-1.49%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.00+2.56%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.85-1.07%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.49-0.23%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :