Osisko Mining Corp.

Published : December 14th, 2009

Releases New Resource Estimate for Canadian Malartic Project

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

 


Press Release

Media Relations

Web Development

 

OSISKO RELEASES NEW RESOURCE ESTIMATE FOR
CANADIAN MALARTIC PROJECT


Global M&I resource increased by 1.28 million ounces gold

Montreal, Quebec, December 14, 2009 - Osisko Mining Corporation (OSK: TSX, EWX: Deutsche Boerse) is pleased to provide an updated resource estimate for its 100%-owned Canadian Malartic project. This new estimate includes the combined, previously-reported resources of the Canadian Malartic deposit and the South Barnat deposit, as well as additional resources defined from ongoing drilling within the previously estimated pit shells and immediately southeast of the pit shells.

Key points:

� Global Measured and Indicated (�M&I�) resource is now 11.20 million ounces gold, up 1.28 million ounces from the total of previously released resources. Additional 470,000 ounces remains in the inferred category.

� Tot al in-pit M&I resource is now 9.17 million ounces at a grade of 1.20 grams per tonne gold, based on a Whittle-optimized pit shell using a gold price of US$825 per ounce and a corresponding lower cut-off grade of 0.34 grams per tonne gold. This represents an increase of 770,000 ounces gold over the total of previous in-pit M&I resource estimates released by Osisko.

� At a US$1100 per ounce gold price, the in-pit M&I resource increases to 10.37 million ounces at an average grade of 1.05 grams per tonne gold, adding more than one million ounces compared to the US$825 pit shell.

� At a conservative lower cut-off of 1 gram per tonne, the in-pit M&I resource is a robust 6.72 million ounces at a grade of 1.85 grams per tonne gold.

� The infill drilling between the Canadian Malartic and South Barnat deposits has been successful in joining the two deposits, allowing for a single pit design to evaluate both deposits. The mineralized system is still open at depth.

� Economic valuation within an optimized engineered pit design will be provided in an updated reserve statement for the entire project by the end of January 2010, which will include revised mining scheduling and stockpiling aimed at maximizing head grade in the early years of production.

� The current mine schedule, as indicated in the previously released Feasibility Study, only includes 6.28 million ounces of reserves at a grade of 1.07 grams per tonne gold.

Belzile Solutions Inc. of Rouyn-Noranda, Qu�bec ("BSI") are the independent resource estimate consultants for Osisko, and have authorized the release of the following estimates. The global Measured and Indicated (�M&I�) resource is 11.20 million ounces of gold at an average undiluted grade of 1.10 g/t Au, with an additional 0.47 million ounces gold at an average grade of 0.73 g/t Au in the Inferred category, based on a lower cut-off grade of 0.34 g/t Au. The tables below summarize the BSI estimates using variable lower cut-off grades:

Canadian Malartic Project global resource estimates

Measured

Indicated

 

TotalM&I

Grade�� (g/t)

Tonnes�� (M)

Oz

(M)

Grade�� (g/t)

Tonnes�� (M)

Oz

(M)

Cut-off�� (g/t)

Grade�� (g/t)

Tonnes�� (M)

Oz

(M)

0.93

33.5

1.00

1.12

282.7

10.20

0.34

1.10

316.2

11.20

1.09

25.5

0.89

1.33

219.2

9.35

0.50

1.30

244.7

10.25

1.21

21.0

0.81

1.45

189.4

8.83

0.60

1.43

210.4

9.64

1.33

17.1

0.73

1.56

166.3

8.35

0.70

1.54

183.4

9.08

1.46

14.1

0.66

1.66

148.5

7.92

0.80

1.64

162.6

8.58

1.58

11.8

0.60

1.75

133.4

7.50

0.90

1.74

145.1

8.10

1.70

9.9

0.54

1.84

120.5

7.11

1.00

1.83

130.3

7.65

 

Inferred

 

Grade�� (g/t)

Tonnes�� (M)

Oz(M)

Cut-off�� (g/t)

0.73

20.0

0.47

0.34

0.97

11.5

0.36

0.50

1.12

8.5

0.31

0.60

1.30

6.2

0.26

0.70

1.46

4.8

0.22

0.80

1.63

3.8

0.20

0.90

1.79

3.1

0.18

1.00


BSI, in collaboration with G Mining Services Inc. of Montreal, also estimated an in-pit M&I resource within a single Whittle-optimized pit shell using a base case gold price of US$825 per ounce. The combined in-pit M&I resource for the Canadian Malartic and South Barnat deposits is 9.17 million ounces of gold at an average undiluted grade of 1.20 g/t Au, with an additional 0.11 million ounces gold at an average grade of 0.90 g/t Au in the inferred category, based on a derived lower cut-off grade of 0.34 g/t Au. The tables below summarize the in-pit estimates using variable lower cut-off grades:

Canadian Malartic Project resource estimates within US$825 Whittle pit shell

Measured

Indicated

 

TotalM&I

Grade�� (g/t)

Tonnes�� (M)

Oz

(M)

Grade�� (g/t)

Tonnes�� (M)

Oz

(M)

Cut-off�� (g/t)

Grade�� (g/t)

Tonnes�� (M)

Oz

(M)

0.97

27.5

0.86

1.23

210.6

8.31

0.34

1.20

238.1

9.17

1.13

21.4

0.78

1.40

174.2

7.82

0.50

1.37

195.6

8.60

1.25

17.6

0.71

1.51

154.3

7.47

0.60

1.48

172.0

8.18

1.38

14.5

0.65

1.61

138.0

7.13

0.70

1.59

152.6

7.78

1.50

12.2

0.59

1.70

125.3

6.83

0.80

1.68

137.5

7.42

1.62

10.3

0.54

1.78

114.1

6.52

0.90

1.77

124.5

7.06

1.75

8.7

0.49

1.86

104.4

6.23

1.00

1.85

113.1

6.72

 

Inferred

 

Grade�� (g/t)

Tonnes�� (M)

Oz(M)

Cut-off�� (g/t)

0.90

3.8

0.11

0.34

1.05

2.9

0.10

0.50

1.18

2.3

0.09

0.60

1.31

1.8

0.08

0.70

1.42

1.6

0.07

0.80

1.55

1.3

0.06

0.90

1.67

1.1

0.06

1.00


Sensitivity of the in-pit M&I resource to gold price is as follows (inferred excluded):

Gold Price (US$)

Grade (g/t)

Tonnes (M)

Oz(M)

Strip Ratio

(Waste/Ore)

$700

1.31

195.8

8.25

2.01

$825

1.20

238.1

9.17

1.91

$900

1.15

255.8

9.48

1.84

$1000

1.09

287.8

10.07

1.81

$1100

1.05

308.0

10.37

1.76

Using an ore-based cost of US$6.38 per tonne (as estimated from costs in the Canadian Malartic Feasibility Study), the corresponding in-pit cut-off grade for the base case US$825/oz Whittle shell is 0.34 g/t gold, giving the resource distribution shown in the following table:

Distribution of Canadian Malartic Project resource estimates using base case
US$825 Whittle pit shell with a 0.34 g/t Au lower cut-off grade

 

TotalM&I

Inferred

 

Grade (g/t)

Tonnes (M)

Oz(M)

Grade (g/t)

Tonnes (M)

Oz(M)

Global

1.10

316.2

11.20

0.73

20.0

0.47

(In-Pit CM)

1.08

198.9

6.88

0.77

2.9

0.07

(In-Pit Barnat)

1.82

39.3

2.30

1.36

0.9

0.04

In-Pit Total

1.20

238.1

9.17

0.90

3.8

0.11

Out-of-Pit

0.81

78.1

2.03

0.69

16.2

0.36

Sean Roosen, President and CEO of Osisko, commented: �We are very pleased with the new pit-constrained M&I resource estimate for the Canadian Malartic Project, which has achieved an increase of 770,000 ounces of gold with respect to the total of previous estimates, while maintaining a relatively low strip ratio of 1.91. The new in-pit M&I resource estimate of 9.17 million ounces is very reliable since it is based on processing and mining costs that were used in the Feasibility Study.�

�We anticipate that over 95% of this resource is going to be converted into reserves for the entire project, once a new reserve estimate is calculated in January 2010. We anticipate that the new engineered pit will provide a significant increase in mine life and allow for mining sequencing and stockpiling aimed at increasing head grade and overall gold production in the early years in order to accelerate pay back of capital.

Finally, it is worth noting that even at a cut-off of 1 g/t Au, we are now looking at a total in-pit M&I resource of 6.72 million ounces gold at an average grade of 1.85 g/t Au, which makes this resource very robust at significantly lower gold prices. This means that 73 percent of the overall 9.17 million ounce in-pit resource should have an average grade 1.85 g/t Au. In the business of open pit gold mining, this is a relatively high grade disseminated deposit with a surrounding low grade halo. It lowers commodity-driven business risk significantly by allowing for mining flexibility.�

Details on the parameters of the resource estimates are as follows:

� The database comprised a total of 228,500 metres of drilling obtained from historical drilling (Canadian Malartic Mines and Lac Minerals) and from approximately 561,200 metres of drilling completed and assayed by Osisko as of the end of September 2009 on a maximum 30 m x 30 metre grid. (All NQ or HQ core assays reported by Osisko were obtained by standard 50 g fire assaying-AA finish or gravimetric finish at ALS Chemex laboratories in Val d'Or, Quebec.)

� The database also comprised a total of 525,105 assays with an average of 1.38 metre per sample for a total of 726,500 assayed metres.

� The estimates were done using Ordinary Kriging (OK) as the geostatistical interpolation method based on 5.0 metre analytical composites. Resources were also estimated using Inverse Distance Squared (ID2) interpolation, which produced similar results, i.e. less than 2 percent difference in total ounces at all cut-offs.

� Calculations are based on original samples cut to a maximum of 10 g/t to 70 g/t Au depending on the domain. This resulted in an approximate 1.7 percent reduction in the overall gold content. All 5m composites are calculated based on cut original data.

� Testing and validation of cut historical Canadian Malartic (CM) drill data using modern (Osisko) drill data revealed negligible bias in the higher grade domains but significant bias (minimum 25%) in the lower grade domains. CM historical data in lower grade domains were therefore discarded for resource estimate and resource classification purposes. CM historical data were used for resource estimate purposes in the higher grade domains but not retained for measured resource classification. Lac Minerals drill core was mostly re-assayed and these data were retained for resource estimate and resource classification purposes.

� All estimates are based on a Parent Cell dimension of 20 metres E, 10 metres N and 10 metres height with estimation parameters determined by variography.

� Geological interpretation identified fourteen high grade domains (higher than 1.0 g/t Au) , six low grade domains (between 0.4 and 1.0 g/t Au) and a broad lower grade envelope (greater than 0.2 g/t Au).

� Underground voids were modeled from historical mine plans and adjusted according to positions of drill intersections in stopes and drifts. Void volumes of stopes were increased by one metre along all edges to compensate for uncertainties. The void models were then used to deplete the resource estimate. All samples located within the voids were then removed from the estimate.

� Tonnage estimates are based on rock densities of 2.69 tonnes/cubic metre for the porphyry, 2.75 for altered sediments and 2.90 for altered ultramafic rocks.

� The resource estimates using the lower cut-off of 0.34 g/t Au is emphasized for reporting purposes as this is the in-pit cut-off estimated for the US$825 Whittle shell.

� The US$825 Whittle shell has approximate maximum dimensions of 2,980 metres in length, 1,180 metres in width and a v ertical depth of 380 metres.

� The average gold recovery in this pit shell is 86.2%. Overall slope angles based on feasibility level geotechnical studies (including provisions for ramps) are between 43 and 55 degrees. Strip ratio is 1.91 for the in-pit resource corresponding to a lower cut-off of 0.34 g/t Au.

Economic valuation within an optimized engineered pit design will be provided in an updated reserve statement for the entire project by the end of January 2010, which will optimize the combined Canadian Malartic and South Barnat pits. Should Osisko successfully prove up economic reserves at South Barnat, additional steps will be taken to obtain the necessary authorizations to mine the South Barnat deposit and integrate it to the Canadian Malartic project. Additional studies are currently under way to evaluate the deviation of highway 117 that will be required for potential mining of the South Barnat deposit. This study will be carried out in cooperati on with the Qu�bec Ministry of Transport and the town of Malartic. The goal of the study will be to minimize the portion of the highway to be relocated as well as the social impact to the community.

The project out-of-pit M&I resource is currently estimated at 2.03 million ounces gold, and further pit optimizations using modified variables, such as increased pit slopes or gold price, may allow for eventual inclusion of some of this resource within the pit. Additional drilling is required to upgrade the remaining inferred resources.

Osisko Mining Corporation is currently developing the Canadian Malartic gold project into a large-scale open pit, bulk-tonnage mining operation. The Company is well-funded with $825 million in cash resources and is carrying out an aggressive mine development, reserve definition and exploration campaign. The Canadian Malartic deposit currently represents one the biggest gold reserves in Canada for a single deposit, and is still growing through ongoing drilling on new mineralized zones.

A NI 43-101 compliant, 7.7 million ounce gold M&I global resource estimate (6.4 million ounce gold M&I in-pit resource) on the main Canadian Malartic gold deposit was released on September 8, 2008 and has been filed on SEDAR.  A NI 43-101 compliant, 6.3 million ounce gold Reserve estimate and Feasibility Study on the main Canadian Malartic gold deposit was released on November 25, 2008 and has been filed on SEDAR. A NI 43-101 compliant, 2.2 million ounce gold M&I global resource estimate (2.0 million ounces gold M&I in-pit resource) on the South Barnat gold deposit was released on June 2, 2009 and has been filed on SEDAR.

Mr. Elz�ar Belzile, P. Eng. of BSI, Mr. Louis-Pierre Gignac, P. Eng. of G Mining Services Inc. and Mr. Robert Wares, P. Geo. and Executive Vice-President of Osisko, are the Qualified Persons who have reviewed this news release and are responsible for the technical information reported herein, including verification of the data disclosed.

Conference Call

Osisko will host a conference call on Monday, December 14 at 11:30 AM Montreal time, where senior management will discuss the press release and will be available to respond to questions from analysts and investors. Thos e interested in participating in the conference call should dial in at 416-981-9000 (Toronto local and international), or 1-800-909-4145 (North American toll free). An operator will direct participants to the call.

THIS PRESS RELEASE CONTAINS A MAP,
CLICK HERE TO VIEW THE FULL DOCUMANT IN PDF FORMAT

Cautionary Notes Concerning Estimates of Mineral Resources

This news release uses the terms measured, indicated and inferred resources as a relative measure of the level of confidence in the resource estimate. Readers are cautioned that mineral resources are not economic mineral reserves and that the economic viability of resources that are not mineral reserves has not been demonstrated. In addition, inferred resources are considered too geologically speculative to have any economic considerations applied to them. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies or economic studies except for Preliminary Assessment as defined under NI 43-101. Readers are cautioned not to assume that that further work will lead to mineral reserves that can be mined economicall y.

Forward Looking Statements

Certain statements contained in this press release may be deemed �forward-looking statements�. All statements in this release, other than statements of historical fact, that address events or developments that the Corporation expects to occur, are forward looking statements.  Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words �expects�, �plans�, �anticipates�, �believes�, �intends�, �estimates�, �projects�, �potential�, �scheduled� and similar expressions, or that events or conditions �will�, �would�, �may�, �could� or �should� occur.  Although the Corporation believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, including, without limitation that all technical, economical and financial conditions will be met in order to put the Canadian Malartic Proje ct into commercial production, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements.  Factors that could cause the actual results to differ materially from those in forward-looking statements include gold prices, access to skilled consultants, mining development and mill production personnel, results of exploration and development activities, the Corporation�s limited experience with production and development stage mining operations, uninsured risks, regulatory changes, defects in title, availability of personnel, materials and equipment, timeliness of government approvals, actual performance of facilities, equipment and processes relative to specifications and expectations, unanticipated environmental impacts on operations market prices, continued availability of capital and financing and general economic, market or business conditions. These factors are discussed in greater detail i n the Corporation�s most recent Annual Information Form filed on SEDAR, which also provides additional general assumptions in connection with these statements. The Corporation cautions that the foregoing list of important factors is not exhaustive.  Investors and others who base themselves on the Corporation�s forward-looking statements should carefully consider the above factors as well as the uncertainties they represent and the risk they entail.  The Corporation believes that the expectations reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements included in this press release should not be unduly relied upon.  These statements speak only as of the date of this press release.

 

 

Contact

Osisko Mining Corporation
John Burzynski 
Vice-President Corporate Development 
Tel.: (514) 735-7131 
www.osisko.com 

Sylvie Prud�homme
Investor Relations
Tel.: (514) 735-7131
Toll Free: 1-888-674-7563

Renmark Financial Communications Inc.
John Boidman: jboidman@renmarkfinancial.com
Dan Symons: dsymons@renmarkfinancial.com
Tel.: (514) 939-3989 or (416) 644-2020 www.renmarkfinancial.com

 

Renmark Financial Communications Inc.

Montreal (Head Office): 2080 boul. Ren�-L�vesque Ouest, Montr�al, Qu�bec, H3H 1R6
Tel.: (514) 939-3989 Fax: (514) 939-3717
Toronto: 121 King Street West, Suite 1140, Toronto, Ontario, M5H 3T9
Tel.: (416) 644-2020 Fax: (416) 644-2021

Website: www.renmarkfinancial.com - Email: info@renmarkfinancial.com

 

Disclaimer: This correspondence is not to be construed as an offer to buy or sell securities or options. Renmark does not have any interest, directly or indirectly, in the Company or its securities, or any right or intent to acquire such an interest.

 

Osisko Mining Corp.

PRODUCER
CODE : OSK.TO
ISIN : CA6882781009
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Osisko Mining is a gold producing company based in Canada.

Osisko Mining holds various exploration projects in Argentina, in Brazil and in Canada.

Its main asset in production is MALARTIC in Canada and its main exploration properties are GOLDBORO, SLEITAT, JC - SMART SKARNS, HAMMOND REEF, MALARTIC CHL GOLD PROPERTY, DUPARQUET and CLEMENT LAKE in Canada, EL POTOSI and SANTA CLARA / CERRO BONITO in El Salvador, CERRO CONDORINI and COAL CREEK in Peru, FAMATINA in Argentina and CASTELO DOS SONHOS in Brazil.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Osisko Mining Corp.
12/20/2018Osisko Mining reports 39% higher grade than resource model a...
Annual reports of Osisko Mining Corp.
2008 Annual report
Financings of Osisko Mining Corp.
8/31/2011Osisko Announces an Increase in Caterpillar Lease Financing ...
8/31/2011Announces an Increase in Caterpillar Lease Financing Facilit...
11/18/2009Strengthens Balance Sheet With $241 M Proceeds From Exercise...
6/30/2009Closes $10.64 Million Flow-Through Financing
4/17/2006Announces C10$ million "bought deal" financing
Nominations of Osisko Mining Corp.
5/10/2013Anounces Election of Directors
4/17/2012Nominates Michele Darling to Board of Directors
3/14/2012Appoints Gary Sugar to Board of Directors
2/2/2012Board Member Resigns
9/16/2011Osisko Appoints Richard Ross to Board of Directors
9/15/2011Appoints Richard Ross to Board of Directors
8/22/2011Director Resigns
Financials of Osisko Mining Corp.
2/14/2014Provides Notice of Fourth Quarter and Year End 2013 Results ...
8/1/2013Reports Second Quarter 2013 Results
7/15/2013Provides Notice of Second Quarter 2013 Operating and Financi...
5/9/2013Reports First Quarter 2013 Results
4/29/2013Provides Notice of First Quarter 2013 Financial Results Rele...
2/21/2013Reports Fourth Quarter and Year-End 2012 Results
11/13/2012Reports Third Quarter 2012 Results
7/5/2012Produces 92,003 Ounces Au in Second Quarter
5/9/2012Provides Notice of First Quarter 2012 Financial Results Rele...
2/27/2012Q4 2011 Net Profit of $37.8 Million
1/16/2012Provides Notice of Fourth Quarter and Year-End 2011 Financia...
8/11/2011Releases Second Quarter 2011 Results
5/16/2011Osisko Releases First Quarter 2011 Results
5/14/2011Osisko Releases First Quarter 2011 Results
2/28/2011Releases Year-End Financial Results and Review of 2010
11/6/2009Releases Third Quarter 2009 Results
8/11/2009Releases Second Quarter 2009 Results
Project news of Osisko Mining Corp.
7/26/2017OSK Osisko Mining drills 2.7 m of 57 g/t Au at Windfall
2/21/2014Intersects 2.26 g/t Gold Over 128 Metres at Kirkland Lake
2/7/2014(Malartic)Commences 2014 Canadian Malartic Exploration Program
2/6/2014(Malartic)Reports Record January Production at Canadian Malartic
12/4/2013Intersects 61.6 Metres Averaging 1.44 g/t Au at Bidgood
11/21/2013(Malartic)Canadian Malartic Mine Produces Millionth Ounce
10/23/2013GLOBAL'S NEVADA PROJECTS ATTRACT STRONG THIRD PARTY INTEREST...
7/10/2013(Malartic)Deposits Study Reporting Local and Regional Economic Impact ...
1/30/2013Intersects 5.5 g/t Au Over 54.0 Metres at Upper Beaver
12/10/2012(Malartic)Reports November Production From Canadian Malartic
11/12/2012Announces Friendly Acquisition of Queenston
10/11/2012(Malartic)Canadian Malartic Mine Produces Half Millionth Ounce
10/10/2012(Malartic)Reports Record Quarterly Production from Canadian Malartic
9/6/2012(Malartic)Reports Record Monthly Production from Canadian Malartic
7/26/2012Acquires Common Shares of Bowmore Exploration Ltd=2E
5/17/2012(Malartic)Canadian Malartic Mill Returns to Operation
5/10/2012(Malartic)Reports Fire Damage at Canadian Malartic Mill Limited to Cyc...
1/30/2012(Famatina)s Status of Famatina Exploration Project
12/22/2011and DIOS Discover New Gold Showings on the AU33 WEST Project
11/28/2011TSX.V Company Adjacent to Osisko Property - 3 Minute Video
9/29/2011(Goldboro)Orex to Pursue Exploration Work on Goldboro Gold Project
9/8/2011(Malartic)Intersects 1.23 g/t Au Over 172 Metres at Barnat Extension
8/31/2011Osisko and EMSE Sign Agreement for Development of Famatina P...
8/31/2011(Famatina)and EMSE Sign Agreement for Development of Famatina Project ...
8/11/2011(Goldboro)Goldboro Gold Project Drill Assay Results Identify Extension...
8/5/2011Osisko Buys Back a 1% Royalty Interest on Canadian Malartic ...
8/5/2011(Malartic)Buys Back a 1% Royalty Interest on Canadian Malartic Propert...
6/21/2011Osisko Declares Commercial Production at Canadian Malartic
6/21/2011(Malartic)Declares Commercial Production at Canadian Malartic
6/17/2011Osisko Submits Notice of Termination in Duparquet Project
6/17/2011(Duparquet)Submits Notice of Termination in Duparquet Project
6/14/2011(Malartic)Intersects 1.50 g/t Au Over 63.6 Metres at Jeffrey Zone
6/13/2011(Duparquet)et Clifton Star annoncent une estimation de ressources pour ...
6/13/2011(Duparquet)and Clifton Star Release Resource Estimate for the Beattie D...
6/1/2011(Malartic)Officially Inaugurates the Canadian Malartic Mine
6/1/2011Osisko Officially Inaugurates the Canadian Malartic Mine
5/2/2011(Malartic)Announces Revised Mine Production Plan at Canadian Malartic
4/21/2011(Goldboro)Orex Exploration Inc.: Drilling Campaign Has Begun at Goldbo...
4/20/2011Osisko Mining Corporation - Drilling campaign has begun at G...
4/20/2011Osisko Mining Corporation - Drilling campaign has begun at G...
4/13/2011(Malartic)Pours First Gold at Canadian Malartic Mine
3/31/2011(Malartic)Increases Gold Reserve at Canadian Malartic to 10=2E7 Millio...
3/29/2011(Malartic)Exercises Buy Out Option in Canadian Malartic Net Smelter Ro...
2/28/2011(Malartic) Découverte de minéralisation de type Canadian Malartic
2/24/2011(Hammond Reef)Reports 124 Metres Averaging 0.73 g/t Au in Southeast Extens...
1/29/2011(Malartic)Osisko Reports Significant New Intersections at Barnat Exten...
1/25/2011(Malartic)Reports Significant New Intersections at Barnat Extension, I...
12/21/2009(Malartic)Provides Update on Construction and Development Progress at ...
12/14/2009(Malartic)Releases New Resource Estimate for Canadian Malartic Project
10/20/2009(Malartic) Intersects New Gold Mineralization on the Malartic CHL Prop...
9/14/2009(Malartic)Intersects 1.20 g/t Au Over 86.9 Metres at Jeffrey Zone
9/1/2009(Malartic)Osisko Mining Corporation: Construction Activities at Canadi...
8/20/2009(Malartic)Quebec Government Authorizes Construction of Osisko's Canadi...
2/26/2009(Malartic) Preliminary Metallurgical Results on Barnat
1/26/2009(Malartic)Announces Inferred Resource Estimate for South Barnat Deposi...
12/3/2008(Malartic) Intersects 102 Metres Averaging 3.21 g/t Au at South Barnat
Corporate news of Osisko Mining Corp.
2/13/2014Mails Letter to Shareholders Regarding Inadequate Goldcorp O...
2/5/2014Provides Corporate Update
1/29/2014Commences Legal Proceeding to Restrain Misuse of Confidentia...
1/29/2014Announces Filing and Mailing of Directors' Circular and Reco...
1/20/2014Reports Preliminary Fourth Quarter 2013 Production
1/15/2014Responds to Unsolicited Proposal From Goldcorp Inc=2E
1/13/2014Responds to Announcement by Goldcorp
12/16/2013Completes Long-Term Debt Renegotiation
10/24/2013Provides Notice of Third Quarter 2013 Operating and Financia...
7/30/2013Enhances Financial Flexibility by Improving Long-Term Debt T...
7/5/2013Intercepts 68 Metres Averaging 1=2E26 =?ISO-8859-1?Q?=20g/t=...
7/2/2013Receives Final $30 Million Payment from Kirkland Lake Gold
4/29/2013Corporate Update
4/17/2013Comments on Trading Activities
4/9/2013(Malartic)Previews Q1 2013 Canadian Malartic Operating Results
3/21/2013Discovers Two New Gold-Copper Zones at Upper Beaver
2/19/2013(Malartic)Receives Modified Operating Parameters at Canadian Malartic
2/19/2013(Malartic)s Reserves at Canadian Malartic
2/11/2013Denis Cimon Receives the 2013 Mineral Processor of the Year
1/29/2013(Hammond Reef)Provides Resource Update for Hammond Reef Project
1/24/2013(Malartic)Previews Q4 2012 Canadian Malartic Operating Results and 201...
11/12/2012(Malartic)Reports Record Monthly Throughput at Canadian Malartic
10/15/2012Founder Retires
10/9/2012Acquires Ground in Emerging Gold Belt in Mexico and Identifi...
10/3/2012Deposits the Second Tranche of itsFinancial Guarantee Coveri...
8/3/2012Secondary Crusher Installation Completed
7/24/2012Acquisition of Subscription Receipts of Druk Capital Partner...
5/16/2012Enhances Credit Agreement With CPPIB
5/14/2012(Malartic)Provides Update on Canadian Malartic
5/10/2012(Malartic)Reports Fire at Canadian Malartic Milling Plant
4/3/2012and Metis Nation of Ontario Sign Memorandum of Understanding
3/12/2012Brings First Half of Secondary Crusher Online
3/1/2012Announces Record Date for Annual Meeting
2/16/2012Canadian gold producer Osisko Mining Corporation joins Globa...
1/12/2012(Malartic)Previews Q4 2011 Canadian Malartic Operating Results
1/3/2012Responds to Below Market Price Offer for 5 Million Shares On...
12/14/2011Osisko Comments on Trading of Common Shares
12/14/2011Comments on Trading of Common Shares
10/8/2011President Sean Roosen Named Ernst & Young 2011 Quebec Entrep...
6/17/2011(Duparquet)met fin =E0 sa participation au projet Duparquet
6/13/2011Osisko and Clifton Star Release Resource Estimate for the Be...
5/14/2011Osisko publie ses r=E9sultats du premier trismestre de 2011
5/12/2011Annual and Special Meeting of Shareholders of Osisko Mining ...
4/29/2011Osisko Announces Revised Mine Production Plan at Canadian Ma...
3/29/2011Osisko Exercises Buy Out Option in Canadian Malartic Net Sme...
2/9/2011Goldcorp Sells Osisko Investment
12/22/2009Donates Shares to McGill University
12/11/2009and Clifton Star Complete Joint Venture Agreement on Duparqu...
11/13/2009Options Goldboro Gold Property From Orex Exploration
9/28/2009 Signs Option Agreement With Claim Post Resources for the Mo...
9/24/2009 Enters Into Financing Agreement With CPPIB Credit Investmen...
8/11/2009Signs Option Agreement With Midland Exploration for the Dunn...
7/10/2009Report on Osisko's Canadian Malartic Bape Hearings is Made P...
7/3/2009Osisko Mining Corporation Completes Strategic Investment
6/18/2009Comments on Trading of Common Shares
5/21/2009Discovers New Mineralized Zone Adjacent to South Barnat
5/19/2009Makes Strategic Investment
1/13/2009 Extends South Barnat to 1200 Metres Length
12/4/2008 Recognized for Strong Sustainability Performance
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (OSK.TO)FRANKFURT (EWX.F)
3.17-0.63%2.43-1.62%
TORONTO
CA$ 3.17
04/23 17:00 -0.020
-0.63%
Prev close Open
3.19 3.15
Low High
3.09 3.23
Year l/h YTD var.
2.42 -  3.21 14.86%
52 week l/h 52 week var.
2.36 -  3.92 -18.72%
Volume 1 month var.
1,022,114 16.54%
Produces Gold
Develops
Explores for Gold - Lead - Silver - Tin - Tungsten - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202416.12%
2023-22.00%4.532.64
2022-6.17%5.022.36
20210.81%3.972.33
2020-4.88%4.851.67
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.71-0.39%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.11+2.21%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55-0.90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.47+3.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.25-3.42%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.79-3.76%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.57+0.84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.88%Trend Power :