MINERA ANDES REPORTS 2008 FINANCIAL RESULTS
AND SAN JOS� PRODUCTION RESULTS

  
TSX: MAI   
NASD-OTCBB: MNEAF   
   

SPOKANE, WA - March 31, 2009 - Minera Andes Inc. (the "Corporation" or "Minera Andes") (TSX-MAI and US OTC: MNEAF) today reported a net loss of $7.0 million ($0.04 per share) for the year ended December 31, 2008.  This compares with a loss of $8.2 million ($0.05 per share) for the year ended December 31, 2007. All amounts in this news release are in US dollars unless otherwise noted.  Our financial statements are available under the Corporation's profile at www.sedar.com.
 
Minera Andes' share of net income derived from Minera Santa Cruz S.A..("MSC") for the 2008 year (before amortization), was $1.96 million where the San Jose mine started full commercial production on January 1, 2008.  MSC is owned 49% by Minera Andes and 51% by Hochschild Mining plc ("Hochschild") (HOCM.L: Reuters and HOC LN: Bloomberg - London Stock Exchange). MSC owns and operates the San Jos� silver/gold mine in southern Argentina, which has recently expanded its processing capacity to a rate of 1,500 metric tonnes per day ("MTPD")..  Hochschild is the operator of the San Jos� mine.

As previously reported, silver and gold sales from the San Jos� mine in the fourth quarter of 2008 totaled $19.6 million.  During 2008, total sales from the San Jos� mine were $111.3 million.  The weighted average sales prices were $8.93/ounce of silver and $774/ounce of gold during the fourth quarter of 2008 and $14.25/ounce of silver and $865/ounce of gold during the 2008 year.  San Jos�'s silver and gold sales are unhedged. Fourth quarter 2008 sales of silver and gold were lower than anticipated because of an inventory build up primarily due to a furnace malfunction, which has been resolved, and the scheduled closure of a refinery used by MSC prior to a Christmas blackout period.

A total of 295,963 tonnes of ore was treated in the 2008 year with an average grade of 559 grams per tonne of silver and 6.69 grams per tonne gold resulting in the production of 4,381,000 ounces of silver and 54,260 ounces of gold during the 2008 year, which was marketed in the form of concentrates, dor� bullion and precipitates.

For the year ended December 31, 2008, the total operating cash costs for San Jos� were $48.5 million.   The total operating cash costs is equivalent to approximately $166/metric ton, or an average of $6.42 per ounce of silver and $375 per ounce of gold on a co-product basis.
 
An expansion increasing the processing capacity of the San Jos� Project from 750 MTPD to 1,500 MTPD was completed in October 2008, and in December 2008 the plant was operating at close to the increased capacity of 1,500 MTPD. Work is underway to also increase mine production from 750 MTPD to 1,500 MTPD, primarily by accessing the Kospi vein, located between the Huevos Verdes and Frea veins from which current production is derived.  However, due to difficult ground conditions, access to the Kospi vein was delayed until late January 2009.  Production from the Kospi vein is anticipated to commence during the second quarter of 2009.  In the meantime, mill feed is being generated from expanded mine production at the Huevos Verde and Frea veins and from a surface stockpile of low grade ore.  For the full year 2009, MSC is forecasting production of 7.5 million ounces of silver and 95,000 ounces of gold.  MSC forecasts that unit operating costs will drop by about a third due to the economies of scale associated with the expansion and the connection to the national power grid.  Further cost reductions may be realized in the future by expanding the Gekko circuit to convert all of the concentrate produced at the mine to dor� bullion.

Allen Ambrose, President of Minera Andes said, "We are delighted to see in 2008 the San Jos� Mine generated its first profitable quarter (Q2), since its startup in late 2007.  We had expected profits earlier but our JV partner and operator of the mine, Hochschild, undertook a capital expansion of the mine before it had yet achieved full commercial production.  However, with the mine expansion behind us now, we look forward to participating in its growing profits as a result of higher production rates, lower operating costs, and potentially higher gold and silver prices.  We are very pleased to see a deposit we discovered in 1997 become a mine that will become one of the top ten primary silver producing mines in the world in 2009!"

Allen V. Ambrose, Minera Andes' President and CEO, who is a "qualified person" as defined by National Instrument 43-101, is responsible for the information used in this news release and has supervised the preparation of the information and reviewed all information used in this news release.

Minera Andes is a gold, silver and copper exploration company working in Argentina. The Corporation holds or has an interest in approximately 304,000 acres of mineral exploration land in Argentina, including the properties comprising the 49% owned San Jos� silver/gold mine.  Minera Andes is also exploring the Los Azules copper project in San Juan province, where a scoping study has been completed and a 43-101 technical report filed.  Other exploration properties, primarily silver and gold, are being evaluated in southern Argentina. The Corporation presently has 230,538,851 shares issued and outstanding.

This news is submitted by Allen V. Ambrose, President, CEO and Director of Minera Andes Inc.



For further information, please contact: Art Johnson at the Spokane office, or Krister A. Kottmeier, investor relations - Canada, at the Vancouver office. Visit our Web site: www.minandes.com.

Spokane Office
111 East Magnesium Rd.,
Spokane, WA 99208 USA
Phone: (509) 921-7322
E-mail: mineraandes@minandes.com

Vancouver Office
Suite 911 - 470 Granville St,
Vancouver, BC. V6C 1V5
Phone: (604) 689-7017 / 877-689-7018
E-mail: ircanada@minandes.com

Non-GAAP Financial Measures:
In this news release, we use the term "operating cash cost." Operating cash costs are defined as the sum of the geology, mining, processing plant, general and administration costs as well as royalties, refining and treatment charges and sales costs applied to dor�, but with respect to concentrate sales do not include refining, treatment charges and sales costs. The operating cash costs per ounce are calculated on a co-product basis by dividing the respective proportionate share of the total costs for the period for each metal by the ounces of each respective metal produced. The proportionate share of the total costs is calculated by multiplying the total cash costs by the percentage of total production value that the respective metal represents. For 2008, approximately 58% of the value of the production was derived from silver and 42% was derived from gold based on the year 2008 average London PM fix for silver and for gold. We use operating cash cost per ounce as an operating indicator. We provide this measure to our investors to allow them to also monitor operational efficiency of MSC's mine at San Jos�. Operating cash cost per ounce should be considered as non-GAAP Financial Measure and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. There are material limitations associated with the use of such non-GAAP Financial Measures. Since these measures do not incorporate revenues, changes in working capital and non-operating cash costs, they are not necessarily indicative of operating profit or cash flow from operations as determined under GAAP. Changes in numerous factors include, but are not limited to, mining rates, milling rates, silver and gold grades, silver and gold recoveries, and the costs of labor, consumables and mine site operations general and administrative activities that can cause these measures to increase or decrease.


Caution Concerning Forward-Looking Statements:
This news release contains forward-looking statements and forward-looking information within the meaning of applicable US and Canadian securities laws. Such forward-looking statements or information include expected production at MSC's San Jos� Project. In making the forward-looking statements and providing the forward-looking information, we have made numerous assumptions. Although our management believes that the assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that the forward-looking statements will prove to be accurate. Forward-looking statements and information involve known and unknown risks, uncertainties and other factors that may cause our actual results to be materially different from that expressed or implied by such forward-looking information. Such risks, uncertainties and other factors include among other things, declines in the price of gold, silver, copper and other base metals, capital and operating cost increases, changes in general economic and business conditions, including changes in interest rates and the demand for base metals, economic and political instability in Argentina, discrepancies between actual and estimated production and mineral reserves and resources; operational and development risk; the speculative nature of mineral exploration and regulatory risks.

Readers should not place undue reliance on forward-looking statements or information. We undertake no obligation to reissue or update forward-looking statements or information as a result of new information or events after the date hereof except as may be required by law. See our annual information form for additional information on risks, uncertainties and other factors relating to the forward-looking statements and information. All forward-looking statements and information made in this news release are qualified by this cautionary statement. Minera Andes' joint venture partner, a subsidiary of Hochschild Mining plc, and its affiliates do not accept responsibility for the use of project data or the adequacy or accuracy of this release.


THE TSX HAS NOT REVIEWED AND DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

 

Forward email


Minera Andes Inc. | S. 911 - 470 Granville Street | Vancouver | British Columbia | V6C 1V5 | Canada

<
Data and Statistics for these countries : Argentina | Canada | All
Gold and Silver Prices for these countries : Argentina | Canada | All

Minera Andes Inc

CODE : MAI.TO
ISIN : CA6029101012
CUSIP : 602910101
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Minera Andes is a silver producing company based in Canada.

Minera Andes is listed in Canada and in United States of America. Its market capitalisation is CA$ 730.0 millions as of today (US$ 728.7 millions, € 555.9 millions).

Its stock quote reached its lowest recent point on February 06, 2009 at CA$ 0.32, and its highest recent level on April 15, 2011 at CA$ 3.39.

Minera Andes has 282 959 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Minera Andes Inc
3/23/2006New Analysis
10/16/2006Learning from the Iconoclast
Annual reports of Minera Andes Inc
2008 Annual report
2006 Annual Report
Financings of Minera Andes Inc
2/26/2009COMPLETES SECOND TRANCHE OF PRIVATE PLACEMENT WITH ROB McEWE...
2/17/2009revised C$40.0 million private placement with Robert R. McEw...
Financials of Minera Andes Inc
8/11/2011Announces Second Quarter 2011 Financial Results
6/6/2011Announces First Quarter 2011 Financial Results and Restated ...
3/30/2011Announces 2010 Full Year Financial Results and Record Earnin...
7/17/2009(San Jose Argentina)second quarter 2009 San José Production
5/16/2009REPORTS FIRST QUARTER 2009 FINANCIAL RESULTS
1/23/2009(San Jose Argentina)ANNOUNCES FOURTH QUARTER GOLD/SILVER PRODUCTION INCREASES AT...
11/14/2008REPORTS THIRD QUARTER 2008 RESULTS
11/11/2008(San Jose Argentina)ANNOUNCES THIRD QUARTER GOLD/SILVER SALES AT THE SAN JOSE MI...
8/15/2008REPORTS NET INCOME FOR SECOND QUARTER OF $0.05 PER SHARE
7/30/2008ANNOUNCES SECOND QUARTER GOLD/SILVER SALES AT THE SAN JOSE M...
5/9/2008(San Jose Argentina)ANNOUNCES FIRST QUARTER 2008 PRODUCTION FOR SAN JOSE MINE TO...
Project news of Minera Andes Inc
12/7/2011(San Jose Argentina)Provides Update On Exploration Drilling at the San Jose Mine
8/30/2011(San Jose Argentina)Provides Update on Exploration Drilling at the San Jose Mine
6/27/2011(Los Azules Argentina)Reports Drill Results and Development Update for the Los Azu...
5/17/2011(Los Azules Argentina)on Litigation With TNR Gold Corp.
5/4/2011(San Jose Argentina)Announces Work Resumption at San Jose Mine
3/13/2011(San Jose Argentina)Announces Outstanding 2010 Exploration Drill Results at the ...
10/5/2009(San Jose Argentina) Production Has Resumed At TheSan Jos=E9 Mine
10/2/2009(Los Azules Argentina)Provides Confirmation of its 100% Earn-In on the Los Azules ...
6/6/2009(San Jose Argentina) Announces completion of NI 43-101 Technical report on the J...
6/6/2009(Los Azules Argentina) Announces delivery of Earn-in notice under option agreement...
1/16/2009(San Jose Argentina)ANNOUNCES INCREASE IN FORECAST PRODUCTION AT THE SAN JOSE GO...
1/10/2009(San Jose Argentina)Announces Remaining Results From 2008 San Jose Drilling
9/25/2008(Los Azules Argentina)ANNOUNCES EXCELLENT METALLURGICAL TESTING RESULTS FOR LOS AZ...
9/8/2008(Los Azules Argentina)announces a mineral resource estimate of 922 million tonnes ...
8/13/2008(San Jose Argentina)REPORTS SAN JOSE PRODUCTION CASH COSTS AT $322/oz GOLD AND $...
6/27/2008(Los Azules Argentina)Exploration Program Increases The Size Of The Los Azules Por...
4/16/2008(Los Azules Argentina)DRILLING CUTS 132 METERS (433FT) OF 1.11 PERCENT COPPER AT L...
3/28/2008(San Jose Argentina) PROVIDES SAN JOSE MINE UPDATE
3/12/2008(Los Azules Argentina)ANNOUNCES 113 METERS OF +1 PERCENT COPPER IN DRILLING AT LOS...
3/7/2008(San Jose Argentina)ANNOUNCES 1.69 OZ/TON GOLD AND 37 OZ/TON SILVER FROM SAN JOS...
12/11/2007(Los Azules Argentina) ANNOUNCES DRILLING COMMENCES AT LOS AZULES COPPER PROJECT
10/26/2007(San Jose Argentina) ENGAGES MACQUARIE BANK LIMITED FOR DEBT FINANCING FOR SAN J...
8/15/2007(San Jose Argentina)ANNOUNCES PROGRESS AND PLANS AT SAN JOSE MINE
5/31/2007(Los Azules Argentina)drills significant copper at Los Azules Project, Argentina
Corporate news of Minera Andes Inc
3/22/2012Files Annual 2011 Financial Statements and MD&A and Project ...
1/18/2012Announces Fourth Quarter and Full Year 2011 San Jose Mine Pr...
1/13/2012(Los Azules Argentina).: Response to TNR Gold Corp. News Release Regarding Los Azu...
12/21/2011Rob McEwen Letter to Shareholders of US Gold and Minera Ande...
10/3/2011(San Jose Argentina)Announces Full Repayment of Loans From San Jose Mine
9/22/2011US Gold and Minera Andes Enter Into Arrangement Agreement to...
7/20/2011Announces Second Quarter 2011 San Jose Mine Production
4/20/2011Announces First Quarter 2011 San Jose Mine Production
2/7/2011' Treasury Increases by $19 Million
1/24/2011Reminds Warrant Holders of Accelerated Expiry on January 31,...
7/3/2009'AGM Presentation On Video
2/23/2009Rob McEwen becomes Executive Chairman of Minera Andes - Two ...
2/6/2009Announces Results Of Preliminary Assessment At Los Azules Co...
10/1/2008Recent Media Coverage on Minera Andes Inc.
9/2/2008ANNOUNCES 2.05 OZ/TON GOLD AND 37 OZ/TON SILVER FROM ONGOING...
8/6/2008ADDS ROB MCEWEN AND OTHER MINING INDUSTRY EXECUTIVES TO ITS ...
7/30/2008Welcomes Lundin Mining Executive To Board
12/22/2007ANNOUNCES 1st CLOSING ON FINANCING
12/19/2007 ANNOUNCES PROPOSED FINANCING
11/27/2007 ANNOUNCES THE SAN JOSE MINE INCREASES SILVER AND GOLD MINE...
11/15/2007SIGNS DEFINITIVE AGREEMENT AT LOS AZULES COPPER PROJECT WITH...
11/9/2007 ANNOUNCES SAN JOSE UPDATE
10/12/2007SAN JOSE PROJECT DRILLING HITS 3.22 OUNCES PER TON GOLD AND ...
9/18/2007ANNOUNCES THE SAN JOSE MINE INCREASES SILVER AND GOLD RESOUR...
9/6/2007SAN JOSE PROJECT DRILLING HITS 1.86 OUNCES PER TON GOLD AND ...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (MAI.TO)OTC BB (MNEAF.OB)
2.58-2.64%2.54-3.05%
Last quotes and information before delisting
Prev close Open
2.65 2.71
Low High
2.48 2.73
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  2.58 -%
Volume 1 month var.
2,733,962 -%
Produces
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 9/7/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.22+1.63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48-1.59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.84-1.31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.85-2.63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.83+0.78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :