In the same category
Copper Fox Reports 2012 Annual Financial Results
Published : February 14, 2013
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Copper Fox Reports 2012 Annual Financial Results

VANCOUVER, Feb. 14, 2013 /CNW/ - Copper Fox Metals Inc. ("Copper Fox" or the "Company") (TSX-V: CUU) is pleased to announce its operating results for the 2012 year-end.  During the year, the Company completed an updated resource estimate, an exploration program and continued the environmental assessment application process on the Schaft Creek deposit. Discussions were undertaken with BC Hydro in an effort to secure a source of electrical power for the Schaft Creek project and the Company made several property acquisitions in British Columbia and Arizona.  Subsequent to year end, the Company announced the results of a positive feasibility study and the filing thereof on www.sedar.com.

Copies of the financial statements and notes and related management discussion and analysis may be obtained on SEDAR at www.sedar.com, the Company web site at www.copperfoxmetals.com or by contacting the Company directly.  All amounts are in Canadian dollars unless otherwise stated.

Highlights

Resource Estimate
In May 2012, Tetra Tech Wardrop ('Tetra Tech') completed the Updated Resource Estimate for the Schaft Creek deposit including the Paramount and Liard zones.  For a more detailed review of the Updated Resource Estimate, please see Copper Fox's news release dated May 31, 2012.

Feasibility Study
Subsequent to the year ended October 31, 2012, the Company announced the results of a positive Feasibility Study on the Schaft Creek project in December 2012, and subsequently filed on www.sedar.com in February 2013.

The first step in determining mineral reserves is to use only the Measured and Indicated resources in combination with certain input parameters and the Whittle Mine Optimization software program to generate a considerable number (in the order of 40-50 runs) of proposed pit shells.  From the 40-50 runs, mining engineers select the pit shell with the most attractive economics and then commence to develop the actual proposed mine plan to be used in the Feasibility Study.  Invariably, the process of establishing reserves normally leaves a considerable portion of the Measured and Indicated mineral resources outside the pit shell.  This process in general explains the significant difference between the mineral resources and the mineral reserves estimated for the Schaft Creek project.  If at a later date, the remaining resources in the Schaft Creek deposit not initially classified as reserves at the time of the feasibility study, can be deemed economically viable they would be included into the reserve category, thus extending mine life. 

The feasibility study was based on an open pit mine with a nominal 130,000 tonne per day ('tpd') milling capacity over a 21 year mine life representing a 30% increase from that proposed in the Preliminary Feasibility Study prepared in September 2008, with only a 20% increase in the estimated Capex.

Highlights of the Feasibility Study (all amounts are stated in Canadian dollars):

  • Nominal 130,000 tpd open pit mine feeding a concentrator with two Semi Autogenous Grinding ('SAG') mills;
  • Initial Capital Cost ('Capex') totals $3.256 billion, which includes contingencies of $374 million;
  • Sustaining Capex totals $1.240 billion over the proposed mine life, including $200 million for BC Hydro tariff;
  • Life-of-Mine ('LOM') metal production contained in concentrates totals 4.88 billion pounds ('lbs') of copper, 4.21 million ounces ('oz.') of gold, 214.92 million lbs of molybdenum and 25.10 million oz. of silver;
  • 5 years pre-production period followed with a productive mine life of 21 years;
  • Proven and Probable Mineral Reserves total 940.8 million tonnes containing 5.6 billion lbs of copper; 5.7 million oz. of gold 363.5 million lbs of molybdenum and 51.7 million oz. of silver on the basis of drill data up to May 23, 2012;
  • Within the pit shell there is a total of 171.16 million tonnes of inferred resource grading 0.25% copper, 0.018% molybdenum, 0.164 grams per tonne ('gpt') gold and 1.58 gpt silver which for purposes of this study must be treated as waste rock;
  • LOM average mill feed grades 0.271% copper, 0.191 gpt gold, 1.716 gpt silver, 0.018% molybdenum and a copper equivalent ('CuEq') of 0.441%.  The CuEq is back calculated based on how much in situ copper is required to provide the same after recovery value to equal the combined metals value after recovery.  The formula is:  CuEq = NSR / (CURec*NSPcu*22.046) NSR=RecCU*Cu grade*NSPcu*22.046+RecMO*Mo grade*NSPmo*22.046+RecAU* Au grade*NSPau+RecAG*AG grade*NSPag , where "Rec" is the recovery based on the recovery formula and grade is in situ with no loss or dilution applied.

Based on recommendations in the Feasibility Study the Company is currently considering programs to enhance the economics of Schaft Creek including:

i)     a Diamond drilling program at Schaft Creek to upgrade the 171.16 million tonnes of Inferred resource, that lie within the pit shell, to a Measured or Indicated Resource; and
ii)     additional metallurgical testwork to increase metal recoveries and reduce processing costs.

2012 Exploration Program
The 2012 exploration program was designed specifically to avoid any work (Diamond drilling, metallurgical test work, etc.) on the Schaft Creek deposit which if successful would have dictated a suspension to update that portion of the Feasibility Study.  The objective of the 2012 exploration program was to test the mineral potential of the Schaft Creek Mineral Trend to host additional copper deposits.  This trend is located on the west side of Mount LaCasse and extends for a distance of approximately 7 kilometres north of the Schaft Creek deposit.  The drilling on the Discovery zone intersected broad intervals of significant copper-gold-silver mineralization that shows a strong correlation to the chargeability signature, a similar relationship to that seen at the Schaft Creek deposit. A considerable amount of Diamond drilling would be required on the Discovery zone to establish the significance of this discovery in terms or dimensions and average grade.  Mapping and sampling over a 6 kilometer long area from the south end of the ES zone to the north end of the GK zone located a significant number of outcrops and boulders that contain copper oxide and copper sulphide minerals.

Bell Copper
During the year, the Company announced that it had entered into a binding offer to purchase from Bell Copper Corporation ('Bell') 100% of Bell's interests in the Van Dyke copper deposit and the adjacent Van Dyke BLM lode claims located in Miami, Arizona and the Sombrero Butte property located near Mammoth, Arizona by paying to Bell CDN $2,000,000 in cash and assumption of Bell's continuing obligations in respect of the properties.

The Company completed the acquisition of the Sombrero Butte property and the Van Dyke BLM Claims for the purchase price of CDN $1.0 million.

The acquisition of Bell's additional interests in the Van Dyke copper deposit is pending subject to Bell completing the acquisition pursuant to the terms of the purchase and sale and royalty agreement.  For more details please refer to Copper Fox's news release of July 9, 2012.

Land Acquisitions
During and subsequent to the year ended October 31, 2012; the Company acquired 89 mineral tenures (21,504.47 hectares) located around and contiguous to the Schaft Creek project.

Subsequent to year end, Copper Fox located (staked) an additional 22 mineral lode claims contiguous to the Sombrero Butte project to protect the extension of the mineralized breccia pipes previously explored by Bell.  The Sombrero Butte project now consists of 60 lode claims and covers 3,342 acres.

Selected Financial Information

               
    Net Loss       Net (loss)/income per share -
basic and diluted
 
2012              
Fourth Quarter $                               (812,324)     $                                        0.00  
Third Quarter $                            (1,328,328)     $                                        0.00  
Second Quarter $                               (514,292)     $                                        0.00  
First Quarter $                               (554,254)     $                                        0.00  
2011              
Fourth Quarter $                            (1,018,883)     $                                      (0.01)  
Third Quarter $                               (504,862)     $                                        0.00  
Second Quarter $                            (2,380,574)     $                                      (0.01)  
First Quarter $                               (726,833)     $                                        0.00


Liquidity and Capital Resources
Copper Fox operates in a capital intensive industry in which the demands for capital to finance exploration and development of its Schaft Creek property as well as corporate overheads generally occur far in advance of the project being put into production and generating cash flow.  The financial requirements of Copper Fox related to the potential development of the Schaft Creek project are mitigated to some extent by the obligations of Teck should they exercise their earn back right on the Schaft Creek property.

The Company's working capital was $5,139,258 at October 31, 2012 inclusive of an increase to prepaid expenses and deposits relating to an agreement on the Schaft Creek property and an increase in accounts receivable with respect to a tax credit claimed.

During the year ended October 31, 2012, the Company raised a total of $17,548,125 from the completion of private placements totaling $17,205,000, 725,000 options exercised for total proceeds of $248,000 and 126,833 warrants for total proceeds of $95,125.  In addition, the Company issued 1,272,727 common shares for repayment of a loan of $1,400,000.  Additional funds will be required to complete the current planned activities and the Company may need to issue additional equity in connection with any development of the project (Refer to Teck Earn Back Option).

Copies of the financial statements and notes and related management discussion and analysis may be obtained on SEDAR at www.sedar.com, our Company web site at www.copperfoxmetals.com or by contacting the Company directly.  All amounts are in Canadian dollars unless otherwise stated.

About Copper Fox
Copper Fox is a Canadian-based resource development company listed on the TSX Venture Exchange (TSX-V: CUU) with a corporate office in Calgary, Alberta and an operations office in Vancouver, British Columbia.  Its major asset is the Schaft Creek copper, gold, molybdenum and silver deposit located in northwestern British Columbia, Canada for which a positive Feasibility Study was recently completed and filed on www.sedar.com.

Copper Fox holds title and a 100% working interest in the Schaft Creek project consisting of 56,267.54 hectares (139,040 acres). Included in this total are the "Schedule A" mineral tenures originally conveyed to Copper Fox pursuant to the Teck Option Agreement, which consist of 8,334.34 hectares (20,594 acres). The "Schedule A" mineral tenures are subject to a 3.5% Net Profits Interest held by Royal Gold, Inc., a 30% carried Net Proceeds Interest held by Liard and, together with the additional mineral tenures  obtained by Copper Fox  within the "Area of Interest" provided for in the Teck Option Agreement, an earn back option held by Teck. On completion of the Feasibility Study, Copper Fox earns Teck's 78% interest in Liard. Teck's earn back option to acquire either, 20%, 40% or 75%, of Copper Fox's interest in the Schaft Creek Project is triggered upon delivery of a "Positive Bankable Feasibility Study" (as defined) to Teck after which they have 120 days to make a decision. Should Teck elect to exercise its option for 75%, Teck is required to fund subsequent property expenditures up to a total of 400% of those incurred by Copper Fox ($85.34 million to December 31, 2012) and use its best efforts to arrange for project financing, including the Copper Fox portion. For full details of the Teck earn back option please refer to the Company's website www.copperfoxmetals.com.

The remainder of Copper Fox's registered interests in mineral tenures in British Columbia total 47,933.19 hectares (118,445 acres). These interests have been acquired by Copper Fox through mineral tenure acquisitions and mineral tenure purchase agreements subsequent to Copper Fox entering into the Teck Option Agreement. Certain portions of these registered mineral tenures are subject to inclusion within the Schaft Creek Project pursuant to the terms of the "Area of Interest" provision of the Teck Option Agreement.

Additionally the Company holds, through wholly-owned subsidiaries, mineral tenures located in Pinal County, Arizona (the 'Sombrero Butte Copper Project') and in Miami, Arizona (the 'Van Dyke BLM Claims'). For further information on these mining projects please refer to the Company's web site at www.copperfoxmetals.com.

On behalf of the Board of Directors

Elmer B. Stewart
President and Chief Executive Officer

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Information

This news release contains "forward-looking information" within the meaning of the Canadian securities laws.  Forward-looking information is generally identifiable by use of the words "believes," "may," "plans," "will," "anticipates," "intends," "budgets", "could", "estimates", "expects", "forecasts", "projects" and similar expressions, and the negative of such expressions.  Forward-looking information in this news release includes statements about the results of a positive Feasibility Study for the Schaft Creek project; the technical and financial viability of a 130,000 tonne-per-day copper mining and processing operation at Schaft Creek; economic potential of the Schaft Creek mineral deposit; the existence and size of the mineral deposit at Schaft Creek; recommended future Diamond drilling programs; potential upgrade of inferred resource currently treated as waste to either measured or indicated mineral resources; the productive mine life of the Schaft Creek project; average annual copper production in concentrates; initial and sustaining capital costs; LOM site operating cash costs and copper production costs; potential expansion and development of the project; opportunities to lower operating and capital costs and increase capital revenue; the length and scope of work for the pre-production period; additional metallurgical testwork to pursue opportunities to increase metal recoveries and reduce processing costs; use of new floatation technology which could ultimately reduce construction and capital costs while at the same time reducing operating costs; timing and amount of estimated future production; a Province of British Columbia Environmental Assessment Application and a Federal Environmental Impact Statement; a British Columbia Environmental Assessment Certificate and Federal environmental approvals; the construction of the NTL and timing thereof; discussions with BC Hydro on the terms and conditions surrounding participation and purchasing of electrical power from the NTL; the development schedule for the project; additional exploration to the east and north of the Paramount zone and north of the Liard zone; the process and expectations for metal recovery; estimated metal production over the life of the mine; estimated LOM average metal content, impurity element levels and, as applicable, moisture content; design, construction and capacity of a tailings storage facility; estimated capital costs; life of mine copper production total and cash costs per produced pound; projected future metal prices; the delivery of the Positive Bankable Feasibility Study and Feasibility Notice to Teck; the commencement of the 120 day period for which Teck may exercise its Back-in Right under the Teck Option Agreement; the aggregate incurred Expenditures; the Option to acquire the Indirect Holdings in Liard Copper Mines; the activity related to the Schaft Creek project during the 120 day period; establishment of work programs; the quantum and quality of porphyry style copper-gold-silver-molybdenum deposits at the Schaft Creek property; the potential to find additional porphyry style copper deposits within the Schaft Creek property; the acquisition of Bell Copper's Sombrero Butte property in Arizona and the pending acquisition of Bell Copper's Van Dyke property in Arizona; ongoing obligations of Copper Fox in connection with the Van Dyke and Sombrero Butte acquisitions; expected capital requirements to continue planned activities; expected sources and the adequacy of required capital resources; the timing and scope of expected Diamond drilling; potential existence and size of mineralization within the Schaft Creek project; estimated timing and amounts of future expenditures and "earn-back" options; geological interpretations and potential mineral recovery processes. Information concerning measured mineral resources, indicated mineral resources and inferred mineral resources also may be deemed to be forward-looking information in that it reflects a prediction of the mineralization that would be encountered if a mineral deposit were developed and mined.

In connection with the forward-looking information contained in this news release, Copper Fox has made numerous assumptions, regarding, among other things: the economic models for the Schaft Creek project, including the NPV and ROV models; the calculation of estimate capital costs of the project; costs of production; success of mining operations; projected future metal prices; engineering, procurement and construction timing and costs; the timing and obtaining of permitting and approvals; the due delivery of the positive Feasibility Study to Teck pursuant to the Teck Option Agreement; the acceptance by Teck of the positive Feasibility Study as a "Positive Bankable Feasibility Study" as defined in the Teck Option Agreement; the commencement of the 120 day period for Teck to exercise its earn back rights; that Expenditures have been incurred in accordance with the Teck Option Agreement and in Company's expected quantumthe potential mineralization in the Schaft Creek deposit; the geological, metallurgical, engineering, financial and economic advice that Copper Fox has received is reliable, and is based upon practices and methodologies which are consistent with industry standards; and the continued financing of Copper Fox's operations. While Copper Fox considers these assumptions to be reasonable, these assumptions are inherently subject to significant uncertainties and contingencies.  Additionally, there are known and unknown risk factors which could cause Copper Fox's actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information contained herein.  Known risk factors include, among others: the results of the positive Feasibility Study may not lead to the development of a mine at Schaft Creek or commercial mining operations; the project development plans and timing for Schaft Creek as outlined in the Feasibility Study may not occur as currently anticipated, or at all; Teck may not accept that the delivery of the positive Feasibility Study constitutes delivery of a "Positive Bankable Feasibility Study" as defined pursuant to the terms of the Teck Option Agreement; the 120 day period that Teck has to exercise its earn back rights may not have commenced; the "Expenditures" may not constitute Expenditures as defined in the Teck Option Agreement in the quantum anticipated by Copper Fox, or at all; inferred resources, currently treated as waste, may never be upgraded to a high category of resource; uncertainty of estimates of capital and operating costs, recovery rates, production estimates and estimated economic return; uncertainties related to the estimated mine life and potential extension thereof; the possibility of delays and cost overruns in engineering, procurement and construction of the project and uncertainty of meeting anticipated project milestones; the Environmental Assessment Application and Federal Environmental Impact Statement may not be completed timely manner, or at all, or provincial or federal environmental approvals may not be obtained in a timely manner, or at all; the possibility that future obligations with respect to the Van Dyke and Sombrero Butte properties may not be met on a timely basis,  or at all; Copper Fox may not proceed or continue with activity on the Schaft Creek project as currently planned; additional metallurgical testwork may not be completed, nor result in increased metal recoveries; further exploration at Schaft Creek may not occur as currently anticipated, or at all; the actual mineralization in the Schaft Creek deposit may not be as favourable as suggested; another deposit may never be discovered on Copper Fox's property, or contain anticipated mineralization, or mineralization of any significance at all; the possibility that future drilling on the Schaft Creek project may not occur on a timely basis, or at all; fluctuations in metal prices and currency exchange rates; conditions in the financial markets and overall economy may continue to deteriorate; uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of the metallurgical testwork; the uncertainty of the estimates of capital and operating costs, recovery rates, and estimated economic return; the need to obtain additional financing and uncertainty as to the availability and terms of future financing; the possibility of delay in exploration or development programs or in construction projects and uncertainty of meeting anticipated program milestones; uncertainty as to timely availability of permits and other governmental approvals.

A more complete discussion of the risks and uncertainties facing Copper Fox is disclosed in Copper Fox's continuous disclosure filings with Canadian securities regulatory authorities at www.sedar.com.  All forward-looking information herein is qualified in its entirety by this cautionary statement, and Copper Fox disclaims any obligation to revise or update any such forward-looking information or to publicly announce the result of any revisions to any of the forward-looking information contained herein to reflect future results, events or developments, except as required by law.

 

SOURCE: Copper Fox Metals Inc.

For further information:

Investor line 1-866-913-1910 or J. Michael Smith, EVP, at 1-604-689-5080.

Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Copper Fox Metals Inc.

DEVELOPMENT STAGE
CODE : CUU.V
ISIN : CA21749Q1046
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Copper Fox is a copper development stage company based in Canada.

Copper Fox develops copper, gold, molybdenum and silver in Canada.

Its main asset in development is SCHAFT CREEK in Canada.

Copper Fox is listed in Canada. Its market capitalisation is CA$ 104.8 millions as of today (US$ 76.4 millions, € 71.4 millions).

Its stock quote reached its highest recent level on April 21, 2011 at CA$ 2.63, and its lowest recent point on March 13, 2020 at CA$ 0.01.

Copper Fox has 427 809 984 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Copper Fox Metals Inc.
2007 Annual report
2006 Annual report
Financings of Copper Fox Metals Inc.
7/1/2016Announces Closing of the Second placement
4/8/2013Announces Closing of a $2,653,000 Financing
2/22/2013announces a $2,500,000 Private Placement Unit Offering, insi...
1/22/2013ANNOUNCES the Closing of a $1,500,000 Financing by an Inside...
1/16/2013Announces a $1,500,000 Private Placement Unit Offering, Insi...
1/16/2013Announces a $1,500,000 Private Placement Unit Offering, Insi...
10/24/2012ANNOUNCES the Closing of a $2,500,000 Financing by an Inside...
9/14/2012Announces the Closing of a $4,025,000 Financing by an Inside...
7/23/2012ANNOUNCES a $4,025,000 Private Placement Unit Offering, Insi...
6/18/2012Announces A $4,480,000 Private Placement Unit Offering Insid...
1/30/2012Announces The Closing Of $2,200,000 Financing By An Insider
1/19/2012Announces a $2,200,000 Private Placement Unit Offering Insid...
12/14/2011Announces the Closing of $4,000,000 Financing by an Insider
12/7/2011Announces Increase of $2,000,000 to previously announced Pri...
10/5/2011Announces the Closing of $5,000,000 Financing by an Insider
9/13/2011Announces an Additional $2,000,000 Private Placement Unit Of...
9/8/2011announces a $3,000,000 Private Placement Unit Offering. Ins...
3/31/2011ANNOUNCES THE ACCELERATION TERM TO BE APPLIED TO THE EXPIRY ...
3/17/2011CLOSING OF A $3,750,000 NON BROKERED PRIVATE PLACEMENT FLOW-...
2/17/2011Announces a $3,750,000 Non Brokered Private Placement Flow-T...
10/22/2009closing of a $2,000,000 Private Placement Unit Offering
9/28/2009$2,000,000 Private Placement
6/23/2009Provides Update on its $6,000,000 Private Placement
6/19/2009 Updates on its $6,000,000 private placement
6/2/2009announces a $6,000,000 non-brokered Private Placement of whi...
12/16/2008Announces the Withdrawal of a Private Placement Financing
11/7/2008ANNOUNCES PRIVATE PLACEMENT FINANCING
11/7/2008Announces Private Placement Financing
5/15/2008closes Non Brokered Private Placement Financing of $12,398,2...
7/17/2007to raise $10,000,000 in flow-through and non-flow-through fu...
7/17/2007Intends to offer a brokered private placement
Option Grants of Copper Fox Metals Inc.
4/30/2012Announces Incentive Stock Option Grants
3/14/2011Grant of 1,700,000 shares at $ 1,69 par share
6/26/2008grant of incentive stock options to Employees, Officers, Con...
Nominations of Copper Fox Metals Inc.
5/3/2011ANNOUNCES RESIGNATION OF CFO, APPOINTMENT OF AN INTERIM CFO
7/16/2009Announces Executive Changes and the Appointment of a Directo...
9/17/2007Announces the appointment of Shane Uren as Vice President
Financials of Copper Fox Metals Inc.
9/22/2016Announces 2016 Third Quarter Financial Results
3/31/2016Announces 2016 First Quarter Financial Results
9/29/2015Announces Third Quarter Results
9/28/2013Announces Third Quarter Results
6/24/2013Announces Second Quarter Results
9/27/2012Announces Third Quarter Results
6/18/2012Announces Second Quarter Results
4/25/2012Announces First Quarter Results
2/29/2012Reports 2011 Annual Financial Results and a Corporate Update
9/29/2011Reports 2011 Third Quarter Financial Results and a Corporate...
6/30/2011Advances Feasibility Study and Reports 2011 Second Quarter F...
3/31/2011Announces First Quarter 2011 Highlights and Financial Result...
2/16/2011Announces Fourth Quarter Highlights and 2010 Year-End Financ...
2/25/2010Announces 2009 Year-End Financial Results
3/6/20092008 Year-end Financial Results
6/4/2008Second Quarter Results Three and Six Months Ended April 30, ...
6/3/2008Second Quarter Results
3/31/2008First Quarter Financials
3/27/2008First Quarter Results Three Months Ended January 31, 2008
2/11/20082007 Year-End Financial Results
9/24/2007Announces third quarter results
3/28/2007announces its first quarter results for the three months en...
Project news of Copper Fox Metals Inc.
1/9/2014Outlines 2014 Diamond Drilling Plans for Van Dyke Copper Pro...
11/19/2013Sampling Locates Two Large Areas Of Porphyry Style Copper-M...
4/12/2013Acquires Van Dyke Copper Deposit in Arizona
3/25/2013(Schaft Creek)Enters Into Facilities Study Agreement with BC Hydro for Sch...
2/4/2013(Schaft Creek)Files Positive Feasibility Study on Schaft Creek Project
9/10/2012Completes Acquisition Of Sombrero Butte Copper Project And V...
7/9/2012To Acquire From Bell Copper The Van Dyke Copper Deposit And ...
5/31/2012(Schaft Creek)Schaft Creek Resource Estimate Update
5/24/2012(Schaft Creek)Provides Update on Schaft Creek Project
5/10/2012(Schaft Creek)Announces 2012 Exploration Program And Acquires Additional M...
3/27/2012(Schaft Creek)Completes Land Acquisitions Covering Positive Magnetic Linea...
3/19/2012(Schaft Creek)s Activities on the Schaft Creek-Copper-Gold-Molybdenum-Silv...
2/3/2012(Schaft Creek)Announces Drilling Intersect of 0.96% CuEq Over 110m and Rep...
12/12/2011Drilling Expands Paramount Zone with Intersection of 1.10% C...
10/13/2011(Schaft Creek)Secures Shipping Facilities for Concentrate at Port of Stewa...
9/23/2011(Schaft Creek)Extends Mineralized Zone to the East And Completes Strategic...
9/6/2011Welcomes the Awarding of the Construction Contract for the N...
7/26/2011(Schaft Creek)Drilling Intersects 1.18% Copper Equivalent Over 161M at Sch...
5/31/2011(Schaft Creek)Commences 2011 Drilling Program, Updates Other Activities ...
5/10/2011(Schaft Creek)Welcomes the Federal Government of Canada's Approval of the ...
5/6/2011(Schaft Creek)Provides Update on 2011 Plans for Schaft Creek, Diamond Dril...
5/5/2011(Schaft Creek)FOX PROVIDES UPDATE ON 2011 PLANS FOR SCHAFT CREEK, DIAMOND ...
3/24/2011(Schaft Creek)Announces Strategic Acquisitions to Enlarge Schaft Creek Pro...
2/28/2011(Schaft Creek)Copper Fox Metals Applauds the Announcement of the Province ...
2/23/2011(Schaft Creek)DDH CF405 Tests Chargeability Anomaly And Expands Zone Of De...
2/14/2011(Schaft Creek)News Release
2/3/2011(Schaft Creek)Latest Assay Results Expands Zone of Deep, Higher Grade Mine...
6/18/2010files an amended Preliminary Feasibility Study on SEDAR
4/1/2010s Status of Feasibility Study and Reports 2010 First Quarter...
1/21/2010(Schaft Creek)Awards Feasibility Study On Schaft Creek Project
11/18/2009(Schaft Creek)Geophysical Survey Outlines "8" IP Anomalies at Schaft Creek...
9/15/2008Positive Results of Preliminary Feasibility Study on Schaft ...
9/15/2008Announces Positive Results of Preliminary Feasibility Study ...
7/14/2008(Schaft Creek)Strategic Drilling Program and Greenfield Camp Expansion Hig...
6/26/2008(Schaft Creek)2007 Drilling And Geophysical Results All Show Increased Pot...
3/20/2008(Schaft Creek)Announces Schaft Creek progress
1/14/2008(Schaft Creek)Releases Positive Preliminary Economic Assessment on its Sch...
11/27/2007(Schaft Creek)continues development of its Schaft Creek British Columbia m...
10/22/2007(Schaft Creek)'Pit Optimization Study Demonstrates 65,000-tonne per-day Op...
7/10/2007(Schaft Creek)Updates 2007 Schaft Creek Work Program
7/4/2007(Schaft Creek)Significantly Increases Resources at Schaft Creek
Corporate news of Copper Fox Metals Inc.
6/29/2016Copper Fox Announces 2016 Second Quarter Financial Results
6/10/2016Copper Fox Announces a $1,000,000 Non-Brokered Private Place...
3/31/2016Copper Fox Announces 2016 First Quarter Financial Results
3/30/2016Copper Fox Annnounces 2016 Schaft Creek Program
1/25/2016Copper Fox Announces Mineral Mountain Copper Project in Ariz...
12/24/2015Copper Fox Files Van Dyke Technical Report on SEDAR
12/22/2015Copper Fox Announces $1,650,000 Non-Brokered Private Placeme...
11/6/2015Copper Fox Provides Update of Activities
9/29/2015Copper Fox Announces Third Quarter Results
9/25/2015Copper Fox Extends Size of Exploration Target on Sombrero Bu...
9/8/2015Copper Fox Reports Large Chargeablity Signature on Sombrero ...
7/28/2015Copper Fox Provides Update of Activities
7/13/2015Copper Fox Commences Titan-24 DCIP Survey at Sombrero Butte ...
4/15/2015Copper Fox Announces Preliminary Results of Metallurgical Te...
4/8/2015Copper Fox Announces Commencement of Preliminary Economic As...
3/31/2015Copper Fox Annnounces First Quarter Results
3/17/2015Copper Fox Annnounces 2015 Schaft Creek Program
3/13/2015Copper Fox Receives $3.63 Million Cash Refund
3/12/2015Copper Fox Extends Warrant Expiry Dates and Announces AGM Da...
2/27/2015Copper Fox Announces Annual Results
2/9/2015Copper Fox Updates Schaft Creek Project Activities
2/3/2015Copper Fox Files Van Dyke Technical Report on SEDAR
1/15/2015Copper Fox Completes Top-Up Investmentin Carmax Mining Corp.
12/24/2014Copper Fox Provides Corporate Update on Project Activities
12/19/2014Copper Fox Completes Inferred Mineral Resource Estimate for ...
12/3/2014Copper Fox Announces Preliminary In-Situ Leach Test Results ...
10/28/2014Copper Fox Announces Commencement of Resource Estimate at Va...
10/23/2014Copper Fox Announces Update on Schaft Creek Project
9/25/2014Copper Fox Completes Top-Up Investment in Carmax Mining Corp...
9/23/2014Copper Fox Announces Third Quarter Results
9/10/2014Copper Fox Announces Van Dyke Drill Results and Provides Oth...
8/7/2014Copper Fox Announces Van Dyke Drill Results and Provides Cor...
7/21/2014Copper Fox Completes Van Dyke Drilling Program and Provides ...
6/18/2014Copper Fox Announces Second Quarter Results
5/29/2014Copper Fox Closes Carmax Investment
5/23/2014Copper Fox Announces Carmax Shareholders Approve Private Pla...
5/15/2014Copper Fox Adds Second Drill to Van Dyke Project and Provide...
12/3/2013s Activities on Van Dyke Copper Deposit in Arizona
11/19/2013Sampling locates two large areas of porphyry style copper-mo...
8/30/2013announces a corporate reorganization
8/12/2013provides update on corporate activities
7/16/2013(Schaft Creek)And Teck Resources Form Schaft Creek Joint Venture
6/5/2013(Schaft Creek)provides update on discussions regarding Schaft Creek
2/7/2013(Schaft Creek)Completes Land Acquisitions at Schaft Creek & Sombrero Butte...
1/17/2013Announces Extension Of Expiry Date Of Certain Stock Options
10/17/2012(Schaft Creek)Reports Diamond Drill Results From the 2012 Drilling Program...
9/25/2012(Schaft Creek)Reports the Status of the Schaft Creek Feasibility Study and...
9/25/2012(Schaft Creek)Reports the Status of the Schaft Creek Feasibility Study and...
9/4/2012Drilling Indicates Widespread Mineralization in the Discover...
8/2/2012(Schaft Creek)Drilling Extends Mineralization In Discovery Zone And Acquir...
2/16/2012(Schaft Creek)Locates a New Zone of Copper Mineralization 1,200M North of ...
1/23/2012Announces The Issuance Of 1,272,727 Shares For Outstanding ...
1/13/2012Announces Shares For Debt Agreement
9/6/2011(Schaft Creek)Drilling Intersects 0.81% Copper Equivalent Over 154m at Sch...
7/11/2011(Schaft Creek)Measured and Indicated Resource Estimate Exceeds 1 Billion T...
6/21/2011(Schaft Creek)High Resolution Magnetic Survey at Schaft Creek Confirms Sim...
4/13/2011Announces Completion of 3D Model and Award of High-Resolutio...
4/13/2011ANNOUNCES COMPLETION OF 3D MODEL AND AWARD OF HIGH-RESOLUTIO...
6/17/2010June 17 2010 news release
6/1/2010June 1 2010 News release
2/2/2010Feb 2 2010 news release
1/21/2010Jan 21, 2010
10/23/2009New release attached
10/22/2009announces the closing of a $2,000,000 Private Placement Unit...
9/17/2009Applauds Federal Government’s Support for British Columbia N...
9/17/2009Applauds Federal Government's Support for British Columbia N...
7/13/2009Special Shareholders Meeting Approves a New control Person -...
7/13/2009July 13, 2009 News release
6/30/2009Three and Six Months Ended April 30, 2009
6/26/2009June 25, 2009 news release
3/3/2009Annual Financial
2/27/2009Feb 26, 2009 News release
2/27/2009Lions Gate Metals Inc. and Copper Fox Metals Inc. Announce B...
2/12/2009Correct News release
2/12/2009Feb 11 09 News release
2/12/2009provides an update of Corporate Activities
2/3/2009Highway 37 Power Line Coalition Applauds Premier for Express...
1/22/2009Cambridge House Invitation - Vancouver
12/18/2008December 17 2008 News release
12/18/2008Announces Resignation Of A Director
9/30/2008Sept 30/08
9/29/2008Applauds Advancement of Northwest Power Line
9/29/2008Applauds Advancement of Northwest Power Line
9/26/2008Northwest Power Line Could Create Thousands of Jobs, Attract...
9/17/2008Schaft not Galore says Copper Fox president
9/2/2008LV Hard Assets Conference Personalized Html
7/17/2008from the Ministry of Energy, Mines and Petroleum Resources r...
6/26/2008June 26 2008 Options
6/26/2008June 26, 2008
5/26/2008Register Today for a Discounted Rate to the New Orleans 2008...
4/4/2008Applauds Advancement of Northwest Power Line Study
3/31/2008$16mm offering
11/15/2007announces the renewal of the engagement of Jason Shepherd fo...
10/12/2007Announces is has earned a 70% Direct Interest in the World C...
10/2/2007$400 million to empower B.C.'s far northwest
8/8/2007Drilling to Commence at Copper Flats
7/12/2007Press Release: Augusta Files Plan of Operations for Rosemont...
7/3/2007 2nd Quarter Financials
6/11/2007announces its request for a trading halt
5/4/2007and the Tahltan Nation Development Corporation complete a "M...
4/22/2007Adopts a Shareholder Rights Plan.
2/27/2007Welcomes New Executive to the Team
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (CUU.V)
0.245-2.00%
TSX-V
CA$ 0.245
04/24 12:18 -0.010
-2%
Prev close Open
0.250 0.250
Low High
0.245 0.250
Year l/h YTD var.
0.160 -  0.250 6.52%
52 week l/h 52 week var.
0.150 -  0.300 -9.26%
Volume 1 month var.
14,494 36.11%
24hGold TrendPower© : 40
Produces
Develops Copper - Gold - Molybdenum - Silver
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 7/8/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202425.64%
202321.88%0.310.15
2022-36.00%0.320.13
2021-25.37%0.660.20
2020346.67%0.470.01
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.05-0.56%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+0.18%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.39-3.24%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.36+0.72%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.76-1.68%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.04-1.00%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :