Orsu metals corporation

Published : May 09th, 2008

Reports Additional Resources at Varvarinskoye Project

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

EPM.JPG

European Minerals Corporation


London, England, May 9, 2008

Trading Symbols EPM (TSX), EUM (London AIM)

 

Additional Resources
Varvarinskoye Update
5-Star CAT Rating



European Minerals Corporation ("EMC" or the "Company") is pleased to report an increase in the gold and copper resources at its Varvarinskoye gold/copper project in Kazakhstan and provide an update on progress at the mine.

Additional Resources


- Assay results from diamond drilling completed in the 2007 field season combined with historical data have enabled the Company to outline significant additional resources beneath the current pit design which is approximately 300 metres below ground surface.

- The Company's internally generated resource estimates were calculated under the definitions and guidelines specified in National Instrument 43-101 of the Canadian Securities Administrators ("NI 43-101") and utilized the key assumptions, parameters and methods used in the preparation of the resource estimates contained in the technical report dated November 2004 and amended March 2005 entitled "Varvarinskoye Gold-Copper Project � Northern Kazakhstan � Technical Report" prepared by MDM Ferroman (Pty) Limited and Mintec Inc. in accordance with NI 43-101 (which is available for review on the SEDAR database at
www.sedar.com) and on the same basis outlined in the 2007 estimated mineral resource previously reported (see the Company's press release dated January 15, 2007).

- The revised resource estimates increase the previously announced estimated measured and indicated mineral resources by approximately 26 million tonnes of ore (at 1.24 g/t gold, 0.32% copper*) containing approximately one million ounces of gold and 157 million lbs of copper, representing an increase of approximately 20% of the total estimated measured and indicated mineral resources tonnages and an increase of approximately 25% in contained gold and 35% in contained copper for the estimated measured and indicated mineral resources.
Appendix 1 provides a more detailed analysis of the additional mineral resource estimates and a table containing the previous estimate of measured and indicated mineral resources, as announced in January 2007 (Table 2).

* % copper based on HGCF only

Varvarinskoye Update

- Further positive progress has been made in bringing the plant to commercial production. During April, mechanical availability of the process equipment was about 93% with no unplanned shutdown of major equipment. Completion of commissioning and commencement of operating ramp up during a severe winter has been successfully achieved with no major impact on operations. Gold continues to be poured on a regular basis; six shipments have now been delivered to the Metalor refinery in Switzerland. The Company's subsidiary, JSC Varvarinskoye ("JSCV"), has approximately 4,000 tonnes of copper gold concentrate (18% copper and 22 g/t gold) bagged at its Tobol railhead, awaiting Russian Railway wagons to dispatch the concentrate to a smelter in May.

- Other highlights as of end of April:-

� JSCV has made adjustments to the crusher which has improved product size, alleviating downstream transfer restrictions to the grinding mills.

� The copper flotation circuit is operating at about 60% design throughput. Polysius, the mill manufacturer, will visit Varvarinskoye in mid May to advise on how to increase the throughput so that the milling circuit will meet its design specification.

� The direct gold milling and leach circuit reached 45% of design throughput in April. Plans are in place to continue ramp up in the next few months as the grinding ball charge is increased and design modifications to the mill discharge pump motors are completed.

� Water return to plant from tailings dam has been achieved following the spring thaw.

� The site evaluation visit by Ausenco Limited of Perth as part of a Scoping Study for a possible expansion of the Varvarinskoye plant was completed in April.


5-Star CAT Rating

- Borusan Makina Kazakhstan LLP ("BMK") operates the Maintenance and Repair Contract (MARC) on JSCV's mining fleet. BMK have informed EMC that the BMK Varvarinskoye maintenance workshop has been awarded a Caterpillar 5-Star rating for contamination control. Varvarinskoye is the first operational mine site in the CIS to achieve this 5-Star rating and rewards the combined efforts of the BMK and JSCV teams over the three years that the MARC has been operating.

- Ozg�r Gunuaydin, BMK's General Director in Kazakhstan, commented "the control of microscopic particulate contamination is very important in the successful operation of modern mining machinery such as Caterpillar. This can assist in avoiding unexpected shutdowns of equipment and reduces maintenance and operating costs."

Bert Kennedy President and CEO of EMC commented today:

�We continue to make good progress increasing our tonnage throughput in the Varvarinskoye process plant. A late spring has eventually arrived and the working conditions for our site team should improve. During a severe winter we have had no freezing of our water reticulation system and the delivery of our electrical power supply by our 70km line was continuous with no significant shutdowns despite temperatures dropping to minus 40o Centigrade with frequent blizzards. I cannot praise the dedication of our employees too highly in commissioning the plant through such a severe winter which other major regional mining companies have also noted adversely impacted on their operations. Metallurgical performance continues to be good and both process streams have been running steadily for the past six weeks. We are now regularly delivering gold dor� to Metalor in Switzerland and our first concentrates are ready to ship. Over the coming months we intend to complete our design modifications in the plant and ramp up to commercial production. We have always believed in the Varvarinskoye project and the announcement of the increase to the measured and indicated mineral resource estimates, although these are situated beneath the lowest elevation of the current pit design, further enhances the value of our ore body. We have also just commenced an independent study to investigate the possibility of increasing the total through put at Varvarinskoye beyond our feasibility design of 4.2 million tonnes of ore per year. Our management and employees have created a producing mine at Varvarinskoye from a green field site in less than 30 months. I believe this achievement ranks as highly as any in the world of mineral developments over the last few years�


Investor Information:

United Kingdom
Tony Williams
Chairman
or
Bert Kennedy
President & CEO

Tel: +44 (0) 20 7529 7508

North America
Keith Schaefer ir@vanguardsolutions.ca
Vanguard Shareholder Solutions Inc.
Tel: 1.866.448.0780


Qualified Person

Bert Kennedy, the Company's President and Chief Executive Officer, is the "qualified person" (as such term is defined in NI 43-101) responsible for all technical and scientific information in this press release.

Forward-Looking Statements


This press release contains or refers to forward-looking statements. All statements, other than statements of historical fact that address activities, events or developments that the Company believes, expects or anticipates will or may occur in the future are forward-looking statements. Such forward-looking statements include statements contained in this press release regarding estimates and/or assumptions in respect of mineral resources, future exploration, development and operational plans and objectives (including the possible expansion of the plant). These forward-looking statements reflect the current expectations or beliefs of the Company based on information currently available to the Company. Forward-looking statements are subject to a number of risks and uncertainties that may cause the actual results of the Company to differ materially from those discussed in the forward-looking statements, and even if such actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on the Company. Factors that could cause actual results or events to differ materially from current expectations include, but are not limited to: the grade and recovery of ore which is mined varying from estimates; capital and operating costs varying significantly from estimates; inflation; changes in exchange rates; fluctuations in commodity prices; delays in the commencement of full scale operations, the Company's Varvarinskoye Project caused by unavailability of equipment, labour or supplies, climatic conditions, delays in the delivery and installation of plant and equipment or otherwise; termination or suspension of the Company's debt facility; uncertainty of the outcome of any litigation; inability to delineate additional mineral resources; and other factors. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Although the Company believes that the assumptions inherent in the forward-looking statements are reasonable, forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

The mineral resource figures disclosed to in this press release are estimates and no assurances can be given that the indicated levels of minerals will be produced. Such estimates are expressions of judgment based on knowledge, mining experience, analysis of drilling results and industry practices. Valid estimates made at a given time may significantly change when new information becomes available. While the Company believes that the resource estimates disclosed in this press release are well established, by their nature resource estimates are imprecise and depend, to a certain extent, upon statistical inferences which may ultimately prove unreliable. If such estimates are inaccurate or are reduced in the future, this could have a material adverse impact on the Company.


Appendix 1

The key assumptions, parameters and methods used in the preparation of the following mineral resource estimates are detailed in the technical report dated November 2004 and amended March 2005 entitled "Varvarinskoye Gold-Copper Project � Northern Kazakhstan � Technical Report" prepared by MDM Ferroman (Pty) Limited and Mintec Inc. in accordance with NI 43-101 (which is available for review on the SEDAR database at www.sedar.com) and on the same basis outlined in the 2007 estimated mineral resource previously reported (see the Company's press release dated January 15, 2007). The effective date for the following mineral resource estimates is April 30, 2008.

Table 1: Additional Mineral Resources as at April 30, 2008

EPM
1.GIF


Table 2: Previously Published Mineral Resources as at December 15, 2006


EPM
2.GIF

Note:
HGCF is High Grade Copper Feed � flotation ore
HGCP is material stockpiled for treatment in the future
LGCF is Low Grade Copper Feed � Gold leach ore
LGCP is Low Grade Copper Feed � Gold leach ore from the weathering zone

















European Minerals
Vanguard Shareholder Solutions
Vanguard Shareholder Solutions (Vanguard) provides, for remuneration, corporate communications and investor relations services to the above mentioned client(s). The information contained in this email is based on existing disclosure documents or other publicly available information. You are encouraged to seek independent verification of any information that is important to your decisions. By responding to your inquiry neither Vanguard nor the above mentioned client(s) is offering securities or advising or soliciting the purchase or sale of securities.


Orsu metals corporation

EXPLORATION STAGE
CODE : OSU.TO
ISIN : VGG3192Y1007
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Orsu is a gold and copper development stage company based in United kingdom.

Orsu holds various exploration projects in Kazakhstan.

Its main exploration properties are TOKHTAZAN, TADYBULAK and TALAS in Kyrgyzstan and KARCHIGA in Kazakhstan.

Orsu is listed in Canada, in Germany, in United Kingdom and in United States of America. Its market capitalisation is CA$ 6.4 millions as of today (US$ 4.9 millions, € 4.6 millions).

Its stock quote reached its highest recent level on October 19, 2007 at CA$ 1.83, and its lowest recent point on March 04, 2016 at CA$ 0.01.

Orsu has 182 696 049 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Orsu metals corporation
2/5/2009investor presentation
Annual reports of Orsu metals corporation
Annual report 2007
Nominations of Orsu metals corporation
4/22/2013Extension of East Balkhash 2 Agreement and Appointment of Te...
5/2/2012Announces the Appointment of Mr Kevin Denham as CFO
5/1/2012Announces Appointment of New Chief Financial Officer and Upd...
7/8/2008Announces Board and Committee Appointments
6/24/2008Results of the AGM and Director Appointments
6/23/2008Director Appointment
Financials of Orsu metals corporation
5/21/2013Re-filing of 2012 Annual Financial Statements
1/11/2013Filing of Revised Interim Financial Reports
8/14/2012Interim Results for the Period Ended June 30, 2012 (Unaudite...
5/14/2012Interim Results for the Period Ended March 31, 2012 (Unaudit...
8/11/2011Releases Interim Results for the Period Ended June 30, 2011
8/11/2011Interim Results for the Six Months Ended June 30, 2011 (Unau...
6/2/2011Interim Results for the Three Months Ended March 31, 2011 (U...
Project news of Orsu metals corporation
4/7/2015(Tokhtazan)New Exclusivity Agreement for Potential Sale of Akdjol-Tokht...
8/20/2012(Karchiga)Announces Approval from the Kazakh Authorities for the Devel...
7/17/2012(Talas)Gold Fields to Buy Remaining 40% Interest in Orsu's Talas Pr...
5/25/2012(Talas)Provides Update on the Talas Project in the Kyrgyz Republic
3/29/2012(Karchiga)Filed Definitive Feasibility Study on SEDAR for the Karchiga...
3/19/2012Develops Copper Mine on Chinese Border
3/14/2012A Step Closer to Production
2/29/2012(Karchiga)Announces Positive Definitive Feasibility Study for the Karc...
12/21/2011Expands Copper Resource On Chinese Border
9/29/2011(Karchiga)Karchiga Definitive Feasibility Study Update-Results of 2011...
5/11/2011(Karchiga)Announces Updated Mineral Resources for its Karchiga Project
4/28/2011(Karchiga)Karchiga Metallurgy Testwork Results
4/12/2011(Karchiga)Increases its Share in Karchiga Project to 94.75 per cent an...
3/3/2011(Tadybulak)Builds Kyrgyzstan Asset
2/24/2011(Karchiga)Drill Results Confirm High Grade Single Lode At Karchiga
2/10/2011(Karchiga)Assay Results for 2010 Infill Drilling Programme on the Karc...
5/26/2010(Karchiga)Completion of Preliminary Assessment Study
5/25/2010(Karchiga)N 43-101 technical report
4/6/2010(Tokhtazan)Provides Update on Extension of Tokhtazan Project Licences
3/23/2010(Karchiga)Resource Calculations on both Taldybulak Gold Asset & Karchi...
2/23/2010(Talas)Gets Approval of Class Action Claim Settlement/ Announces Co...
11/18/2009(Talas)Provides Update on Mineral Exploration Projects
6/15/2009(Varvarinskoye Mine)Sale of Varvarinskoye Project
1/30/2009(Varvarinskoye Mine)Mineral Reserves and Resources at Varvarinskoye Mine
12/11/2008completes 6,334m infill diamond drilling at the Taldybulak c...
5/9/2008(Varvarinskoye Mine)Reports Additional Resources at Varvarinskoye Project
Corporate news of Orsu metals corporation
8/3/2016Orsu Metals Corporation Reports Its Unaudited Results for th...
8/2/2016Orsu Metals Corporation Announces Sale of its Akdjol-Tokhtaz...
6/24/20162016 Annual Shareholders’ Meeting
5/31/2016Notice of Annual and Special Meeting of Shareholders and Pos...
5/12/2016Orsu Metals Corporation Reports its Unaudited Results for th...
5/10/2016Orsu Metals Corporation Reminder on Cancellation of Admissio...
5/5/2016Orsu Metals Corporation Update on Conditional Sale of Karchi...
4/11/2016Orsu Metals Corporation Announces Conditional Sale of Karchi...
3/30/2016Orsu Metals Corporation Reports its Audited Annual Results f...
1/26/2016Orsu Metals Corporation Update on Akdjol-Tokhtazan Project
1/25/2016Orsu Metals Corporation: Update on Akdjol-Tokhtazan Project
1/6/2016Update on Exclusivity Agreement for Potential Sale of Akdjol...
1/4/2016Orsu Metals Corporation: Update on Exclusivity Agreement for...
9/3/2015Orsu Metals Corporation Announces Grant of Options
9/2/2015Orsu Metals Corporation: Grant of Options
8/12/2015Orsu Metals Corporation Reports Its Unaudited Results for th...
8/12/2015Orsu Metals Corporation results for the period ended June 30...
7/14/2015Notification of Holding in Company
7/13/2015Orsu Metals Corporation: Notification of Holding in Company
6/23/20152015 Annual Shareholders’ Meeting
6/22/2015Orsu Metals Corporation: 2015 Annual Shareholders' Meeting
4/21/2015Orsu Metals Corporation: Expiry of Options
4/7/2015Orsu Metals Corporation Announces a New Conditional Exclusiv...
4/7/2015Orsu Metals Corporation: New Exclusivity Agreement for Poten...
3/27/2015Orsu Metals Corporation Reports its Audited Annual Results f...
3/27/2015Orsu Metals Corporation annual results for the year ended De...
3/24/2015Orsu Metals Corporation Announces Lapse of Mandate with UniC...
3/23/2015Lapse of Mandate With UniCredit and Barclays
3/23/2015Orsu Metals Corporation: Lapse of Mandate With UniCredit and...
1/29/2015Orsu Metals Corporation Announces Change in Senior Managemen...
1/29/2015Orsu Metals Corporation: Change in Senior Management
12/18/2014Orsu Metals Corporation Announces Assay Results for the Kogo...
12/18/2014Orsu Metals Corporation: Assay Results for Kogodai Licence A...
11/17/2014IIROC Trading Halt - OSU
11/17/2014Orsu Metals Corporation: New Exclusivity Agreement for Poten...
11/17/2014IIROC Trade Resumption - OSU
11/13/2014Orsu Metals Corporation Results for the Quarter Ended Septem...
10/14/2014Orsu Metals Corporation: Update on Exclusivity Agreement for...
10/6/2014Orsu Metals Corporation: Update on Exclusivity Agreement for...
9/24/2014Orsu Metals Corporation: Suspension of Joint Exploration of ...
9/19/2014Orsu Metals Corporation: New Exclusivity Agreement for Poten...
8/13/2014Orsu Metals Corporation: Results for the Quarter Ended June ...
8/4/2014Orsu Metals Corporation: Grant of License to Explore the Kog...
7/7/2014Orsu Metals Corporation: Update on the Potential Sale of Akd...
7/7/2014Orsu Metals Corporation: Update on the Potential Sale of Akd...
7/3/2014Orsu Metals Corporation: Extension of Exclusive Agreement to...
7/3/2014Orsu Metals Corporation: Extension of Exclusive Agreement to...
1/10/2014(Tokhtazan)=3A New Exclusivity Agreement for Potential Sale of Akdjol=2...
9/20/2013Exclusive Agreement to Continue Joint Exploration of the Eas...
9/12/2013(Tokhtazan)New Exclusivity Agreement for Potential Sale of Akdjol-Tokht...
8/13/2013Results for the Quarter Ended June 30, 2013 (Unaudited)
7/24/2013Completion of the Gold Fields Subscription
6/28/2013Annual Shareholders' Meeting Statement
6/28/2013Annual Shareholders' Meeting Statement
6/5/2013Notice of Annual Meeting and Posting of Circular
5/15/2013Results for the Quarter Ended March 31, 2013
5/15/2013Results for the Quarter Ended March 31, 2013 (Unaudited)
3/27/2013Annual Results for the Year Ended December 31, 2012
11/12/2012Grant of Exclusive Right to Explore the East Balkhash 2 Lice...
11/1/2012(Tokhtazan)on Sale of Akdjol-Tokhtazan
7/31/2012Appoints Barclays and UniCredit to Arrange a Senior Debt Fac...
7/24/2012(Talas)Completion of the Sale of Talas to Gold Fields
7/17/2012(Talas)sells Talas to Gold Fields for $10-million (U.S.)
6/19/2012Corrective Announcement of Extension of Endeavour Agreement
6/19/2012Extension of Endeavour Agreement
5/30/2012Notice of Annual General Meeting and Posting of Circular
3/30/2012Annual results for the year ended December 31, 2011
3/5/2012Hits The Sweet Spot In Kazakhstan
3/2/2012(Karchiga)Karchiga Feasibility Lifts Orsu Metals
12/8/2011(Karchiga)Announces An Increased Mineral Resource for its Karchiga Pro...
12/8/2011As Part the Ongoing Definitive Feasibility Study, Orsu Annou...
9/21/2011Receives US$6.83 Mil in Cash for Deferred Consideration and ...
9/21/2011Receives US$6.83 Million in Cash in Early and Final Settleme...
9/1/2011Completes Infill Drilling Programme in Connection With Ongoi...
7/27/2011in Growth Stocks Weekly
7/25/2011Receives US$5.5 Mil In Early and Final Settlement of Deferre...
7/25/2011to Receive US$5.5 Million Cash in Early and Final Settlement...
7/18/2011Commences Infill Drilling Programme in Connection With Ongoi...
3/23/2011Holding(s) in Company
8/6/2010Kyrgyzstan Project Updates: James Winston
7/22/2010Confirms Copper Deposit in Kazakhstan
7/21/2010Provides Update on Mineral Exploration Projects in Kyrgyzsta...
5/27/2010James Winston on Orsu Metals
5/20/2010Enters into Agreement to Increase Share in Karchiga to 94.75...
5/18/2010Interim Results for the Period Ended March 31, 2010
4/23/2010Holding(s) in Company - Sprott Holds 7.2 per cent
2/4/2010Completion of 1st Phase
11/27/2009Agreement to Settle Class Action Claim
11/24/2009Completes Share Consolidation
10/14/2009Provides Update on Sale of Varvarinskoye Project
10/2/2009The Speculative Investor Updates Orsu Metals
9/14/2009Sale of Varvarinskoye Project
7/13/20092009 Annual and Special Meeting Statement
6/24/2009Notice of 2009 Annual and Special Meeting of Shareholders
1/27/2009Winston updates Orsu Metals
1/14/2009Varvarinskoye Update
1/8/2009Announces Update on Extension of Principal Payment Deadline
12/3/2008announces completion of joint venture agreement with Gold Fi...
11/21/2008Crisis or Opportunity?
11/13/2008Corp: Interim Results for the Period Ended 30 September 2008...
11/3/2008poised to evolve into major gold producer, says Roulston
9/26/2008announces update on Varvarinskoye and exploration projects, ...
9/19/2008Winston Updates Orsu Metals Corp
9/9/2008' Denver Gold Forum presentation is available online
9/5/2008Director Share Purchase
8/19/2008Interim Results for the Period Ended 30 June 2008
7/30/2008The Speculative Investor Updates Orsu Metals
7/14/2008European Minerals name change to Orsu; symbol change
7/10/2008Completes First Sale of Copper-Gold Concentrate from the Var...
6/27/2008 Announces the Issue of Shares Pursuant to Acquisition
3/31/2008Varvarinskoye Quarterly Update, Litigation Update, and Finan...
12/27/2007Achieves First Gold Pour on 22 December
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (OSU.TO)LSE (OSU.L)
0.035-12.50%1.25-10.71%
TORONTO
CA$ 0.035
01/31 15:27 -0.010
-12.5%
Prev close Open
0.040 0.035
Low High
0.035 0.035
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.035 -12.50%
Volume 1 month var.
202,000 -12.50%
24hGold TrendPower© : 44
Produces
Develops
Explores for Copper - Gold - Molybdenum
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/28/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :