Channel Resources Ltd.

Published : July 04th, 2012

Reports Final Drilling Results for Mankarga 5 Resource Estimate at Tan

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Marketwire
 
 
Channel Resources Ltd.
TSX VENTURE: CHU
Other Recent News | Printer Friendly Version

July 4, 2012
Channel Resources Reports Final Drilling Results for Mankarga 5 Resource Estimate at Tanlouka Gold Project, Burkina Faso
Highlights include 37.5 metres of 1.38 grams gold per tonne ("g/t Au") and 25.5 metres of 1.47 g/t Au
VANCOUVER, BRITISH COLUMBIA--(Marketwire - July 4, 2012) - Channel Resources Ltd. ("Channel" or the "Company") (TSX VENTURE:CHU) is pleased to report final assay results from its 15,400 metre core definition drilling program on the Mankarga 5 gold deposit at the Tanlouka Gold Project ("Tanlouka") in Burkina Faso, West Africa.

Results reported in this release are from infill holes along nominal 100 metre spaced lines targeting previously intersected mineralized structures.

The Mankarga 5 core-drilling program was completed in February of 2012, with over 15,400 metres in 71 holes drilled, assay results for all of which have now been reported. This program's results, together with those of 58 RC holes for 7,096 metres drilled previously on Mankarga 5 will form the basis of a maiden resource estimate for the deposit currently being prepared by AMEC Americas Ltd.

The drilling program has so far delineated a mineralized zone that is over two kilometres long and up to 300 metres wide on the northeast-trending Mankarga 5 structure. The main objectives of this program have been to provide a geological and structural context for the deposit, to further expand the zone and to support the deposit's maiden resource estimate. Mineralized zones are steeply dipping to the northwest, the majority extending from surface, and reported widths for all holes drilled at -50 degrees to azimuth 120 degrees (southeast) are believed to be in the range of 80-90% of true width. The deposit remains open along strike and to-depth, with mineralization encountered to a maximum vertical depth of approximately 260 metres in the current program.

Detailed results from the eight holes reported in this release are presented in order of their location on sevent sections on the Mankarga 5 grid in Appendix A to this release, and can be viewed on a drill hole location map presented on the Company's website at http://www.channelresources.ca/i/pdf/CHUmap070412.pdf. Mankarga 5 cross sections are also available for download at http://www.channelresources.ca/s/Tanlouka.asp. Please refer to Channel's drilling, sampling and assay reporting practices below the results tables for further information on how the results are reported.

Exploration of the Tanlouka Project Advancing Quickly

Channel's activities at the Tanlouka gold project are focused on both advancing the Mankarga 5 deposit as quickly as possible through to feasibility and development, and demonstrating the exploration potential of the Mankarga 5 deposit and the remainder of the permit. The Company expects to report on numerous work programs in the near future, including:

--  Metallurgical testing on oxidized and non-oxidized samples from the
    Mankarga 5 deposit; 
--  Maiden resource estimate for the Mankarga 5 deposit; 
--  2,000 metres of core drilling recently completed in the area of the
    Mankarga 1 target, to follow up on previous high-grade discovery holes
    drilled in 2010, and also to investigate possible mineralized continuity
    between Mankarga 5 and Mankarga 1; and, 
--  Soil sampling programs underway on the Manesse and Tanawaka target areas
    to the north of the Mankarga Zone on the 79 square kilometre Tanlouka
    permit.
 
Future drill programs and other exploration activities are being planned for Mankarga 5 and other targets on the Tanlouka project, based on the results of current programs and will be announced as the news becomes available.

Note re QA/QC Testing Procedures

Channel Resources Ltd. maintains a rigorous quality control program involving the use of duplicate samples and blanks and certified gold standards from an accredited Canadian laboratory in every batch of 20 samples. Core samples are assayed using standard fire assay techniques on a 50-gram charge with an atomic absorption finish by ACTLABS - Burkina Faso SARL, SGS Burkina Faso SA and Abilab Burkina SARL (ALS Laboratory Group) in Ouagadougou, Burkina Faso. RC samples discussed in this release were assayed using the same methods at Abilab Burkina SARL (ALS Laboratory Group) in Ouagadougou. The drilling program was supervised by John Adams P.Geo., a qualified person as defined by NI 43-101, who has reviewed the contents of this news release.

Some of the statements contained herein are forward-looking statements, which involve known and unknown risks and uncertainties. Without limitation, statements regarding potential mineralization and resources, exploration results, and future plans and objectives of the Company are forward looking statements that involve various degrees of risk. The following are important factors that could cause the Company's actual results to differ materially from those expressed or implied by such forward looking statements: changes in the price of minerals, general market conditions, risks inherent in mineral exploration, risks associated with development, construction and mining operations, the uncertainty of future profitability and the uncertainty of access to additional capital. The Company undertakes no obligation to update publicly or otherwise revise any forward-looking statements or the foregoing list of factors, whether as a result of new information or future events or otherwise. Further disclosure on risk factors is available in the Company's various corporate filings at www.sedar.com.

APPENDIX A - Significant Assay Results                                      
Presented in Order of Section Line from SW to NE                            
                                                                            
----------------------------------------------------------------------------
                                                                    Weighted
                                               Interval              Average
                                               (metres)   Intercept    Grade
Hole Number                                  From      To  (metres) (g/t Au)
----------------------------------------------------------------------------
                                                                            
Section 700 SW                                                              
----------------------------------------------------------------------------
Tan12-DD66                                   15.0    19.5       4.5     0.60
Hole length 202.0m                           42.0    46.5       4.5     0.55
-50 degrees/120 degrees azimuth              73.0   101.5      28.5     0.79
----------------------------------------------------------------------------
                                                                            
Section 400 SW                                                              
----------------------------------------------------------------------------
Tan11-DD50                                   89.0   117.5      28.5     1.21
Hole length 183.5m               includes    93.5    95.0       1.5     11.3
-50 degrees/120 degrees azimuth       and   114.5   116.0       1.5     4.24
----------------------------------------------------------------------------
                                                                            
Section 300 SW                                                              
----------------------------------------------------------------------------
Tan11-DD48                                   45.5    59.0      13.5     0.28
Hole length 180.5m                          111.5   123.5      12.0     0.73
-50 degrees/120 degrees azimuth             128.0   132.5       4.5     0.62
----------------------------------------------------------------------------
                                                                            
Section 200 SW                                                              
----------------------------------------------------------------------------
Tan11-DD46                                   18.5    23.0       4.5     0.64
Hole length 234.0m                           97.5   103.5       6.0     1.33
-50 degrees/120 degrees azimuth  includes   102.0   103.5       1.5     4.21
                                            145.5   151.5       6.0     1.09
                                            153.0   198.0      45.0     0.52
                                 includes   180.0   189.0       9.0     1.50
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Tan12-DD69                                   16.5    27.0      10.5     1.84
Hole length 180.0m               includes    21.0    22.5       1.5     7.77
-50 degrees/120 degrees azimuth              75.5   106.5      31.0     0.62
----------------------------------------------------------------------------
                                                                            
Section 150 NE                                                              
----------------------------------------------------------------------------
Tan11-DD38                                    1.5    58.0      56.5     0.58
Hole length 152.0m               includes    50.5    52.0       1.5     5.21
-50 degrees/120 degrees azimuth              59.5    71.5      12.0     0.22
                                             82.0    95.5      13.5     0.28
----------------------------------------------------------------------------
                                                                            
Section 450 NE                                                              
----------------------------------------------------------------------------
Tan11-DD39                                      0    54.5      54.5     0.53
Hole length 155.0m                           57.5    95.0      37.5     1.38
-50 degrees/120 degrees azimuth  includes    86.0    87.5       1.5     5.12
----------------------------------------------------------------------------
                                                                            
Section 550 NE                                                              
----------------------------------------------------------------------------
Tan12-DD41                                   13.5    24.0      10.5     0.37
Hole length 152.0m                           71.0    96.5      25.5     1.47
-50 degrees/120 degrees azimuth  includes    84.5    87.5       3.0     2.86
                                      and    90.5    95.0       4.5     3.07
----------------------------------------------------------------------------
 
Drilling, sampling and reporting practices:

--  All hole collars are set to dip at -50 degrees to their respective
    azimuths. 
--  Core holes are sampled geologically with a maximum sample interval of
    1.5 metres. 
--  "Mineralized rock" is defined as rock with a grade of over 0.10 g/t Au. 
--  "Significant assay results" is defined as samples, or series of
    consecutive samples, with grade thickness (i.e. weighted average gold
    grades multiplied by their intervals), of greater than 2.0. 
--  The amount of internal waste (i.e. with a grade of less than 0.10 g/t
    Au) included in a reported mineralized interval does not exceed 10%. 
--  No top cut has been applied to the individual grades before weighted
    average grades have been calculated. 
--  Unless otherwise stated, reported intersections are downhole lengths.
    True widths, other than as estimated on each section, shall be
    determined once geological modeling of the zone has been completed.
 
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

CONTACT INFORMATION:
Channel Resources Ltd.
Colin McAleenan
President & CEO
604.684.7098

or

Channel Resources Ltd.
Cyrus Ameli
Senior Vice President
604.684.7098
Fax: 604.684.7079
info@channelresources.ca
www.channelresources.ca
INDUSTRY: Manufacturing and Production - Mining and Metals

If you no longer want to receive announcements from us, please do not reply to this e-mail. Instead simply click .
Data and Statistics for these countries : Burkina Faso | All
Gold and Silver Prices for these countries : Burkina Faso | All

Channel Resources Ltd.

EXPLORATION STAGE
CODE : CHU.V
ISIN : CA15916P1053
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Channel Res. is a gold exploration company based in Canada.

Channel Res. holds various exploration projects in Burkina Faso, in Canada and in Ecuador.

Its main exploration properties are FOX CREEK and WEST BIENVILLE in Canada, TANLOUKA and NAOUBE in Burkina Faso and EL MOZO in Ecuador.

Channel Res. is listed in Canada. Its market capitalisation is CA$ 5.4 millions as of today (US$ 4.8 millions, € 3.5 millions).

Its stock quote reached its highest recent level on November 05, 2010 at CA$ 0.45, and its lowest recent point on August 09, 2013 at CA$ 0.01.

Channel Res. has 119 349 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Channel Resources Ltd.
5/7/2010Closes Private Placement Financing
2/10/2010Closes Private Placement Financing
1/29/2010Announces Non-Brokered Private Placement Financing
1/13/2010Announces Oversubscription of Private Placement
12/22/2009Conducts Partial Closing of Private Placement Financing
12/2/2009Announces Non-Brokered Private Placement Financing
12/11/2008Appoints IBK Capital Corp to Lead Private Placement Financin...
10/31/2007 Closes Final Tranche of Private Placement Financing
Option Grants of Channel Resources Ltd.
2/25/2011Grant of 500,000 options at $ 0,21 per share
3/25/2010Welcomes Dr. Richard Schutte to Board of Directors, Grants S...
11/10/2009Appoints Frank Crerie and Richard Schutte to Advisory Commit...
Nominations of Channel Resources Ltd.
6/27/2013Appoints Archie Nesbitt Non-Executive Chairman
1/24/2012Appoints Archibald J. Nesbitt, LLB as Director
2/25/2011Appoints Stephen Rea to Board of Directors
11/15/2007 Appoints Chief Financial Officer
Financials of Channel Resources Ltd.
5/28/2010Announces Change to Board of Directors and Filing of Second ...
8/27/2009Files Third Quarter Financial Statements, Extends Warrants
Project news of Channel Resources Ltd.
3/20/2013(Tanlouka)Ltd=2E: Tanlouka Gold Project Ready for Next Growth Cycle
7/12/2012Reports Positive Metallurgical Results for the Mankarga 5 De...
4/30/2012(Fox Creek)Earns 100% Interest in Fox Creek Mineral Brine Project & Fil...
3/5/2012(Tanlouka)Infill Drilling Continues to Define Mankarga 5 Zone at Tanlo...
2/9/2012(Tanlouka)Infill Drilling Continues to Define Mankarga 5 Zone at Tanlo...
1/11/2012(Tanlouka)Drilling Continues to Expand =?ISO-8859-1?Q?=20Mankarga=205=...
9/14/2011(Tanlouka)Results From Core Drilling Program On Mankarga 5 Deposit at ...
6/16/2011(Tanlouka)Commences 15,000 Metre Core Drilling Program at Tanlouka Gol...
5/17/2011(Tanlouka)to Commence 15,000 Metre Core Drilling Program at Tanlouka G...
4/27/2011(Tanlouka)Extends Mankarga 5 Strike Length to 1.85 Kilometres at Tanlo...
4/7/2011(Tanlouka)Reports Metallic Screen Assay Results From Tanlouka Gold Pro...
3/24/2011(Tanlouka)Mankarga 5 Gold Deposit Strike Length Now 1.5 Kilometres at ...
8/17/2010(Tanlouka)Makes New Gold Discovery at Tanlouka Project, Burkina Faso
10/7/2009(Fox Creek)Confirms Multi-Product Mineral Potential at Fox Creek Brine ...
8/17/2009(Fox Creek)Initiates Sampling Program at Fox Creek Lithium / Potash Bri...
2/24/2009(Fox Creek)Enters into Option Agreement to Acquire 100% of Fox Creek Li...
5/21/2008(West Bienville) Expands & Advances West Bienville Uranium Project, Complete...
4/23/2008(El Mozo)Defers Exploration Activities in Ecuador
2/29/2008(El Mozo) Reports on Mozo Project Drilling and Metallurgical Results
2/14/2008(Bombore)Initial Resource Estimate Issued for Bombore Gold Project, B...
12/14/2007(El Mozo)Completes Drilling at El Mozo, Discovers Radiometric Anomaly...
10/18/2007(El Mozo) Commences Drill Program at El Mozo Gold Project, Ecuador
Corporate news of Channel Resources Ltd.
9/26/2013and West African Resources Execute Definitive Agreement
4/25/2013Adopts Advance Notice Policy
8/31/2012Reports Drilling Results for Mankarga 1 and Mankarga 1-South...
7/19/2012(Tanlouka)Announces Maiden Resource Estimate for Tanlouka Gold Project...
7/4/2012Reports Final Drilling Results for Mankarga 5 Resource Estim...
5/23/2012Drilling Results Continue to Enhance Potential of Mankarga 5...
4/16/2012Mankarga 5 Drilling Results Reinforce Size and Growth Potent...
3/19/2012(Fox Creek)Announces Maiden Resource Estimate for Fox Creek Mineral Bri...
10/3/2011Announces Senior Management Appointments
6/3/2011(Tanlouka)Reports Drill Results & Geophysical Extensions to Mankarga 5...
5/6/2011Announces Closing of $7 Million Bought Deal Private Placemen...
4/8/2011Announces $5 Million Bought Deal Private Placement
7/14/2010Provides Operational Update
6/30/2010Announces Changes to Board of Directors
1/26/2010Adds Five New Lithium Brine Permits to Alberta Portfolio
12/23/2009Files Annual Financial Statements
1/23/2009Files Annual Financial Statements
11/12/2008Enters Into Letter of Intent for Option to Acquire Alberta L...
7/30/2008Update
1/21/2008 Issues Options, Files Annual Financial Statements
9/28/2007Advances El Mozo, Tanlouka and West Bienville Projects
9/10/2007FN Series drilling program confirms new zone of gold mineral...
9/4/2007 and Azimut Sign Letter of Intent on West Bienville Uranium ...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (CHU.V)
0.045+0.00%
TSX-V
CA$ 0.045
01/23 15:53 -
0%
Prev close Open
0.045 0.040
Low High
0.040 0.045
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.045 -%
Volume 1 month var.
428,500 -%
24hGold TrendPower© : 44
Produces
Develops
Explores for Gold - Lithium
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.22+1.63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48-1.59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.84-1.31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.85-2.63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.83+0.78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :