Sherwood Copper Corp.

Published : August 21st, 2008

Reports Further High Grade Copper-Gold Results From Areas 2 & 118 at M...

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Sherwood Copper Corporation

SUITE 860-625 HOWE STREET ? VANCOUVER, BC ? V6C 2T6 ? CANADA ? TEL: (604-687-7545) ? FAX: (604-689-5041)

PRESS RELEASE

FOR IMMEDIATE RELEASE

 

August 21, 2008                                                                                                                                                                                   #08-31

 

Sherwood Reports Further High Grade Copper-Gold Results From Areas 2 & 118 at Minto Mine

Multiple high grade intercepts including 4.7% copper & 1.2g/t gold over 8.5m in 08SWC-316

and 3.1% copper & 1.4g/t gold over 8.1m in 08SWC-313

 

VANCOUVER, BRITISH COLUMBIA - Sherwood Copper Corporation (SWC: TSX-V) today announced results for 15 further drill holes from its 2008 exploration program at the high grade Minto copper-gold mine in the Yukon.  Highlights from this latest batch of results include continued high grade intercepts in the Area 118 deposit, including a hole that equals the prior highest grade intercept in Area 118, returning 4.7% copper and 1.2g/t gold over 8.5m.  Also of significance is the discovery of further high grade mineralization in wide spaced drilling on the south margin of the Area 2 deposit, expanding the mineralization in that direction, and a strong intercept from the Copper Keel prospect.  Highlights from this latest batch of 15 holes are summarized in the table below while complete assay results for the fifteen holes reported herein are attached.

 

Hole ID

& Target

Target Area

From

(m)

To

(m)

Interval (m)

Interval (ft)

Copper (%)

Gold (g/t)

Silver (g/t)

08SWC-307

Area 118

206.3

208.7

2.4

7.9

6.53

2.48

pending

08SWC-308

Area 2 East

295.0

310.0

15.0

49.2

1.25

0.50

pending

 including

 

299.0

304.0

5.0

16.4

2.10

1.31

pending

08SWC-311

Area 118

190.8

201.7

10.9

35.8

1.63

0.64

pending

 including

 

196.8

200.8

4.0

13.1

2.45

1.12

pending

08SWC-312

Copper Keel

234.2

245.8

11.6

38.1

2.13

0.80

7.9

 including

 

234.2

239.8

5.6

18.4

2.85

1.05

10.8

08SWC-313

Area 118

195.3

203.4

8.1

26.6

3.12

1.37

10.7

 including

 

199.8

203.4

3.6

11.8

4.04

1.75

13.7

08SWC-315

Area 118

92.6

100.8

8.2

26.9

1.66

0.40

4.3

 including

 

94.6

100.8

6.2

20.3

2.07

0.51

5.0

08SWC-316

Area 118

171.6

180.1

8.5

27.9

4.71

1.19

15.0

 including

 

173.1

180.1

7.0

23.0

5.11

1.31

16.1

 

 

?Our in-fill and step-out drill program in the high grade Area 2 and Area 118 copper-gold deposits at the Minto Mine continues to reap considerable rewards,? said Stephen Quin, President & CEO of Sherwood Copper and Minto Explorations Ltd.  ?The Area 2 deposit is being expanded to the south, at relatively shallow depths, while Area 118 is returning consistent, very high grade copper and gold values,? he said.  ?The results from the Copper Keel area, an early stage prospect, are particularly encouraging since they suggest that the Area 2 and Copper Keel mineralization may link up, providing considerable additional opportunities for further resource increases.?

 

2008 Drill Program

The 2008 drill program has evaluated the Area 2, Area 118 and Ridgetop deposits and several other targets in a program comprised of a balance of infill, step-out and exploration drilling.  To date, 116 holes have been completed in 2008, with the primary objective of expanding the known resources at Area 2, Area 118 and Ridgetop, and increasing confidence in those resources in support of future feasibility studies geared to increasing high grade production at the Minto Mine over and above the levels already achieved.

 

In addition, as announced on August 5, 2008, Sherwood plans to explore the possibility of linking the Area 2, Area 118 and Ridgetop mineralized systems together, into one large deposit following the release of resource estimates at cut-offs lower than the current mining operation that suggested potential for a much larger, more moderate grade scenario with a lower strip ratio.  As part of this evaluation, Sherwood has completed a substantial part of the wide spaced pattern designed to evaluate this potential, and results are pending for these drill holes.

 

As of August 20, 2008 a total of 23,057 metres of drilling has been completed in 116 holes in 2008.  Seventeen holes for 4,470 metres were completed during the winter, the results of which were reported on May 14, 2008. A further 99 holes for 18,587 metres have been completed since then and drilling is still ongoing, but nearing completion of the program. Copper and gold assay results have been received for only 51 of the 116 holes completed to date, results for a further 15 of which are reported herein.

 

Please follow the link below to a map identifying the priority exploration areas for 2008: www.sherwoodcopper.com/i/pdf/2008-08-21PriorityExplorationCorridor.pdf.

 

2008 Discussion of Results to Date

The 2008 drill program is proceeding very well and is nearing completion. A drill statistics table attached to this release details how the drilling in 2008 is distributed thus far, while a synopsis of results is discussed below. It is anticipated that drilling will resume early in 2009.

Area 118: Infill and partial step-out drilling at Area 118 has returned excellent results with 5 of 7 holes reported in this latest batch of assay data grading better than 2% copper over significant intervals and 3 holes reporting greater than 3% copper.  Results from hole 08SWC-316 matched exactly the previous highest grade intersection reported at Area 118 (08SWC-310 reported on July 21)grading an impressive 4.71% copper and 1.19g/t gold over 8.5m (27.9ft).  This hole is located more than 120m north-northeast of hole 08SWC-310.  Hole 08SWC-313 also intersected very high grade mineralization, grading 3.12% copper and 1.37g/t gold over 8.1m (26.6ft).  Hole 08SWC-307 intersected even higher grades, with 6.53% copper and 2.48g/t gold over an interval of 2.4 metres (7.9ft).

Area 2: Three of the four holes drilled on the east perimeter of the previously known limit of the Area 2 deposit intersected between 1% and 2% copper over significant intervals.  Three holes drilled on the south perimeter of the deposit also intersected similar grades of copper mineralization at shallower depths. These results indicate potential to increase the Area 2 mineral resource beyond that announced June 17, 2008. The details of these intersections are in the table appended to this news release.

Copper Keel:  Preliminary geological interpretations suggest there is probable continuity between the Area 2 deposit and the Copper Keel prospect located to the east of Area 2.  Hole 08SWC-312 graded 2.13% copper and 0.80g/t gold over 11.6 metres (38.1ft) and supports that postulation. More drilling would be required to conclusively prove a link between these two deposits.

 

For current drill hole locations, please view the accompanying map: (www.sherwoodcopper.com/i/pdf/2008-08-212008DHLocationMap.pdf).

 

About Sherwood Copper

Sherwood Copper?s objective is the profitable production of base and precious metals from high grade, open pit mines in Canada.  Sherwood?s first operating mine, the high grade Minto copper-gold mine in Yukon, Canada, was built on budget and ahead of schedule.  The Minto Mine is one of the highest-grade open pit copper-gold mines in the world, and is forecast to be a low cost producer.  Aggressive exploration on the Minto property has yielded significant success, providing Sherwood the opportunity to ?grow from within? by expanding the resource and reserve base, potentially leading to further production increases.  To further accelerate its production growth, Sherwood intends to pursue merger & acquisition opportunities that fit its business model and, in May 2008, Sherwood acquired 100% ownership in Western Keltic Mines (now Kutcho Copper Corp.), owner of the high-grade Kutcho copper-zinc-gold-silver deposit in northwestern British Columbia.  Sherwood expects to lever off its successful development of the Minto Mine and rapidly advance the Kutcho project to a production decision.

 

Quality Assurance

The technical information in this news release has been prepared in accordance with Canadian regulatory requirements set out in National Instrument 43-101 and reviewed by Stephen P. Quin, P. Geo., President & CEO for Sherwood Copper Corporation.  The exploration activities at the Minto project site are carried out under the supervision of Brad Mercer, P. Geol., V.P. Exploration for Sherwood.

 

The analytical method for copper and silver performed by SGS Laboratories under a contract arrangement at the Minto Mine Site, Yukon includes digestion in aqua regia followed by absorption spectroscopy.  Gold is measured using fire assay with atomic absorption spectroscopy; analysis is performed by SGS Laboratories at Red Lake, Ontario.  When visible gold is noted in drill core samples or regular analytical values exceed 5 grams per tonne, the pulp and screen metallic assay method is used to determine total gold content and gold content of different size fractions. This is considered industry best practice when dealing with coarse gold mineralization where a nugget effect is suspected. The result of the pulp and screen metallic assay is accepted as the most representative value and used in the assay database for resource calculations. Blank and standard samples are added to all sample shipments prior to submittal to the lab for quality assurance and quality control.  If more than two check samples assay outside of expected ranges, the work order is re-assayed. After the completion of planned drill programs, random check assays will be carried out by ALS Chemex of North Vancouver, BC.

 

Assay intervals reported herein are drill core lengths unless otherwise stated.  Because the known deposits are essentially flat lying and most drill holes reported to date are vertical, true widths are generally expected to be the same as reported core lengths unless otherwise stated. 

 

Additional Information

Additional information on Sherwood and its Minto Project can be obtained on Sherwood?s website at http://www.sherwoodcopper.com.

 

On behalf of the board of directors

SHERWOOD COPPER CORPORATION

?Stephen P. Quin?

Stephen P. Quin

President & CEO

 

 


 

Investor Contacts:

Stephen P. Quin 604.687-7545 or Neil MacRae 604-687-7545

 

 

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this press release.

 

Forward Looking Statements

This document may contain "forward-looking statements" within the meaning of Canadian securities legislation and the United States Private Securities Litigation Reform Act of 1995. These forward-looking statements are made as of the date of this document and the Company does not intend, and does not assume any obligation, to update these forward-looking statements.

 

Forward-looking statements relate to future events or future performance and reflect management's expectations or beliefs regarding future events and include, but are not limited to, statements with respect to the estimation of mineral reserves and resources, the realization of mineral reserve estimates, the timing and amount of estimated future production, costs of production, capital expenditures, success of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage. In certain cases, forward-looking statements can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative of these terms or comparable terminology. By their very nature forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others, risks related to actual results of current exploration activities; changes in project parameters as plans continue to be refined; future prices of resources; possible variations in ore reserves, grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities; as well as those factors detailed from time to time in the Company's interim and annual financial statements and management's discussion and analysis of those statements, all of which are filed and available for review on SEDAR at www.sedar.com. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.


Accordingly, readers should not place undue reliance on forward-looking statements.

 


 

 

2008 Drill Statistics ? Minto Property

To Accompany Sherwood Copper News Release SWC-08-31

 

 

 

Holes Completed

Status

Drill Area and

Type of Hole

2008

Phase 1

2008

Phase 2

Assay Data Released (*)

Assay Data Pending

Exploration Holes

 

 

 

 

Airstrip SW

0

1

1

0

Airstrip C.

0

0

0

0

Area 2

0

14

13

1

Area 118

0

27

18

9

Area 118 SW

3

0

3

0

Regional Picture

0

5

0

5

Copper Keel

0

2

2

0

Gap

1

0

1

0

Minto Valley

13

0

13

0

Ridgetop

0

47

0

47

Ridgetop W

0

3

0

3

 

17

99

51

65

Summary

 

 

 

 

# of Holes to Date

116

 

# of Metres to Date

23,057

 

 


 

Details of Drill Results

To accompany Sherwood Copper News Release SWC-08-31

 

Hole ID

& Target

Comments

From

(m)

To

(m)

Interval (m)

Interval (ft)

Copper (%)

Gold (g/t)

Silver (g/t)

Holes 08SWC-270 to -304 Previously Released

 

 

 

 

 

 

 

 

 

08SWC-305

 

151.5

155.0

3.5

11.5

0.54

0.11

2.20

?Area 2 East?

 

159.2

172.0

12.8

42

0.67

0.03

3.0

 

including

170.4

172.0

1.6

5.2

2.29

0.11

7.5

 

 

197.7

199.8

2.1

6.9

0.83

0.01

pending

 

 

238.7

244.0

5.3

17.4

0.68

0.08

pending

 

 

278.2

300.2

22.0

72.2

0.42

0.15

pending

 

including

298.4

300.2

1.8

5.9

1.49

0.50

pending

 

 

306.8

315.0

8.2

26.9

0.77

0.36

pending

 

 

 

 

 

 

 

 

 

08SWC-306

 

47.8

51.8

4.0

13.1

2.71

2.15

pending

?Area 2 East?

 

223.1

240.5

17.4

57.1

0.54

0.19

pending

 

 

228.8

301.3

12.5

41

0.42

0.16

pending

 

 

322.7

330.3

7.6

24.9

1.03

0.37

pending

 

including

325.7

328.7

3.0

9.8

1.56

0.44

pending

 

 

 

 

 

 

 

 

 

08SWC-307

 

88.8

100.4

11.6

38.1

0.60

0.08

pending

?Area 118?

 

121.0

129.6

8.6

28.2

0.75

0.09

pending

 

 

206.3

208.7

2.4

7.9

6.53

2.48

pending

 

 

 

 

 

 

 

 

 

08SWC-308

 

169.3

173.6

4.3

14.1

0.78

0.04

pending

?Area 2 East?

 

214.3

216.0

1.7

5.6

0.67

0.28

pending

 

 

295.0

310.0

15.0

49.2

1.25

0.50

pending

 

including

299.0

304.0

5.0

16.4

2.10

1.31

pending

 

 

 

 

 

 

 

 

 

08SWC-309

 

51.7

55.5

3.8

12.5

2.05

0.54

pending

?Area 2 East?

 

73.9

77.6

3.7

12.1

0.98

0.27

pending

 

 

165.6

182.3

16.7

54.8

0.61

0.15

pending

 

including

176.2

179.9

3.7

12.1

1.28

0.29

pending

 

 

188.6

193.0

4.4

14.4

0.97

0.31

pending

 

 

206.5

221.4

14.9

48.9

0.48

0.12

pending

 

 

273.7

291.8

18.1

59.4

0.76

0.41

2.6

 

including

277.1

283.5

6.4

21

0.99

0.52

2.4

 

and

289.1

291.8

2.7

8.9

1.76

0.97

7.81

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

08SWC-310

 

Previously Released

?Area 118?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

08SWC-311

 

2.9

6.1

3.3

10.8

0.75

0.03

pending

?Area 118?

 

61.7

71.0

9.3

30.5

0.90

.15

pending

 

including

61.7

65.8

4.0

13.1

1.39

0.18

pending

 

 

89.2

92.5

3.3

10.8

2.30

0.71

Pending

 

 

190.8

201.7

10.9

35.8

1.63

0.64

pending

 

including

196.8

200.8

4.0

13.1

2.45

1.12

pending

 

 

 

 

 

 

 

 

 

08SWC-312

 

104.7

114.8

10.1

33.1

0.47

0.14

2.3

?Copper Keel?

 

234.2

245.8

11.6

38.1

2.13

0.80

7.9

 

including

234.2

239.8

5.6

18.4

2.85

1.05

10.8

 

 

 

 

 

 

 

 

 

08SWC-313

 

195.3

203.4

8.1

26.6

3.12

1.37

10.7

?Area 118?

including

199.8

203.4

3.6

11.8

4.04

1.75

13.7

 

 

 

 

 

 

 

 

 

08SWC-314

 

34.7

38.4

3.7

12.1

1.38

0.51

2.7

?Area 2 South?

 

83.4

86.8

3.4

11.2

1.34

0.54

1.6

 

 

90.9

105.7

14.8

48.6

0.51

0.14

1.1

 

including

102.6

105.7

3.1

10.2

1.22

0.30

2.4

 

 

144.7

148.4

3.8

12.5

0.52

0.04

1.4

 

 

189.4

191.8

2.4

7.9

0.93

0.43

4.3

 

 

222.8

232.2

9.5

31.2

0.56

0.17

3.2

 

 

 

 

 

 

 

 

 

08SWC-315

 

41.9

44.6

2.7

8.9

0.77

0.14

2.5

?Area 118?

 

92.6

100.8

8.2

26.9

1.66

0.40

4.3

 

including

94.6

100.8

6.2

20.3

2.07

0.51

5.0

 

 

105.2

109.6

4.4

14.4

0.58

0.11

1.7

 

 

140.7

154.3

13.6

44.6

0.56

0.01

1.0

 

 

 

 

 

 

 

 

 

08SWC-316

 

7.3

12.2

4.9

16.1

0.53

0.04

2.2

?Area 118?

 

70.1

77.5

7.4

24.3

0.66

0.10

1.4

 

 

87.4

90.9

3.5

11.5

0.57

0.09

1.8

 

 

155.5

158.1

2.6

8.5

1.72

0.62

6.4

 

 

171.6

180.1

8.5

27.9

4.71

1.19

15.0

 

 

173.1

180.1

7.0

23.0

5.11

1.31

16.0

 

 

 

 

 

 

 

 

 

08SWC-317

 

28.0

29.2

1.2

3.9

1.22

0.23

4.0

?Area 2 South?

 

237.7

241.0

3.3

10.8

1.03

0.16

3.2

 

 

280.0

288.0

8.0

26.2

0.73

0.29

3.6

 

including

282.4

286.2

3.8

12.5

1.44

0.38

5.5

 

 

 

 

 

 

 

 

 

08SWC-318

 

129.5

134.1

4.6

15.1

0.76

0.15

2.0

?Area 118?

 

146.4

150.1

3.8

12.5

0.63

0.13

3.3

 

 

 

08SWC-319

 

104.6

118.9

14.3

46.9

0.87

0.37

3.6

?Area 2 South?

including

108.0

110.5

2.5

8.2

2.01

1.04

7.5

 

 

 

 

 

 

 

 

 

08SWC-320

 

126.0

130.4

4.4

14.4

1.56

0.37

4.4

?Area 118?

 

142.2

156.2

14

45.9

0.60

0.06

2.5

 

including

145.2

149.0

3.8

12.5

1.03

0.09

3.1

 

 

175.5

193.1

17.6

57.7

0.70

0.16

3.4

 

including

175.5

181.0

5.5

18

1.18

0.22

3.8

 

 

 

 

 

 

 

 

 

08SWC-321 to 08SWC-385 are all awaiting assay results

 

 
 
 

 

 
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Sherwood Copper Corp.

CODE : SWC.V
CUSIP : 82442N 103
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Sherwood Copper is a copper development stage company based in Canada.

Sherwood Copper is listed in Canada and in United States of America. Its market capitalisation is CA$ 56.5 millions as of today (US$ 46.4 millions, € 36.8 millions).

Its stock quote reached its highest recent level on December 31, 2007 at CA$ 8.26, and its lowest recent point on November 21, 2008 at CA$ 1.01.

Sherwood Copper has 53 853 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Sherwood Copper Corp.
2007 Annual report
Financings of Sherwood Copper Corp.
2/29/2008 Signs Committed Term Sheet for Corporate Credit Facility wi...
2/15/2008 Announces $7.2 million Flow-through Financing
Nominations of Sherwood Copper Corp.
4/1/2008Makes Key Appointments to its Board & Management
1/16/2008 Appoints Kevin Weston as Chief Operating Officer
Financials of Sherwood Copper Corp.
8/27/2008Reports Continued Strong Financial Results for the Three Mon...
7/22/2008Reports Increased Copper Production & Reduced Costs in Secon...
5/30/2008Reports Strong Results from Operations in First Quarter 2008
Project news of Sherwood Copper Corp.
1/26/2009(Minto Mine)Capstone Mining Corp. Commences US$ 3 Million Resource Expan...
12/10/2008(Minto Mine)Capstone Mining Corp. Reports Final Drill Intercepts of Nea...
11/13/2008(Kutcho Creek)Increases Continuity of High Grade Copper Trend at its Kutch...
11/7/2008(Minto Mine)Raises US$37.5 million from Minto Precious Metal ProductionT...
11/4/2008(Minto Mine)Reports New Copper-Gold Discovery at Minto Mine and possible...
9/22/2008(Kutcho Creek)Reports Further High Grade Intercepts from its Kutcho Copper...
9/18/2008(Minto Mine)Reports Thick Intervals of Near Surface Copper-Gold Minerali...
9/2/2008(Kutcho Creek)Reports Multiple High Grade Intercepts from its Kutcho Coppe...
8/28/2008(Minto Mine)Reports High Rainfall temporarily restricts access to its Mi...
8/21/2008(Minto Mine)Reports Further High Grade Copper-Gold Results From Areas 2 ...
7/17/2008(Minto Mine)Releases Further High Grade Copper-Gold from Area 2 & Area 1...
7/14/2008(Kutcho Creek)Reports High Grade Intercepts from the Kutcho Drill Program
6/17/2008(Minto Mine)Announces Significant Increase in Copper-Gold Resources at M...
4/17/2008(Minto Mine)Reports Minto Copper-Gold Mine Achieves & Exceeds Design Cap...
3/10/2008(Kutcho Creek) Completes Funding Arrangements for Kutcho Project & Begins ...
2/25/2008(Minto Mine)Reports 2007 Production Results & 2008 Production Estimate f...
2/13/2008(Minto Mine)Intersects High Grade Copper-Gold Mineralization in 4 Separa...
1/14/2008(Minto Mine)Intersects High Grade Copper-Gold Mineralization at Area 118...
12/18/2007(Minto Mine) Reports Phase 2 Mill Expansion at Minto Copper-Gold Mine Co...
12/12/2007(Minto Mine) Reports Results of Pre-feasibility Study for Expansion of M...
12/7/2007(Minto Mine)Reports Groundwork has Commenced on Carmacks to Stewart Tran...
12/3/2007(Minto Mine)Intersects High Grade Copper-Gold Mineralization at Ridgetop...
10/29/2007(Minto Mine) Intersects High Grade Copper-Gold Mineralization at Area 11...
10/25/2007(Minto Mine) Ships first Minto Mine Concentrates from Skagway
9/25/2007(Minto Mine)Receives Encouraging Results From 2007 Gradient IP Geophysic...
9/19/2007Discovers High Grade at Airstrip & Expands High Grade at Are...
9/5/2007(Minto Mine)Reports "On budget & Ahead of Schedule" Phase 1 Construction...
7/25/2007(Minto Mine)Delivers First Concentrates from Minto Mine to Port of Skagw...
6/15/2007(Minto Mine)Phase 2 Exploration Program Underway at Minto Copper-Gold Mi...
6/12/2007(Minto Mine)Reports Excellent Metallurgical Test Results from Area 2 at ...
5/24/2007(Minto Mine)Discovers High Grade Copper-Gold Mineralization in Minto 'Ga...
4/24/2007(Minto Mine)Awarded Funding from the Yukon Government to Advance Area 2 ...
4/12/2007(Minto Mine)Expands Scope of Pre-feasibility Study on Minto Copper-Gold ...
4/11/2007Accelerates Phase 2 Mill Expansion at Minto Copper-Gold Mine...
Corporate news of Sherwood Copper Corp.
1/23/2009Capstone Mining Corp. Reports Debt Repayments, Funding of De...
12/24/2008Capstone Mining Corp. Mails Offer to Purchase to its Debentu...
11/24/2008Reports Cash Flow from Mining Operations of $29.9 million in...
11/21/2008Announces Closing of Precious Metal Transaction
9/19/2008sets Shareholder Meeting Date for Capstone Combination
8/5/2008Reports Higher Copper Production Forecast for 2009 & Updated...
7/25/2008Reports Phase 3 Mill Throughput Increase to 3,200tpd Approve...
6/30/2008Finalizes Exploration Agreement with Northern Tiger Resource...
6/12/2008Reports Results of Preliminary Economic Assessment for Kutch...
6/5/2008Holds Successful Annual Meeting & Reports on Strategic Objec...
5/28/2008and Western Keltic Announce Closing of Business Combination
4/7/2008and Western Keltic Mines Inc. Announce Planned Business Comb...
3/6/2008 Increases Holdings to Approximately 93% of Western Keltic S...
3/3/2008Signs Exploration Memorandum of Understanding with Firestone...
2/22/2008Acquires 91.7% of Western Keltic Shares & Extends Offer for ...
2/12/2008Takes up 85.6% of Western Keltic Shares & Extends Offer for ...
1/30/2008Extends Offer for Western Keltic Mines to February 11, 2008
12/24/2007 Mails Offer for Western Keltic Mines
11/26/2007 Announces Agreement for Acquisition of Western Keltic Mines
10/29/2007 Appear on BNN TV
10/12/2007 Holds the Official Opening Ceremony for the Minto Mine, Yuk...
10/4/2007 Reports that Minto Mine Declares Commercial Production
7/17/2007Identifies Two Extensive Copper-Gold Systems at Minto Projec...
7/16/2007Reports Geotech Program Results in Improved Pit Slopes at Mi...
5/29/2007reports Yukon Utilities Board Approves Revised Power Purchas...
5/15/2007reports Yukon Government Support for Revamped Power Purchase...
5/10/2007Nominates Industry Leader for election to its Board of Direc...
5/2/2007Announces Yukon Utilities Board Turns Down Provisions of the...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (SWC.V)
1.05-7.89%
Last quotes and information before delisting
Prev close Open
1.14 1.04
Low High
1.02 1.12
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  1.05 -%
Volume 1 month var.
0 -%
Produces
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 9/7/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.66+0.39%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.18+0.74%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.62+5.07%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64+1.15%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.85-2.10%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.84+0.00%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 50.56-0.82%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :