Stornoway Diamond Corporation

Published : February 19th, 2009

Reports Initial Diamond Results From Aviat 200 Tonne Bulk Sample: 210 Cpht In First 43 Tonnes

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Diamond | Gem | Market | Recovery | Volatility |

February 19, 2009

STORNOWAY REPORTS INITIAL Diamond RESULTS FROM AVIAT 200 TONNE BULK SAMPLE: 210 CPHT IN FIRST 43 TONNES

Stornoway Diamond Corporation (TSX-SWY) and Hunter Exploration Group (Hunter) are pleased to report results from the processing of the first 43 tonnes of an approximately 200 tonne sample of kimberlite collected during 2008 from within the Eastern Sheet Complex (?ESC?) of the Aviat Project, Nunavut. To date, 89.55 carats of diamonds have been recovered from 42.67 tonnes (dry weight) of kimberlite, representing an overall Diamond recovery of 210 carats per hundred tonnes (cpht) for stones retained on a +1 DTC screen. The largest Diamond recovered in this sample is a 0.81 carat grey fragment. The largest Diamond recovered from the ESC from previous sampling is a 3.64 carat gem quality white dodecahedron (see press release dated January 21, 2008).

This first 43 tonnes of sample was collected at a kimberlite outcrop within the ESC previously named ?AV6?. The balance of the 200 tonne sample was collected at a nearby outcrop previously named ?AV2?. The two outcrop samples are being processed separately, but ?AV6? and ?AV2? are now considered to represent two exposures of the same ?ES1? kimberlite sheet occurring within the ESC. The second tranche of Diamond recovery results are expected before the end of the first quarter.

Complete Diamond recovery data, following Dense Media Separation (?DMS?) processing and utilizing both x-ray sorter and grease table recovery circuits, are as follows:

Sample Dry Weight (tonnes) Stones (retained on +1 DTC screen) Carats (retained on +1 DTC screen) Diamond Content1 (cpht)2 Largest Diamonds (carats)
ES1 Part 1 ("AV6"-2008) 42.67 24473 89.5453 210 0.81, 0.77, 0.67

1The estimated Diamond content, expressed as carats per hundred tonnes, may not be representative of the overall Diamond content of the body due to a number of factors, including location/size of the samples and processing parameters.
2Carats per hundred tonnes
3Represents only stones retained on a +1 or greater DTC screen, as discussed below

Matt Manson, President and CEO, stated: ?We are encouraged by these first results from the 2008 sampling program at Aviat, which have confirmed very high Diamond grades within the dominant kimberlite body of the Eastern Sheet Complex. This is consistent with the recently reported conceptual study of the project, authored independently by SRK Consulting (Canada) Inc. and released in October 2008. Processing of the balance of the 200 tonne sample is currently underway.?

The Aviat Project is located on the Melville Peninsula in eastern Nunavut, Canada, and is a joint venture between Stornoway (90%) and Hunter (10%). Stornoway holds 100% of the Diamond marketing rights. A map outlining the series of significantly diamondiferous kimberlite pipes and sheets discovered to date is available at http://www.stornowaydiamonds.com/Kimberlite-Bodies-October-6.jpg.

Recently, Stornoway released the results of a conceptual study at Aviat authored by SRK Consulting (Canada) Inc. (?SRK?) an independent, international consulting practice (Stornoway press release of October 7, 2008). This study concluded that based on the drilling undertaken to date, the ESC contained an estimated 12.4 to 16.0 million tonnes of kimberlite material within four separately distinguishable kimberlite sheets of the ESC. One of these sheets, named ES1, spans an area of some 260 hectares and represents about 78% of the total kimberlite volume. Based on the limited micro and macro Diamond data collected during the 2003 to 2007 field campaigns, SRK estimated a total Diamond content of 235 carats per hundred tonnes (cpht) +/- 30 cpht at a bottom cut-off of +1.0mm (approximately equivalent to a +2 DTC sieve). The conceptual range of total content of kimberlite material and the estimate of total Diamond content, taken together, imply between 24.1 to 40.3 million carats in the ground, after an allowance for approximately 5% internal dilution within the conceptual model. This conceptual study did not include Aviat?s pipe-like kimberlite bodies (AV1, AV4 and AV9), kimberlite sheets outside of the currently defined ESC (such as AV1W and AV5) or drill intersections of as yet un-named kimberlite sheets that have not yet been integrated into the overall geologic model. The ESC remains open down dip to the southeast, and across the Centennial Fault to the west.

The potential quantity of diamonds that can be inferred from the above estimates is conceptual in nature and does not constitute a mineral resource. The reader is cautioned that to date there has been insufficient exploration to define a mineral resource according to CIM Definition Standards for Mineral Resources and Mineral Reserves for the ESC, and it is at this stage uncertain if further exploration will be able to delineate a mineral resource for the ESC.

Next Steps

Following receipt of the final Diamond recovery results from the balance of the 200 tonne sample, Stornoway expects to conduct a market valuation exercise on the full parcel of diamonds recovered from the ES1 kimberlite sheet to date. This will be undertaken once the world rough Diamond market, which is currently experiencing internal financial volatility, has stabilized such that valuation data usable for advanced level exploration planning can be obtained. Although this valuation work, being based on a small parcel of diamonds, will provide only a preliminary sense of the average Diamond price at Aviat, it will be sufficient, in conjunction with the October 2008 conceptual study, to provide a qualified estimate of value contained within the ESC. This estimate will in turn support subsequent desktop studies aimed at determining optimum mining scenarios for the ESC. The conclusions of these studies will dictate the nature and type of future sampling required to obtain a National Instrument (?NI?) 43-101 compliant mineral resource statement at Aviat.

Note on Diamond Recoveries

The estimate of total Diamond content for the ESC sheets provided in the SRK independent study (235 +/- 30 cpht undiluted) used a 1.0mm (approximately equivalent to a +2 DTC sieve) bottom cut-off and assumed 100% recovery of stones of all size fractions. No corrections were applied for breakage and/or loss of smaller diamonds that would typically occur during recovery of diamonds in a commercial DMS plant. Quantification of commercial Diamond recoveries is extremely difficult at this stage of the project due to numerous factors that need to be studied in greater detail (for example: economical bottom cut-off; efficiencies of the process plant; Diamond breakage and/or loss; etc.). However, SRK has stated that in a commercial DMS plant it is not unreasonable to expect a 15-20% reduction in recovered diamonds from the total Diamond content estimation assuming a similar bottom cut-off of +1.00 mm.

The initial results from the ES1 kimberlite sheet reported today represent diamonds retained on a +1 DTC screen (approximately equivalent to a 0.85mm square mesh screen) and, as described below, the sample was processed utilizing a crushing regime designed to maximise the recovery of small diamonds in exploration scale samples. The efficiency of small stone recovery achieved with this method is higher than would be expected in a commercial DMS plant. The sample results, therefore, better approximate a total Diamond content measurement of the ES1 kimberlite sheet, and as such are consistent with the estimated range of total Diamond content provided in the SRK independent study. As with the total Diamond content estimate, actual Diamond recoveries in a commercial setting can be expected to be reduced with respect to Diamond content and substantially higher with respect to average stone size as a large number of very small diamonds are not recovered.

Previously reported DMS results from kimberlite outcrops now considered part of the ES1 kimberlite sheet are provided in the table below. The increase in Diamond content evident in the larger samples is ascribed to the increase in sample size, and the collection of fresher, more representative kimberlite.

Disclosure Date Sample Type Dry Weight (tonnes) Carats Diamond
Content1
(cpht)2
Largest
Diamonds (carats)
February 19, 2009 Outcrop ES1 Part 1 ("AV6"-2008) 42.67 89.55 2103 0.81, 0.77, 0.67
January 21, 2008 Outcrop "AV2" (2007) 20.60 33.36 1624 3.64, 0.551, 0.525
January 11, 2007 Outcrop "AV2" (2005) 2.19 1.58 724 0.19
July 11, 2006 Outcrop "AV7" (2005) 2.32 1.78 774 0.19
June 21, 2006 Outcrop "AV6" (2005) 2.15 2.08 974 0.10

1The estimated Diamond content, expressed as carats per hundred tonnes, may not be representative of the overall Diamond content of the body due to a number of factors, including location and size of the samples or drill holes
2Carats per hundred tonnes
3Represents only stones retained on a +1 or greater DTC screen
4Represents only stones retained on a +0.85 mm square mesh screen

Scientific and Technical Data

Diamond results reported in this release are based on DMS processing work completed by Microlithics Laboratories, Thunder Bay, Ontario, an independent mineral process laboratory currently providing services to Stornoway. The 42.67 tonne sample was processed through a 1.5 tonne per hour (tph) DMS plant designed to recover stones retained on a 0.85mm square mesh sieve. Kimberlite was prepared through a primary jaw crusher, with -10 mm material fed directly into the DMS.  All +10 mm material was subsequently reduced through secondary cone crushing. A further re-crush of +2mm reject material is performed to facilitate the recovery of small diamonds. Recovery of diamonds from the DMS concentrate was carried out at Stornoway's wholly owned Diamond laboratory in North Vancouver whereby concentrates were processed twice through x-ray sorter equipment to generate a final concentrate which was hand sorted to extract diamonds.  A grease table finish was used to recover diamonds from all x-ray sorter rejects.  Quality assurance protocols, security and actual operating procedures for the processing, transport and recovery of diamonds conform to industry standard Chain of Custody provisions.  As part of Stornoway's ongoing QA/QC program, DMS tails, concentrate residues and other materials are also subject to audit.  Any significant changes to the recovered Diamond grades provided above will be reported when available.

Stornoway Diamond Corporation

Stornoway Diamond Corporation is one of Canada's leading Diamond exploration and development companies, involved in the discovery of over 200 kimberlites in seven Canadian Diamond districts. The Company benefits from a diversified Diamond property portfolio, a strong financial platform and management and technical teams with experience in each segment of the Diamond "pipeline" from exploration to marketing. Stornoway's Diamond exploration programs are conducted under the direction of Robin Hopkins, P.Geol. (NT/NU), Vice President, Exploration, a Qualified Person under NI 43-101.  Mr Hopkins has read this press release and approves of its contents.

On behalf of the Board
STORNOWAY Diamond CORPORATION
/s/ ?Matt Manson?
Matt Manson
President and Chief Executive Officer

For further information, please contact Nick Thomas , Investor Relations Manager at 604.983.7754 or 1.877.331.2232

<
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Stornoway Diamond Corporation

DEVELOPMENT STAGE
CODE : SWY.TO
ISIN : CA86222Q8065
CUSIP : 86222Q806
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Stornoway Diamond is a gold and copper exploration company based in Canada.

Stornoway Diamond develops gold, copper, diamonds and nickel in Canada, and holds various exploration projects in Botswana and in Canada.

Its main asset in development is RENARD (FOXTROT) in Canada and its main exploration properties are RAVEN, CHURCHILL, KINGORA, LDG, DARING LAKE, JEWEL, STARFISH, WALES ISLAND, SCEPTRE AND TIARA, HAMMER, QILALUGAQ, PORTAGE MINE, MELVILLE PENIN. and MELVILLE PENINSULA (AVIAT PROJECT) in Canada.

Stornoway Diamond is listed in Canada. Its market capitalisation is CA$ 16.6 millions as of today (US$ 12.6 millions, € 11.4 millions).

Its stock quote reached its highest recent level on May 14, 2004 at CA$ 9.80, and its lowest recent point on September 06, 2019 at CA$ 0.01.

Stornoway Diamond has 828 659 968 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Stornoway Diamond Corporation
4/10/2019Stornoway Diamond halts open pit operations at Quebec mine
11/15/2018Stornoway Diamond shares down on $37 million loss, departure...
Annual reports of Stornoway Diamond Corporation
LAUNCHES 2008 ONLINE ANNUAL REPORT: Posts Presentation from ...
Financings of Stornoway Diamond Corporation
7/11/2016Stornoway Receives C$82.72 Million from Warrant Exercise
3/31/2016Stornoway Announces Funding Of Third Tranche Of Stream Finan...
10/1/2015Stornoway Announces Funding of Second Tranche of Stream Fina...
11/13/2013Announces Increase To Bought Flow-Through Financing
4/19/2012Closes Private Placement of Units
3/8/2012Announces Bought Deal Equity Financing
8/1/2011Announces Financing Agreements With Québec For the Route 167...
5/29/2009Announces Closing of Flow-Through Financing
11/14/2008Announces Closing of Financings
11/5/2008Increases Previously Announced Private Placement
11/4/2008Announces Flow-Through Financing
8/1/2008Closes $22 Million Private Placement and Redeems Convertible...
7/28/2008Announces $22 Million Private Placement To Close Within 21 D...
7/16/2008ARRANGES $22 MILLION PRIVATE PLACEMENT Proceeds To Redeem Co...
Nominations of Stornoway Diamond Corporation
8/15/2013Announces Appointment to Board of Directors
6/25/2013Announcement of Appointment
8/3/2011Announces Changes To The Board Of Directors
7/20/2011Announces New Appointments to the Board of Directors
5/3/2010Announces Appointment Of Chief Operating Officer
3/1/2010Announces Management Appointments
Financials of Stornoway Diamond Corporation
8/10/2017Second Quarter Results
7/27/2017Stornoway Announces Second Quarter Release Date
5/17/2016Stornoway Announces Results From Annual General Meeting
5/10/2016Stornoway Announces FY2016 First Quarter Results
5/5/2016Annual General Meeting
9/15/2009First Quarter Financial Results Posted, Matt Manson’s AGM Pr...
Project news of Stornoway Diamond Corporation
7/15/2016(Renard (foxtrot))Stornoway Commences Ore Processing At Renard Diamond Project
1/28/2014Provides Update On Exploration Joint Ventures
10/10/2013To Commence Early Construction Of Renard Mine Airport
9/3/2013First Vehicle Arrives At Renard Project Site Via New Permane...
8/7/2013Provides Update On Exploration Joint Ventures
7/23/2013Announces Updated Renard Mineral Resource Estimate
7/16/2013Receives Federal Government Authorisation For Renard Project
6/3/2013Provides Renard Project Update
3/14/2013Options Non-Core Exploration Projects
2/14/2013Reports Arrival Of Winter Road At Renard Project Site
1/28/2013Reports Optimized Renard Mine Design And Cost Estimates
6/1/2012Exhibiting at the World Resource Investment Conference: Vanc...
3/27/2012Signs Impacts And Benefits Agreement For The Renard Diamond ...
2/17/2012Renard Diamond Project Digital Fly-Through Video
1/4/2012Files NI 43-101 Technical Report For The Renard Feasibility ...
12/10/2011Renard Diamond Project Community Relations Video
10/3/2011Provides Update On Pipeline Projects
5/25/2011(Hammer)Announces Exploration Drill Program at Hammer Property, Nuna...
4/28/2011(Renard (foxtrot))Provides Renard Project Update Feasibility Study on Track fo...
4/1/2011(Renard (foxtrot))Announces Closing Of Agreement To Acquire Remaining 50% Of R...
3/7/2011(Aviat)Announces New Microdiamond Results From the Aviat Project, N...
2/23/2011(Renard (foxtrot))Announces Positive Microdiamond Results from Renard 1
2/10/2011(Renard (foxtrot))Shareholders Overwhelmingly Approve Acquisition Of Remaining...
2/7/2011(Renard (foxtrot))Files NI 43-101 Technical Report On The Recently Revised Res...
1/24/2011(Renard (foxtrot))Announces Increased Ni 43-101 Mineral Resource Estimate For ...
12/14/2010(Renard (foxtrot))Stornoway Announces Acquisition Of Remaining 50% Of Renard P...
3/22/2010(Renard (foxtrot))Renard Updated Economic Assessment Teleconference Archive No...
12/8/2009Announces Revised Ni 43-101 Mineral Resource Estimate For Re...
3/9/2009(Renard (foxtrot))Provides Renard Drilling Update: Renard 2 Kimberlite Greatly...
2/19/2009(Aviat)Reports Initial Diamond Results From Aviat 200 Tonne Bulk Sa...
12/15/2008Reports Filing of NI 43-101 Technical Report for Renard Prel...
11/28/2008(Churchill)Reports Diamond Counts From Two Kimberlites At Churchill
9/24/2008(Churchill)And Shear Announce 9 New Kimberlites At Churchill Diamond Pr...
9/15/2008(Churchill)and Shear Announce New Killiq Kimberlite at Churchill Diamon...
9/8/2008(Aviat)Doubles Size of Aviat’s Highly Diamondiferous AV267 Sheet
9/4/2008(Qilalugaq)Discovers New Kimberlite at Qilalugaq
7/2/2008(Churchill)and Shear Announce 2008 Program Underway at the Churchill Di...
6/27/2008(Churchill)And Shear Report Additional High Interest Mineral Dispersion...
5/15/2008(Aviat) Provides Aviat Project Spring Update Increases Project Inte...
4/28/2008(Renard (foxtrot))New Renard Diamond Valuation Results and Pre-Feasibility Upd...
3/13/2008(Aviat)Improves On Diamond Content of Aviat Kimberlites AV1 and AV2...
2/20/2008(Churchill)and Shear Report Additional Diamonds from Kahuna Drilling
1/31/2008(Churchill) and Shear Report High Diamond Counts from Four Kimberlites ...
1/29/2008(Aviat)Reports Diamond Content of 162 Cpht from 20.6 Tonne Aviat Sa...
1/28/2008(Renard (foxtrot))HIGH DIAMOND CONTENT CONFIRMED AT HIBOU DYKE 126 Cpht from 3...
12/12/2007(Melville Peninsula Aviat 1)Third Kimberlite Pipe At Aviat Proves Diamondiferous
11/14/2007(Churchill Project) and Shear Recover a 5.43 Carat Diamond fromChurchill?sKahun...
9/25/2007(Sua Pan (stornoway/motapa Jv))and Motapa Commence Drilling at Sua Pan Project, Botswana
7/25/2007 Commences Pre-Feasibility Study on Renard Diamond Deposit
Corporate news of Stornoway Diamond Corporation
6/29/2016Stornoway Reminds Warrantholders Of Upcoming Exercise Deadli...
6/22/2016Stornoway commences plant commissioning at Renard Diamond Pr...
6/6/2016Stornoway Provides Renard Operational Readiness Update
5/5/2016Stornoway Intersects Kimberlite At Adamantin Project
3/30/2016Stornoway Announces Updated Renard Mine Plan and Mineral Res...
10/14/2015Stornoway Files Renard NI 43-101 Technical Report
9/8/2015North Arrow Confirms High Diamond Counts From Pk150 Kimberli...
3/30/2015North Arrow Discovers Three New Kimberlites at the Pikoo Dia...
3/24/2015Stornoway Announces Third Quarter 2015 Results
3/24/2015Stornoway Commences Pre-Stripping at Renard 2-Renard 3 Open ...
3/11/2015Stornoway Announces Third Quarter 2015 Results
2/26/2015North Arrow Reports Initial Diamond Recoveries From First 60...
2/12/2015Stornoway to Attend Upcoming Investor Conferences
2/11/2015North Arrow Drilling Program Underway at Pikoo, Saskatchewan
1/21/2015North Arrow Updates Qilalugaq Project Bulk Sample Processing
12/16/2014Stornoway Announces Second Quarter 2015 Results
12/15/2014Stornoway Announces Second Quarter 2015 Results
11/17/2014Stornoway Completes Field Portion Of 2014 Renard Drill Progr...
11/17/2014Stornoway Completes Field Portion of 2014 Renard Drill Progr...
11/10/2014Stornoway Lists Convertible Debentures
11/10/2014Stornoway Lists Convertible Debentures
10/22/2014Stornoway Announces Results From Annual General Meeting
10/22/2014Stornoway Announces Results From Annual General Meeting
10/20/2014Stornoway Adds Large Diamond Recovery Capacity To Renard Dia...
10/20/2014Stornoway Adds Large Diamond Recovery Capacity to Renard Dia...
9/23/2014North Arrow Identifies New Targets at the Pikoo Diamond Proj...
9/22/2014Stornoway Announces Notice of 2014 Annual Meeting of Shareho...
9/15/2014Stornoway Announces First Quarter 2015 Results
8/25/2014Stornoway Provides Renard Project Update
7/21/2014Stornoway Awards EPCM Contract to SNC-Lavalin Inc.
7/16/2014Stornoway Announces Appointment of Douglas Silver to Board o...
7/10/2014Stornoway Announces Formal Production Decision at Renard
7/8/2014Announces Closing Of Comprehensive Financing Package To Fund...
7/8/2014Stornoway Announces Closing of Comprehensive Financing Packa...
6/27/2014Shareholders Overwhelmingly Approve Resolutions Relating To ...
6/26/2014Stornoway Shareholders Overwhelmingly Approve Resolutions Re...
3/27/2014Stornoway Confirms Negotiations For Project Financing
11/13/2013Announces Flow-Through Financing For Renard Resource Expansi...
11/5/2013Hosts Québec Minister of Natural Resources at Montreal Press...
10/24/2013Announces Results From Annual General Meeting
10/21/2013to Proceed With Liquefied Natural Gas (LNG) Power Plant for ...
10/2/2013Arranges $20M Bridge Facility for Renard Diamond Project
6/25/2013Reports Quebec Strike Action Settled
6/19/2013Provides Renard Mine Road Update
5/7/2013Welcomes Clarity On Future Quebec Mining Taxation
4/11/2013Reports Positive Renard 65 Diamond Valuation Result
3/27/2013Provides Construction Update on the Renard Mine Road
3/12/2013Reports Fatality In Accident On The Winter Road
2/25/2013Completes Renard 65 Diamond Recovery
12/11/2012Recovers High Value 9.78 Carat Stone From Renard 65 Bulk Sam...
10/29/2012Provides Update on the Route 167 Extension
10/18/2012Receives Renard Mining Lease
9/25/2012Annual Summary
9/11/2012Announces Results From Annual General Meeting
9/6/2012Executes Mandate Letter With Lead Arrangers For Renard Proje...
8/30/2012Announces The Successful Completion Of The Final Public Hear...
7/23/2012to Commence Bulk Sampling of Renard 65 Kimberlite
7/5/2012Signs Partnership Accord With Chibougamau And Chapais
7/4/2012Provides Update On Renard Powerline Study
7/4/2012Presentation from the RBC Diamond Conference in London, June...
6/12/2012(Qilalugaq)Reports Initial 26.1 Million Carat Mineral Resource Estimate...
6/8/2012Announces the Successful Completion of Federal Public Consul...
5/31/2012Announces Establishment Of Head Office In Montreal
5/24/2012Video of the Mecheshoo Agreement Signing Ceremony
5/23/2012Announces $28.4m Renard Pre-Development Capital Program
5/4/2012Arranges a $20 Million Unsecured Debt Facility for Renard Di...
3/22/2012Conducts Successful Open Houses in Chibougamau and Mistissin...
2/3/2012Announces Commencement Of Construction Of Route 167 Extensio...
1/12/2012Corporate Video, Social Media, and Upcoming Events
12/28/2011Announces Filing of the Renard Environmental and Social Impa...
12/7/2011Québec Releases Certificate Of Authorization For The Constr
12/5/2011Video Presentation from the 2011 Scotia Capital Mining Confe...
10/26/2011Annual Summary
9/20/2011Provides Renard Project Update
9/12/2011Announces Addition to S&P/TSX SmallCap Index
8/6/2011English Language Media Attention Regarding Route 167 Road Ag...
8/1/2011Announces FinancingAgreements With Québec For Th
7/11/2011Announces Acquisition of "Aeon" Claims in Northern Quebec
6/13/2011Announces 56% Increase in Renard Diamond Price Estimate
4/27/2011Announces 2011 Exploration Program And Budget
3/20/2011Welcomes Quebec Budget Announcement of Financing for the Rou...
2/18/2011to Commence Trading on Consolidated Basis at Market Opening ...
4/7/2010Matt Manson on CBC's the Lang and O'Leary Exchange
3/22/2010Reports Updated Renard Preliminary Assessment Pre-Tax NPV In...
3/8/2010Reports Overall Diamond Recovery Of 86.2 CPHT From Notch Sam...
2/12/2010Files Renard “Notice Of Intent”
1/15/2010Upcoming Conferences in Vancouver
11/28/2009Presentation from the Quebec Exploration Conference: the 200...
10/6/2009s Announces Fourfold Tonnage Increase In Renard 2 Following ...
8/10/2009And Shear Option Chesterfield Inlet Claims, Nunavut
7/30/2009(Hammer)Reports Discovery Of Hammer Kimberlite
7/8/2009is now on Twitter
6/8/2009Renard Summer Drill Program Commences
1/24/2009Upcoming Events
1/15/2009Reports 144 Cpht In Large Tonnage Hibou Dyke Sampling
1/7/2009Provides 2009 Exploration Outlook
12/17/2008Provides Corporate Update
7/14/2008Related News
5/1/2008 is Attending the CIM Conference in Edmonton, May 4-6
3/4/2008Additional Diamond Results From Renard 65 and North Anomaly ...
1/21/20083.64 Carat Diamond Recovered from AV2 Kimberlite at Aviat
12/14/2007 Announces Additional Renard Diamond Recovery Results
12/3/2007 And Shear Recover 337 Carats From 356 Tonne Kahuna Bulk Sam...
10/22/2007 Announces Positive Valuation Results From Renard Bulk Sampl...
9/19/2007Yves Harvey Appointed Member of Stornoway Board of Directors
9/18/2007And Shear Confirm High Commercial Diamond Content AtChurchil...
9/11/2007Qilalugaq Diamond Exploration Program Update
9/6/2007Aviat's Eastern Sheet Complex Points To Significant Tonnage
8/23/2007New Kimberlite Pipe Discovered At Aviat
8/14/2007 Reports 2,213 Carats Recovered From Renard 4
8/1/2007Reports an Additional 31 Diamonds Weighing 1.74 Carats from ...
7/31/2007Reports 1,642 Carats Recovered from Renard 2 Including a 15....
7/17/2007and Shear Announce Closing of BHP Billiton Diamond Inc's Int...
7/10/2007Enters Into Agreement with Bayswater to Explore Diamond Targ...
6/20/2007Reports 2,681 Carats Recovered From Renard 3 Including A 10....
5/17/2007Reports an Initial Diamond Content of 150 cpht from Renard 3...
5/14/2007Provides Exploration Update - On Schedule For First Renard D...
5/14/2007Provides Exploration Update
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (SWY.TO)
0.020+100.00%
TORONTO
CA$ 0.020
09/06 17:15 0.010
100%
Prev close Open
0.010 0.010
Low High
0.010 0.020
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.020 -%
Volume 1 month var.
15,947,741 -%
24hGold TrendPower© : -33
Produces
Develops Diamonds
Explores for Diamonds - Gold - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :